JPS6329802Y2 - - Google Patents

Info

Publication number
JPS6329802Y2
JPS6329802Y2 JP8494683U JP8494683U JPS6329802Y2 JP S6329802 Y2 JPS6329802 Y2 JP S6329802Y2 JP 8494683 U JP8494683 U JP 8494683U JP 8494683 U JP8494683 U JP 8494683U JP S6329802 Y2 JPS6329802 Y2 JP S6329802Y2
Authority
JP
Japan
Prior art keywords
concrete pole
plate
bottom plate
concrete
pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP8494683U
Other languages
Japanese (ja)
Other versions
JPS59190841U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP8494683U priority Critical patent/JPS59190841U/en
Publication of JPS59190841U publication Critical patent/JPS59190841U/en
Application granted granted Critical
Publication of JPS6329802Y2 publication Critical patent/JPS6329802Y2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 この考案は、コンクリートポールの建柱装置に
関するものであり、特に、従来、電柱等を上下に
分割し、その分割部位に設けた夫々の接続金具を
ボルトにて結合して、分割せられた上下電柱を結
合させるようにしたコンクリートポールの建柱装
置の改良に関するものである。
[Detailed description of the invention] [Field of industrial application] This invention relates to a concrete pole erection device. This invention relates to an improvement in a concrete pole erection device that connects divided upper and lower utility poles by connecting metal fittings with bolts.

〔従来の技術及び考案が解決しようとする問題
点〕 従来、此種のもので特に電柱を上下に分割し、
この分割部位に夫々接続金具を取付け、そして、
夫々の接続金具を接合し該周縁部をボルト・ナツ
トにて締結して、双方の接続金具を介して前記上
下に分割せられた電柱を結合したものが、登録実
用新案第26282号公報に記載せられている。而し
て、該公報に記載せられている前記のものは、上
下分割せられた電柱の夫々の分割部位の接続金具
の周縁部近傍にボルト穴を一致せしめて開穿し、
而も、これらの上下の接続金具の上記ボルト締付
部位は上下の電柱の側方に大きく突設して設けら
れており、従つて外物に下慮引掛して該接合部を
破壊する等の憂がある。而して、周知の如く、近
年はプレストレストコンクリート柱体が製作せら
れているが、このプレストレストコンクリート柱
体を製作するに当つては、型枠内に挿入した鉄筋
篭の両端部に取付けてある端板に緊張プレートを
ボルトを介して結合し、そして該緊張プレートを
引張装置に結合して緊張し、両端板間のPC鋼材
を緊張し、然る後、コンクリートを該型枠内に注
入し乍ら遠心締固めて製作する方法が用いられて
いる。
[Problems to be solved by conventional techniques and ideas] Conventionally, in this type of equipment, the utility pole was divided into upper and lower parts.
Attach the connecting fittings to each of these divided parts, and
Registered Utility Model No. 26282 describes a system in which the vertically divided utility poles are connected via both connecting fittings by joining the respective connecting fittings and fastening the peripheral parts with bolts and nuts. I am forced to do so. Accordingly, in the above-mentioned method described in the publication, bolt holes are aligned and drilled near the periphery of the connecting fittings of the respective divided parts of the utility pole divided into the upper and lower parts,
However, the above-mentioned bolt tightening parts of these upper and lower connection fittings are provided so as to protrude greatly from the sides of the upper and lower utility poles, so there is a possibility that they may get caught on foreign objects and destroy the joints. There is a feeling of sadness. Therefore, as is well known, in recent years prestressed concrete columns have been manufactured, and when manufacturing these prestressed concrete columns, they are attached to both ends of a reinforcing bar cage inserted into the formwork. A tensioning plate is connected to the end plate through bolts, and the tensioning plate is connected to a tensioning device and tensioned to tension the PC steel material between both end plates, and then concrete is poured into the formwork. However, a manufacturing method using centrifugal compaction is used.

而して、前記端板間はPC鋼材が介装され、そ
して該PC鋼材を緊張するために端板を緊張プレ
ートに結合し、更に該緊張プレートを引張装置に
結合していた。このとき、端板は前記緊張プレー
トからボルトを挿通し、そして、端板に設けたボ
ルト締付孔に該ボルトを締付けて両者を結合して
いた。そして、前記引張装置によつて緊張プレー
トを緊張し、PC鋼材を緊張せしめた後は前記の
通りコンクリートの遠心締固めを行うが、該操作
が終了したときには、前記緊張プレートは端板よ
り取外されるのである。従つて、該端板には前記
緊張プレートとの締結用のボルト締付孔が上面に
開孔した状態で残るのである。依つて、このボル
ト締付孔を利用して上下主体を結合するために解
決せらるべき技術的問題点が生じてくるのであ
る。
Thus, a prestressing steel material was interposed between the end plates, and in order to tension the prestressing steel material, the end plate was coupled to a tensioning plate, and the tensioning plate was further coupled to a tensioning device. At this time, a bolt was inserted through the tension plate into the end plate, and then the bolt was tightened into a bolt tightening hole provided in the end plate to connect the two. After the tension plate is tensioned by the tensioning device and the prestressing steel material is tensioned, the concrete is centrifugally compacted as described above, but when this operation is completed, the tension plate is removed from the end plate. It will be done. Therefore, a bolt tightening hole for fastening to the tension plate remains open in the upper surface of the end plate. Therefore, there are technical problems that must be solved in order to connect the upper and lower bodies using the bolt tightening holes.

〔問題点を解決するための手段〕[Means for solving problems]

この考案は、上記問題点に鑑み之を解決せんと
して提案せられたものであり、コンクリートポー
ルの下端部に、これより大径の底板が緊張鋼線と
共に一体的に設けられ、一方、地中に所定の深さ
に沈設されたプレストレストコンクリートパイル
の上端部の端板に前記コンクリートポールの底板
を載置して、該端板と底板とをボルトにて緊締し
て前記コンクリートポールとプレストレストコン
クリートパイルとを結合するようにしたコンクリ
ートポールの建柱装置に於て、前記コンクリート
ポールの下端部に設けた底板に開穿せらるべきボ
ルト挿通孔は該コンクリートポールの下部に結合
せられるプレストレストコンクリートパイルの遠
心締固め時に、前記端板を緊張用プレートにボル
トを介して結合する際、該端板に設けたボルト締
付孔に対峙して設けられたことを特徴とするコン
クリートポールの建柱装置を提供せんとするもの
である。
This idea was proposed in view of the above-mentioned problems, and a bottom plate with a larger diameter than this is integrally installed at the lower end of the concrete pole together with tensioned steel wire. The bottom plate of the concrete pole is placed on the end plate of the upper end of the prestressed concrete pile that has been sunk to a predetermined depth, and the end plate and the bottom plate are tightened with bolts to connect the concrete pole and the prestressed concrete pile. In the concrete pole erection device, the bolt insertion hole to be drilled in the bottom plate provided at the lower end of the concrete pole is connected to the prestressed concrete pile connected to the lower part of the concrete pole. A concrete pole erecting device is provided which is provided facing a bolt tightening hole provided in the end plate when the end plate is connected to the tensioning plate via bolts during centrifugal compaction. This is what we intend to provide.

〔作用〕[Effect]

この考案は、プレストレストコンクリートパイ
ルを遠心締固めによる製作が終了したときは、緊
張用プレートを端板より取外す。然るときは、該
端板には前記緊張プレートをボルト締めしたボル
ト締付孔が開放せられた状態で残つている。而し
て、先づ、該プレストレストコンクリートパイル
を地下に所定深さに沈設する。勿論、該プレスト
レストコンクリートパイルの上端部の端板は一体
となつて上端部に配設された状態となる。一方、
この端板と円周を等しくする底板をコンクリート
ポールの下端部に一体的に設けてあるが、この底
板には、前記端板のボルト締付孔と対峙する位置
にボルト挿通孔が設けられているので、前記底板
を下部の端板に載置して、該底板のボルト挿通孔
を端板のボルト締付孔に合致させてボルトにてコ
ンクリートポールとプレストレストコンクリート
パイルとを結合すれば、両者は強固に締着せられ
る。このとき、ボルトの締着部はプレストレスト
コンクリートパイル径の範囲内の上面に存在する
ので、他物が不慮引掛して該締着部を破壊させる
こともなくなり、且つ、端板と底板とをボルトに
て締着するために端板に別のボルト締付孔を設け
る必要もなくなり、極めて経済的となる。
In this invention, when the production of a prestressed concrete pile by centrifugal compaction is completed, the tension plate is removed from the end plate. In this case, the bolt tightening hole into which the tension plate is bolted remains open in the end plate. First, the prestressed concrete pile is sunk underground to a predetermined depth. Of course, the end plate at the upper end of the prestressed concrete pile is integrally disposed at the upper end. on the other hand,
A bottom plate having the same circumference as this end plate is integrally provided at the lower end of the concrete pole, and a bolt insertion hole is provided in this bottom plate at a position facing the bolt tightening hole of the end plate. Therefore, by placing the bottom plate on the lower end plate, aligning the bolt insertion holes of the bottom plate with the bolt tightening holes of the end plate, and connecting the concrete pole and prestressed concrete pile with bolts, both is firmly fastened. At this time, since the fastening part of the bolt exists on the upper surface within the range of the prestressed concrete pile diameter, there is no possibility that other objects will accidentally get caught and destroy the fastening part, and the end plate and the bottom plate are connected with the bolt. There is no need to provide a separate bolt tightening hole in the end plate for fastening, which is extremely economical.

〔実施例〕〔Example〕

以下、この考案の一実施例を別紙添附図面に従
つて説明する。尚、説明の都合上、従来公知に属
する構成も同時に説明する。図に於て、コンクリ
ートポール1の下端部にこのコンクリートポール
1よりも大径の底板2を遠心締固め造形にて一体
に設ける。而して、この底板2には遠心締固め時
に於てPC鋼線3,3…の端部に設けてある鋲頭
を係止せしめてある。又、該底板2には、プレス
トレストコンクリートパイル4の上端部の端板5
に設けてある複数のボルト締付孔6,6…と同一
のピツチにてボルト挿通孔7,7…が設けてあ
る。勿論、該端板5にはPC鋼線9,9…の鋲頭
が係止して緊張せられている。
An embodiment of this invention will be described below with reference to the accompanying drawings. For convenience of explanation, conventionally known configurations will also be explained at the same time. In the figure, a bottom plate 2 having a larger diameter than the concrete pole 1 is integrally provided at the lower end of a concrete pole 1 by centrifugal compaction modeling. The bottom plate 2 is fitted with rivet heads provided at the ends of the PC steel wires 3, 3, . . . during centrifugal compaction. The bottom plate 2 also includes an end plate 5 at the upper end of the prestressed concrete pile 4.
Bolt insertion holes 7, 7, . . . are provided at the same pitch as the plurality of bolt tightening holes 6, 6, . Of course, the rivet heads of the PC steel wires 9, 9, . . . are engaged with the end plate 5 and are tensioned.

而して、建込作業を行うには、先づプレストレ
ストコンクリートパイル4を所定の深さに沈設
し、そして、このプレストレストコンクリートパ
イル4の上端部の端板5の上面にコンクリートポ
ール1の下端部の底板2を載置し、更に、該底板
2のボルト挿通孔7,7…を下面のボルト締付孔
6,6…に合致させ、そして、上方より夫々ボル
ト8,8…を挿通し乍ら下部の端板5に設けた前
記ボルト締付孔6に締結すれば、前記コンクリー
トポール1をプレストレストコンクリートパイル
4の上面に結合して一体的に建柱することができ
るのである。
Therefore, in order to carry out the construction work, first, the prestressed concrete pile 4 is sunk to a predetermined depth, and then the lower end of the concrete pole 1 is placed on the upper surface of the end plate 5 at the upper end of the prestressed concrete pile 4. Further, the bolt insertion holes 7, 7... of the bottom plate 2 are aligned with the bolt tightening holes 6, 6... on the lower surface, and the bolts 8, 8... are inserted from above, respectively. By fastening the concrete pole 1 to the bolt tightening hole 6 provided in the lower end plate 5, the concrete pole 1 can be connected to the upper surface of the prestressed concrete pile 4 and erected integrally.

この考案の一実施例は叙述せる如き構成に係る
から、コンクリートポール1の下端部に設けた底
板2はPC鋼線3,3…を係止してコンクリート
と一体成形せられるが、該底板2にはプレストレ
ストコンクリートパイル4の上端の端板5の上面
に重ねられて該底板2のボルト挿通孔7,7…と
端板5のボルト締付孔6,6…とを一致せしめ、
そして一致した該孔6,7に夫々上面よりボルト
8,8…を挿入し乍ら締結するのであるから、建
込作業が極めて容易確実であり、且つ、底板2に
は螺子部を設けず単に、下部の端板5に設けたボ
ルト締付孔6,6…に一致する個所にボルト8,
8…の挿通孔7,7…のみを開穿するのであるか
ら、コンクリートポール1の製作も容易且つ低廉
であつて、ボルト8,8…にて結合した後も該締
付部が側方に突出しないので、締付部が不慮破壊
されることは全くなくなつて安全となるのであ
る。
Since one embodiment of this invention has the configuration described above, the bottom plate 2 provided at the lower end of the concrete pole 1 is integrally formed with the concrete by locking the PC steel wires 3, 3... is superimposed on the upper surface of the end plate 5 at the upper end of the prestressed concrete pile 4, so that the bolt insertion holes 7, 7... of the bottom plate 2 are aligned with the bolt tightening holes 6, 6... of the end plate 5,
Since the bolts 8, 8, etc. are inserted into the matching holes 6, 7 from the upper surface, respectively, and the bolts are fastened, the construction work is extremely easy and reliable. , bolts 8, 6, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8, 8,
Since only the insertion holes 7, 7... of 8... are drilled, the production of the concrete pole 1 is easy and inexpensive, and even after joining with the bolts 8, 8..., the tightening part does not move laterally. Since it does not protrude, there is no chance of the tightening part being accidentally destroyed, making it safer.

〔考案の効果〕[Effect of idea]

この考案は上述せる一実施例に詳述せる如く、
コンクリートポールを建柱する際、従来と同様に
上下に分割して建込可能であることは当然である
が、特に地中に埋設せらる柱体は遠心締固めにて
成形せられるプレストレストコンクリートパイル
を用い、そして、この端板に設けられ、且つ、
PC鋼線の緊張時に使用する緊張用プレートとの
結合時のボルト締付孔に合致する個所にコンクリ
ートポールの底板にボルト挿通孔を設けた為、下
部のプレストレストコンクリートパイルには上部
のコンクリートパイルを結合するための特別の連
接板を備える必要もなく、且つ又、該端板にはボ
ルト締結用の螺子部を特別に設ける必要もなくな
つたのである。
As detailed in one embodiment mentioned above, this invention
When constructing a concrete pole, it is natural that it can be divided into upper and lower parts as in the past, but in particular the column body buried underground is a prestressed concrete pile that is formed by centrifugal compaction. and is provided on this end plate, and
Bolt insertion holes are provided in the bottom plate of the concrete pole at locations that match the bolt tightening holes when connecting with the tensioning plate used when tensioning the PC steel wire, so the upper concrete pile is attached to the lower prestressed concrete pile. There is no need to provide a special connecting plate for connection, and there is also no need to provide a special screw portion for bolt fastening on the end plate.

而も、ボルトの締結部は、側方に突出しない
為、外物によつて破壊せられることがなく安全と
なり、而も、建込作業も容易確実であつてコスト
ダウンにも寄与する等、正に諸種の実用的価値の
ある考案である。
Moreover, since the bolt fastening part does not protrude laterally, it is safe because it will not be destroyed by foreign objects, and the construction work is easy and reliable, which also contributes to cost reduction. This is truly a device with various practical values.

【図面の簡単な説明】[Brief explanation of drawings]

図はこの考案の一実施例を示し、その建柱状態
における一部を切欠した要部縦断正面図である。 符号説明、1……コンクリートポール、2……
底板、3,9……PC鋼線、4……プレストレス
トコンクリートパイル、5……端板、6……ボル
ト締付孔、7……ボルト挿通孔、8……ボルト。
The figure shows an embodiment of this invention, and is a partially cutaway longitudinal sectional front view of the main part in the pillar erected state. Code explanation, 1... Concrete pole, 2...
Bottom plate, 3, 9...PC steel wire, 4...Prestressed concrete pile, 5...End plate, 6...Bolt tightening hole, 7...Bolt insertion hole, 8...Bolt.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] コンクリートポールの下端部に、これより大径
の底板が緊張鋼線と共に一体的に設けられ、一方
地中に所定の深さに沈設されたプレストレストコ
ンクリートパイルの上端部の端板に前記コンクリ
ートポールの底板を載置して、該端板と底板とを
ボルトにて緊締して前記コンクリートポールとプ
レストレストコンクリートパイルとを結合するよ
うにしたコンクリートポールの建柱装置に於て、
前記コンクリートポールの下端部に設けた底板に
開穿せらるべきボルト挿通孔は該コンクリートポ
ールの下部に結合せられるプレストレストコンク
リートパイルの遠心締固め時に、前記端板を緊張
用プレートにボルトを介して結合する際、該端板
に設けたボルト締付孔に対峙して設けられたこと
を特徴とするコンクリートポールの建柱装置。
A bottom plate with a larger diameter is integrally installed with the tension steel wire at the lower end of the concrete pole, while a bottom plate of the concrete pole is installed at the upper end of the prestressed concrete pile sunk to a predetermined depth in the ground. In a concrete pole erection device that connects the concrete pole and prestressed concrete pile by placing a bottom plate and tightening the end plate and the bottom plate with bolts,
Bolt insertion holes to be drilled in the bottom plate provided at the lower end of the concrete pole are used to connect the end plate to the tensioning plate via bolts during centrifugal compaction of the prestressed concrete pile to be connected to the lower part of the concrete pole. A concrete pole erection device, characterized in that the concrete pole is provided facing a bolt tightening hole provided in the end plate when the concrete pole is connected.
JP8494683U 1983-06-03 1983-06-03 Concrete pole erection equipment Granted JPS59190841U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8494683U JPS59190841U (en) 1983-06-03 1983-06-03 Concrete pole erection equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8494683U JPS59190841U (en) 1983-06-03 1983-06-03 Concrete pole erection equipment

Publications (2)

Publication Number Publication Date
JPS59190841U JPS59190841U (en) 1984-12-18
JPS6329802Y2 true JPS6329802Y2 (en) 1988-08-10

Family

ID=30214913

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8494683U Granted JPS59190841U (en) 1983-06-03 1983-06-03 Concrete pole erection equipment

Country Status (1)

Country Link
JP (1) JPS59190841U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008106508A (en) * 2006-10-25 2008-05-08 Nippon Concrete Ind Co Ltd Centrifugal reinforced concrete pile

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008013951A (en) * 2006-07-03 2008-01-24 Atlas Communication Co Ltd Split concrete pole

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008106508A (en) * 2006-10-25 2008-05-08 Nippon Concrete Ind Co Ltd Centrifugal reinforced concrete pile

Also Published As

Publication number Publication date
JPS59190841U (en) 1984-12-18

Similar Documents

Publication Publication Date Title
JPS6329802Y2 (en)
JP3384820B2 (en) Prefabricated bridge pier
KR200213564Y1 (en) Fabricated pier
JP3450272B2 (en) Retaining wall block
JPH046458Y2 (en)
JP3154035B2 (en) How to build reinforced concrete columns
JPS6122088B2 (en)
KR20140111798A (en) Footing for column and construction method thereof
KR100695491B1 (en) Binding holes, formwork structures for pre-assembled concrete structures and construction methods using them
JPH0232417B2 (en)
CN212716404U (en) Ladder stand device for overhead transmission line mountain area high outcrop foundation
JPS61233131A (en) Foundation structure of pole
KR100229166B1 (en) Head cover structure of steel pile
JPH05306524A (en) Steel-framed column base
JPH0637774B2 (en) Column base joining method
KR102893485B1 (en) Joint Structure Of Walls using anchor bolts
JPS6147381A (en) Method of constructing side wall in tank, etc. made of prestressed concrete
JPH0868113A (en) Joint structure of steel beam and reinforced concrete beam
JPH0634427Y2 (en) Device for connecting concrete columns and foundations
JPS5941224Y2 (en) median strip
JPS62133262A (en) Method of constructing "torii"
JPS61282526A (en) Method for connecting iron skeletal pillar and beam
JPH0476119A (en) Joining structure of block structure for constructing foundation
JPH0610403U (en) Steel reinforced concrete column base structure
JP2760247B2 (en) Hardware for building a ramen structure using wood