JPS628399B2 - - Google Patents

Info

Publication number
JPS628399B2
JPS628399B2 JP54009589A JP958979A JPS628399B2 JP S628399 B2 JPS628399 B2 JP S628399B2 JP 54009589 A JP54009589 A JP 54009589A JP 958979 A JP958979 A JP 958979A JP S628399 B2 JPS628399 B2 JP S628399B2
Authority
JP
Japan
Prior art keywords
crane
tower
assembly
legs
climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP54009589A
Other languages
Japanese (ja)
Other versions
JPS55101592A (en
Inventor
Akira Oochi
Shigeto Matsumoto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
Ishikawajima Harima Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ishikawajima Harima Heavy Industries Co Ltd filed Critical Ishikawajima Harima Heavy Industries Co Ltd
Priority to JP958979A priority Critical patent/JPS55101592A/en
Publication of JPS55101592A publication Critical patent/JPS55101592A/en
Publication of JPS628399B2 publication Critical patent/JPS628399B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
  • Jib Cranes (AREA)

Description

【発明の詳細な説明】 最近、都市部における電力需要は増加の一途を
たどり、各地で大規模な発電、送電計画が進めら
れている。送電に必要な送電鉄塔も送電のパワー
アツプにともない年々大形化し、同時に送電ルー
トも環境問題などにより人里から離れた山岳地へ
移さざるを得なくなつてきている。鉄塔の大形化
や作業環境の悪化にともない、鉄塔建設工事に対
して高能率機械導入による省力化が急務となり、
本格的なクライミングクレーン採用計画が進めら
れている現状にある。クライミングクレーンは従
来のジンポール、デリツク式クレーンなどに比
べ、性能、安全性では格段にすぐれているが、道
路事情、設置条件の悪い山岳地設置の場合には運
搬、クレーンの据付、組立、撤去の面で制約条件
が多く採用が皆無に近い状態であつた。それ故従
来山岳地に於て使用される送電鉄塔組立用揚重装
置としては第1図〜に示す「ジンポール」と
第2図に示す「デリツク式タワークレーン」が代
表的なものであつた。
[Detailed Description of the Invention] Recently, the demand for electric power in urban areas has been increasing steadily, and large-scale power generation and transmission plans are being advanced in various places. The power transmission towers necessary for power transmission are becoming larger year by year as the power of power transmission increases, and at the same time, power transmission routes are being forced to move to mountainous areas far from human settlements due to environmental issues and other factors. As steel towers become larger and the working environment worsens, there is an urgent need to save labor by introducing high-efficiency machinery for steel tower construction work.
Plans to adopt full-scale climbing cranes are currently underway. Climbing cranes are far superior in performance and safety compared to conventional gin-pole and derrick-type cranes, but when installed in mountainous areas where road conditions and installation conditions are poor, transportation, crane installation, assembly, and removal may be difficult. There were many restrictions in terms of the technology, and there was almost no adoption. Therefore, typical lifting devices for assembling power transmission towers used in mountainous areas have been the ``gin pole'' shown in Figures 1 to 2 and the ``derrick type tower crane'' shown in Figure 2.

「ジンポール」方式は第1図に示すようにジ
ンポールaを地上に置き一端を固定アンカーbに
て固定し、つぎにウインチcを用いて引き起し揚
重装置とする。第1図,に示すように鉄塔
d1,d2を一定高さまで組立てた後に第1図に示
すように鉄塔を利用してジンポールaをワイヤロ
ープにて上方に盛り替え、つぎの揚重作業を行
う。以降は同様な方法で鉄塔の組立進度に応じて
順次ジンポールを盛り替えながら揚重作業を行
う。
As shown in Fig. 1, the "gin pole" method places a gin pole a on the ground, fixes one end with a fixed anchor b, and then raises it using a winch c to form a lifting device. As shown in Figure 1, the steel tower
After assembling d 1 and d 2 to a certain height, gin pole a is moved upwards using a wire rope using a steel tower as shown in Figure 1, and the next lifting operation is performed. From then on, the lifting work will be carried out in the same way, changing the gin poles one by one according to the progress of the tower assembly.

「デリツク式タワークレーン」は第2図のよう
に中心タワーaの両側にジブbを取付け、下部に
ガイドタワーcを配している。またガイドタワー
cには高さ約10mおきに鉄塔dから支線eにて控
えをとつている。鉄塔の組立進度に従つてガイド
タワーcを利用し、順次中心タワーaを上方にせ
り上げて揚重作業を行うものである。
As shown in Figure 2, the ``derrick type tower crane'' has jibs b attached to both sides of a central tower a, and a guide tower c arranged at the bottom. In addition, guide tower c has a branch line e from steel tower d at intervals of about 10 meters in height. According to the progress of assembling the steel tower, the guide tower c is used to successively raise the center tower a upward to carry out lifting work.

これらの方式のうち、前者は装置も簡単であ
り、設備費も安いが、反面ジンポールの取扱及び
揚重作業に熟練を要し、かつ、作業性、安全性の
面で問題があり、さらにジンポールの盛り替え作
業に要する手間がわずらわしく、時間もかかるな
どの欠点があつた。後者は前述の問題点を相当改
善したものであるが、デリツク式のため、旋回作
業範囲に制約があるなど作業性に難点があつた。
また、山岳地設置の場合には中心タワー、両側の
ガイドタワーの下端をそれぞれ同一水平レベルに
置く必要があるため、地山を相当広範囲にわたつ
て掘削するかあるいはコンクリートなどを用いて
水平基礎を構築するなどの方法を講じる必要があ
り、それに要する手間、費用が大掛りであつた。
また、最近では環境保護の面から、地山の掘削、
樹木の伐採などに対しての規制が一段と厳しくな
り、該クレーンの山岳地への設置が困難になつて
きている現状にある。
Of these methods, the former has simple equipment and low equipment costs, but on the other hand, it requires skill in handling and lifting the gin pole, and has problems in terms of workability and safety. There were disadvantages such as the troublesome and time-consuming work required to replenish the plates. The latter was a considerable improvement over the above-mentioned problems, but because it was a derrick type, there were difficulties in workability, such as restrictions on the swinging work range.
In addition, when installing in a mountainous area, it is necessary to place the center tower and the lower ends of the guide towers on both sides at the same horizontal level, so it is necessary to excavate a fairly wide area of ground or build a horizontal foundation using concrete. It was necessary to take measures such as constructing a new one, which required a large amount of effort and expense.
In recent years, from the perspective of environmental protection, geological excavation,
Regulations regarding felling of trees, etc. are becoming more and more strict, and it is becoming increasingly difficult to install such cranes in mountainous areas.

このほか、トラツククレーンによる方法もある
が100m以上の高さの鉄塔組立および山岳地に対
しての使用は不可能であり、鉄塔組立用機械とし
ては一般的でない。
Another method is to use a truck crane, but it cannot be used for assembling steel towers over 100 meters in height or in mountainous areas, and is not a commonly used machine for assembling steel towers.

本発明は主に山岳地などの不特定傾斜地におけ
るクライミングクレーンの使用を可能ならしめる
鉄塔の構築方法及び該構築用クライミングクレー
ン装置に関するもので、鉄塔構築場所の中心に、
鉄塔脚の内側におさまる広さの上平面を有し、部
材置場、作業台を兼ねる組立ユニツトをその上平
面が水平になる様支持した後組立ユニツトに簡易
クレーンを設けて、該簡易クレーンにより組立ユ
ニツト上鉄塔構築場所中心にクライミングクレー
ンを組立て、更に該クライミングクレーンにより
鉄塔を構築する鉄塔構築方法、及び鉄塔脚の内側
におさまる広さのクレーン設置平面をフレーム枠
及び台板で成形せしめ、該フレーム枠を前記平面
に垂直且つ下方に延びる所要数の伸縮固定可能な
脚で支持せしめ、前記クレーン設置平面周辺部に
簡易クレーンを設けると共にクレーン設置平面中
心部にクライミングクレーンを設けた鉄塔構築用
クライミングクレーン装置に係るものである。
The present invention mainly relates to a method for constructing a steel tower that enables the use of a climbing crane on unspecified sloped areas such as mountainous areas, and a climbing crane device for the construction.
After supporting the assembly unit, which has an upper plane large enough to fit inside the tower legs and serves as a parts storage area and a workbench so that the upper plane is horizontal, a simple crane is installed on the assembly unit, and assembly is carried out using the simple crane. A method for constructing a steel tower in which a climbing crane is assembled at the center of the tower construction site, and the tower is constructed using the climbing crane; A climbing crane for constructing a steel tower, in which a frame is supported by a required number of extendable and fixable legs extending perpendicularly and downward to the plane, a simple crane is provided around the crane installation plane, and a climbing crane is provided at the center of the crane installation plane. It is related to the device.

以下図面に基づき本発明の実施例を説明する。
第3図は全体図を示し、第4図〜は組立ユニ
ツトを示す。主フレーム1及び横桁2によつて形
成されるフレーム枠20は主フレーム1に垂直下
方に延びる様設けられた伸縮装置26を有する伸
縮且つ固定可能な脚3a,3b,3cで支持され
る。フレーム枠20には機器据付台21をフレー
ム枠20の一辺に接続させ設けてあり、該据付台
21に着脱可能に小形発電装置5、組立用ウイン
チ6、頂部にシーブ22を有するサポートフレー
ム7、折畳み自在のジンポール或は該ジンポール
と同等の荷役機能を有する簡易クレーン12を配
設し、又フレーム枠20の他方の一辺には補助組
立台8を着脱可能に接合する。該補助組立台8は
伸縮装置(図示せず)を有し伸縮且つ固定可能な
脚3dで支持され、昇降タラツプ10を備えてい
る。さらに、フレーム枠20及び補助組立台8の
上面には台板9、周囲には安全手摺11が配設さ
れる。前記脚3a,3b,3c,3dとあらかじ
め設置してある基礎台4a,4b,4c,4dと
は脚3a,3b,3c,3dが基礎台4a,4
b,4c,4dに立設する様相互の位置を定めて
いる。以上の如き構成の他にクレーン架台13、
マスト昇降用ガイドフレーム14等が配置された
組立ユニツト23、補助組立台8は建設される鉄
塔脚17a,17bの内側、鉄塔脚17a,17
bで囲まれた空間に設置される。
Embodiments of the present invention will be described below based on the drawings.
FIG. 3 shows the overall view, and FIGS. 4-4 show the assembled unit. A frame 20 formed by the main frame 1 and the cross beams 2 is supported by extendable and fixable legs 3a, 3b, and 3c having extendable devices 26 provided on the main frame 1 so as to extend vertically downward. The frame frame 20 is provided with an equipment installation stand 21 connected to one side of the frame frame 20, and is detachably attached to the installation stand 21, including a small power generator 5, an assembly winch 6, a support frame 7 having a sheave 22 on the top, A foldable gin pole or a simple crane 12 having the same cargo handling function as the gin pole is provided, and an auxiliary assembly stand 8 is removably connected to the other side of the frame 20. The auxiliary assembly table 8 has a telescopic device (not shown), is supported by telescopic and fixable legs 3d, and is equipped with a lifting ramp 10. Further, a base plate 9 is provided on the upper surface of the frame frame 20 and the auxiliary assembly table 8, and a safety handrail 11 is provided around the periphery. The legs 3a, 3b, 3c, 3d and the pre-installed foundations 4a, 4b, 4c, 4d are the same as the legs 3a, 3b, 3c, 3d.
The mutual positions are determined so that they are erected at points b, 4c, and 4d. In addition to the above configuration, the crane mount 13,
The assembly unit 23 in which the mast elevating guide frame 14, etc. are arranged, and the auxiliary assembly stand 8 are located inside the tower legs 17a, 17b to be constructed.
It is installed in the space surrounded by b.

ここで組立ユニツトの各構成に関する作用につ
いて述べる。
Here, the functions of each structure of the assembly unit will be described.

第4図およびに示す基礎台4a,4b,4
c,4dは脚3a,3b,3c,3dにかかる組
立ユニツト23、補助組立台8およびクレーン荷
重を支え、かつ地盤に伝達する作用を有し、ま
た、脚3a,3b,3c,3dは地盤の形状に合
わせ、脚3a,3b,3c,3dの長さ寸法を伸
縮および固定し得る構造であり、脚付属の伸縮装
置26を調整することによつて組立ユニツト上面
の水平レベルを保つことが可能である。
Foundations 4a, 4b, 4 shown in Figure 4 and
The legs 3a, 3b, 3c, 3d have the function of supporting the assembly unit 23, the auxiliary assembly table 8, and the crane load applied to the legs 3a, 3b, 3c, and 3d, and transmitting it to the ground. It has a structure in which the length dimensions of the legs 3a, 3b, 3c, and 3d can be expanded/contracted and fixed according to the shape of the unit, and the horizontal level of the top surface of the assembled unit can be maintained by adjusting the expansion/contraction device 26 attached to the legs. It is possible.

つぎに、主フレーム1および横桁2はクレーン
および組立用各機材の荷重を支え、かつ、脚3
a,3b,3c,3dに伝達し、さらにクレーン
組立時においては作業台として使用するものであ
る。また、該フレーム1に付属している小形発電
装置5はクレーンの組立に必要な動力電源を供給
するもので、該装置5により、組立用ウインチ6
を駆動して、ジンポール12の起伏動作および吊
荷の巻上動作を行う。また、サポートフレーム7
はジンポール12の引き起しおよび支えを行うも
のである。
Next, the main frame 1 and the crossbeam 2 support the load of the crane and each assembly equipment, and the legs 3
a, 3b, 3c, and 3d, and is further used as a workbench when assembling the crane. In addition, a small power generator 5 attached to the frame 1 supplies power necessary for assembling the crane.
is driven to perform the raising and lowering operation of the gin pole 12 and the hoisting operation of the suspended load. In addition, support frame 7
is for raising and supporting the gin pole 12.

つぎに、補助組立台8および台板9はクレーン
各部材の荷おろし場や仮置場となり、かつ、組立
時は作業台として使用するものである。
Next, the auxiliary assembly table 8 and the base plate 9 serve as an unloading area and a temporary storage area for each member of the crane, and are also used as a work table during assembly.

また、昇降タラツプ10は作業員の昇降用とし
て、安全手摺11は作業員の墜落防止用として、
それぞれ設けたものである。
In addition, the elevator ramp 10 is used for lifting and lowering workers, and the safety handrail 11 is used to prevent workers from falling.
They are set up respectively.

つぎに、第4図,に示すジンポール12は
ジブクレーンにおけるジブに相当するものであ
り、また仮固定材27はジンポール12の一時的
な固定を行う装置である。
Next, the gin pole 12 shown in FIG. 4 corresponds to a jib in a jib crane, and the temporary fixing member 27 is a device for temporarily fixing the gin pole 12.

クライミングクレーン装置更に鉄塔の構築手順
について述べる。
This section describes the climbing crane equipment and the construction procedure for the steel tower.

クライミングクレーン設置場所に第4図に
示す簡単な基礎台4a,4b,4c,4dを設
けておく。
Simple foundations 4a, 4b, 4c, and 4d shown in FIG. 4 are provided at the location where the climbing crane is installed.

第4図に示す組立ユニツト23を所定の基
地から、ヘリコプターあるいは索道などの運搬
手段により目的地まで運び、前記基礎台4a,
4b,4c,4d上に置き、脚3a,3b,3
c,3dの伸縮などの調整を行い組立ユニツト
23上面を水平に保つ。つぎに、アンカーボル
トなどにより地盤に固定する。
The assembly unit 23 shown in FIG. 4 is transported from a predetermined base to a destination by means of transportation such as a helicopter or a cableway, and the foundation 4a,
4b, 4c, 4d, legs 3a, 3b, 3
The upper surface of the assembled unit 23 is kept horizontal by adjusting the expansion and contraction of the parts c and 3d. Next, secure it to the ground using anchor bolts, etc.

尚、脚3a,3b,3c,3dの長さ寸法は
事前に各基礎面高さに合わせて、おおまかな調
整をしておけば、現地では微調整だけですみ簡
単である。
It should be noted that if the length dimensions of the legs 3a, 3b, 3c, and 3d are roughly adjusted in advance according to the height of each foundation surface, only minor adjustments are required on site.

第4図に示す、小形発電装置5、組立用ウ
インチ6および第4図に示すサポートフレー
ム7を前記ユニツト23のそれぞれ所定の位置
に配設する。
The small power generator 5 shown in FIG. 4, the assembly winch 6, and the support frame 7 shown in FIG. 4 are arranged at predetermined positions of the unit 23, respectively.

第4図に示す補助組立台8、台板9、昇降
タラツプ10および安全手摺11をそれぞれ前
記ユニツト23の所定の位置に配設する。
An auxiliary assembly table 8, a base plate 9, a lifting ramp 10, and a safety handrail 11 shown in FIG. 4 are arranged at predetermined positions of the unit 23, respectively.

第4図に示すジンポール12を台板9上面
に置き根元部をピン18にて固定した後にワイ
ヤロープ19を所定の方法で掛け渡し、組立用
ウインチ6を用いて第4図,に示すように
ジンポール12の引き起しを行う。つぎに仮固
定装置27を用いてジンポール12を仮固定
し、折りたたんであるジンポール12の先端部
を第4図に示すように伸ばして1本形にす
る。
After placing the gin pole 12 shown in FIG. 4 on the upper surface of the base plate 9 and fixing the base part with the pin 18, the wire rope 19 is stretched in a predetermined manner, and the assembly winch 6 is used to assemble the gin pole 12 as shown in FIG. 4. Raise the gin pole 12. Next, the gin pole 12 is temporarily fixed using the temporary fixing device 27, and the tip of the folded gin pole 12 is stretched out into a single shape as shown in FIG.

以上で組立ユニツト23が完成したことにな
る。
With the above steps, the assembly unit 23 is completed.

つぎに、クレーン各部材の運搬、荷おろし、
仮置きを行う。まず、第4図に示すクレーン
架台13をジンポール12、サポートフレーム
7、組立用ウインチ6を用いて所定の位置に揚
重、配設し、アンカーボルトなどの手段を用い
て組立ユニツト23に固定する。つぎに第4図
に示す昇降ガイドフレーム14,15をクレ
ーン架台13と同様な据付方法により、クレー
ン架台13の上に配設固定する。
Next, we will transport and unload the various parts of the crane.
Perform temporary storage. First, the crane mount 13 shown in FIG. 4 is lifted and placed in a predetermined position using the gin pole 12, the support frame 7, and the assembly winch 6, and then fixed to the assembly unit 23 using means such as anchor bolts. . Next, the lifting guide frames 14 and 15 shown in FIG. 4 are installed and fixed on the crane pedestal 13 using the same installation method as the crane pedestal 13.

以降は第3図に示すクレーンマスト16をは
じめクレーン各部材を所定の組立順序で配設建
立しクレーンを完成させる。
Thereafter, each crane member including the crane mast 16 shown in FIG. 3 is arranged and erected in a predetermined assembly order to complete the crane.

尚、本クレーン28はクライミング式であ
り、最初から第3図のような状態に組立てる必
要はない。即ち初回のクレーン組立はジンポー
ル12の機能範囲内で十分に組立でき、その後
クレーン付属のクライミング装置を用いて、マ
ストをクレーン自身で順次追加して第3図の状
態にすればよい。
Incidentally, this crane 28 is a climbing type, and there is no need to assemble it in the state shown in FIG. 3 from the beginning. That is, the initial crane assembly can be fully assembled within the functional range of the gin pole 12, and then the masts can be added one by one by the crane itself using the climbing device attached to the crane to achieve the state shown in FIG. 3.

鉄塔構築作業に於いて、小物の組立、溶接作
業等が伴うが、斯かる作業は作業ユニツト上で
行い、該作業ユニツト上で必要な揚重作業はジ
ンポールで行う。鉄塔構築作業自体の揚重作業
はクライミングクレーンにより行い、鉄塔構築
作業の進捗に併せてクライミングクレーン自体
マストを追加する。
Steel tower construction work involves assembly of small items, welding work, etc., but such work is performed on a work unit, and the necessary lifting work on the work unit is performed using a gin pole. Lifting work for the tower construction work itself will be carried out by a climbing crane, and masts will be added to the climbing crane itself as the tower construction work progresses.

クレーン28および組立ユニツト23の撤去
は、原理的には組立の逆を行う。但し建設した
鉄塔の内部に位置する様クレーンおよび組立ユ
ニツトを設置した場合には完成した鉄塔を利用
してクレーンおよび組立ユニツト23の揚重作
業や横持ち作業を行い鉄塔部材の所定の隙間か
らクレーンおよび組立ユニツト23の搬出を行
い、その後、鉄塔外部からヘリコプターあるい
は索道などの運搬手段を用いて運搬、撤去すれ
ばよい。
Removal of the crane 28 and assembly unit 23 is, in principle, performed in the reverse order of assembly. However, if the crane and assembly unit 23 are installed inside the constructed steel tower, the completed steel tower will be used to lift and hold the crane and assembly unit 23 horizontally, and the crane will be removed from the specified gap between the tower members. Then, the assembled unit 23 is carried out, and then transported and removed from the outside of the tower using a transport means such as a helicopter or a cableway.

尚上記クレーンの設置に関し問題となる、ク
レーンの運搬についてはヘリコプター、索道な
どの運搬手段を大形化し対応するか、あるいは
クレーンのブロツク分割の検討を行うことによ
り十分に解決可能である。
Incidentally, the transportation of the crane, which is a problem related to the above-mentioned installation of the crane, can be satisfactorily solved by increasing the size of the transportation means such as a helicopter or cableway, or by considering dividing the crane into blocks.

尚以上述べた実施例に於て小形発電装置5、組
立用ウインチ6、サポートフレーム7等を組立ユ
ニツト23に対して別取付形式にしたが運搬上の
制約がなければ予め該ユニツト23に1体式に組
込でおくほうが効果的であり、又ジンポール12
を折り曲げ式でなく最初から1本形にしておいて
もよく、更に組立ユニツトを支持する脚を5本、
補助組立台を支持する脚を2本としたが脚本数は
設置条件等により適宜増減可能であり、又補助台
は現場によつては不要な場合もあり必ずしも設け
る必要はない。
In the embodiments described above, the small power generator 5, the assembly winch 6, the support frame 7, etc. are attached separately to the assembly unit 23, but if there are no transportation restrictions, they can be attached to the unit 23 in advance. It is more effective to incorporate it into the ginpole 12
It is also possible to have a single shape from the beginning instead of a foldable type, and furthermore, there are five legs to support the assembled unit.
Although two legs are used to support the auxiliary assembly stand, the number of legs can be increased or decreased as appropriate depending on the installation conditions, and the auxiliary stand may not be necessary depending on the site, so it is not necessarily necessary to provide it.

次に前記組立ユニツトの他の例について述べ
る。
Next, another example of the assembly unit will be described.

(1) 第5図に示すように脚3a,3b,3c,3
dを継ぎ足し式にして、その一部にジヤツキ2
4を設ける方法あるいは地盤条件によつてはコ
ンクリートなどの基礎の代わりに爪25a,2
5b,25c,25dとしてもよい。
(1) As shown in Figure 5, legs 3a, 3b, 3c, 3
d is added and part of it is jacked 2.
4 or depending on the ground conditions, nails 25a, 2 may be used instead of a foundation such as concrete.
It may also be 5b, 25c, or 25d.

(2) つぎに第6図に示す脚3a,3b,3c,3
dを長くして、周囲の樹木29の頂部より、さ
らに高い位置に組立ユニツトのフレーム1を設
ける方法もある。本方式を採用すれば樹木29
の伐採量を減少できるなどの長所を有する。
(2) Next, legs 3a, 3b, 3c, 3 shown in Figure 6
There is also a method of increasing d and installing the frame 1 of the assembly unit at a higher position than the tops of the surrounding trees 29. If this method is adopted, 29 trees
It has the advantage of reducing the amount of felling.

(3) 又、上記実施例のいずれも脚の基礎台4a,
4b,4c,4dをユニツト23配設前に別途
に設けておく方法を採用しているが第5図に示
す爪25a,25b,25c,25dあるいは
トラツククレーンなどに使用されているアウト
リガーを複数固組立ユニツト23に装着し、該
ユニツト23をヘリコプターなどによつて投下
した後に該ユニツト23に内蔵した掘削装置に
よつて穴を掘り、コンクリートを充填してクレ
ーンあるいは該ユニツトの基礎を後から構築す
ることも可能である。
(3) Also, in any of the above embodiments, the leg base 4a,
4b, 4c, and 4d are separately provided before installing the unit 23, but it is also possible to fix multiple claws 25a, 25b, 25c, and 25d shown in Fig. 5 or outriggers used in truck cranes, etc. After the unit 23 is attached to the assembly unit 23 and dropped by a helicopter or the like, a hole is dug using a drilling device built into the unit 23, and concrete is filled to construct a crane or the foundation of the unit later. It is also possible.

以上述べた如く本発明によれば以下の優れた効
果を発揮する。
As described above, the present invention exhibits the following excellent effects.

(i) 本方法は組立ユニツトを使用しクライミング
クレーンを組立てるので主に山岳地における鉄
塔組立の揚重装置として本格的クライミングク
レーンの導入を可能ならしめ、鉄塔組立作業、
安全性の向上及び工期の大幅な短縮が期待でき
る。
(i) Since this method uses an assembly unit to assemble a climbing crane, it is possible to introduce a full-scale climbing crane as a lifting device for assembling steel towers mainly in mountainous areas, and it can be used for tower assembly work.
It is expected to improve safety and significantly shorten the construction period.

(ii) 組立ユニツトの脚を伸縮固定自在にしたこと
により、1台のユニツトを平地あるいは山岳地
で広範囲に使用できる。そのため転用汎用性、
経済性を向上させることができる。また、クレ
ーン設置に必要な基礎を小形化でき、同時に地
山掘削面積や樹木伐採面積を減少できる。
(ii) By making the legs of the assembled unit expandable and fixed, one unit can be used over a wide range of flat areas or mountainous areas. Therefore, it has versatility for diversion,
Economical efficiency can be improved. In addition, the foundation required for installing the crane can be downsized, and at the same time, the area of earth excavation and tree felling can be reduced.

(iii) 小形発電装置、組立用ウインチ、サポートフ
レームおよびジンポールなどのクレーン組立用
機材を組立ユニツトに配設したことにより、鉄
塔構築場所の条件に関係なく、組立作業の標準
化が可能となり、同時に組立用機材の段取りの
手間を不要とし、あるいは減少させ、鉄塔組立
工程の大幅な短縮を可能にしたこと。
(iii) By arranging crane assembly equipment such as a small power generator, an assembly winch, a support frame, and a gin pole in an assembly unit, it is possible to standardize the assembly work regardless of the conditions of the tower construction site, and it is possible to assemble the tower at the same time. This eliminates or reduces the hassle of setting up equipment and equipment, making it possible to significantly shorten the tower assembly process.

また、作業の標準化にともない、鉄塔構築作
業に対して熟練者を不要とし、かつ、作業性、
安全性を向上させ得る。
In addition, with the standardization of work, skilled workers are not required for tower construction work, and work efficiency is improved.
Safety can be improved.

(iv) 補助組立台や台板を組立ユニツトに着脱自在
に装着したことにより、クレーン部材の荷おろ
し台や仮置場として多目的に使用でき得る。そ
のため、別の荷おろし台や仮置場を設ける必要
がないので地山掘削や樹木伐採面積を減少で
き、それに要する手間、費用を軽減でき、か
つ、環境破壊防止の効果が大きい。また、地形
に関係なく、常に台板上面を水平に保つことが
できるため作業足場として理想的であり、さら
に昇降タラツプ、安全手摺の効果的な配設によ
つて作業性、安全性の向上を期待できる。
(iv) By removably attaching the auxiliary assembly table and base plate to the assembly unit, it can be used for multiple purposes as an unloading table or temporary storage area for crane components. Therefore, there is no need to provide a separate unloading platform or temporary storage area, so the area required for earth excavation and tree felling can be reduced, the effort and cost required for this can be reduced, and the effect of preventing environmental destruction is significant. In addition, the top surface of the base plate can always be kept horizontal regardless of the terrain, making it ideal for use as a work scaffold.Furthermore, the effective arrangement of lifting ramps and safety handrails improves work efficiency and safety. You can expect it.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図〜及び第2図は従来の説明図、第3
図は本発明の実施例の全体を示す側面図、第4図
は本発明の1部をなす組立ユニツトの斜視図、
第4図〜は本発明の組立順序を示す説明図、
第5図および第6図は本発明の他の実施例を示す
側面図である。 1は主フレーム、2は横桁、3a,3b,3
c,3dは脚、4a,4b,4c,4dは基礎
台、8は補助組立台、9は台板、12はジンポー
ル、23は組立ユニツトを示す。
Figures 1 to 2 are conventional illustrations;
The figure is a side view showing the entire embodiment of the present invention, FIG. 4 is a perspective view of an assembly unit forming a part of the present invention,
FIGS. 4 to 4 are explanatory diagrams showing the assembly order of the present invention,
FIGS. 5 and 6 are side views showing other embodiments of the present invention. 1 is the main frame, 2 is the crossbeam, 3a, 3b, 3
3c and 3d are legs, 4a, 4b, 4c, and 4d are base stands, 8 is an auxiliary assembly stand, 9 is a base plate, 12 is a gin pole, and 23 is an assembly unit.

Claims (1)

【特許請求の範囲】 1 鉄塔構築場所の中心に、鉄塔脚の内側におさ
まる広さの上平面を有し、部材置場、作業台を兼
ねる組立ユニツトをその上平面が水平になる様支
持した後組立ユニツトに簡易クレーンを設けて、
該簡易クレーンにより組立ユニツト上鉄塔構築場
所中心にクライミングクレーンを組立て、更に該
クライミングクレーンにより鉄塔を構築すること
を特徴とする鉄塔構築方法。 2 鉄塔脚の内側におさまる広さのクレーン設置
平面をフレーム枠及び台板で成形せしめ、該フレ
ーム枠を前記平面に垂直且つ下方に延びる所要数
の伸縮固定可能な脚で支持せしめ、前記クレーン
設置平面周辺部に簡易クレーンを設けると共にク
レーン設置平面中心部にクライミングクレーン設
けたことを特徴とする鉄塔構築用クライミングク
レーン装置。
[Scope of Claims] 1. At the center of the tower construction site, there is an upper plane large enough to fit inside the tower legs, and after supporting an assembly unit that also serves as a parts storage area and a workbench so that the upper plane is horizontal. A simple crane is installed in the assembly unit,
A method for constructing a steel tower, comprising assembling a climbing crane at the center of the tower construction site on the assembly unit using the simple crane, and further constructing the steel tower using the climbing crane. 2. A crane installation plane with a width that fits inside the tower legs is formed by a frame frame and a base plate, and the frame frame is supported by a required number of extendable and fixable legs extending perpendicularly and downward to the plane, and the crane installation A climbing crane device for constructing a steel tower, characterized in that a simple crane is provided at the periphery of the plane, and a climbing crane is provided at the center of the plane where the crane is installed.
JP958979A 1979-01-29 1979-01-29 Method of assembling climbing crane and unit for climbing crane assembly Granted JPS55101592A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP958979A JPS55101592A (en) 1979-01-29 1979-01-29 Method of assembling climbing crane and unit for climbing crane assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP958979A JPS55101592A (en) 1979-01-29 1979-01-29 Method of assembling climbing crane and unit for climbing crane assembly

Publications (2)

Publication Number Publication Date
JPS55101592A JPS55101592A (en) 1980-08-02
JPS628399B2 true JPS628399B2 (en) 1987-02-23

Family

ID=11724505

Family Applications (1)

Application Number Title Priority Date Filing Date
JP958979A Granted JPS55101592A (en) 1979-01-29 1979-01-29 Method of assembling climbing crane and unit for climbing crane assembly

Country Status (1)

Country Link
JP (1) JPS55101592A (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6042132B2 (en) * 1976-03-31 1985-09-20 住友重機械工業株式会社 Portable cargo handling equipment
JPS549860A (en) * 1977-06-25 1979-01-25 Shimizu Construction Co Ltd Tower crane

Also Published As

Publication number Publication date
JPS55101592A (en) 1980-08-02

Similar Documents

Publication Publication Date Title
CN102213033B (en) Construction method of wind turbine hybrid tower
US8584801B2 (en) Self-climbing hoist, deck and scaffold platform system
US4134237A (en) Modular section mast
WO2007136241A1 (en) A portable mobile communication tower
JP3732414B2 (en) Method and apparatus for constructing tower structure
WO2023126974A1 (en) Portable footing based telecom tower
US3127996A (en) Climbing cranes
JP2002356297A (en) Steel tower construction crane and steel tower construction method using the crane
JP3905103B2 (en) Tower-like building erection method and erection device
JP2579715B2 (en) External tower crane
JP3822084B2 (en) Construction lifting system for high-rise buildings
JPS628399B2 (en)
JPH08120936A (en) Construction method of high-rise building structure and its construction equipment
JP3765102B2 (en) Construction method on slopes
JPH028106B2 (en)
JP4785013B2 (en) Tower crane and floor climbing system
JPH06101348A (en) How to build a tower
JP2704446B2 (en) Lift-up method using temporary columns
RU2768534C1 (en) Method of mounting a permanent quick-erect lightweight support for emergency recovery works on power transmission lines
CN223422266U (en) A lifting vessel for steel sheet piles
US20250003390A1 (en) Wind turbine lifting rig
RU2758014C2 (en) Crane, method for assembling crane and method for disassembling crane
JP2024011580A (en) How to build a tower structure
JP7158304B2 (en) Transport system and installation method
JP2737047B2 (en) Deep foundation pile foundation construction device and construction method of deep foundation pile foundation