JPS6233040Y2 - - Google Patents
Info
- Publication number
- JPS6233040Y2 JPS6233040Y2 JP1982189463U JP18946382U JPS6233040Y2 JP S6233040 Y2 JPS6233040 Y2 JP S6233040Y2 JP 1982189463 U JP1982189463 U JP 1982189463U JP 18946382 U JP18946382 U JP 18946382U JP S6233040 Y2 JPS6233040 Y2 JP S6233040Y2
- Authority
- JP
- Japan
- Prior art keywords
- bobbin
- twisting machine
- wire twisting
- storage area
- lifting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Ropes Or Cables (AREA)
- Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
Description
【考案の詳細な説明】
本考案は、チユーブラ撚線機のボビン着脱装置
に関するものである。[Detailed Description of the Invention] The present invention relates to a bobbin attachment/detachment device for a tubular wire twisting machine.
従来のチユーブラ撚線機のボビン着脱装置を第
1図および第2図を参照して説明する。第1図は
正面説明図、第2図は側面説明図である。1はチ
ユーブラ撚線機4の長手方向と直交方向にチユー
ブラ撚線機1内に装着されている空ボビン、2は
床面上に置かれている満巻ボビン、3は支柱、7
はホイスト等の昇降装置、8は昇降装置7の支持
部材である。昇降装置7は支持部材8の長手方向
に移動自在に取付けられており、また、支柱3は
回動自在に植立されていることにより、昇降装置
7はチユーブラ撚線機4のいずれの上部にも位置
できるようになつている。 A conventional tubular wire twisting machine bobbin attachment/detachment device will be described with reference to FIGS. 1 and 2. FIG. 1 is an explanatory front view, and FIG. 2 is an explanatory side view. 1 is an empty bobbin installed in the tubular wire twisting machine 1 in a direction perpendicular to the longitudinal direction of the tubular wire twisting machine 4; 2 is a full bobbin placed on the floor; 3 is a support; 7
8 is a lifting device such as a hoist, and 8 is a support member for the lifting device 7. The lifting device 7 is attached so as to be movable in the longitudinal direction of the support member 8, and the support 3 is rotatably installed, so that the lifting device 7 can be attached to any upper part of the tubular wire twisting machine 4. It is now possible to locate
ボビン交換作業の場合は、支持部材8を回動さ
せることにより昇降装置7を所定位置まで移動
し、昇降装置7を下げてチユーブラ撚線機4内の
空ボビン1を吊上げ、再び支持部材8を回動して
床面上に取外す。続いて満巻ボビン2を昇降装置
7により吊上げ、チユーブラ撚線機7上部へ移動
し、空ボビン1を外した後へ装着する。この時点
で、1個のボビンの交換が完了し、同様にして複
数個のボビン交換作業を行う。 In the case of bobbin replacement work, move the lifting device 7 to a predetermined position by rotating the supporting member 8, lower the lifting device 7 to lift the empty bobbin 1 in the tubular wire twisting machine 4, and then turn the supporting member 8 again. Rotate and remove onto the floor. Subsequently, the fully wound bobbin 2 is lifted up by the lifting device 7, moved to the upper part of the tubular wire twisting machine 7, and installed after removing the empty bobbin 1. At this point, one bobbin has been replaced, and a plurality of bobbins are replaced in the same manner.
このように、1個ずつ排出、装着を行うために
ボビン交換作業に長時間を要し、撚線作業の能率
向上を阻害している。 In this way, bobbin replacement requires a long time because bobbins are ejected and installed one by one, which impedes improvement in the efficiency of the wire stranding work.
本考案は、上記の状況に鑑みなされたもので、
ボビン交換作業を短縮できる撚線機のボビン着脱
装置の提供を目的とするものである。 This idea was created in view of the above situation.
The object of the present invention is to provide a bobbin attachment/detachment device for a wire twisting machine that can shorten bobbin replacement work.
本考案のボビン着脱装置は、チユーブラ撚線機
に装着された空ボビンを吊上げてボビン置場まで
移動すると共にボビン置場から満巻ボビンを吊上
げてチユーブラ撚線機まで移動して装着する昇降
装置と、チユーブラ撚線機の長手方向のほぼ中心
軸線位置上に配置されたレールと、上記昇降装置
が長手方向に所定間隔をおいて複数個吊下げら
れ、上記レールに走行自在に装着されてチユーブ
ラ撚線機とボビン置場間を往復移動するボビン吊
用ビームとからなることを特徴とするものであ
る。 The bobbin attachment/detachment device of the present invention includes a lifting device that lifts an empty bobbin attached to a tubular wire twisting machine and moves it to a bobbin storage area, and also lifts a full bobbin from the bobbin storage area and moves it to the tubular twisting machine and attaches it. A tubular stranded wire is produced by installing a rail disposed approximately on the center axis in the longitudinal direction of the tubular stranding machine, and a plurality of the above-mentioned lifting devices being suspended at predetermined intervals in the longitudinal direction, and mounted on the rail so as to be freely movable. It is characterized by consisting of a bobbin suspension beam that moves back and forth between the machine and the bobbin storage area.
以下、本考案の撚線機のボビン着脱装置の一実
施例を第3図および第4図を参照して説明する。
第3図は正面説明図、第4図は側面説明図であ
り、第1図および第2図の従来例と同一部品には
同一番号を付してある。 Hereinafter, an embodiment of the bobbin attaching/detaching device for a wire twisting machine according to the present invention will be described with reference to FIGS. 3 and 4.
FIG. 3 is an explanatory front view, and FIG. 4 is an explanatory side view, and the same parts as in the conventional example shown in FIGS. 1 and 2 are given the same numbers.
5はレールで、チユーブラ撚線機4の長手方向
の中心軸線の上部位置に支柱9および横梁10を
介して支持され、さらに満巻ボビン2、空ボビン
1が保管されているボビン置場11まで延長され
ている。6はボビン吊用ビームであり、レール5
に摺動自在に吊下げられると共に、空ボビン1お
よび満巻ボビン2を吊下げる例えばホイストなど
からなる昇降装置7を備えている。本実施例で
は、チユーブラ撚線機4に取付けられるボビン数
が6個であり、このボビン装置位置に合つた間隔
でもつて昇降装置7は空ボビン1用6個と満巻ボ
ビン2用6個とが交互に合わせて12個取付けられ
ている。 Reference numeral 5 denotes a rail, which is supported at an upper position of the central axis in the longitudinal direction of the tubular wire twisting machine 4 via a support 9 and a cross beam 10, and further extends to a bobbin storage area 11 where full bobbins 2 and empty bobbins 1 are stored. has been done. 6 is a bobbin hanging beam, and rail 5
A lifting device 7, such as a hoist, for suspending the empty bobbin 1 and the fully wound bobbin 2 is provided. In this embodiment, the number of bobbins attached to the tubular wire twisting machine 4 is 6, and the lifting device 7 has 6 bobbins for the empty bobbin 1 and 6 for the fully wound bobbin 2, even at intervals that match the position of the bobbin device. 12 pieces are installed alternately.
ボビン交換に際しては、ボビン吊用ビーム6を
摺動してボビン置場11上部へ移動した後、昇降
装置7の1個おきに満巻ボビン2を吊上げてチユ
ーブラ撚線機4上に移動する。1個おきの空の昇
降装置7によりチユーブラ撚線機4内の空ボビン
1を吊上げてチユーブラ撚線機4内のボビン装着
位置を空にした後満巻ボビン2をそれぞれ降下さ
せて装着する。全部の満巻ボビン2の装着が終つ
たら、ボビン吊用ビーム6をボビン置場11まで
移動し、空ボビン1を取外して交換作業が完了す
る。 When replacing the bobbin, the bobbin lifting beam 6 is slid to move to the upper part of the bobbin storage place 11, and then every other fully wound bobbin 2 is lifted up by the lifting device 7 and moved onto the tubular wire twisting machine 4. After every other empty bobbin 1 is lifted up in the tubular wire twisting machine 4 to empty the bobbin mounting position in the tubular wire twisting machine 4, each fully wound bobbin 2 is lowered and mounted. When all the fully wound bobbins 2 have been installed, the bobbin hanging beam 6 is moved to the bobbin storage area 11, and the empty bobbin 1 is removed to complete the replacement work.
このように、複数個のボビンの交換を行うの
に、従来のように1個の空ボビンを取外した後に
1個の満巻ボビンを取付けるのではなく、チユー
ブラ撚線機上に複数個の満巻ボビンを用意してお
き、空ボビンを取外した後に満巻ボビンを装着
し、これをこれを繰り返して行うようにするの
で、ボビン交換時間を従来の1/3以下に著しく短
縮することができ、撚線機の能率を大幅に向上で
きる。 In this way, when replacing multiple bobbins, instead of removing one empty bobbin and installing one full bobbin as in the conventional method, multiple full bobbins are replaced on the tubular twisting machine. By preparing a winding bobbin, removing an empty bobbin, installing a full winding bobbin, and repeating this process, the bobbin replacement time can be significantly reduced to less than 1/3 of the conventional time. , the efficiency of the wire twisting machine can be greatly improved.
なお、ボビン吊用ビームは本実施例では撚線機
の長さと同じにしたので、細長いスペースを必要
とするが、スペースに制限があるときはビーム長
を短縮してボビンの吊上げ個数を少なくしてもよ
い。 In addition, in this example, the bobbin suspension beam was made to be the same length as the wire twisting machine, so it requires a long and narrow space. However, if space is limited, the beam length can be shortened to reduce the number of bobbins to be suspended. You can.
以上記述した如く、本考案の撚線機のボビン着
脱装置は、ボビン交換時間を短縮し、撚線機の能
率を著しく向上できる効果を有するものである。 As described above, the bobbin attaching/detaching device for a wire twisting machine of the present invention has the effect of shortening the bobbin replacement time and significantly improving the efficiency of the wire twisting machine.
第1図は従来のボビン交換装置の正面説明図、
第2図は従来のボビン交換装置の側面説明図、第
3図は本考案の一実施例の正面説明図、第4図は
本考案の一実施例の側面説明図である。
1:空ボビン、2:満巻ボビン、4:チユーブ
ラ撚線機、5:レール、6:ボビン吊用ビーム、
7:昇降装置、11:ボビン置場。
Figure 1 is a front explanatory view of a conventional bobbin exchange device.
FIG. 2 is a side view of a conventional bobbin changing device, FIG. 3 is a front view of an embodiment of the present invention, and FIG. 4 is a side view of an embodiment of the present invention. 1: empty bobbin, 2: full bobbin, 4: tubular stranding machine, 5: rail, 6: bobbin hanging beam,
7: Lifting device, 11: Bobbin storage.
Claims (1)
げてボビン置場まで移動すると共にボビン置場か
ら満巻ボビンを吊上げてチユーブラ撚線機まで移
動して装着する昇降装置と、チユーブラ撚線機の
長手方向のほぼ中心軸線位置上に配置されたレー
ルと、上記昇降装置が長手方向に所定間隔をおい
て複数個吊下げられ、上記レールに走行自在に装
着されてチユーブラ撚線機とボビン置場間を往復
移動するボビン吊用ビームとからなることを特徴
とする撚線機のボビン着脱装置。 A lifting device that lifts an empty bobbin attached to the Tubular wire twisting machine and moves it to the bobbin storage area, and a lifting device that lifts a full bobbin from the bobbin storage area and moves it to the Tubular wire twisting machine and installs it, and A rail placed approximately on the central axis position and a plurality of the above-mentioned lifting devices are suspended at predetermined intervals in the longitudinal direction, and are mounted on the rail so as to be freely movable and move back and forth between the tubular wire twisting machine and the bobbin storage area. A bobbin attaching/detaching device for a wire twisting machine, comprising a bobbin hanging beam.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP18946382U JPS5995194U (en) | 1982-12-15 | 1982-12-15 | Bobbin attachment/detachment device for wire twisting machine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP18946382U JPS5995194U (en) | 1982-12-15 | 1982-12-15 | Bobbin attachment/detachment device for wire twisting machine |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5995194U JPS5995194U (en) | 1984-06-28 |
| JPS6233040Y2 true JPS6233040Y2 (en) | 1987-08-24 |
Family
ID=30408477
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP18946382U Granted JPS5995194U (en) | 1982-12-15 | 1982-12-15 | Bobbin attachment/detachment device for wire twisting machine |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5995194U (en) |
-
1982
- 1982-12-15 JP JP18946382U patent/JPS5995194U/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5995194U (en) | 1984-06-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH02225280A (en) | Assemblying method of elevator and its assembled elevator | |
| JPS6233040Y2 (en) | ||
| JPH07288954A (en) | Method and device for disassembling and assembling stator windings of rotating electric machine | |
| JPS6214159Y2 (en) | ||
| CN216549328U (en) | General type electrodynamic type has suspension core device of on-load switch | |
| CN215287463U (en) | Inverted automatic disc-changing wire-rewinding machine | |
| CN219469242U (en) | Stainless steel cable pay-off rack | |
| CN212785109U (en) | Magnetic pole iron core soaks dries by fire and uses subassembly | |
| CN219296818U (en) | Vertical pay-off of high strength sinle silk | |
| US2575785A (en) | Wire handling apparatus | |
| JP2000045526A (en) | How to build a roof frame | |
| CN214101150U (en) | A V-shaped multi-layer multi-axis enameled wire winding and pay-off rack | |
| JP3254136B2 (en) | Heavy lifting equipment | |
| JP2839970B2 (en) | Elevator main cable replacement method | |
| CN210724511U (en) | Special frock is transported to motor stator | |
| JPH10263695A (en) | Tension reel or payoff reel sleeve supply device and its supply method | |
| CN115783704B (en) | A device for online upright positioning and placement of welding wire shafts | |
| CN219838933U (en) | Cable reel rack | |
| CN220519923U (en) | Steel construction hoist device | |
| CN214828028U (en) | A coil discharger | |
| JPH11349258A (en) | Construction elevator and method of extending construction elevator up and down stroke | |
| CN213484726U (en) | Double-layer hanging basket for vacuum continuous dip coating and drying of motor stator core with winding | |
| CN217171913U (en) | Old and useless train part storage rack | |
| CN111824934B (en) | A lifting tool for assisting power cable reel to transfer cables | |
| JP5410322B2 (en) | Structure building method and structure building jig used therefor |