JPS6124448B2 - - Google Patents
Info
- Publication number
- JPS6124448B2 JPS6124448B2 JP9367478A JP9367478A JPS6124448B2 JP S6124448 B2 JPS6124448 B2 JP S6124448B2 JP 9367478 A JP9367478 A JP 9367478A JP 9367478 A JP9367478 A JP 9367478A JP S6124448 B2 JPS6124448 B2 JP S6124448B2
- Authority
- JP
- Japan
- Prior art keywords
- dust
- gas
- chamber
- separation chamber
- dust catcher
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Blast Furnaces (AREA)
- Separating Particles In Gases By Inertia (AREA)
- Cyclones (AREA)
Description
この発明は高炉より排出されたガス中のダスト
を捕集する高炉ガス清浄設備に関する。
高炉ガスは高い発熱量を有し、重要な熱エネル
ギ源となつているが、多量のダストを含んでいる
ので脱じんしないで用いると諸設備を損傷する恐
れがある。高炉ガスの清浄設備としては乾式集じ
ん装置,湿式集じん装置,電気集じん機などを適
当に組み合せた設備が広く用いられている。
第1図および第2図は従来の高炉ガス清浄設備
の例を示す設備構成図である。第1図において、
高炉1で発生した含じんガスはダストキヤツチヤ
入口荒ガス管2を経てダストキヤツチヤ3に流
入、する。ダストキヤツチヤ3では重力沈降によ
りダストが分離され、ダストキヤツチヤ3入口で
20g/Nm3程度であつた含じん濃度が出口では5
g/Nm3程度にまで低下する。ダストキヤツチヤ
3を出たガスはダストキヤツチヤ出口荒ガス管4
を経てベンチユリスクラバ5に流入し、ベンチユ
リスクラバ5において洗浄される。ベンチユリス
クラバ5出口におけるガスの含じん濃度は100m
g/Nm3程度である。ベンチユリスクラバ5にお
いて洗浄されたガスはベンチユリスクラバ出口管
6またはベンチユリスクラバミストセパレータ5
の途中で炉頂均圧用として使用する一部のガス
と、燃料として使用する大部分のガスに二分され
る。
炉頂均圧用として使用する一部のガスは炉頂均
圧管7を経て高炉炉頂に設けた原料装入装置に送
られ、原料装入時の均圧用として使用される。燃
料として使用する大部分のガスは半清浄ガス管6
を経てベンチユリスクラバ8に送られ、洗浄され
て所定の含じん濃度以下に下げられる。そして、
清浄ガス管9を経てホツトストーブ,ガスホルダ
等へ送られ、燃料として使用される。
第2図に示す設備は、第1図に示す設備の二段
目のベンチユリスクラバ8を電気集じん機10で
置き換えたものであり、他の装置は全く同一であ
り、その作用も同様である。
ところで、上記従来の高炉ガス清浄設備には次
のような欠点があつた。すなわち、ダストキヤツ
チヤ3に続いて少くとも2基以上の集じん装置を
設けねばならず、設備費,運転費が高く、また広
い設置スペースを必要とする。さらに、ダストキ
ヤツチヤ3における集じんが十分でないため後続
の集じん装置の部材の摩耗が激しい。さらにま
た、ガス清浄設備全体の圧力損失がかなり高く、
高炉ガスが有するエネルギを効率よく利用するこ
とができない。
そこで、この発明は従来の高炉ガス清浄設備に
おける上記のような問題を解決したもので、経済
的かつ装置部材の摩耗が少く、しかも圧力損失が
小さい高炉ガス清浄設備を提供することを目的と
している。
以下この発明を望ましい実施例に基づいて図面
を参照しながら詳細に説明する。
第3図はこの発明の一例を示す設備構成図であ
る。同図において、高炉1の炉頂出側にはダスト
キヤツチヤ入口荒ガス管2を介して複式ダストキ
ヤツチヤ11が接続されている。複式ダストキヤ
ツチヤ11は重力沈降分離室13と遠心分離室ま
たは静電集じん室14を備えた密閉容器12を有
している。
複式ダストキヤツチヤ11の出側はダストキヤ
ツチヤ出口荒ガス管15を介してベンチユリスク
ラバ17が接続されており、ダストキヤツチヤ出
口荒ガス管15は途中において炉頂均圧管16を
介して高炉1の炉頂に接続されている。また、ベ
ンチユリスクラバ17の出側は従来の設備と同様
にホツトストーブ,ガスホルダ等に清浄ガス管1
8を介して接続されている。
第4図はこの発明の他の例を示すもので、第3
図に示す装置においてベンチユリスクラバ17を
単に公知の電気集じん機19,移動充填層集じん
機19または静電凝集型移動充填集じん機19で
置き換えたものである。
ここで、第3図および第4図に示した複式ダス
トキヤツチヤ11について詳細に説明する。
第5図に示す複式ダストキヤツチヤは、遠心分
離室がサイクロンにより構成されている。複式ダ
ストキヤツチヤは大体において円筒状をなす密閉
容器21を備えており、容器21は胴軸が垂直に
なるように設置される。容器21は下方より順次
ダストホツパ22,重力沈降分離室23および清
浄ガス室24よりなつており、重力沈降分離室2
3と清浄ガス室24は仕切板25によつて仕切ら
れている。また、容器21にはこれの頂部26を
貫通し、重力沈降分離室23に下端が開口する垂
直なガス導入管27および清浄ガス室24より容
器21外へ通じる出口ダクト28を取り付けてい
る。
上記重力沈降分離室23内には2個のサイクロ
ン29を取り付けている。すなわち、サイクロン
29の頂部は前記仕切板25に固着され、サイク
ロン29の導入管30は重力沈降分離室23に、
また出口管31は清浄ガス室24に開口してい
る。そして、それぞれのサイクロン29のダスト
ホツパ32に容器21外に通じる排出ダクト35
を接続している。
なお、容器21のダストホツパ22の底部およ
び上記排出ダスト35の出口にそれぞれ切出し装
置36および37を取り付けている。
次に、上記のように構成した複式ダストキヤツ
チヤの作用について説明する。
炉頂からの高炉ガスはガス導入管27を通り、
重力沈降分離室23に流入する。流入したガスは
重力沈降分離室23において室内いつぱいに広つ
て流速を落すと共に上向きに反転する。このとき
粒径の大きいダストの大部分と粒径の小さいダス
トの一部はダストの下方に向かおうとする慣性と
重力の作用によりガス流から分離し、ダストホツ
パ22にたまる。
次いで、重力沈降分離室23の頂部に達したガ
スはここでサイクロン29に流入する。このと
き、ガスはサイクロン円胴部33に接線方向に入
り、旋回流となつて円胴部33内をら旋状に降下
する。この間、ガス中のダストは遠心力を受けて
胴壁34に衝突して沈着する。そして、沈着した
ダストは重力および下向きのガス流によつて胴壁
34面に沿つて下降し、ダストホツパ32下部へ
と沈降する。
このようにして重力沈降分離室23およびサイ
クロン29を通過して清浄となつたガスは、清浄
ガス室24を経て出口ダクト28より次の集じん
機17又は19に流入する。一方、容器21のダ
ストホツパ22およびサイクロン29のダストホ
ツパ32にそれぞれ沈降したダストPは切出し装
置36および37によつて複式ダストキヤツチヤ
外へ取り出される。
第6図は複式ダストキヤツチヤの他の例を示す
ものである。この複式ダストキヤツチヤも第6図
に示すものと同様にダストホツパ42,重力沈降
分離室43,遠心分離室44および清浄ガス室4
7などよりなる密閉容器41,ガス導入管48,
出口ダクト49ならびに切出し装置50などを備
えている。そして、遠心分離室44内には、ら旋
状の案内板45を入口ダクト48周りに取り付け
て下方より上方に向うら旋状流路46を形成して
いる。
上記のように構成した複式ダストキヤツチヤに
おいて、重力沈降分離室43を通過したガスは遠
心分離室44に流入し、ら旋状流路46を経て清
浄ガス室47に至る。このとき、ガスは流路46
に沿つてら旋運動する。そして、重力沈降分離室
43で分離されずに残つたダストは、遠心作用に
よつて外方に向い容器41の胴壁あるいは案内板
45に衝突してガスより分離し、流路46に沿い
ダストホツパ42に落下する。
第7図および第8図は複式ダストキヤツチヤの
更に他の例を示すものである。この複式ダストキ
ヤツチヤも第6図に示すものと同様にダストホツ
パ52,重力沈降分離室53,遠心分離室54お
よび清浄ガス室55などよりなる密閉容器51お
よびガス導入管59,出口ダクト60ならびに切
出し装置69などを備えている。上記重力沈降分
離室53と遠心分離室54との間に環状の傾斜し
た仕切板56を取り付けている。この仕切板56
には斜円筒状の周壁61を容器胴壁58との間に
環状のダストため部62を形成するように取り付
けている。そして、この周壁61の上端に頂部が
盲板64で塞れたほぼ円筒状の旋回室63を取り
付けている。旋回室63は重力沈降分離室53と
通じる内室65から遠心分離室54に連通するよ
うに半径方向に開口している。この連通路は旋回
流路66となつており、横断面がく字形に湾曲し
た多数の案内羽根67を円周方向に沿つて配列し
ている。したがつて、ガスは旋回流路66より円
周方向に案内され、遠心分離室54に旋回するよ
うにして流出する。また、旋回流路66の下端は
外側に向つて傾斜した底板68によつて塞がれて
いる。
上記のように構成した複式ダストキヤツチヤに
おいて、重力沈降分離室53を通過したガスは、
周壁61内を経て内室65に至り、旋回流路66
に流入する。ここで、ガスは旋回流となつて遠心
分離室54に流出する。このとき、ダストは案内
羽根67に衝突して沈着し、底板68上に落下
し、更に底板68に沿つてダストため部62内に
滑り落ちる。また、遠心分離室54においてはガ
ス中のダストはガスの旋回流のために遠心力を受
け容器胴壁58に衝突して沈着し、容器胴壁58
に沿つて落下し、ダストため部62内にたまる。
第9図〜第12図は遠心分離室の代りに静電集
じん室を備えた複式ダストキヤツチヤの例を示す
もので、第9図は縦断面、第10図は第9図のA
−A断面図、第11図は第9図のB−B断面図お
よび第12図は第9図のA−A断面における構造
の他の例を示すものである。この複式ダストキヤ
ツチヤも第6図に示すものと同様に、ダストホツ
パ72,重力沈降分離室73および清浄ガス室7
4などよりなる密閉容器71およびガス導入管7
5,出口ダクト76ならびに切出し装置77など
を備えている。なお、第6図に示す遠心分離室4
4がここでは静電集じん室78となつている。
静電集じん室78は第10図(または第12
図)および第11図に示すように、入口ダクト7
5を中心にして例えばその周囲に放射状かつ同心
円板状に多数の仕切つた空間を形成するように板
状集じん極79を設け、各空間内に放電線80を
配置している。放電線80はその上端で同心円板
状の放電線支持枠81によつて保持されている。
そして、この放電線支持枠81は吊ロツド82を
介して容器71の頂部に設けた支持碍子83によ
つて懸吊されている。なお、第10図に示す集じ
ん極79の代りに第12図に示す管状の集じん極
79を使用してもよい。また、放電線および集じ
ん極に付着したダストの払落し用槌打装置は図示
していないが、勿論適宜位置に設置することがで
きる。
上記複式ダストキヤツチヤの重力沈降分離室7
3までの作用は前述の三つの複式ダストキヤツチ
ヤと同様である。重力沈降分離室73において反
転上昇したガス流は静電集じん室78に入り、放
電線80および集じん極79または79′間のコ
ロナ放電により帯電した粒子が集じん極79また
は79′に付着する。したがつて、この静電集じ
ん室78では重力沈降分離室73で分離されずに
残つた粒径の大きなダストと粒径の小さなダスト
の大部分がほぼ完全にガス中から分離されること
になる。
集じん極79または79′および放電線80に
付着したダストは自重または槌打装置等によつて
下方に払い落されてダストホツパ72にたまり、
適宜切出し装置77によつて排出される。
複式ダストキヤツチヤは上記実施例に限られる
ものではない。例えば、第5図に示す実施例の場
合、サイクロンは2基あつたが、これを1基ある
いは3基以上であつてもよく、要するに一つの密
閉容器内に重力沈降分離室と遠心分離室または静
電集じん室とを備えておればよい。
この発明の高炉ガス清浄設備では全体としての
作用は従来の設備と同様であるが、次のような効
果を有している。
この発明の高炉ガス清浄設備は従来の設備に比
べベンチユリスクラバ1基が不要であるため、装
置の設置スペース,設備費,運転費,メンテナン
ス費等は少くて済む。
また、複式ダストキヤツチヤにおいて重力沈降
分離と遠心分離または静電集じんとによりダスト
を捕集するようにしているので、複式ダストキヤ
ツチヤの入口で含じん濃度が20g/Nm3程度であ
つたものが、出口では100〜300mg/Nm3程度とな
る。したがつて、従来の5g/Nm3に比べ著しく
小さく、複式ダストキヤツチヤに続くベンチユリ
スクラバの部材のダストによる摩耗は大きく軽減
される。
さらにまた、この発明の高炉ガス清浄設備では
圧力損失が少い。第1表および第2表は、炉頂圧
2.0Kg/cm2の場合の操業状態における圧力損失を
従来の設備のものとこの発明のものとを比較した
例を示している。
The present invention relates to blast furnace gas cleaning equipment that collects dust in gas discharged from a blast furnace. Blast furnace gas has a high calorific value and is an important source of thermal energy, but since it contains a large amount of dust, there is a risk of damaging various equipment if used without removing the dust. Equipment that appropriately combines dry dust collectors, wet dust collectors, electrostatic precipitators, etc. is widely used as blast furnace gas purification equipment. FIGS. 1 and 2 are equipment configuration diagrams showing examples of conventional blast furnace gas purification equipment. In Figure 1,
The dust-containing gas generated in the blast furnace 1 flows into the dust catcher 3 via the dust catcher inlet rough gas pipe 2. In dust catcher 3, dust is separated by gravity settling, and at the inlet of dust catcher 3.
The dust concentration, which was about 20g/Nm3, decreased to 5 at the outlet.
g/ Nm3 . The gas leaving the dust catcher 3 is the dust catcher outlet rough gas pipe 4.
The water flows through the bench lily scrubber 5 and is cleaned in the bench lily scrubber 5. The concentration of gas and dust at the vent lily scrubber 5 outlet is 100m
g/ Nm3 . The gas cleaned in the bench lily scrubber 5 is transferred to the vent lily scrubber outlet pipe 6 or the bench lily scrubber mist separator 5.
Part of the gas is used for pressure equalization at the top of the furnace, and most of the gas is used as fuel. A part of the gas used for equalizing the pressure at the top of the furnace is sent through the top pressure equalizing pipe 7 to a raw material charging device provided at the top of the blast furnace, and is used for equalizing the pressure at the time of charging the raw material. Most of the gas used as fuel is semi-clean gas pipe 6
The dust is then sent to a bench lily scrubber 8 where it is cleaned and reduced to a predetermined dust concentration or lower. and,
The gas is sent to a hot stove, gas holder, etc. through the clean gas pipe 9 and used as fuel. The equipment shown in Fig. 2 is the equipment shown in Fig. 1 in which the second-stage bench turret scrubber 8 is replaced with an electrostatic precipitator 10, and the other equipment is exactly the same and its operation is the same. be. By the way, the above conventional blast furnace gas cleaning equipment has the following drawbacks. That is, at least two or more dust collectors must be installed following the dust catcher 3, which increases equipment and operating costs and requires a large installation space. Furthermore, since dust collection in the dust catcher 3 is insufficient, the members of the subsequent dust collection device are severely worn. Furthermore, the pressure loss throughout the gas cleaning equipment is quite high.
The energy contained in blast furnace gas cannot be used efficiently. Therefore, this invention solves the above-mentioned problems in conventional blast furnace gas cleaning equipment, and aims to provide an economical blast furnace gas cleaning equipment with less wear on equipment members and low pressure loss. . Hereinafter, the present invention will be explained in detail based on preferred embodiments with reference to the drawings. FIG. 3 is an equipment configuration diagram showing an example of the present invention. In the figure, a duplex dust catcher 11 is connected to the top side of a blast furnace 1 via a dust catcher inlet coarse gas pipe 2. The dual dust catcher 11 has a closed container 12 with a gravity settling chamber 13 and a centrifugal or electrostatic dust collection chamber 14. The outlet side of the duplex dust catcher 11 is connected to a bench turret scrubber 17 via a dust catcher outlet rough gas pipe 15, and the dust catcher outlet rough gas pipe 15 is connected to the blast furnace via a furnace top pressure equalizing pipe 16 in the middle. It is connected to the top of the furnace. In addition, the outlet side of the bench uri scrubber 17 is connected to a hot stove, gas holder, etc. with a clean gas pipe 1, as in conventional equipment.
8. FIG. 4 shows another example of this invention, and the third
In the apparatus shown in the figure, the bench unit scrubber 17 is simply replaced with a known electrostatic precipitator 19, moving packed bed dust collector 19 or electrostatic coagulation type moving packed dust collector 19. The duplex dust catcher 11 shown in FIGS. 3 and 4 will now be described in detail. In the dual dust catcher shown in FIG. 5, the centrifugal separation chamber is constituted by a cyclone. The duplex dust catcher includes a closed container 21 having a generally cylindrical shape, and the container 21 is installed so that the axis of the container is vertical. The container 21 consists of a dust hopper 22, a gravity sedimentation separation chamber 23, and a clean gas chamber 24 in order from the bottom.
3 and the clean gas chamber 24 are separated by a partition plate 25. Further, the container 21 is provided with a vertical gas introduction pipe 27 which passes through the top 26 of the container and whose lower end opens into the gravity sedimentation separation chamber 23, and an outlet duct 28 which leads from the clean gas chamber 24 to the outside of the container 21. Two cyclones 29 are installed in the gravity sedimentation separation chamber 23. That is, the top of the cyclone 29 is fixed to the partition plate 25, and the introduction pipe 30 of the cyclone 29 is connected to the gravity sedimentation separation chamber 23.
The outlet pipe 31 also opens into the clean gas chamber 24 . A discharge duct 35 is connected to the dust hopper 32 of each cyclone 29 to the outside of the container 21.
are connected. Note that cutting devices 36 and 37 are attached to the bottom of the dust hopper 22 of the container 21 and the outlet of the discharged dust 35, respectively. Next, the operation of the dual dust catcher configured as described above will be explained. The blast furnace gas from the top of the furnace passes through the gas introduction pipe 27,
It flows into the gravity sedimentation separation chamber 23. The inflowing gas spreads throughout the chamber in the gravity sedimentation separation chamber 23, reduces the flow velocity, and is reversed upward. At this time, most of the dust with large particle diameters and some of the dust with small particle diameters are separated from the gas flow due to the action of inertia and gravity that tend to move downward, and accumulate in the dust hopper 22. The gas that has reached the top of the gravity settling chamber 23 then flows into the cyclone 29 here. At this time, the gas enters the cyclone barrel 33 in a tangential direction, becomes a swirling flow, and descends spirally inside the barrel 33. During this time, the dust in the gas collides with the trunk wall 34 under the influence of centrifugal force and is deposited. The deposited dust then descends along the shell wall 34 due to gravity and the downward gas flow, and settles to the lower part of the dust hopper 32. The gas thus purified after passing through the gravity sedimentation separation chamber 23 and the cyclone 29 flows into the next dust collector 17 or 19 via the clean gas chamber 24 and the outlet duct 28 . On the other hand, the dust P that has settled in the dust hopper 22 of the container 21 and the dust hopper 32 of the cyclone 29 is taken out of the multiple dust catcher by the cutting devices 36 and 37. FIG. 6 shows another example of a dual dust catcher. Similar to the one shown in FIG.
7, etc., a closed container 41, a gas introduction pipe 48,
It is equipped with an outlet duct 49, a cutting device 50, and the like. Inside the centrifugal separation chamber 44, a spiral guide plate 45 is attached around the inlet duct 48 to form a spiral flow path 46 extending from the bottom to the top. In the dual dust catcher configured as described above, the gas that has passed through the gravity sedimentation separation chamber 43 flows into the centrifugal separation chamber 44 and reaches the clean gas chamber 47 via the spiral flow path 46. At this time, the gas flows through the flow path 46
spiral movement along. The dust remaining without being separated in the gravity sedimentation separation chamber 43 is directed outward by centrifugal action and collides with the body wall of the container 41 or the guide plate 45 to be separated from the gas, and is sent to the dust hopper along the flow path 46. Falling at 42. FIGS. 7 and 8 show still another example of a dual dust catcher. Similar to the one shown in FIG. 6, this double dust catcher also includes a closed container 51, a gas inlet pipe 59, an outlet duct 60, and a gas inlet pipe 59, an outlet duct 60, and a closed container 51, which is composed of a dust hopper 52, a gravity sedimentation separation chamber 53, a centrifugal separation chamber 54, a clean gas chamber 55, etc. It is equipped with a device 69 and the like. An annular inclined partition plate 56 is installed between the gravity sedimentation separation chamber 53 and the centrifugation chamber 54. This partition plate 56
An oblique cylindrical peripheral wall 61 is attached to the container body wall 58 so as to form an annular dust storage portion 62 therebetween. A substantially cylindrical turning chamber 63 whose top portion is closed with a blind plate 64 is attached to the upper end of this peripheral wall 61. The swirling chamber 63 opens in the radial direction from an inner chamber 65 communicating with the gravity sedimentation chamber 53 to the centrifugation chamber 54 . This communication path is a swirling flow path 66, and a large number of guide vanes 67 having a dogleg-shaped cross section are arranged along the circumferential direction. Therefore, the gas is guided in the circumferential direction from the swirling flow path 66 and flows out into the centrifugal separation chamber 54 in a swirling manner. Further, the lower end of the swirl flow path 66 is closed by a bottom plate 68 that slopes outward. In the dual dust catcher configured as described above, the gas that has passed through the gravity settling separation chamber 53 is
It reaches the inner chamber 65 through the surrounding wall 61, and the swirling flow path 66
flows into. Here, the gas becomes a swirling flow and flows out into the centrifugal separation chamber 54. At this time, the dust collides with the guide vane 67 and settles, falls onto the bottom plate 68, and further slides along the bottom plate 68 into the dust storage section 62. Further, in the centrifugal separation chamber 54, the dust in the gas is subjected to centrifugal force due to the swirling flow of the gas, collides with the container body wall 58, and is deposited.
The dust falls along the dust trap 62 and accumulates in the dust storage section 62. Figures 9 to 12 show an example of a dual dust catcher equipped with an electrostatic dust collection chamber instead of a centrifugal separation chamber.
-A sectional view, FIG. 11 is a sectional view taken along line BB in FIG. 9, and FIG. 12 is a sectional view taken along line AA in FIG. 9. Similar to the one shown in FIG.
4, etc., and a gas introduction pipe 7.
5, an outlet duct 76, a cutting device 77, etc. In addition, the centrifugation chamber 4 shown in FIG.
4 serves as an electrostatic dust collection chamber 78 here. The electrostatic dust collection chamber 78 is shown in Fig. 10 (or Fig. 12).
) and FIG. 11, the inlet duct 7
A plate-shaped dust collection electrode 79 is provided so as to form a large number of partitioned spaces radially and concentrically around the center 5, for example, and a discharge wire 80 is arranged in each space. The discharge wire 80 is held at its upper end by a concentric disk-shaped discharge wire support frame 81.
This discharge wire support frame 81 is suspended by a support insulator 83 provided at the top of the container 71 via a suspension rod 82. Note that a tubular dust collection electrode 79 shown in FIG. 12 may be used instead of the dust collection electrode 79 shown in FIG. 10. Furthermore, although a hammering device for brushing off dust adhering to the discharge wires and dust collecting electrodes is not shown, it can of course be installed at an appropriate position. Gravity sedimentation separation chamber 7 of the above duplex dust catcher
The operations up to 3 are similar to the three dual dust catchers described above. The gas flow reversed and ascended in the gravity sedimentation separation chamber 73 enters the electrostatic dust collection chamber 78, where particles charged by corona discharge between the discharge wire 80 and the dust collection electrode 79 or 79' adhere to the dust collection electrode 79 or 79'. do. Therefore, in this electrostatic dust collection chamber 78, most of the large particle size dust and small particle size dust that remained unseparated in the gravity sedimentation separation chamber 73 are almost completely separated from the gas. Become. The dust adhering to the dust collecting electrode 79 or 79' and the discharge wire 80 is knocked off by its own weight or by a hammering device or the like, and accumulates in the dust hopper 72.
It is appropriately discharged by a cutting device 77. The dual dust catcher is not limited to the above embodiment. For example, in the case of the embodiment shown in Fig. 5, there were two cyclones, but there may be one or three or more cyclones; in short, a gravity sedimentation separation chamber, a centrifugation chamber, or It is only necessary to have an electrostatic dust collection chamber. The overall function of the blast furnace gas cleaning equipment of the present invention is similar to that of conventional equipment, but it has the following effects. Compared to conventional equipment, the blast furnace gas cleaning equipment of the present invention does not require a single bench lily scrubber, so the installation space, equipment cost, operating cost, maintenance cost, etc. of the equipment can be reduced. In addition, since the duplex dust catcher collects dust by gravity sedimentation, centrifugation, or electrostatic collection, the dust concentration at the inlet of the duplex dust catcher was approximately 20 g/Nm3. However, at the outlet, the concentration is about 100 to 300 mg/ Nm3 . Therefore, it is significantly smaller than the conventional value of 5 g/Nm 3 , and wear caused by dust on the members of the ventilator scrubber following the dual dust catcher is greatly reduced. Furthermore, the blast furnace gas cleaning equipment of the present invention has less pressure loss. Tables 1 and 2 show the furnace top pressure
An example is shown in which the pressure loss in the operating state in the case of 2.0 Kg/cm 2 is compared between the conventional equipment and the equipment of the present invention.
【表】【table】
【表】
両表から明らかなように、この発明の高炉ガス
清浄設備全体の圧力損失は従来設備のものに比べ
著しく小さい。したがつて、例えば炉頂圧回収タ
ービンを設備した場合、この発明の設備を使用す
ると回収エネルギが大きく、省エネルギ化を図る
ことができる。
また、炉頂均圧ガスに関しては、従来の設備で
は一次ベンチユリスクラバ5出口のガスを用いる
が、この発明の設備では複式ダストキヤツチヤ1
1出口のガスを用いることができる。第1表およ
び第2表から明らかなように炉頂圧力を炉頂均圧
用ガス圧力との差は従来設備の場合には1600mm
Aqであるが、この発明の場合には300mmAqであ
る。したがつて、ダストキヤツチヤあるいはベン
チユリスクラバを出たガスの炉頂均圧能力は、こ
の発明の設備の方が高いことになり、炉頂均圧用
として補助的に使用する窒素等の圧縮気体の使用
量が少くて済む。
以上詳細に説明したようにこの発明の高炉ガス
清浄設備では重力沈降分離室と遠心分離室または
静電集じん室とを備えた複式ダストキヤツチヤを
ベンチユリスクラバ,電気集じん機,移動充填層
集じん機または静電凝集型移動充填層集じん機の
前段に設けているので、設備全体の設置スペース
は小さく、また、極めて経済的である。さらに、
ベンチユリスクラバの部材の摩耗が少く、しかも
設備全体の圧力損失が小さいので省エネルギ化を
図ることができる。[Table] As is clear from both tables, the pressure loss of the entire blast furnace gas cleaning equipment of the present invention is significantly smaller than that of the conventional equipment. Therefore, when a furnace top pressure recovery turbine is installed, for example, when the equipment of the present invention is used, a large amount of recovered energy can be recovered and energy saving can be achieved. Regarding the pressure equalizing gas at the top of the furnace, conventional equipment uses the gas at the outlet of the primary venturi scrubber 5, but in the equipment of this invention, the gas from the outlet of the dual dust catcher 1 is used.
One outlet of gas can be used. As is clear from Tables 1 and 2, the difference between the furnace top pressure and the furnace top equalization gas pressure is 1600 mm in the case of conventional equipment.
Aq, but in the case of this invention it is 300 mmAq. Therefore, the ability of the furnace top pressure equalization of the gas exiting the dust catcher or the bench scrubber is higher in the equipment of this invention, and compressed gas such as nitrogen, which is used auxiliary for furnace top pressure equalization, is higher. Only a small amount is required. As explained in detail above, in the blast furnace gas purification equipment of the present invention, a dual dust catcher equipped with a gravity sedimentation separation chamber and a centrifugal separation chamber or an electrostatic precipitator chamber is used as a bench scrubber, an electrostatic precipitator, and a moving packed bed. Since it is installed before the dust collector or electrostatic coagulation type moving packed bed dust collector, the installation space of the entire equipment is small and it is extremely economical. moreover,
There is little wear on the members of the bench lily scrubber, and the pressure loss of the entire equipment is small, so energy savings can be achieved.
第1図および第2図は従来の高炉ガス清浄設備
の構成図である。第3図および第4図はこの発明
に係る高炉ガス清浄設備の構成図である。第5図
はこの発明の設備に用いる複式ダストキヤツチヤ
の一例を示す縦断面図である。第6図は複式ダス
トキヤツチヤの他の例を示す一部断面図である。
第7図は複式ダストキヤツチヤの更に他の例を示
す縦断面図である。第8図は第7図のA−A線に
沿う断面図である。第9図は遠心分離室の代りに
静電集じん室を備えた複式ダストキヤツチヤの例
を示す縦断面図である。第10図および第11図
はそれぞれ第9図のA−A線およびB−B線に沿
う断面図である。第12図は第9図のA−A断面
における構造の他の例を示す断面図である。
1……高炉、2……入口管、3……ダストキヤ
ツチヤ、4,15……出口管、5,8,17……
ベンチユリスクラバ、6……半清浄ガス管、7,
16……炉頂均圧管、9,18……清浄ガス管、
10,19……電気集じん機,移動充填層集じん
機または静電凝集型移動充填層集じん機、21,
41,51,71……密閉容器、22,42,5
2,72……ダストホツパ、23,43,53,
73……重力沈降分離室、24,47,55,7
4……清浄ガス室、27,48,59,75……
入口ダクト、28,49,60,76……出口ダ
クト、29……サイクロン、44,54……遠心
分離室、78……静電集じん室、79……集じん
極、80……放電線、21A,41A,51A,
71A……重力沈降分離室外殻。
FIGS. 1 and 2 are block diagrams of conventional blast furnace gas cleaning equipment. FIG. 3 and FIG. 4 are configuration diagrams of the blast furnace gas cleaning equipment according to the present invention. FIG. 5 is a longitudinal sectional view showing an example of a dual dust catcher used in the equipment of the present invention. FIG. 6 is a partially sectional view showing another example of the dual dust catcher.
FIG. 7 is a longitudinal cross-sectional view showing still another example of the duplex dust catcher. FIG. 8 is a sectional view taken along line A--A in FIG. 7. FIG. 9 is a longitudinal sectional view showing an example of a dual dust catcher having an electrostatic dust collection chamber instead of a centrifugation chamber. 10 and 11 are cross-sectional views taken along the lines AA and BB in FIG. 9, respectively. FIG. 12 is a sectional view showing another example of the structure taken along the line AA in FIG. 9. 1... Blast furnace, 2... Inlet pipe, 3... Dust catcher, 4, 15... Outlet pipe, 5, 8, 17...
Bench lily scrubber, 6...Semi-clean gas pipe, 7,
16...Furnace top pressure equalization pipe, 9,18...Clean gas pipe,
10, 19...Electrostatic precipitator, moving packed bed dust collector or electrostatic coagulation type moving packed bed dust collector, 21,
41, 51, 71... airtight container, 22, 42, 5
2,72...Dusthopper, 23,43,53,
73...Gravity sedimentation separation chamber, 24, 47, 55, 7
4...Clean gas chamber, 27, 48, 59, 75...
Inlet duct, 28, 49, 60, 76... Outlet duct, 29... Cyclone, 44, 54... Centrifugal separation chamber, 78... Electrostatic dust collection chamber, 79... Dust collection electrode, 80... Discharge wire , 21A, 41A, 51A,
71A...Gravity sedimentation separation chamber outer shell.
Claims (1)
チヤの下流側に二次集塵機を設けた高炉ガス清浄
設備において、前記一次ダストキヤツチヤを構成
するケーシング内に下方より重力沈降分離室,遠
心分離室を独立させて設けると共に、前記重力沈
降分離室内にガス導入管を設け、前記重力沈降分
離室の出口端と遠心分離室の入口端を連通する如
く形成し、又前記ガス導入管と高炉炉頂,遠心分
離室の出口端と二次集塵機を連通したことを特徴
とする高炉ガス清浄設備。 2 一次ダストキヤツチヤと該一次ダストキヤツ
チヤの下流側に二次集塵機を設けた高炉ガス清浄
設備において、前記一次ダストキヤツチヤを構成
するケーシング内に下方より重力沈降分離室,静
電集塵室を独立させて設けると共に、前記重力沈
降分離室内にガス導入管を設け、前記重力沈降分
離室の出口端と静電集塵室の入口端を連通する如
く形成し、又前記ガス導入管と高炉炉頂,静電集
塵室の出口端と二次集塵機を連通したことを特徴
とする高炉ガス清浄設備。[Scope of Claims] 1. In a blast furnace gas purification equipment provided with a primary dust catcher and a secondary dust collector on the downstream side of the primary dust catcher, a gravity settling separation chamber is installed from below in a casing constituting the primary dust catcher. , a centrifugal separation chamber is provided independently, a gas introduction pipe is provided in the gravity sedimentation separation chamber, and the outlet end of the gravity sedimentation separation chamber is formed to communicate with the inlet end of the centrifugation chamber, and the gas introduction pipe A blast furnace gas cleaning equipment characterized by communicating the top of the blast furnace, the outlet end of the centrifuge chamber, and a secondary dust collector. 2. In a blast furnace gas purification facility equipped with a primary dust catcher and a secondary dust collector on the downstream side of the primary dust catcher, a gravity sedimentation separation chamber and an electrostatic precipitator are installed from below in the casing constituting the primary dust catcher. A gas introduction pipe is provided in the gravity sedimentation separation chamber, and the outlet end of the gravity sedimentation separation chamber is formed to communicate with the inlet end of the electrostatic precipitator chamber, and the gas introduction pipe and the blast furnace Blast furnace gas cleaning equipment characterized by communicating the outlet end of the electrostatic precipitator chamber at the top of the furnace with a secondary precipitator.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9367478A JPS5521545A (en) | 1978-08-02 | 1978-08-02 | Blast furnace gas purifying facility |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9367478A JPS5521545A (en) | 1978-08-02 | 1978-08-02 | Blast furnace gas purifying facility |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5521545A JPS5521545A (en) | 1980-02-15 |
| JPS6124448B2 true JPS6124448B2 (en) | 1986-06-11 |
Family
ID=14088941
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP9367478A Granted JPS5521545A (en) | 1978-08-02 | 1978-08-02 | Blast furnace gas purifying facility |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5521545A (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS586389A (en) * | 1981-07-01 | 1983-01-13 | 新日本製鐵株式会社 | Method of operating dust collector |
| EP2031078A1 (en) * | 2007-08-29 | 2009-03-04 | Paul Wurth S.A. | Dust catcher for blast furnace gas |
| JP2009090185A (en) * | 2007-10-05 | 2009-04-30 | Nippon Steel Engineering Co Ltd | Dust catcher for blast furnace gas |
| JP5331641B2 (en) * | 2009-10-05 | 2013-10-30 | スチールプランテック株式会社 | Cleaning dust collection equipment |
| JP5320514B1 (en) * | 2013-02-01 | 2013-10-23 | 新日鉄住金エンジニアリング株式会社 | Dust catcher for blast furnace gas |
| JP5873147B2 (en) * | 2014-07-24 | 2016-03-01 | 株式会社Ihi | Blast furnace gas cleaning device, blast furnace, and blast furnace gas cleaning method |
| DE102014112724A1 (en) * | 2014-09-04 | 2016-03-10 | Dürr Ecoclean GmbH | Separator and method for separating particles from a gas stream |
| IT201800003381A1 (en) * | 2018-03-08 | 2019-09-08 | Hsd Holding Smart Device S R L | AN ASSEMBLY OF VENTILATION |
-
1978
- 1978-08-02 JP JP9367478A patent/JPS5521545A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5521545A (en) | 1980-02-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4198290A (en) | Dust separating equipment | |
| US3802570A (en) | Cyclone separator | |
| US1416995A (en) | Dust collector | |
| US2360355A (en) | Apparatus for separating suspended particles from gaseous media | |
| US4286974A (en) | Compound particle separator | |
| US6238459B1 (en) | Ultra-high particulate collection of sub-micron aerosols | |
| JPS6124448B2 (en) | ||
| AU695179B2 (en) | A fluidized catalytic cracking apparatus with contained vortex third stage separator | |
| JP4402239B2 (en) | Cyclone dust collector | |
| CN105797491B (en) | A kind of high-temperature gas spiral purifying device | |
| US3042202A (en) | Cyclone classifier | |
| US3150943A (en) | Cyclone-type dust collector | |
| US4337068A (en) | Methods for removing entrained solids from gases | |
| US2347731A (en) | Gas purifier | |
| JP2009090185A (en) | Dust catcher for blast furnace gas | |
| US4316729A (en) | Highly efficient cyclone separator | |
| CN105148672B (en) | A kind of combined duster for fuel gas | |
| CN211069531U (en) | Multi-pipe cyclone dust collector | |
| KR102317976B1 (en) | Swirling flow type electic dust collector including multicyclone | |
| US2005305A (en) | Dust collector | |
| CN111686519B (en) | Cyclone dust removal device | |
| US2713920A (en) | Mechanical dust collector | |
| US4380105A (en) | Method for shaping, forming and assembling a highly efficient cyclone separator | |
| US1715549A (en) | Dust collector and gas cleaner | |
| US2339416A (en) | Dust concentrator |