JPS6098110A - Turbine bypass device - Google Patents

Turbine bypass device

Info

Publication number
JPS6098110A
JPS6098110A JP20590183A JP20590183A JPS6098110A JP S6098110 A JPS6098110 A JP S6098110A JP 20590183 A JP20590183 A JP 20590183A JP 20590183 A JP20590183 A JP 20590183A JP S6098110 A JPS6098110 A JP S6098110A
Authority
JP
Japan
Prior art keywords
valve
turbine bypass
cooling water
steam
turbine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP20590183A
Other languages
Japanese (ja)
Other versions
JPH0416601B2 (en
Inventor
Kazu Nakao
中尾 和
Masaaki Matsumoto
政明 松本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP20590183A priority Critical patent/JPS6098110A/en
Publication of JPS6098110A publication Critical patent/JPS6098110A/en
Publication of JPH0416601B2 publication Critical patent/JPH0416601B2/ja
Granted legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K9/00Plants characterised by condensers arranged or modified to co-operate with the engines
    • F01K9/04Plants characterised by condensers arranged or modified to co-operate with the engines with dump valves to by-pass stages

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Turbines (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔発明の技術分野] 本発明は火力および原子力発電プラントにおけるタービ
ンバイパス装置に関する。
DETAILED DESCRIPTION OF THE INVENTION [Technical Field of the Invention] The present invention relates to a turbine bypass device in thermal and nuclear power plants.

〔発明の技術的背景〕[Technical background of the invention]

第1図はタービンバイパス系統を備えた典型的な原子力
発電プラントの系統の一部を示すものである。同区にお
いて、図示しない蒸気発生器から送給された蒸気は主蒸
気管1およびこの主蒸気龜1に介挿されタービンへの蒸
気の供給をしゃ断する主蒸気止め弁2、さらに蒸気流量
を制御する高気加減弁3を通って高圧タービン44二至
る。この11圧タービン4で仕事をした蒸気はさらに並
列(ユニ系統配置された各低圧タービン5に尋人されし
低圧タービン5で仕事をした後復水器6にて復水される
。一方、主蒸気’Ft 1から分岐したタービンバイパ
ス管7は三系統に分岐しており、夫々(ニタービンバイ
パス弁8が配設され復水器6に連設された多段オリフィ
スからなる翻圧器9に接続している。この減圧器9には
外部に設けられた冷却水タンク等から、冷却水が冷却水
管IOおよびこの冷却水管10に設けられた冷却水スプ
レー弁11を通って供給される。そうして上記タービン
バイパス弁8を開作動させた場合には同時に冷却水スプ
レィ弁11を全開し、タービンをバイパスするようター
ビンバイパス管7を通った主蒸気を冷却しつつ復水器6
(二導くようになっている。
FIG. 1 shows part of a typical nuclear power plant system with a turbine bypass system. In the same area, steam supplied from a steam generator (not shown) is inserted into a main steam pipe 1 and this main steam head 1, and is passed through a main steam stop valve 2 that cuts off the supply of steam to the turbine, and further controls the steam flow rate. It passes through the high air control valve 3 and reaches the high pressure turbine 442. The steam that has done work in the 11-pressure turbine 4 is further sent to each low-pressure turbine 5 arranged in parallel (unisystem), and after doing work in the low-pressure turbine 5, it is condensed in the condenser 6. The turbine bypass pipe 7 branched from the steam 'Ft 1 branches into three systems, each of which is connected to a pressure converter 9 consisting of a multi-stage orifice provided with a turbine bypass valve 8 and connected to the condenser 6. Cooling water is supplied to this pressure reducer 9 from an external cooling water tank or the like through a cooling water pipe IO and a cooling water spray valve 11 provided in this cooling water pipe 10. When the turbine bypass valve 8 is opened, the cooling water spray valve 11 is fully opened at the same time, and the main steam passing through the turbine bypass pipe 7 is cooled and sprayed into the condenser 6 so as to bypass the turbine.
(It is designed to lead to two.

かかるタービンバイパス系統は火力および原子力発1は
プラントζ二採用されており、その目的とするところは
プラント起動時やタービン運転中の系統負荷じゃbit
時等−二も蒸気発生器を好適に運転継続できるよう該蒸
気発生器にて生成された蒸気の一部乃至全部を復水器に
回収することである。以下(−このタービンバイパス系
統の作用をプラント起動時および系統負荷しゃ断時を例
(二説明する。
Such turbine bypass systems are used in thermal and nuclear power plants, and their purpose is to reduce the system load during plant startup and turbine operation.
The second purpose is to recover part or all of the steam generated by the steam generator into the condenser so that the steam generator can continue to operate properly. The operation of this turbine bypass system will be explained below as an example at the time of plant startup and at the time of system load cutoff.

(1) プラント起動時 プラント起動時には蒸気発生器において少なくとも最低
必要蒸気量が生成され、該蒸気発生器自体の過熱防止と
安定性確保が図られる。このとき生成された蒸気のうち
タービン起動に必要な蒸気量以外の主蒸気はタービンバ
イパス管7を経て復水器6に回収されろようになってい
る。そしでタービンの負荷上昇に伴って蒸気加減弁3の
開度が徐々(−増しタービンへの供給詠気量が多く心裏
tになるに従い、タービ〉′バイパス弁8は徐々に閉成
されバイパス蒸気は詠少する。通常はタービンがきに上
記タービンバイパス弁は全閉される。
(1) At plant start-up At plant start-up, at least the minimum required amount of steam is generated in the steam generator, and overheating of the steam generator itself is prevented and stability is ensured. Among the steam generated at this time, the main steam other than the amount of steam necessary for starting the turbine is recovered to the condenser 6 via the turbine bypass pipe 7. As the load on the turbine increases, the opening degree of the steam control valve 3 gradually increases.As the amount of air supplied to the turbine increases, the turbine bypass valve 8 gradually closes and the bypass steam Normally, the turbine bypass valve is fully closed when the turbine is running.

■ 系統負荷しゃ断時 タービンが通常運転されている場合に電力系統の事故等
により負荷しゃ断されるに至ると、蒸気加減弁3は急速
にm1されタービンへ流入すべき生蒸気をしゃ断する。
■ When the load is cut off when the turbine is normally operated, and when the load is cut off due to an accident in the electric power system, the steam control valve 3 is rapidly turned m1 to cut off the live steam that should flow into the turbine.

同時に蒸気発生器の出方は低下するよう制御されるが蒸
気加減弁3の急閉により蒸気発生器の圧力は急上昇する
ため、上記蒸気加減弁3の急開に連動してタービンバイ
パスヲ「8が急開される。しかしてタービンバイパスも
7を通った生蒸気は減圧器9で減圧されさらに冷却水に
より減温されて復水器6に回収される。なお、冷却水を
供給する冷却水スプレィ弁11はタービンバイパス弁8
に連動して開作動するようになっている。こうして蒸気
発生器の汗カ上昇を防止できるため、原子炉のスクラム
といったプラントの緊急停止を回避することができる。
At the same time, the output of the steam generator is controlled to decrease, but the pressure of the steam generator rises rapidly due to the sudden closing of the steam regulating valve 3. Therefore, in conjunction with the sudden opening of the steam regulating valve 3, the turbine bypass is The live steam that has also passed through the turbine bypass 7 is depressurized by the pressure reducer 9, further reduced in temperature by the cooling water, and recovered in the condenser 6. Note that the cooling water supplying the cooling water The spray valve 11 is the turbine bypass valve 8
It is designed to open in conjunction with. In this way, it is possible to prevent sweat buildup in the steam generator, thereby avoiding an emergency shutdown of the plant such as a nuclear reactor scram.

またこのとき急開したタービンバイパス弁は蒸気発生器
の出方減少に伴って閉成されるよう(−なっており、そ
して蒸気発生器の出力が定格の30〜50%程度になる
とタービンは発電所内の負荷によって運転され、余剰の
生蒸気を復水器へバイパスしなから系さて、上記のよう
Cニタービンバイパス系統を有する蒸気タービンプラン
ト(二あっては、高温面圧の主蒸気を直接に復水器へ導
入する構成であるからそれによる復水器のJハ傷を防止
]−るようタービンバイパス系統において主蒸気を夾6
/+するとともに減/+1品するようにしている。軸に
蒸気を1渦Tるために従来は第1図に不し7こようにタ
ービンバイパス弁8の開信号に基づいて4.・動水スプ
レープpHを開作動させン′δ却水惰1oから冷却水を
供給するようにしていたが、万一タービンバイパス弁8
のみが開口し冷却水スプレー弁11が作動しなかった場
合然気は減温されないまま復水器6(二bW人すること
にな。。云うまでもなくかがる不測の事態に至つ7こと
きにはタービンバイパス弁8を閉鎮スれはよいwくであ
るが、そうすると蒸気発生器を停止させなければならず
、ぞオしではXjス気発生器の運転林続を確保するとい
うターピ〉・バイパス系統の本来の目的が何ら果たされ
ないこと1−なる。
In addition, the turbine bypass valve that suddenly opened at this time is closed as the output of the steam generator decreases (-), and when the output of the steam generator reaches about 30 to 50% of the rated value, the turbine stops generating electricity. A steam turbine plant that is operated according to the internal load and bypasses excess live steam to the condenser as described above (in some cases, the main steam under high temperature surface pressure is directly supplied to the steam turbine) Since the main steam is introduced into the condenser at the same time, it is possible to prevent the main steam from being damaged in the condenser by introducing it into the condenser.
I try to increase /+ and decrease /+1 item. Conventionally, in order to generate one vortex of steam on the shaft, 4.・I was trying to supply cooling water from the water sprayer 1o by opening the hydraulic sprayer pH, but in the unlikely event that the turbine bypass valve 8
If only the cooling water spray valve 11 were to open and the cooling water spray valve 11 did not operate, the temperature of the condenser 6 (2 bW) would not have been reduced.Needless to say, such an unexpected situation would have occurred. In this case, it would be a good idea to close the turbine bypass valve 8, but then the steam generator would have to be stopped, and it would be difficult to ensure continuous operation of the steam generator.・The original purpose of the bypass system will not be fulfilled.

〔発明の目的] 本発明は上記の点C1籟みてなされたり:、ので、その
目的とするところは1血イ゛旬じゃmr Il=、4等
のタービンバイパス系統作動時に冷却水スプレーブ「が
11110−14−ず蒸気の#i温がtrされtcかっ
た1゛J1合(二も、1り水器を保獲し安全性を416
保すると共にプラント或は蒸気発生器の4¥動停止を回
避することのできるタービンバイパス装置i′lLを提
1)(することである。
[Object of the Invention] The present invention has been made with the above point C1 in mind: Therefore, its purpose is to reduce the amount of cooling water spray "11110 -14- When the #i temperature of the steam was tr and tc (in the second case, one water vessel was retained and the safety was 416
The present invention is to provide a turbine bypass device i'lL that can maintain the engine speed and avoid a shutdown of the plant or steam generator.

〔発明の概要〕 本発明は主蒸気管から分岐して復水器(二接続する糸路
に設けられたタービンバイパス弁と、該糸路から復水器
(二専入される蒸気を乙?却する冷却水を(,4?給す
る藩路に設けられた冷却水スプレー弁と、前記タービン
バイパスJrがf、11.10したときC二FJiJ記
冷却水スプレー弁を開口するとともC−該冷却水スプレ
ー弁の動作を検出し、該冷却水スプレー5Fが正常に開
口しなかった堤合f二hlj記タービンバイパス弁を一
定時間経過後全閉する制御装置からなるタービンバイパ
ス装置である。
[Summary of the Invention] The present invention includes a turbine bypass valve provided in a line path that branches off from a main steam pipe and connects to a condenser (two condensers), and a turbine bypass valve provided in a line path that branches from the main steam pipe to a condenser (two separate lines). When the turbine bypass Jr reaches f, 11.10, the cooling water spray valve is opened and the cooling water spray valve is opened. This turbine bypass device includes a control device that detects the operation of the cooling water spray valve and fully closes the turbine bypass valve in which the cooling water spray 5F has not opened normally after a certain period of time has elapsed.

すなわち従来より冷却水スプレー弁を開口するC−はタ
ービンバイパス弁の開口を検出しこれ(二連動するよう
(二行っているが、本発明C二おいてはさら(二冷却水
スプレー弁の動作を検出し、もし該冷却水スプレー弁か
止7’+E i二開口しなかった場合上記タービンバイ
パス弁を一定時間経過後に全閉させる。しかしてこのタ
ービンバイパス弁が開口している上記一定時間のあいた
、バイパス蒸気は十分な冷却水を供稍されず不完全なM
錨しかなさないわけであるか、このff1r (AMの
バイパス蒸気が尋人される復水器の内部温度の上昇が計
容範囲内となる、よう(二上記時間を定めることにより
、蒸気発生器が出力降下する迄発生する蒸気を好適(二
処理しうるものである。
That is, in the past, C-, which opens the cooling water spray valve, detects the opening of the turbine bypass valve and operates in conjunction with the opening of the turbine bypass valve, but in the present invention C-2, the operation of the cooling water spray valve is detected, and if the cooling water spray valve is not opened, the turbine bypass valve is fully closed after a certain period of time has elapsed. The bypass steam is not supplied with enough cooling water and is incomplete.
This ff1r (bypassing the AM bypass steam) will cause the rise in the internal temperature of the condenser to be within the measurement range. It is preferable that the steam generated until the output decreases (can be treated in two ways).

〔発明の実施例〕[Embodiments of the invention]

以下に本発明の実施例を図面を参照して説明する。なお
、以下の[31面(二おいて第1図(二示したのと同一
部分をボす場合には同一符号を付しその説明を省略する
Embodiments of the present invention will be described below with reference to the drawings. In addition, when the following [31 page (2) and the same part as shown in FIG.

第2図は本実施例(−係るタービンバイパス装置t′t
を具備した蒸気タービンプラントの系統を示すもので、
タービンバイパス弁8 a 、 8 b 、 8cおよ
び冷却水スプレー弁11a、11b、llc i二接続
する制御装置20が設置され、上記各弁は該制御装置2
0(二よって制御されるようC二なっている。
FIG. 2 shows the present embodiment (- related turbine bypass device t't
This shows the system of a steam turbine plant equipped with
A control device 20 is installed which connects the turbine bypass valves 8a, 8b, 8c and the cooling water spray valves 11a, 11b, llc i, and each of the valves is connected to the control device 2.
C2 is controlled by 0(2).

制御装置20の内部構成を第3図に示す。第3図におい
てタービンから検出されたタービン速度4M号30は負
荷設定器31に設定された設定負侑仏号32とともに蒸
気量演算器33に人力される。
The internal configuration of the control device 20 is shown in FIG. In FIG. 3, a turbine speed 4M 30 detected from the turbine is manually input to a steam amount calculator 33 together with a setting value 32 set in a load setting device 31.

この蒸気量演算器331−おいて負狗の大きさ、および
実際のタービン速度と定格速度のイiit+差の二つを
パラメータとしてタービン運転に必要な蒸気量を算出す
るようになっている。しかして得られた必要蒸気量信号
34は、リミッタ−35において各種の要因に基づく負
荷制限あるいは原子炉設H1最太蒸気流量などの制限を
加味さ牡て然気加減弁流量信号36となる。他方、原子
炉(二おける蒸気圧力を示す主蒸気圧力信号37は主蒸
気量演’4Ti器38に人力され、R&主詠気h1演算
器38(”て原子炉発生蒸気量が↓?、出される。そし
てバイパス蒸気萌算器39においてこの原子炉発生然気
1jIからgrt吐の蒸気量11戎弁流量□を減界し、
その差としてタービンバイパス弁a m! 48号40
がめられる。このタービンバイパス弁流114’s号4
0は三カ(−分岐し、各タービンバイパス弁8a、8b
、8cl二ついて夫々独立して設けられた制御系に伝達
されるが、ここではその内のタービンバイパス弁8Cの
系統のみについて図示しである。
This steam amount calculator 331- calculates the amount of steam required for turbine operation using two parameters: the size of the dog and the difference between the actual turbine speed and the rated speed. The thus obtained required steam amount signal 34 is converted into a control valve flow rate signal 36 by a limiter 35, which takes into account load restrictions based on various factors or restrictions such as the maximum steam flow rate of the reactor H1. On the other hand, the main steam pressure signal 37 indicating the steam pressure in the reactor (2) is input manually to the main steam amount calculator 38, and the R & main air pressure h1 calculator 38 ("The amount of steam generated in the reactor is ↓?" is output). Then, in the bypass steam calculator 39, the amount of steam discharged from the reactor 11 and the valve flow rate □ are reduced from this reactor generated natural air 1jI,
The difference is the turbine bypass valve am! No. 48 40
I get criticized. This turbine bypass valve flow 114's No. 4
0 is three (-branched, each turbine bypass valve 8a, 8b
, 8cl are transmitted to control systems provided independently, of which only the system of the turbine bypass valve 8C is illustrated here.

さて、かかるタービンバイパス弁+51t k 48号
40はタービンバイパス弁制御装fPi41に入力され
る。
Now, the turbine bypass valve +51t k 48 40 is input to the turbine bypass valve control device fPi41.

このタービンバイパス弁制御%r、41はタービンバイ
パス弁8Cのサーボ弁を上記タービンバイパス弁i!d
E in 4D号40に基づいて制御し、その結果ター
ビンバイパス弁8Cの開度を制御するものである。この
ためにタービンバイパス弁制御信号42がタービンバイ
パス弁8Cに出力される。さらに上記タービンバイパス
弁制御装置41は、タービンバイパス弁流量信号40も
しくはタービンバイパス弁制御信号42の信号ステータ
スかタービンバイパス弁を開作動させる状態にあること
を検出して冷却水スプレー弁11Cを開口させる冷却水
スプレー弁開信号43を出力する。符号44は上記冷却
水スプレー弁110が動作したことを検出する接点であ
り、タービンバイパス弁8C1二ついて同様に設置され
た動作検出接点45を介し′遅延作動リレー46を励磁
あるいは無励磁とするようじなっている。そうしてこの
遅延作動リレー46によって駆動される接点47の一端
にはタービンバイパス弁8c、他端にはタービンバイパ
ス弁制御装置41および全閉信号発信器48が接続され
ており、遅延作動リレー46の動作(二よってタービン
バイパス弁8Cはタービンバイパス弁制御装圃41ある
いは全閉信号発信器48のいずれかと接続するようにな
っている。
This turbine bypass valve control %r, 41 controls the servo valve of the turbine bypass valve 8C to the turbine bypass valve i! d
E in 4D No. 40, and as a result, the opening degree of the turbine bypass valve 8C is controlled. For this purpose, a turbine bypass valve control signal 42 is output to the turbine bypass valve 8C. Further, the turbine bypass valve control device 41 detects the signal status of the turbine bypass valve flow signal 40 or the turbine bypass valve control signal 42 that the turbine bypass valve is in a state of being opened, and opens the cooling water spray valve 11C. A cooling water spray valve open signal 43 is output. Reference numeral 44 is a contact point for detecting the operation of the cooling water spray valve 110, and a contact point for energizing or de-energizing the delayed activation relay 46 via an operation detection contact 45 installed in the same manner as that of the two turbine bypass valves 8C1. It has become. The turbine bypass valve 8c is connected to one end of the contact 47 driven by the delay activation relay 46, and the turbine bypass valve control device 41 and the full close signal transmitter 48 are connected to the other end. (2) Therefore, the turbine bypass valve 8C is connected to either the turbine bypass valve control device 41 or the fully closed signal transmitter 48.

上記タービンバイパス弁8Cおよび冷却水スプレー弁1
1Cの制御回路を更に詳細に示したのが桐。
The above turbine bypass valve 8C and cooling water spray valve 1
Paulownia shows the 1C control circuit in more detail.

4図である。第4図(二おいてバイパス蒸気演3′−器
39から伝達されたタービンバイパス弁かr量信号40
は弁位置制御回路50に入力される。この弁位置制御回
路50には各タービンバイパス弁8 a 。
This is Figure 4. Figure 4 (2) Turbine bypass valve r amount signal 40 transmitted from bypass steam generator
is input to the valve position control circuit 50. This valve position control circuit 50 includes each turbine bypass valve 8 a .

8b 、scによって異なる弁開き始めバイアス51が
与えられており、また同時に、蒸気流量に対応した弁開
度を与える弁開度信号52が入力されている。しかして
上記弁位置制御回路5oにて、タービンバイパス弁流量
信号40は上記弁開度46号52および弁開き始めバイ
アス51に従って61i ’l1l−サitタービンバ
イパス弁制御伯号42(二度押すiする。
Different valve opening start biases 51 are applied depending on 8b and sc, and at the same time, a valve opening degree signal 52 which gives a valve opening degree corresponding to the steam flow rate is inputted. Therefore, in the valve position control circuit 5o, the turbine bypass valve flow rate signal 40 is generated according to the valve opening degree 46 and the valve opening start bias 51. do.

他方、上記ヲ1位置制御回路50にはタービンバイパス
弁制御信号42が弁5開”の状態にあることを検出する
バイパス弁開信号検出器53が付設されている。このバ
イパス弁開信号検出器53はタービンバイパス弁制御信
号42が弁”開”の状態(二あることを検出すると、冷
却水スプレー弁ソレノイド54にi点列C−接続された
接点55を導通するようになっている。この接点55が
導通すると冷却水スプレー弁ソレノイド54には制御母
線P。。
On the other hand, the first position control circuit 50 is provided with a bypass valve open signal detector 53 that detects that the turbine bypass valve control signal 42 is in the state of "valve 5 open".This bypass valve open signal detector When 53 detects that the turbine bypass valve control signal 42 is in the valve "open" state, it conducts to the contact 55 connected to the cooling water spray valve solenoid 54 in the i-point series C. When the contact 55 is conductive, the control bus P is applied to the cooling water spray valve solenoid 54.

Plを介して?tpltが供給され、該冷却水スプレー
弁ソレノイド54は励磁状態となる。すなわちタービン
バイパス弁制御信号42が弁“開”の状態であるときに
冷却水スプレー弁ソレノイド54を励磁し冷却水スプレ
ー弁IICを開口するようになっている。上記接点55
と並列にリレー57が励磁されたときに非導通となる接
点56が接続されている。上記リレー5711−J、タ
ービンバイパス5f’8Cが全閉しているときに4通す
るバイパス弁開検出スイッy−45を介して制御母線P
0. P1+二叛続されており、したがってタービンバ
イパス弁8cが1)110するとバイパス弁開検出スイ
ッチ45が非導通となり、リレー57が非励磁となって
接点56が導通する。このように冷却水スプレー弁11
Cを誤りド54に通電する糸路は接点55および接点5
6の二系統設けられており、これらの接点はタービンバ
イパス弁8C開口時にいずれも導通するようになってい
る。
Via Pl? tplt is supplied, and the cooling water spray valve solenoid 54 is energized. That is, when the turbine bypass valve control signal 42 is in the valve "open" state, the cooling water spray valve solenoid 54 is energized to open the cooling water spray valve IIC. The above contact point 55
A contact 56 that becomes non-conductive when the relay 57 is energized is connected in parallel with the relay 57 . The relay 5711-J and the control bus P
0. P1+2 are connected, so when the turbine bypass valve 8c becomes 1)110, the bypass valve open detection switch 45 becomes non-conductive, the relay 57 becomes de-energized, and the contact 56 becomes conductive. In this way, the cooling water spray valve 11
The thread path for energizing C to the wrong lead 54 is the contact 55 and the contact 5.
Two systems, 6, are provided, and these contact points are both electrically connected when the turbine bypass valve 8C is opened.

一方、接点56と同様にリレー57が励磁されていると
きに非導通となる接点58には、冷却水スプレー弁11
Cが作動しなかった場合に導通する接点44を介して遅
延作動リレー46が接続されでいる、この遅延作動リレ
ー46はス1ツノ電されてから一定u・r同経た後励磁
してその接点47を駆動するようになっている。上記遅
凱作動リレー46の接点47は一端がタービンバイパス
Eft 8c O) −9−−ボ升59に接続されてお
り、他端(二は弁位置制御回路50」dよび全閉信号発
信器48が接続されている。そして上記接点47は遅延
作動リレー46かり(種駒?1彫1h’j l二はサー
ボ弁59と弁位置副使1回路50を、遅延イ′1動リレ
ー46が励磁されたときに1;1f−ボ弁59と全閉伯
号兄伯器48を夫々接続するよう(ニなっている。
On the other hand, a contact 58 that becomes non-conductive when the relay 57 is energized, like the contact 56, has a cooling water spray valve 11
A delayed activation relay 46 is connected via a contact 44 that becomes conductive when C is not activated.This delayed activation relay 46 is energized after a certain period of time U/R after being energized to close its contact. 47. One end of the contact 47 of the slow-actuation relay 46 is connected to the turbine bypass valve 59, and the other end (the second end is connected to the valve position control circuit 50'd and the fully closed signal transmitter 48). The contact 47 is connected to the delay activation relay 46 (Tanekoma? 1H'j l2 is the servo valve 59 and the valve position sub-circuit 50, and the delay activation relay 46 is energized. When the valve is opened, the valve 59 and the valve 48 are respectively connected.

次に本実h1.!例の作用につき説明する、クーピンバ
イパス系統は起動ll′Iおよび;!ii 4ム中の系
統負荷しや噸1時じ主とし、て作動するが、ここでは後
者のタービン運転中に系統負荷しゃ断が生じた場合を例
1:説明する。
Next, Honji h1. ! To explain the operation of the example, the Coupin bypass system starts ll'I and;! ii) The system mainly operates during the 4th period when the system load is interrupted.Here, we will explain the case where the system load interruption occurs during the latter turbine operation as Example 1.

通7Gのタービン運転中にはバイパス詠気演I−4器3
9から出力されるタービンバイパス抑流組信号40はO
または負の値であり、したがって、弁位U−り制m回路
50からjuせられるタービンバイパス弁制御信号42
もバイパス弁“閉”の状態(二ある。
During the turbine operation of 7G, the bypass power supply I-4 unit 3
The turbine bypass suppression group signal 40 output from 9 is O
or a negative value, and therefore the turbine bypass valve control signal 42 is rejected from the valve position control circuit 50.
Also, the bypass valve is in the “closed” state (there are two types).

しかしてこれらのイロ号によりタービンバイパス弁8C
は全閉しているからバイパス弁開検出スイッチ45は導
通状態(二あり、該バイパス弁ill 4r’j=出ス
イツチ45に接続されたリレー57〃1励る筐されて接
点56および58は非導通となっている。また上記のよ
うCニタービンバイパス升制仙1他号42がバイパス弁
1閉”の状態にあるどきタービンバイパス弁開信号検出
器53によってバイパス弁1閉のときに導通する接点5
5も非導通と7.【つている。
However, due to these Iro, the turbine bypass valve 8C
Since the bypass valve open detection switch 45 is fully closed, the bypass valve open detection switch 45 is in a conductive state (there are two, and the relay 57 connected to the bypass valve ill 4r'j = output switch 45 is activated, and the contacts 56 and 58 are non-conducting. As mentioned above, when the turbine bypass valve 1 and the other No. 42 is in the state of ``closed bypass valve 1'', the turbine bypass valve open signal detector 53 establishes conduction when the bypass valve 1 is closed. Contact 5
5 is also non-conducting and 7. [It's on.

したがって伍点55および56のいずれもが非導通であ
り冷却水スプレー弁ソレノイド54は用F励磁となるか
ら冷却水スプレー弁11C);l開口丈ることはない。
Therefore, both points 55 and 56 are non-conductive, and the cooling water spray valve solenoid 54 is energized, so that the opening length of the cooling water spray valve 11C) does not increase.

さらに接点58もシト8辿であるから遅延作動リレー4
6も作動することはなく、この遅延作動リレーによって
駆動される採点47はサーボ弁59と弁位置制御回路5
0の導通を保つこと(二なる。
Furthermore, since the contact 58 is connected to the position 8, the delay activation relay 4
6 is not activated, and the scoring 47 driven by this delayed activation relay is connected to the servo valve 59 and the valve position control circuit 5.
To maintain continuity of 0 (2).

この状態で系統負荷しゃ断という事態(=至ると主蒸気
止め弁が全閉されるとともに蒸気加減弁流量信号36が
O(二なり、バイパス蒸気演算器39から出力されるタ
ービンバイパス弁1f+E N 4F4号40は急増す
る。このタービンバイパス弁流量信号40の急増に応じ
て弁位置制御回&’650はタービンバイパス弁制御信
号42を増大せしめサーボ弁59を稼動してタービンバ
イパス弁8Cを急開させる。
In this state, the system load is cut off (= When the main steam stop valve is fully closed and the steam control valve flow rate signal 36 is O (2, the turbine bypass valve 1f + E N 4F4 output from the bypass steam calculator 39 is reached) 40 suddenly increases. In response to this sudden increase in the turbine bypass valve flow rate signal 40, the valve position control circuit &'650 increases the turbine bypass valve control signal 42, operates the servo valve 59, and suddenly opens the turbine bypass valve 8C.

同時C二、かかるタービンバイパス弁制御(9号42が
増大したことをタービンバイパス弁開(g号検出器53
が検出し接点55を導通する。他力、タービンバイパス
弁8Cが開口したことをバイパス弁開検出スイッチ45
が検出すると、リレー57が励磁され接点56.58が
導通される。したがつプレー弁11Cが開口する。この
とき冷却水スプレー弁11Cが正常じ作動して開口すれ
は、タービンバイパス蒸気は上記冷却水スプレー弁11
Cを介して供給された冷却水によって減温され復水器に
回収される。そし゛〔この冷却水スプレー弁11Cの開
口状態はタービンバイパス弁8Cが開口している限り、
すなわち接点55あるいは接点56が導通しているある
だ維持される、 これに反してタービンバイパス弁8Cが開口しているに
もかかわらず冷却水スプレー弁11Cが正Uに開口しな
かった場合、本実施例では次のようC二作動する。すな
わち、タービンバイパス弁8 cが開口するとタービン
バイパス弁開検出スイッチ45が香油しリレー57が励
磁されて接点56゜58が導通ずる。接点56の香油に
より冷却水スプレー弁ソレノイド54には励磁電流が流
れるが、弁体の故障或はソレノイドのFMr線等により
冷却水スプレー弁110が正常に開口しなかったとき、
かかる冷却水スプレー弁11Cの動作不具合を検出する
接点44・が導通ずる。このときリレー57の励磁によ
り接点58も導通しているから、上記接点44が導通す
ると同時に遅延作動リレー46が動作を始める。この遅
延作IQ リレー46はAil +のように通電されて
から一定時同経た後併設された接点47を駆動するよう
(ニなっているが、このjk点47の作動によりタービ
ンバイパス弁8Cのサーボ弁59と弁位置制御回路50
とのそれまでの接続が解離され、代わって上記サーボ弁
59は全閉信号発4M器48と接続されるようC:なる
。この全閉信号発信器48と接続されることによりサー
ボ弁59にはタービンバイパス弁全閉信号が入力され、
タービンバイパス弁8Cは直ちに全閉される。
Simultaneously C2, the turbine bypass valve control (No. 9 42 increases) is detected by opening the turbine bypass valve (No. G detector 53
is detected and the contact 55 is made conductive. The bypass valve open detection switch 45 detects that the turbine bypass valve 8C has opened due to external force.
When detected, the relay 57 is energized and the contacts 56 and 58 are made conductive. The play valve 11C then opens. At this time, if the cooling water spray valve 11C operates normally and opens, the turbine bypass steam is transferred to the cooling water spray valve 11C.
The temperature of the water is reduced by the cooling water supplied through C, and the water is collected in the condenser. [The opening state of this cooling water spray valve 11C is as long as the turbine bypass valve 8C is open.
In other words, the contact point 55 or the contact point 56 is maintained as long as it is conductive.On the other hand, if the cooling water spray valve 11C does not open to the positive U even though the turbine bypass valve 8C is open, the main In the embodiment, C2 operates as follows. That is, when the turbine bypass valve 8c opens, the turbine bypass valve open detection switch 45 is turned on, the relay 57 is energized, and the contacts 56 and 58 are brought into conduction. Excitation current flows through the cooling water spray valve solenoid 54 due to the fragrance oil at the contact point 56, but if the cooling water spray valve 110 does not open normally due to a failure of the valve body or the FMr line of the solenoid, etc.
The contact 44 for detecting malfunction of the cooling water spray valve 11C becomes conductive. At this time, since the contact 58 is also conductive due to the excitation of the relay 57, the delay activation relay 46 starts operating at the same time as the contact 44 is conductive. This delayed action IQ relay 46 is configured to drive the attached contact 47 after a certain period of time has elapsed after being energized like Ail + (it is shown as D), but the activation of this JK point 47 causes the servo of the turbine bypass valve 8C to be activated. Valve 59 and valve position control circuit 50
The servo valve 59 is now connected to the fully closed signal generator 48 (C:). By being connected to this fully closed signal transmitter 48, a turbine bypass valve fully closed signal is input to the servo valve 59.
The turbine bypass valve 8C is immediately fully closed.

このようにタービンバイパス弁8Cが開口したにもかか
わらず冷却水スプレー弁11Cが正常(二開口しなかっ
た場合(:は、上記タービンバイパス弁8Cが開口して
から一定の時間、すなわち迎延作動リレー46が通電さ
れてから接点47を駆動するまでの時間が経過してから
タービンバイパス弁8Cは全閉されるようになっている
In this case, even though the turbine bypass valve 8C has opened, the cooling water spray valve 11C has not opened normally. The turbine bypass valve 8C is fully closed after a period of time has elapsed from when the relay 46 is energized to when the contact 47 is driven.

以上の説明C二おいては一系統のターヒフ144フ1フ
升8Cのみを例(二述べたが、第2図に示した三系統の
タービンバイパス弁の残りの二押8 a r 8 bに
ついても同縁である。なおこれらの三つのタービンバイ
パス弁8 a + 8 b−80の夫々について設けら
れた第4図に示す開き始めバイアス51にはそれぞれバ
イアス値として異なる値が設定されており、通7には三
つの弁が順次シーケンシャルに開口するようになってい
る。
In the above explanation C2, only one system of Tahif 144F 1F 8C is used as an example (as mentioned above, regarding the remaining two of the three systems of turbine bypass valves 8a r 8b shown in Fig. 2) The opening biases 51 shown in FIG. 4 provided for each of these three turbine bypass valves 8a + 8b-80 are set to different values as bias values, respectively. Three valves are arranged in the passage 7 to open sequentially.

第5図に示す曲線71は系統負荷しゃ断後のタービンバ
イパス蒸気流t>lの時間変化を示すもので、縦軸とし
てバイパス蒸気流量の定格主蒸気流廿に対する比率を表
しである。同図から明らかなように、バイパス蒸気量は
負荷しゃ断直後急激じ増大しやがて最大となる。このと
き原子炉で発生した主蒸気の全量がバイパスされている
こと(−なるが、直ちに原子炉出力が魚類されるためバ
イパス蒸気」もそれに呼応して漸減する。また同図中に
示した一点鎖線の@線72a、72b、72cは、それ
ぞれタービンバイパス弁が1弁のみ開口したとき、2弁
のみのとき、3弁全てが開口したときのバイパスt′1
−容蒸気量を示している。これらの図から本実施例にお
けるように三系統あるタービンバイパス弁のうち一系統
のタービンバイパス弁についてバイパス弁が開口したに
もかかわらず冷却水が供給されず、一定時間経過した後
に該タービンバイパス弁を閉釦しても残りの二押で十分
Cニバイパス蒸気を処理できることがわかる。
A curve 71 shown in FIG. 5 shows the time change of the turbine bypass steam flow t>l after the system load is cut off, and the vertical axis represents the ratio of the bypass steam flow rate to the rated main steam flow rate. As is clear from the figure, the amount of bypass steam increases rapidly immediately after the load is cut off, and eventually reaches its maximum value. At this time, the entire amount of main steam generated in the reactor is bypassed (-However, since the reactor output is immediately reduced, the amount of bypass steam gradually decreases accordingly. Also, one point shown in the figure Chain @ lines 72a, 72b, and 72c represent the bypass t'1 when only one turbine bypass valve is open, when only two valves are open, and when all three turbine bypass valves are open, respectively.
- Indicates volumetric vapor content. These figures show that, as in this embodiment, cooling water is not supplied to one of the three turbine bypass valve systems even though the bypass valve opens, and after a certain period of time, the turbine bypass valve closes. It can be seen that even if the button is closed, the remaining two presses are enough to process the C bypass steam.

また第6図は負荷しゃ断後の経過時間と復水器内部の温
+1U化との関係を示す線図である。図中曲線81は冷
却水スプレー弁が正常に開口した場合であって然気が冷
却水によって減温され復水器内部の温度上昇は小さいこ
とをボしている。他力曲線82は本実施例によるタービ
ンバイパス装置が稼動した場合の温良変化であり、負荷
しゃ断後一定時間冷却水が供給されない状態でタービン
バイパス弁を開口し、この間蒸気を冷却せずに復水器に
導入しても該復水器内部の温度は設計限界値に刻し十分
余裕がある高さまでしか上昇しないことを示す。なお破
線で示した曲線83は、冷却水が供給されないにもかか
わらずタービンバイパス弁を開口し続けた場合を示した
もので、このとき急激な温度上昇により短時間で復水器
を破損するに至る。
Further, FIG. 6 is a diagram showing the relationship between the elapsed time after the load is cut off and the temperature inside the condenser increased by +1 U. A curve 81 in the figure indicates a case where the cooling water spray valve is normally opened, and indicates that the temperature of the natural air is reduced by the cooling water and the temperature rise inside the condenser is small. The external force curve 82 shows the temperature change when the turbine bypass device according to this embodiment is operated, and the turbine bypass valve is opened with no cooling water being supplied for a certain period of time after the load is cut off, and during this period, the steam is not cooled and the steam is condensed. This shows that even if the condenser is introduced into the condenser, the temperature inside the condenser will rise only to a level that is within the design limit value and has a sufficient margin. Curve 83 shown by a broken line shows the case where the turbine bypass valve continues to be opened even though cooling water is not supplied. reach.

なお本実施例における遅延作動リレー46の遅延時間す
なわち通電されてから併設された採)’a、 47が起
動されるまでの時間は、バイパス蒸気量および復水器強
度等に応じて適宜定められるものである。この場合にバ
イパス蒸気+5tf MTと相関するようにこの遅延時
間なil 彩21式としてもよい。またタービンバイパ
ス弁および冷却水スプレー弁の動作状況を検出するスイ
ッチ、接点は直接弁体に散層する形式のものであっても
或はその他の形式のものであっても差支えン7いのは云
うまでもないところである。さらに冷却水を減温器では
なく復水器自体に導入するようにした系統であっても本
実施例は好適に実施されうる。
Note that the delay time of the delayed activation relay 46 in this embodiment, that is, the time from energization until the attached reactor 47 is activated, is determined as appropriate depending on the amount of bypass steam, the strength of the condenser, etc. It is something. In this case, this delay time may be set to the formula 21 so as to correlate with the bypass steam +5tf MT. In addition, it does not matter whether the switches and contacts that detect the operating status of the turbine bypass valve and cooling water spray valve are of a type that is directly spread on the valve body or of another type. Needless to say. Furthermore, this embodiment can be suitably implemented even in a system in which cooling water is introduced into the condenser itself rather than into the desuperheater.

〔発明の効果〕〔Effect of the invention〕

以上のとおり、本発明はタービンバイパス弁開口時に冷
却水スプレー弁を開口させると共(二該冷却水スプレー
弁の動作を検出し、このt1i却水スプレー弁が正常に
開口しなかった場合に」−記タービンバイパス弁を一定
時間だけ開口さセ゛Cバイパス蒸気を復水器(二導入す
る構成であるから、蒸気発生器が出力を降下する迄の間
蒸気を処理することができ、蒸気発生器の稼動停止及び
蒸気の大気放出等の事態に至るのを回避することができ
る等の効果がある。またその結果復水器を損傷すること
も7fいので、実用上極めて有用な装置であると云うこ
とができる。
As described above, the present invention opens the cooling water spray valve when the turbine bypass valve opens (2) detects the operation of the cooling water spray valve, and detects the operation of the cooling water spray valve when the cooling water spray valve does not open normally. - Since the turbine bypass valve is opened for a certain period of time and the bypass steam is introduced into the condenser (two), the steam can be processed until the output of the steam generator decreases, and the steam generator It has the effect of being able to avoid situations such as stopping the operation of the equipment and releasing steam into the atmosphere.In addition, as a result, there is a possibility of damaging the condenser, so it is considered to be an extremely useful device in practice. I can say it.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はタービンバイパス系統の説明図、第2図乃至第
6図は本発明の一実施例を説明する図で、第2図はター
ビンバイパス表置の概要を示す系統図、第3図は制御装
置f(の内部構成を示すブロック囚、第4図は制il+
装置の一部を詳細に示した回路図、果5図は負荷しゃ断
後の経過時間とバイパス魚気流坩の関係を示す線図、第
6図は負荷しゃ断後の経過IIjr間と復水器内部rj
犠の関係を示す線図である。 1・・・主蒸気管 6・・・腹水器 7・・・タービンバイパス管 8a、8b18G・・・タービンバイパス弁10・・・
冷却水管 11a、11b、11C=−冷却水スプレー弁20・・
・制御装置 代理人 弁理士 則 近 辺 佑 (ほか1名) 第4図 第5図 貞荷塾−げ斥う支のるltす各間 弔6図 り荀嘉前棧0盃過特開
Fig. 1 is an explanatory diagram of a turbine bypass system, Figs. 2 to 6 are explanatory diagrams of an embodiment of the present invention, Fig. 2 is a system diagram showing an overview of the turbine bypass surface arrangement, and Fig. A block diagram showing the internal configuration of the control device f (Fig. 4 shows the control device f)
A circuit diagram showing a part of the device in detail, Figure 5 is a diagram showing the relationship between the elapsed time after load cutoff and the bypass fish flow crucible, and Figure 6 shows the elapsed time after load cutoff and the inside of the condenser. rj
It is a line diagram showing a sacrificial relationship. 1... Main steam pipe 6... Ascites 7... Turbine bypass pipe 8a, 8b18G... Turbine bypass valve 10...
Cooling water pipes 11a, 11b, 11C=-cooling water spray valve 20...
・Control device agent Patent attorney Yu Chikabe (and 1 other person) Fig. 4 Fig. 5 Sadakajuku-Gekisu support Noru's condolence 6 plans Sun Kazen 0 Sakakura special public disclosure

Claims (1)

【特許請求の範囲】[Claims] 主蒸気管から分岐して復水器に接続する糸路に設けられ
たタービンバイパス弁と、該糸路から復水器に41人さ
れる蒸気を冷却する冷却水を供給するも路に設けられた
冷却水スプレー弁と、前記タービンバイパス弁が開口し
たときには前記冷却水スプレー弁を開口するとともに該
冷却水スプレー弁の動作を検出し、該冷却水スプレー弁
が正常に開口しなかった場合に^i」記タービンバイパ
ス弁を一定時間経過後全閉する制御装置とからなるター
ビンバイパス装−0
A turbine bypass valve is installed in the line that branches from the main steam pipe and connects to the condenser, and a turbine bypass valve is installed in the line that supplies cooling water to cool the steam flowing from the line to the condenser. When the cooling water spray valve and the turbine bypass valve open, the cooling water spray valve is opened and the operation of the cooling water spray valve is detected, and when the cooling water spray valve does not open normally, Turbine bypass system-0 consisting of a control device that fully closes the turbine bypass valve after a certain period of time has elapsed.
JP20590183A 1983-11-04 1983-11-04 Turbine bypass device Granted JPS6098110A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20590183A JPS6098110A (en) 1983-11-04 1983-11-04 Turbine bypass device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20590183A JPS6098110A (en) 1983-11-04 1983-11-04 Turbine bypass device

Publications (2)

Publication Number Publication Date
JPS6098110A true JPS6098110A (en) 1985-06-01
JPH0416601B2 JPH0416601B2 (en) 1992-03-24

Family

ID=16514619

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20590183A Granted JPS6098110A (en) 1983-11-04 1983-11-04 Turbine bypass device

Country Status (1)

Country Link
JP (1) JPS6098110A (en)

Also Published As

Publication number Publication date
JPH0416601B2 (en) 1992-03-24

Similar Documents

Publication Publication Date Title
US4104119A (en) Emergency feed system for cooling nuclear reactor installations
JP2502224B2 (en) Air operated valve
JPH0416601B2 (en)
US3619724A (en) Fuel burner safety control circuit
JP2509612B2 (en) Bypass controller
JPS6239655B2 (en)
JPH0217302A (en) Automatic control device for the number of boilers
JPS57137610A (en) Controller of turbine bypass valve in compound power generating equipment
SU1627739A2 (en) Device for protection of steam-turbine plant
JP2892744B2 (en) On-off valve operation diagnostic device
SU1305494A1 (en) Automatic control system for steam-release devices
JP2722786B2 (en) Mixed pressure extraction turbine
JP2637194B2 (en) Combined plant startup bypass system and its operation method
JPH03123909A (en) Abnormality diagnostic controller
JPS6235592B2 (en)
CN117784583A (en) Multiple redundant control system of rotating partition plate
JPH01305A (en) Steam turbine control device
JPH0238842B2 (en)
JPS62111105A (en) Mixture volume control device
JPH06284797A (en) Emergency counter measures system for generator equipment
JPS6014890B2 (en) Turbine plant accident prevention device
CN203335142U (en) Turbine main throttle valve accidental-closing-prevention device of thermal power plant
JPS59225392A (en) Cooling facility for core of nuclear reactor
JPS607168B2 (en) Turbine driven water pump recirculation flow control device
JPS6152504A (en) Method and device for interlocking bleed check valve