Method for manufacturing beams for pouring wall concrete from beam slits

Info

Publication number
JPS6172156A
JPS6172156A JP19436884A JP19436884A JPS6172156A JP S6172156 A JPS6172156 A JP S6172156A JP 19436884 A JP19436884 A JP 19436884A JP 19436884 A JP19436884 A JP 19436884A JP S6172156 A JPS6172156 A JP S6172156A
Authority
JP
Japan
Prior art keywords
formwork
regular intervals
concrete
wall concrete
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP19436884A
Other languages
Japanese (ja)
Inventor
福沢 六朗
辰彦 加藤
川瀬 和夫
徳永 優
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP19436884A priority Critical patent/JPS6172156A/en
Publication of JPS6172156A publication Critical patent/JPS6172156A/en
Pending legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 工場にて製作し、現場にて梁を組みその下部に壁体を現
場打ちしていたものであるが、この場合は第7図に示す
ように梁囚の下部に壁体用の屋枠但)を枠組みし、型枠
■の上端部を開口してその開口部に斜状にコンクリート
打設用兼盟枠用の補助型枠板(Oを取り付け、この補助
型枠板(Oの開口部よりコンクリートを打設し壁体■)
を形成するものである。
[Detailed Description of the Invention] This was manufactured in a factory, and a beam was assembled on site and a wall was cast on the bottom of the beam, but in this case, as shown in Figure 7, a Frame the roof frame for the wall (however), open the upper end of the formwork ■, attach an auxiliary formwork plate (O) diagonally to the opening for the concrete pouring frame, and insert this auxiliary formwork plate (O) into the opening. Frame board (wall by pouring concrete from the opening of O)
It forms the

このため補助型枠板ρの内側の余分な=/りIJ−) 
@ (斜線部分〕をハック、仕上加工しなげればならな
い等の欠点を有していたものである。
Therefore, the extra inside of the auxiliary formwork plate ρ =/IJ-)
It had drawbacks such as the need to hack and finish the (hatched area).

そして現在はスリットを有する梁を工場くてている。Currently, beams with slits are being manufactured at the factory.

しかしながらスリット付きの梁の製造に当つ部水平筋を
垂直に上方に起立させてコンクリートを打設して梁を形
成し養生後スリット用屋枠を曲折して配筋する等の工法
を取っていたものを曲折するlY4が大変である等の欠
点を有しているものである。
However, when manufacturing beams with slits, a construction method is used in which horizontal reinforcement is raised vertically upwards, concrete is poured to form the beam, and after curing, the slit frame is bent and reinforcement is placed. This method has drawbacks such as the fact that it is difficult to bend the objects.

本願はこれ等の欠点に鑑み発明したものであって、今そ
の実施例を説明すれば、上部を開放上下を開放した長方
形のリブラス筒状枠(5)を一定間隔毎に下部型枠(3
)上に配列した後リブラス筒状枠(5)と外型枠(1)
間にコンクリート(6)ヲ打設して成るものである。
The present application was invented in view of these shortcomings, and to explain its embodiment now, a rectangular librus cylindrical frame (5) with an open top and a bottom is spaced at regular intervals into a lower formwork (3
) After arranging on top of the librus cylindrical frame (5) and outer formwork (1)
This is made by pouring concrete (6) in between.

コンクリート(6)を打設するとリブラスの小孔からコ
ンクリートが少しはみ出すようになるがリブラスはこの
ま一理め殺しとするので差支えなく、コンクリート(6
)と壁体コンクリートとより一層強固に一体にする。必
要があるときは、あである。
When concrete (6) is poured, the concrete will protrude a little from the small hole of Ribras, but since Ribras is used for this purpose, there is no problem.
) and the wall concrete more firmly. When it's necessary, I'm there.

従って前記のように製造した梁(8)(第3図参照)を
柱間に組んだ後、梁(8)の下部に壁型枠(9)を枠組
みし、スリット(2)よりコンクリートαlを打設して
成るものである。
Therefore, after installing the beam (8) manufactured as described above (see Figure 3) between the columns, a wall formwork (9) is framed at the bottom of the beam (8), and concrete αl is poured through the slit (2). It is made by pouring.

本願は叙上のように上部を開放した梁用外聾枠の底枠板
上に抜き孔用の低く且つ抜き孔巾と間中の下部型枠を長
手方向に一定長さのものを隔毎に起立させると共に、上
下を開放した長方形のリブラス筒状枠を一定間隔毎に下
部型枠上に配列した後、リブラス筒状枠の外側と外型枠
の内側間にコンクリートを打設して成ることをにて組み
合せて形成することができる等の特徴を有するものであ
る。
As mentioned above, on the bottom frame plate of the external deaf frame for beams with the upper part open, a lower formwork for a punching hole is formed at intervals of a constant length in the longitudinal direction, and the lower formwork is located between the width of the punching hole and the width of the punching hole. The rectangular Libras cylindrical frames with open top and bottom are arranged at regular intervals on the lower formwork, and then concrete is poured between the outside of the Libras cylindrical frame and the inside of the outer form. It has the characteristics that it can be formed by combining various things.

【図面の簡単な説明】 第1図は梁施工の断面図、第2図はリブラス筒状枠の斜
視図、第3図は完成した梁の斜視図、第4図は同平面図
、第5図は同側面図、第6図は壁施工の断面図、第7図
は従来工法の断面図である。
[Brief explanation of the drawings] Fig. 1 is a cross-sectional view of the beam construction, Fig. 2 is a perspective view of the librus cylindrical frame, Fig. 3 is a perspective view of the completed beam, Fig. 4 is the same plan view, and Fig. 5 is a perspective view of the completed beam. The figure is a side view of the same, FIG. 6 is a sectional view of wall construction, and FIG. 7 is a sectional view of the conventional construction method.

Claims (1)

【特許請求の範囲】[Claims] (1)上部を開放した梁用外型枠の底枠板上に抜き孔用
の低く且つ抜き孔巾と同巾の下部型枠を長手方向に一定
長さのものを一定間隔毎或は長手方向全長にわたつて設
け、下部型枠上に長方形に形成した梁主筋を一定間隔毎
に起立させると共に、上下を開放した長方形のリブラス
筒状枠を一定間隔毎に下部型枠上に配列した後、リブラ
ス筒状枠の外側と外型枠の内側間にコンクリートを打設
して成ることを特徴とする梁スリットから壁コンクリー
トを打設するための梁の製造方法。
(1) On the bottom frame plate of the outer formwork for beams with the upper part open, a lower formwork for punching holes that is low and has the same width as the punched hole width is installed at regular intervals in the longitudinal direction or at regular intervals along the length. After the beam main reinforcements, which are provided over the entire length of the direction and are formed in a rectangular shape on the lower formwork, are erected at regular intervals, and the rectangular librus cylindrical frames with the top and bottom open are arranged at regular intervals on the lower formwork. A method for manufacturing a beam for pouring wall concrete from a beam slit, characterized by pouring concrete between the outside of a librus cylindrical frame and the inside of an outer formwork.
JP19436884A 1984-09-17 1984-09-17 Method for manufacturing beams for pouring wall concrete from beam slits Pending JPS6172156A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19436884A JPS6172156A (en) 1984-09-17 1984-09-17 Method for manufacturing beams for pouring wall concrete from beam slits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19436884A JPS6172156A (en) 1984-09-17 1984-09-17 Method for manufacturing beams for pouring wall concrete from beam slits

Publications (1)

Publication Number Publication Date
JPS6172156A true JPS6172156A (en) 1986-04-14

Family

ID=16323422

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19436884A Pending JPS6172156A (en) 1984-09-17 1984-09-17 Method for manufacturing beams for pouring wall concrete from beam slits

Country Status (1)

Country Link
JP (1) JPS6172156A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02144915U (en) * 1989-05-11 1990-12-10
JPH0331621U (en) * 1989-08-04 1991-03-27

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5934357A (en) * 1982-08-17 1984-02-24 フジタ工業株式会社 Precast concrete beam and production thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5934357A (en) * 1982-08-17 1984-02-24 フジタ工業株式会社 Precast concrete beam and production thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02144915U (en) * 1989-05-11 1990-12-10
JPH0331621U (en) * 1989-08-04 1991-03-27

Similar Documents

Publication Publication Date Title
US4700523A (en) Reinforcing frame work for constructing reinforced concrete structure
JPS6172156A (en) Method for manufacturing beams for pouring wall concrete from beam slits
JP3179738B2 (en) Basic structure of building
JPH0215952Y2 (en)
JPS6268946A (en) Beam construction method
JP2512327Y2 (en) Concrete formwork for underground beams
JPS6014008U (en) concrete exterior wall
JPS59121048U (en) Precast concrete foundation blocks for concrete frame structures such as parallel retaining walls
JPS59177445A (en) Semi-pc slab construction method and semi-pc panel used therein
JP2002256654A (en) Reinforcing bar holding frame and method of installing rebar using the rebar holding frame
JPS60482U (en) Drenfrium
JPS62211459A (en) Construction of inclined body
JP2025070410A (en) Concrete structure construction method
JPH047237Y2 (en)
JPH0437114Y2 (en)
JPS6127538B2 (en)
JPH01271526A (en) Construction method for foundation
JPS625476Y2 (en)
JPH0219451Y2 (en)
JPS5847124Y2 (en) Fixed structure of portable buildings
JPS61151358A (en) Stifener
JPH04309621A (en) Basement with dry area
JPS62107138A (en) Hollow slab construction method
JPS63167853A (en) Structure of insulation part of slit shear wall and its construction method
JPH05311675A (en) Beam bottom member for foundation beam and foundation beam construction method