JPS6128108A - Control system of open waterway - Google Patents
Control system of open waterwayInfo
- Publication number
- JPS6128108A JPS6128108A JP14750884A JP14750884A JPS6128108A JP S6128108 A JPS6128108 A JP S6128108A JP 14750884 A JP14750884 A JP 14750884A JP 14750884 A JP14750884 A JP 14750884A JP S6128108 A JPS6128108 A JP S6128108A
- Authority
- JP
- Japan
- Prior art keywords
- gate
- demand
- calculation
- open channel
- flow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05D—SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- G05D9/00—Level control, e.g. controlling quantity of material stored in vessel
- G05D9/12—Level control, e.g. controlling quantity of material stored in vessel characterised by the use of electric means
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Control Of Non-Electrical Variables (AREA)
- Feedback Control In General (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
〔発明の利用分野〕
本発明は開水路の制御方式に係り、特に長距離緩勾配等
で流下遅れ時間が大きく、かつ貯留効果の大きい開水路
に好適な、制御方式に関する。[Detailed Description of the Invention] [Field of Application of the Invention] The present invention relates to a control system for open channels, and is particularly suitable for open channels that have long-distance, gentle slopes, long flow delay times, and large storage effects. Regarding.
従来の多段開水路制御は水位一定制御が一般的、であり
、全水路における流況が安定するまでに水路末端までの
流下時間が必要であった。一方、各水路区間毎に設けら
れた制御機器を同時に制御する声により、安定までに要
する時間を1段の流下時間のみに減らす事は、理論的に
は可能である。Conventional multi-stage open channel control generally involves constant water level control, and it takes time for the flow to reach the end of the channel until the flow conditions in the entire channel are stabilized. On the other hand, it is theoretically possible to reduce the time required for stabilization to only one stage of flow time by simultaneously controlling the control devices installed in each waterway section.
しかし、その実現には、各制御機器のタイミングを取る
ここの伸に、岬御前の流況午制御後の流況この変化を考
慮した安全な制御を行−う必要があり、適yな制御方式
が開発されていなかった。However, in order to achieve this, it is necessary to perform safe control that takes into account the changes in the flow condition after the flow control at Cape Gozen, in order to take the timing of each control device. A method had not been developed.
本発明の目的は、上記問題点を解決して短時間に水路全
体の流況を安定化させる。制御方式を提供する事にある
。An object of the present invention is to solve the above problems and stabilize the flow condition of the entire waterway in a short time. The purpose is to provide a control method.
多段の開水路の制御において、全水路区間で早期に安定
な流況を得るために、本発明では水路貯留量に着目した
制御方式をとる。すなわち、短時間のうちに各水路区間
での貯留量を目標流量に応じた適正な量にする事により
、早期に定常不等法状態へ導くものである6又実際に制
御されるゲートの開度計算方式および予測値と実際値が
異なる場合の修正方式も含めた一連の制御方式を考案し
た。In controlling a multistage open channel, in order to quickly obtain stable flow conditions in all channel sections, the present invention adopts a control method that focuses on the amount of channel storage. In other words, by bringing the storage amount in each waterway section to an appropriate amount according to the target flow rate in a short time, it is possible to quickly reach a steady inequality state. A series of control methods were devised, including a method for calculating the temperature and a method for correcting when the predicted value and the actual value differ.
以下、本発明の一実施例を第1図から第4図により説明
する。第1図に多段開水路中の1水路区間の機能構成を
示す。この図中では需要量予測値1及ぞ水路貯留量12
から運用計画部2を用いてゲート通過目標流量3を求め
る。制御演算部6ででは、この流量と水路状況4、施設
条件5から不定流水理演算又は不定流水理演算を用い水
路区間毎の貯水量12と各施設毎のゲート開度7を求め
、中央管理所から各制御機器を同時に制御する。An embodiment of the present invention will be described below with reference to FIGS. 1 to 4. Figure 1 shows the functional configuration of one channel section in a multi-stage open channel. In this figure, the predicted demand value is 1, and the canal storage amount is 12.
Using the operation planning unit 2, the target flow rate 3 passing through the gate is determined. The control calculation unit 6 calculates the water storage volume 12 for each channel section and the gate opening degree 7 for each facility using unsteady flow hydraulic calculation or unsteady flow hydraulic calculation from this flow rate, waterway status 4, and facility conditions 5, and calculates the water storage amount 12 for each waterway section and the gate opening degree 7 for each facility. Control each control device simultaneously from a location.
一方、観測されるゲート通過流量8.ゲート上・下流水
位9は需要変化推定部10で流況の監視を行ない、需要
量12が需要量予測値1と大きく違う場合には、制御演
算部6へ需要推定量11を送り、ゲート開度7の補正を
行う。次に各制御ステップを具体的に説明する。On the other hand, the observed flow rate through the gate 8. The water level 9 above and downstream of the gate is monitored by the demand change estimating unit 10, and if the demand amount 12 is significantly different from the predicted demand value 1, the estimated demand amount 11 is sent to the control calculation unit 6 and the gate is opened. Perform degree 7 correction. Next, each control step will be specifically explained.
運用計画部2では早期流況安定を図るため1例えば第2
図に示す如く水路内貯留量を考慮した方式を採用する。In order to stabilize the flow situation early, the operation planning department 2
As shown in the figure, a method will be adopted that takes into account the amount of water stored in the waterway.
つまり、ステップ21で需要予測値と水路貯留量v1.
Iを入力し、需要予測値よりステップ22で各ゲート毎
の必要流量を算出する。That is, in step 21, the demand forecast value and the waterway storage amount v1.
I is input, and the required flow rate for each gate is calculated in step 22 from the demand forecast value.
次に、ステップ23で各ゲートの下流水路区間毎に、需
要変化後の定常状態での貯留量V 2 Nを計算し、ス
テップ24で設定されている貯留量調節時間Tまでの間
で、 V2NどVt++の差の容量を定常必要流量Q、
に加算する。つまり、制御を行ってからの時間tが(1
)式の条件時はゲート通過流量を(2)式とする。又、
同様に、(3)式の条件時は(4)式とする。Next, in step 23, the storage volume V 2 N in a steady state after the demand change is calculated for each downstream channel section of each gate, and until the storage volume adjustment time T set in step 24, V 2 N is calculated. The capacity of the difference between Vt++ and Q is the steady required flow rate Q,
Add to. In other words, the time t after control is (1
), the flow rate passing through the gate is expressed as equation (2). or,
Similarly, when the condition of equation (3) is satisfied, equation (4) is used.
0≦t<T ・・・(1)Q
、、=Q、+Σ(V2.−V、、)/T −(2
)t≧T ・・・(3)
Q□=Q、 ・・・
(4)ここで
Q、:N番目ゲートでの定常必要流量
Q、、:N番目ゲートでのゲート通過目標流量以上の様
にゲート流量を決める事により、所定の流量での定常状
態にすみやかに移行し、特に水路途中にある分水工にお
ける過渡異常水位状態の時間短縮に貢献する。0≦t<T...(1)Q
,,=Q,+Σ(V2.-V,,)/T-(2
)t≧T...(3)
Q□=Q, ・・・
(4) Here, Q: Steady required flow rate at the Nth gate Q: By determining the gate flow rate so that it is greater than the target flow rate through the gate at the Nth gate, a steady state at a predetermined flow rate can be quickly achieved. This contributes to reducing the time required for transient abnormal water level conditions, especially in diversion works located midway through waterways.
制御演算部6では運用計画部2で求めた流量を得るため
のゲート開度を求めるものである。この単純な方式とし
ては、ゲート流量の一定制御方式があるが、水路流況の
時定数が大きい為、ゲートがハンチングを起こし頻繁な
ゲート動作が予想される。そこで例えば第3図に示す制
御方式の適用を考える。つまり運用計画部2からのゲー
ト通過目標流量とゲート上流設定水位及びゲート流量を
計算する為の施設条件の初期値をステップ31で入力後
、ステップ32で各ゲートの下流水路区間毎に不定流演
算を行いゲート下流水位とゲート下料区間の貯留量V1
Nを求める。ステップ33では、ゲート上流設定水位と
今求めたゲート下流水位そして施設条件からゲート流量
式を用いて、ゲート通過目標流量を満たす開度を決定す
る。The control calculation unit 6 determines the gate opening degree to obtain the flow rate determined by the operation planning unit 2. A simple method is to control the gate flow rate at a constant rate, but since the time constant of the channel flow condition is large, it is expected that the gate will hunt and frequent gate operations will be required. Therefore, consider application of the control method shown in FIG. 3, for example. In other words, after inputting the target flow rate passing through the gate from the operation planning section 2, the set water level upstream of the gate, and the initial values of the facility conditions for calculating the gate flow rate in step 31, in step 32, unsteady flow calculation is performed for each downstream channel section of each gate. The water level downstream of the gate and the storage volume V1 in the gate sewage section are determined by
Find N. In step 33, the opening degree that satisfies the target flow rate through the gate is determined using the gate flow rate formula from the gate upstream set water level, the gate downstream water level just found, and facility conditions.
需要変化推定部10の一例を第4図に示す。ステップ4
1で初期値(需要予測値Q、)を入力し、ステップ42
でゲート毎の通過流量及びゲート上下流水位を計測器に
より常時観測し、流況の変化からステップ43で推定需
要量Q1.を求めるもので、特に不定流水理演算の簡易
手法として先願の特願昭58−27561号で述べた三
種モデルを用いると、制御用計算機によるオンライン制
御をさらに容易にすることも出来る。ステップ44でこ
の推定需要量Qtwと需要予測値Q。、この差が需要量
誤差許容量Kを越えた場合は、ステップ45で制御演算
部6へ推定需要量Q1□を伝達しゲート開度制御値の変
更の指標とする。An example of the demand change estimation section 10 is shown in FIG. Step 4
Input the initial value (demand forecast value Q,) in step 1, and proceed to step 42.
At step 43, the flow rate passing through each gate and the water level upstream and downstream of the gate are constantly observed using measuring instruments, and based on changes in flow conditions, the estimated demand amount Q1. In particular, if the three-type model described in the earlier Japanese Patent Application No. 58-27561 is used as a simple method for unsteady flow hydraulic calculations, online control by a control computer can be further facilitated. In step 44, this estimated demand quantity Qtw and demand forecast value Q are determined. If this difference exceeds the demand quantity error tolerance K, the estimated demand quantity Q1□ is transmitted to the control calculation unit 6 in step 45 and is used as an index for changing the gate opening degree control value.
本発明によれば、需要の変化時にゲート制御を行う場合
、水路内貯留量の収支を考慮した制御を行うので、水路
全体の流況が安定するまでの時間を短縮する効果がある
。さらに、水路状態を常時監視し、需要予測値この比較
を行うので、需要量の急変に対して適切な修正が可能で
あり安全性を高める効果がある。According to the present invention, when gate control is performed when demand changes, the control is performed in consideration of the balance of the amount stored in the waterway, so there is an effect of shortening the time until the flow condition of the entire waterway becomes stable. Furthermore, since the condition of the waterway is constantly monitored and the predicted demand value is compared, appropriate corrections can be made in response to sudden changes in demand, which has the effect of increasing safety.
第1図は本発明による制御方式の実施例の全体機能構成
図、第2図は運用計画部における処理のフローチャート
、第3図は制御演算部における処理のフローチャート、
第4図は需要変化推定部における処理のフローチャート
である。
1・・・需要量予測値、2・・・運用計画部、3・・・
ゲート通過目標流量、4・・・水路状況(水位・流量)
、5・・・施設条件、6・・・制御演算部、7・・・ゲ
ート開度、8・・・ゲート通過流量、9・・・ゲート上
・下流水位。
10・・・需要変化推定部、11・・・需要推定量、1
2Z1図
第Z図
第 3 図
第 4 図FIG. 1 is an overall functional configuration diagram of an embodiment of the control method according to the present invention, FIG. 2 is a flowchart of processing in the operation planning section, and FIG. 3 is a flowchart of processing in the control calculation section.
FIG. 4 is a flowchart of processing in the demand change estimation section. 1... Demand amount forecast value, 2... Operation planning department, 3...
Target flow rate for passing through the gate, 4... Channel status (water level/flow rate)
, 5...Facility conditions, 6...Control calculation section, 7...Gate opening degree, 8...Gate passing flow rate, 9...Gate upper/downstream water level. 10... Demand change estimation unit, 11... Demand estimation amount, 1
2Z1 Figure Z Figure 3 Figure 4
Claims (1)
段の開水路において、運用計画をたてる第1のステップ
と、制御演算をおこなう第2のステップと、需要変化を
推定する第3のステップとにより複数のゲートを同時に
制御することを特徴とする開水路の制御方式。 2、上記第1のステップは、水路内の貯留量を水理演算
により求め、需要変化前後の貯留量の差をあらかじめゲ
ート流量に上乗せする演算をおこなうことを特徴とする
第1項の開水路の制御方式。 3、上記第2のステップは、需要変化後の定常流況を非
定常不等流(不定流)演算を用いて求め、この水理状況
をもとに各ゲートの開度を計算することを特徴とする第
1項の開水路の制御方式。 4、上記第3のステップは、予測値と実需要量の差を常
時監視し異常時には、制御演算部へゲート開度修正を要
求し、計算機による簡易不定流計算を用い実需要量を推
定することを特徴とする第1項の開水路の制御方式。[Claims] 1. A first step of formulating an operation plan, a second step of performing control calculations, and a second step of estimating demand changes in a single-stage or multi-stage open channel separated by check gates. A control method for an open channel characterized by controlling a plurality of gates simultaneously by the step of step 3. 2. The open channel of item 1, wherein the first step is to calculate the storage amount in the waterway by hydraulic calculation, and perform a calculation to add the difference in the storage amount before and after the demand change to the gate flow rate in advance. control method. 3. The second step above is to find the steady flow condition after the demand change using unsteady non-uniform flow (unsteady flow) calculation, and calculate the opening degree of each gate based on this hydraulic condition. The first feature is the open channel control method. 4. The third step is to constantly monitor the difference between the predicted value and the actual demand, and in the event of an abnormality, request the control calculation unit to correct the gate opening, and estimate the actual demand using a simple unsteady flow calculation by a computer. 1. The open channel control method according to item 1, characterized in that:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14750884A JPS6128108A (en) | 1984-07-18 | 1984-07-18 | Control system of open waterway |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14750884A JPS6128108A (en) | 1984-07-18 | 1984-07-18 | Control system of open waterway |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPS6128108A true JPS6128108A (en) | 1986-02-07 |
Family
ID=15431943
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP14750884A Pending JPS6128108A (en) | 1984-07-18 | 1984-07-18 | Control system of open waterway |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6128108A (en) |
-
1984
- 1984-07-18 JP JP14750884A patent/JPS6128108A/en active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPS5816205B2 (en) | Dam control method | |
| JPH03195398A (en) | Control unit for hydraulic power station | |
| CN115930110A (en) | A valve control method and related device | |
| RU2047887C1 (en) | Proportional integral-differential regulator | |
| JPH052768B2 (en) | ||
| JP3015456B2 (en) | Dam inflow calculator | |
| CN118778714B (en) | Ammonia water flow regulating method, ammonia water flow regulating equipment, server and storage medium | |
| SU1656496A1 (en) | Two-way channel control | |
| JPH06173236A (en) | Dam discharge monitoring control method and dam discharge facility control system | |
| JP2620248B2 (en) | PID control device | |
| JPH06117888A (en) | Weir discharge calculation method | |
| JPS5968415A (en) | Controller for gate of irrigation channel | |
| JP3018767B2 (en) | Water level adjustment device | |
| SU1278808A1 (en) | Adaptive control system of check process | |
| JPS5952316A (en) | Flow rate control system | |
| JP2574779B2 (en) | Water level control device for feed water heater | |
| JPS6220005A (en) | Feedback controller | |
| JPS59108103A (en) | Controlling system of flow rate | |
| JPS6224804B2 (en) | ||
| JPS63101905A (en) | Operation monitor and control equipment for filter plant | |
| CN121274236A (en) | Heat value accurate control system for multi-fuel mixed combustion | |
| JP2574576B2 (en) | Dam gate control device | |
| JPS61235914A (en) | Gate control method | |
| CN118170012A (en) | A first-order active disturbance rejection control method and system based on improved Smith predictor | |
| JPS58153051A (en) | Method of controlling refrigerator |