- JPS633086B2 JPS633086B2 JP58091125A JP9112583A JPS633086B2 JP S633086 B2 JPS633086 B2 JP S633086B2 JP 58091125 A JP58091125 A JP 58091125A JP 9112583 A JP9112583 A JP 9112583A JP S633086 B2 JPS633086 B2 JP S633086B2
- Authority
- JP
- Japan
- Prior art keywords
- slope
- waterproof sheet
- sheet
- watertight
- bituminous mixture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
- Processing Of Solid Wastes (AREA)
Description
【発明の詳細な説明】
本発明は貯水池又は産業廃棄物の廃棄処理場等
において地盤の不等沈下や湛水等のために外力が
働き、斜面と底面の接合部に亀裂が生じたり、接
合部のシートが破れる等して、該接合部から水漏
れすることを防止するようにした貯水池等を施工
するときの遮水工法である。DETAILED DESCRIPTION OF THE INVENTION The present invention is designed to prevent cracks from occurring at the joint between the slope and the bottom surface due to uneven ground subsidence, flooding, etc. in reservoirs or industrial waste disposal sites, etc. This is a water-blocking construction method used when constructing a reservoir or the like to prevent water from leaking from the joints due to, for example, tearing of the sheets at the joints.
貯水池等の遮水工法として従来は、土質材料が
主であり、つぎにコンクリート構造物であつた
が、良質な土質材料の入手がむづかしく、又は皆
無の状況である。コンクリート構造物の場合は経
年による地盤の不等沈下に追従しきれないため、
クラツクの発生はさけられず水漏れの遠因とな
る。近年従来の遮水工法に代つてアスフアルトフ
エイシング・ライニングによる瀝青質混合物締固
め工法が採用されてきた。また石油化学の発展は
各種合成ゴムや合成繊維を土木材料として市場に
出現させ、これ等を使用した合成ゴムシートやア
スフアルト含浸合成繊維シート等にて貯水池等の
内面を覆うことによる遮水シート工法及び貯水池
等の底面を瀝青質混合物締固め工法で行ない、斜
面はシート工法で行なうという瀝青質混合物締固
め工法とシート工法を組合せた工法等が施工され
ている。水密性の密粒度アスフアルトコンクリー
トを締固めて底面から斜面までを形成する瀝青質
混合物締固め工法は耐久性や基盤に対する順応性
等すぐれた面が多いが、斜面が急傾斜であると
か、斜面成形が困難な場合等には斜面成形が高コ
ストとなり、全体として工事費が嵩む欠点があ
る。又、シートにより貯水池成形面を覆うシート
工法は比較的低コストで施工することが可能であ
るがシートの強度、耐久性等において欠点があ
る。 Conventionally, the main method of impermeability construction for reservoirs and the like has been to use soil materials, followed by concrete structures, but it is difficult to obtain high-quality soil materials, or there are none at all. In the case of concrete structures, it is difficult to follow the uneven settling of the ground over time.
Occurrence of cracks cannot be avoided and becomes a cause of water leakage. In recent years, a bituminous mixture compaction method using asphalt facing and lining has been adopted as an alternative to the conventional impermeability method. Furthermore, with the development of petrochemistry, various synthetic rubbers and synthetic fibers have appeared on the market as civil engineering materials, and a water-blocking sheet construction method is used to cover the inner surfaces of reservoirs, etc. with synthetic rubber sheets or asphalt-impregnated synthetic fiber sheets using these materials. A combination of the bituminous mixture compaction method and the sheet method is used for construction, in which the bottom of reservoirs, etc. is constructed using the bituminous mixture compaction method, and the slopes are constructed using the sheet method. The bituminous mixture compaction method, in which watertight, dense-grained asphalt concrete is compacted to form a structure from the bottom to the slope, has many advantages such as durability and adaptability to the foundation. In cases where it is difficult to form slopes, forming the slope becomes expensive, which has the disadvantage of increasing the overall construction cost. Further, although the sheet construction method of covering the reservoir molding surface with a sheet can be constructed at relatively low cost, it has drawbacks in the strength, durability, etc. of the sheet.
一方瀝青質混合物締固め工法とシート工法を組
合わせた工法によると、傾斜面を遮水性のシート
で覆うシート工法で施工し、次に底面は瀝青質混
合物締固め工法によつて施工することにより、両
工法の特色を生かし比較的低コストで、しかも耐
久性のある貯水池等を構成することができるが貯
水量の変動や、地盤の不等沈下の際に発生する外
力によつて底面と斜面との接合部に亀裂が生じて
漏水したり、シートが破損し易い等の欠点は未だ
解決していない。 On the other hand, according to a construction method that combines the bituminous mixture compaction method and sheet construction method, the slope is covered with a water-blocking sheet using the sheet method, and then the bottom surface is constructed using the bituminous mixture compaction method. By taking advantage of the characteristics of both construction methods, it is possible to construct a relatively low-cost and durable reservoir, etc. However, due to fluctuations in the amount of water stored and external forces generated when the ground settles unevenly, the bottom and slopes may deteriorate. The drawbacks of water leakage due to cracks occurring at the joint with the sheet, and the sheet being easily damaged have not yet been resolved.
本発明は上記に鑑み、かかる貯水池等の遮水工
法として防水性のシートで覆われた斜面と、水密
性の瀝青質混合物を締固めて成形した底面により
構成される貯水池等において、該底面と斜面の接
する底面側に周縁に沿つてトレンチを穿削し、前
記防水性シートを斜面から連続して該トレンチの
内面を覆い、該防水性シートで覆われたトレンチ
内を下部は粒状材料にて、上部は柔軟なシール材
にて充填した防水性シートの伸縮調節部を設け、
シートに作用する引張力によりシートが破損して
漏水することを防止する遮水工法を提供せんとす
るものである。 In view of the above, the present invention provides a water-blocking construction method for reservoirs, etc., which consists of a slope covered with a waterproof sheet and a bottom formed by compacting a watertight bituminous mixture. A trench is drilled along the periphery on the bottom side where the slope contacts, the waterproof sheet is continuously covered from the slope to cover the inner surface of the trench, and the lower part of the trench covered with the waterproof sheet is made of granular material. , The upper part has an expansion/contraction adjustment section made of a waterproof sheet filled with a flexible sealing material.
It is an object of the present invention to provide a water-blocking method that prevents water from leaking due to damage to the sheet due to tensile force acting on the sheet.
以下本発明を実施例について図により説明す
る。 Hereinafter, the present invention will be explained with reference to embodiments.
第1図は防水性シートにアスフアルト含浸シー
トを使用した実施例で、1は地山を堀削して設け
られた貯水池である。該貯水池1の斜面2は地山
の斜面部3を前記の防水性シート4にて覆つて構
成されている。即ち防水性シート4の上端部は木
材等に捲付けたのちこれを地山の斜面部上部の土
中に埋め込んで固定し、一方下端部は貯水池等の
底部にある砕石基盤5の上面に敷かれ水密性アス
コン層7による底面6と砕石基盤5間に挾持され
ている。斜面2と加熱水密性アスコン層7の端面
間には柔軟性を有する特殊シール材9が常温で充
填され、その隙間を埋めると共にクツシヨン効果
をもたせる。特殊シール材としては有機高分子材
料と軟質アスフアルトとの混合物、例えばブテ
ン、ハイロードK(ブタヂエンゴム溶液)、非晶質
プロピレン等と軟質アスフアルトとの混合物が使
用される。更に水密性アスコン層7の上面全面に
わたつてマスチツクシールコート8を被覆して底
面6が形成される。11は底面6に設けられた防
水性シート4の伸縮調節部である。此の伸縮調節
部11は斜面2と底面6の接合部即ち底面6の周
縁部を穿削してトレンチ10を設け、該トレンチ
10に位置する前記防水性シート4によりトレン
チ10内面を覆わせ、トレンチ10内の下部には
砂等の充填材11′を充填し、底面6に作用する
外力で防水性シート4が引張られたとき等にトレ
ンチ10内の防水性シート4が引出され引張り応
力を緩和するようにしたものである。12は砕石
基盤5内に設けられたドレン排出用パイプであ
る。尤も防水性シート4にアスフアルト系シート
を用いるこの実施例にあつては素材の性質上該防
水性シートは引張り応力による劣化が少ないから
伸縮調節部11を省略することもできる。 FIG. 1 shows an example in which an asphalt-impregnated sheet is used as the waterproof sheet, and 1 is a reservoir built by excavating the ground. The slope 2 of the reservoir 1 is constructed by covering the slope 3 of the ground with the waterproof sheet 4 described above. That is, the upper end of the waterproof sheet 4 is wrapped around a piece of wood or the like and then embedded and fixed in the soil at the top of the slope of the ground, while the lower end is laid on the top surface of the crushed stone base 5 at the bottom of a reservoir, etc. It is sandwiched between a bottom surface 6 formed by a watertight ascon layer 7 and a crushed stone base 5. A flexible special sealing material 9 is filled at room temperature between the slope 2 and the end face of the heated watertight ascon layer 7 to fill the gap and provide a cushioning effect. As the special sealing material, a mixture of an organic polymeric material and soft asphalt is used, such as a mixture of butene, Hyroad K (butadiene rubber solution), amorphous propylene, etc., and soft asphalt. Furthermore, a mastic seal coat 8 is applied over the entire upper surface of the watertight ascon layer 7 to form a bottom surface 6. Reference numeral 11 denotes an expansion/contraction adjustment section of the waterproof sheet 4 provided on the bottom surface 6. This expansion/contraction adjustment part 11 is made by drilling the junction between the slope 2 and the bottom surface 6, that is, the peripheral edge of the bottom surface 6 to provide a trench 10, and covering the inner surface of the trench 10 with the waterproof sheet 4 located in the trench 10. The lower part of the trench 10 is filled with a filler 11' such as sand, so that when the waterproof sheet 4 is pulled by an external force acting on the bottom surface 6, the waterproof sheet 4 in the trench 10 is pulled out and the tensile stress is absorbed. This is meant to be relaxed. 12 is a drain discharge pipe provided within the crushed stone base 5. Of course, in this embodiment where an asphalt-based sheet is used as the waterproof sheet 4, the expansion/contraction adjustment section 11 can be omitted because the waterproof sheet is less susceptible to deterioration due to tensile stress due to the nature of the material.
第2図は防水性シートに合成ゴム系や塩化ビニ
ロン、ポリエチレン等の高分子系のシートを用い
た実施例であつて、前記の実施例の場合に比較し
て防水性シート4は加熱による劣化が大きく、例
えば合成ゴム系シート等の場合は100〜200℃に加
熱されると一部分解が起るため、防水性シート4
の下端が底面を形成する加熱水密性アスコン層7
下面に敷込まれる部分の基盤5′を砕石基盤5の
基盤面5aより一段低く形成しておき、該基盤
5′上に防水性のシート4の下端部を敷き、その
上に常温アスコン層7′を舗設して防水性シート
4を固定し、更に常温アスコン層7′の上に加熱
水密性アスコン層7を締固めて底面6を形成さ
せ、防水性シート4が直接に加熱水密性アスコン
層7と接触することを避け、防水性シート4が熱
により損傷することを防止するようにした実施例
である。 Figure 2 shows an example in which a synthetic rubber sheet, a polymer sheet such as vinylon chloride, or polyethylene is used as the waterproof sheet, and the waterproof sheet 4 deteriorates due to heating compared to the previous example. Waterproof sheet 4
Heated watertight ascon layer 7 whose lower end forms the bottom surface
The part of the base 5' to be laid on the lower surface is formed one step lower than the base surface 5a of the crushed stone base 5, the lower end of the waterproof sheet 4 is laid on the base 5', and the room-temperature ascon layer 7 is placed on top of the lower end of the waterproof sheet 4. ' is paved to fix the waterproof sheet 4, and then the heated watertight ascon layer 7 is compacted on top of the room temperature ascon layer 7' to form the bottom surface 6, and the waterproof sheet 4 is directly attached to the heated watertight ascon layer 7. This is an embodiment in which the waterproof sheet 4 is prevented from being damaged by heat by avoiding contact with the waterproof sheet 7.
以上のように本発明による貯水池等の遮水工法
は貯水池等の防水性シートで地山の斜面部を覆つ
て成形した斜面と、水密性の瀝青質混合物を締固
めた底面との接合部に柔軟性を有する特殊シール
材を充填することにより、底面端縁と斜面が直接
接触することを防止し、貯水池等の貯水量の増
減、地表面からの浸透水の揚圧力の変化、及び地
盤の不等沈下等の時に作用する力をシール材の柔
軟性により緩衝して斜面と底面端縁の接合部の損
傷及び亀裂の発生を防止することができる。又、
底面の周縁にシートの伸縮調節部を設けることに
よつて、上記の諸原因によつて作用する応力を緩
和させてシートが破損することを防止することが
でき、特に合成ゴム系シート等を使用した場合に
その素材の性質より引張り応力下でのオゾン劣化
が促進されてシートが破損することを防止できる
など比較的低コストであつて遮水性、耐久性にす
ぐれた貯水池等を構成できる特色がある。 As described above, the waterproof construction method for reservoirs, etc. according to the present invention is applied to the joint between the slope of the reservoir, etc., which is formed by covering the slope of the ground with a waterproof sheet, and the bottom surface, which is compacted with a watertight bituminous mixture. Filling with a special flexible sealing material prevents direct contact between the bottom edge and the slope, preventing increases and decreases in the amount of water stored in reservoirs, changes in the uplift pressure of seepage water from the ground surface, and preventing soil damage. The flexibility of the sealing material can buffer the force that acts during uneven settlement, etc., thereby preventing damage and cracking at the joint between the slope and the bottom edge. or,
By providing a sheet expansion/contraction adjustment section on the periphery of the bottom surface, it is possible to alleviate the stress that acts due to the various causes mentioned above and prevent the sheet from being damaged.Especially when using a synthetic rubber sheet, etc. In such cases, due to the properties of the material, ozone deterioration under tensile stress is accelerated and the sheet is prevented from being damaged.This feature allows the construction of reservoirs, etc. that are relatively low cost, have excellent water-blocking properties, and are highly durable. be.
第1図は本発明の実施例を示す貯水池の要部断
面図、第2図は別の実施例の同断面図である。
1…貯水池、2…斜面、4…防水性シート、5
…砕石基盤、6…底面、7…加熱水密性アスコン
層、7′…常温アスコン層、8…マスチツクシー
ルコート、9…特殊シール材、10…トレンチ、
11…伸縮調節部。
FIG. 1 is a sectional view of a main part of a reservoir showing an embodiment of the present invention, and FIG. 2 is a sectional view of the same in another embodiment. 1... Reservoir, 2... Slope, 4... Waterproof sheet, 5
...crushed stone base, 6...bottom surface, 7...heated watertight ascon layer, 7'...normal temperature ascon layer, 8...mastic seal coat, 9...special sealing material, 10...trench,
11...Expansion adjustment section.
Claims (1)
面と底面部を水密性の瀝青質混合物で締固めてな
る底面により構成される貯水池等において、斜面
と底面の接する法尻部に底面側の周縁に沿つてト
レンチを穿削し、前記防水性シートを斜面から連
続して該トレンチの内面を覆い該防水性シートで
覆われたトレンチ内を下部は粒状材料にて、上部
は柔軟なシール材にて埋めてなる防水性シート伸
縮調節部を設けることを特徴とする貯水池等の遮
水工法。 2 地山の斜面部を防水性シートで覆つてなる斜
面と、底面部を水密性の瀝青質混合物で締固めて
なる底面により構成される貯水池等において、斜
面から連続して底面に延設された防水性シートと
接する底面部には常温瀝青混合物層を介在させて
防水性シートの熱による劣化を防止し、次に底面
部全体を水密性の瀝青質混合物を敷設することを
特徴とする貯水池等の遮水工法。[Scope of Claims] 1. In a reservoir, etc., which is composed of a slope formed by covering the slope of the ground with a waterproof sheet and a bottom formed by compacting the bottom with a watertight bituminous mixture, the slope and the bottom are in contact with each other. A trench is excavated along the bottom edge of the slope, and the waterproof sheet is continuously applied from the slope to cover the inner surface of the trench. A waterproof construction method for water reservoirs, etc., characterized in that the upper part is provided with a waterproof sheet expansion/contraction adjustment section filled with a flexible sealing material. 2. In reservoirs, etc., which are constructed by covering the slope of the ground with a waterproof sheet and the bottom by compacting the bottom with a watertight bituminous mixture, A room-temperature bituminous mixture layer is interposed on the bottom surface in contact with the waterproof sheet to prevent deterioration of the waterproof sheet due to heat, and then a watertight bituminous mixture is laid over the entire bottom surface. Waterproof construction methods such as
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58091125A JPS59217817A (en) | 1983-05-24 | 1983-05-24 | Water shield work for water reservoir |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58091125A JPS59217817A (en) | 1983-05-24 | 1983-05-24 | Water shield work for water reservoir |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS59217817A JPS59217817A (en) | 1984-12-08 |
| JPS633086B2 true JPS633086B2 (en) | 1988-01-21 |
Family
ID=14017801
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP58091125A Granted JPS59217817A (en) | 1983-05-24 | 1983-05-24 | Water shield work for water reservoir |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS59217817A (en) |
-
1983
- 1983-05-24 JP JP58091125A patent/JPS59217817A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS59217817A (en) | 1984-12-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP1157168B1 (en) | Method and device for the waterproofing of joints and cracks in hydraulic works, concrete and masonry structures | |
| US4065924A (en) | Method of lining a waterway or reservoir | |
| US5845456A (en) | Basement waterproofing | |
| KR100278173B1 (en) | Double waterproof sheet for concrete structure | |
| US20090050025A1 (en) | Use of Encapsulated Water Soluble Material as a Construction Material | |
| CN103643656A (en) | High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body | |
| CN108547260A (en) | Seepage-proofing treatment structure for reservoir full-reservoir basin in karst region and construction method | |
| CN110052471B (en) | Petroleum and natural gas drilling waste landfill process | |
| CN209114512U (en) | The water proof structure of basement roof deformation joint | |
| JPH06235224A (en) | Trapizoidal treating method | |
| GB1498691A (en) | Waterproof sealing means | |
| CN218322878U (en) | Anti-seepage and anti-impact structure for tower footing | |
| JPS633085B2 (en) | ||
| JPS59217817A (en) | Water shield work for water reservoir | |
| KR102103978B1 (en) | Reinforcement and waterproof structure of vertical shafts for utility interface | |
| CN211498742U (en) | Composite geomembrane seepage-proofing structure | |
| CN210797668U (en) | Basement pile head waterproof construction | |
| CN210216475U (en) | Sump pit waterproof construction | |
| CN223634127U (en) | Basement post-pouring belt seepage prevention structure | |
| KR200458991Y1 (en) | A protection board for waterproofing layer having anti-plant rooting performance | |
| RU2282695C1 (en) | Watertight channel liner joint | |
| CN221855608U (en) | Waterproof construction structure for preventing building foundation from floating upwards | |
| JP3518225B2 (en) | Impermeable structure | |
| JPS60123609A (en) | Artificial reservior and construction thereof | |
| CN216428317U (en) | Water-resisting and seepage-preventing terrace structure suitable for collapsible loess area |