JPS6333530B2 - - Google Patents

Info

Publication number
JPS6333530B2
JPS6333530B2 JP2492182A JP2492182A JPS6333530B2 JP S6333530 B2 JPS6333530 B2 JP S6333530B2 JP 2492182 A JP2492182 A JP 2492182A JP 2492182 A JP2492182 A JP 2492182A JP S6333530 B2 JPS6333530 B2 JP S6333530B2
Authority
JP
Japan
Prior art keywords
dome
side wall
central
lift
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP2492182A
Other languages
Japanese (ja)
Other versions
JPS58143038A (en
Inventor
Masaru Moryama
Takeshi Yamada
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOMOEGUMI IRON WORKS
Original Assignee
TOMOEGUMI IRON WORKS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOMOEGUMI IRON WORKS filed Critical TOMOEGUMI IRON WORKS
Priority to JP2492182A priority Critical patent/JPS58143038A/en
Publication of JPS58143038A publication Critical patent/JPS58143038A/en
Publication of JPS6333530B2 publication Critical patent/JPS6333530B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Vibration Dampers (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 この発明は、全天候型野球場等に使用する網目
骨格ドームの構築方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing a mesh skeleton dome used for all-weather baseball stadiums and the like.

この種の網目骨格ドームの従来の構築方法とし
ては、基底円周部から順に内側上方へと構築を進
め、最終の天窓まで行なう方法がある。しかしな
がら、このような構築方法の場合、ドームの内側
上方へ進む程、構築作業位置が高くなるため、屋
根パネルまたは各杆材の吊上げや結合作業に種々
の不便や危険を伴ない工期の長期化を免れなかつ
た。
A conventional method for constructing this type of mesh skeleton dome is to proceed inwardly and upwardly from the base circumference until reaching the final skylight. However, in the case of this construction method, the construction work position becomes higher as you move upwards inside the dome, so lifting and joining the roof panels or each rod member involves various inconveniences and dangers, prolonging the construction period. I couldn't escape it.

この発明は、このような事情に鑑みて提案され
たもので、その目的は作業の安全性が高く工期の
短縮が図れる構築方法を提供することにある。
The present invention was proposed in view of the above circumstances, and its purpose is to provide a construction method that provides high work safety and shortens the construction period.

この発明に係る構築方法は、略多角形状の中央
ドーム部と、この略多角形状の辺に対応して分割
配置された側壁ドーム部とからなる網目骨格ドー
ムの構築方法であつて、前記中央ドーム部の各頂
点部分にリフトアツプ用支柱を立設するとともに
ドーム中央にリフトアツプ用中央支柱を立設し、
前記側壁ドーム部を内側に倒した状態で地上にお
いて組立てた後引き起こして前記リフトアツプ用
支柱により支持させ、前記中央ドーム部を地上付
近において組立ててリフトアツプ用中央支柱およ
びリフトアツプ用支柱によつて上昇させ、前記中
央ドーム部の端部と前記側壁ドーム部の端部とを
接続し、地上付近において全ての組立てを行なう
ようにしたものである。
The construction method according to the present invention is a method for constructing a mesh skeleton dome comprising a substantially polygonal central dome portion and side wall dome portions divided and arranged corresponding to the sides of the substantially polygonal dome, the method comprising: Lift-up pillars are erected at each apex of the dome, and a central lift-up pillar is erected at the center of the dome.
The side wall dome portion is assembled on the ground in a state in which it is tilted inward, and then raised and supported by the lift-up support column; the central dome portion is assembled near the ground and raised by the lift-up center support column and the lift-up support column; The ends of the central dome portion and the side wall dome portions are connected, and all assembly is performed near the ground.

以下、この発明を図示する一実施例に基づいて
説明する。第1図、第2図に示すように、網目骨
格ドームDは、中央に天窓Wを有する略六角形状
の中央ドーム部D1と、この略六角形状の辺に対
応して分割配置された側壁ドーム部D2とからな
り、中央ドーム部D1の各頂点部分にリフトアツ
プ用支柱2を、ドーム中央にリフトアツプ用中央
支柱1を、完成時にその頭部がドームから突出す
るように立設する。
The present invention will be described below based on an illustrated embodiment. As shown in FIGS. 1 and 2, the mesh skeleton dome D includes a substantially hexagonal central dome portion D1 having a skylight W in the center, and side wall domes divided into sections corresponding to the sides of this substantially hexagonal shape. A lift-up pillar 2 is provided at each vertex of the central dome part D1, and a lift-up central pillar 1 is erected at the center of the dome so that its head protrudes from the dome when completed.

このような構成において、第3図に示すよう
に、断面三角形状のコンクリート基礎3が打設さ
れており、先づ、六つの側壁ドーム部のうち間隔
をおいた三つの側壁ドーム部D2aをその内面が
下へ向くように倒した状態でガイド兼用組立架台
4を使用して地上で組立てる。ここで、側壁ドー
ム部D2aの両端部における下端には車輪5が突
設されるとともにこの車輪5に対応して基礎3面
上に案内レール6が敷設され、側壁ドーム部D2
aが内側に向かつて移動自在とされている。この
ような状態から、側壁ドーム部D2aの先端部に
支柱2のワイヤロープを接続して引き起こし、こ
の側壁ドーム部D2aを支柱2に支持させる。こ
の場合、側壁ドーム部D2aは支柱2にジヤツキ
13により完成時より開き気味に支持させる。
In such a configuration, as shown in FIG. 3, a concrete foundation 3 with a triangular cross section is poured, and first, three of the six side wall dome parts D2a at intervals are placed on the concrete foundation 3. It is assembled on the ground using an assembly frame 4 which also serves as a guide, with the inner surface facing downward. Here, wheels 5 are protruded from the lower ends of both ends of the side wall dome portion D2a, and guide rails 6 are laid on the foundation 3 surface corresponding to the wheels 5.
A is movable inward. From this state, the wire rope of the support column 2 is connected to the tip of the side wall dome portion D2a and raised, and the side wall dome portion D2a is supported by the support column 2. In this case, the side wall dome portion D2a is supported by the support column 2 with the jacks 13 so as to be slightly open from the time of completion.

次に、残りの三つの側壁ドーム部D2bを組立
てて前述と同様の方法で引き起こし支柱2に支持
させる。
Next, the remaining three side wall dome portions D2b are assembled and raised in the same manner as described above to be supported by the pillars 2.

次に、リフトアツプ用中央支柱1は、内部にタ
ワークレーン7を備えるとともに上下動自在に支
持された吊上リング8を有している。第7図に示
すように、中央ドーム部D1の中央部を地上で組
立て、中央ドーム部D1全体を組立てることので
きる最小高さまで持ち上げ、トラツククレーン9
によりサポート10を使用して残りの中央ドーム
部D1を組立てる。第8図に示すように、吊上リ
ング8と支柱2に取付けられた吊具11とによつ
て中央ドーム部D1を吊上げ、中央ドーム部D1
と側壁ドーム部D2との端部どうしを接続する。
ここで、端部と端部との間に接続部材12を介在
させても良い。さらに、側壁ドーム部D2aとD
2bとの周方向端部どうしを接続する。接続が終
われば支柱1,2を取去る。
Next, the lift-up central column 1 is provided with a tower crane 7 therein and has a lifting ring 8 supported so as to be movable up and down. As shown in FIG. 7, the central part of the central dome part D1 is assembled on the ground, lifted to the minimum height at which the entire central dome part D1 can be assembled, and then the truck crane 9
Assemble the remaining central dome portion D1 using the support 10. As shown in FIG. 8, the central dome portion D1 is lifted up by the lifting ring 8 and the lifting tool 11 attached to the support column 2.
and the side wall dome portion D2 are connected to each other.
Here, the connecting member 12 may be interposed between the ends. Furthermore, side wall dome portions D2a and D
2b and the circumferential ends thereof are connected to each other. Once the connection is complete, remove supports 1 and 2.

側壁ドーム部の組立て方法としては、第10
図、第11図に示すように、側壁ドーム部D2の
支持方法を、組立て、引き起しの後、ジヤツキ1
3により完成時よりも開き気味にその接続端部を
リフトアツプ用支柱2に支持させるか、あるい
は、第12図、第13図に示すように、引き起し
の後中央ドーム部D1の端部と側壁ドーム部D2
の端部との間に間隙が生じるように側壁ドーム部
D2を支持させて中央ドーム部D1を吊上げた後
この側壁ドーム部D2を内側へ移動させて端部ど
うしを当接させるかの方法がある。なお、この場
合六つの側壁ドーム部D2のうち間隔をおいた三
つの側壁ドーム部D2aを中央ドーム部D1に接
続した後、残りの側壁ドーム部D2bに接続する
こともできる。
As a method of assembling the side wall dome part, the 10th
As shown in FIG. 11, the method of supporting the side wall dome portion D2 is as follows:
3, the connecting end is supported by the lift-up column 2 so that it is slightly open compared to when completed, or as shown in FIGS. Side wall dome part D2
There is a method in which the side wall dome part D2 is supported so that a gap is created between the center dome part D1 and the center dome part D1 is lifted up, and then the side wall dome part D2 is moved inward to bring the ends into contact with each other. be. In this case, it is also possible to connect three spaced side wall dome parts D2a among the six side wall dome parts D2 to the central dome part D1 and then connect them to the remaining side wall dome parts D2b.

前述のとおりこの発明によれば、組立作業のほ
とんどが地上付近において行なえるため作業の安
全性が高く、工期の短縮が図れる。高揚程のクレ
ーンがほとんどいらず、大型ドームの建設に有効
である。
As described above, according to the present invention, most of the assembly work can be performed near the ground, so the safety of the work is high and the construction period can be shortened. It requires almost no high-lift crane and is effective for constructing large domes.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図、第2図はこの発明に係る網目骨格ドー
ムを示す平面図、縦断面図、第3図は側壁ドーム
部の車輪部分を示す概略図、第4図、第5図、第
6図、第7図、第8図、第9図はこのドームを構
築する方法を工程順に示した縦断面図、第10
図、第11図は側壁ドーム部の支持方法の第一実
施例を示す平面図、縦断面図、第12図、第13
図は同様の第二実施例を示す平面図、縦断面図で
ある。 1……リフトアツプ用中央支柱、2……リフト
アツプ用支柱、3……コンクリート基礎、4……
トラツククレーン、5……車輪、6……案内レー
ル、7……タワークレーン、8……吊上リング、
9……トラツククレーン、10……サポート、1
1……吊具、12……接続部材、13……ジヤツ
キ。
1 and 2 are a plan view and a vertical sectional view showing a mesh skeleton dome according to the present invention, FIG. 3 is a schematic diagram showing a wheel portion of a side wall dome portion, and FIGS. 4, 5, and 6. , Fig. 7, Fig. 8, and Fig. 9 are longitudinal cross-sectional views showing the method of constructing this dome in order of process, and Fig. 10.
11 are a plan view, a vertical cross-sectional view, FIG. 12, and FIG.
The figures are a plan view and a longitudinal sectional view showing a similar second embodiment. 1... Central support for lift-up, 2... Support for lift-up, 3... Concrete foundation, 4...
Truck crane, 5... Wheels, 6... Guide rail, 7... Tower crane, 8... Lifting ring,
9...Truck crane, 10...Support, 1
1... Hanging tool, 12... Connection member, 13... Jacket.

Claims (1)

【特許請求の範囲】[Claims] 1 略多角形状の中央ドーム部と、この略多角形
状の辺に対応して分割配置された側壁ドーム部と
からなる網目骨格ドームの構築方法であつて、前
記中央ドーム部の各頂点部分にリフトアツプ用支
柱を立設するとともにドーム中央にリフトアツプ
用中央支柱を立設し、前記側壁ドーム部を内側に
倒した状態で地上において組立てた後引き起こし
て前記リフトアツプ用支柱により支持させ、前記
中央ドーム部を地上付近において組立ててリフト
アツプ用中央支柱およびリフトアツプ用支柱によ
つて上昇させ、前記中央ドーム部の端部と前記側
壁ドーム部の端部とを接続することを特徴とする
網目骨格ドームの構築方法。
1. A method for constructing a mesh skeleton dome consisting of a substantially polygonal central dome part and side wall dome parts divided and arranged corresponding to the sides of the substantially polygonal dome part, the method comprising lifting up each vertex part of the central dome part. At the same time, a central support for lift-up is erected in the center of the dome, and the side wall dome is assembled on the ground with the side wall dome inwardly tilted, and then raised and supported by the lift-up support, so that the central dome is supported by the lift-up support. A method for constructing a mesh skeleton dome, which comprises assembling the dome near the ground, lifting it up using a lift-up central column and a lift-up column, and connecting the ends of the central dome part and the side wall dome parts.
JP2492182A 1982-02-18 1982-02-18 Construction of network skeletal dome Granted JPS58143038A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2492182A JPS58143038A (en) 1982-02-18 1982-02-18 Construction of network skeletal dome

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2492182A JPS58143038A (en) 1982-02-18 1982-02-18 Construction of network skeletal dome

Publications (2)

Publication Number Publication Date
JPS58143038A JPS58143038A (en) 1983-08-25
JPS6333530B2 true JPS6333530B2 (en) 1988-07-06

Family

ID=12151601

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2492182A Granted JPS58143038A (en) 1982-02-18 1982-02-18 Construction of network skeletal dome

Country Status (1)

Country Link
JP (1) JPS58143038A (en)

Also Published As

Publication number Publication date
JPS58143038A (en) 1983-08-25

Similar Documents

Publication Publication Date Title
JPS6333530B2 (en)
JPS6332939B2 (en)
JPS6333529B2 (en)
JPH10280543A (en) Construction method of dome-like roof
JPH04161566A (en) Constructing apparatus for large space building
JP2985110B2 (en) Construction method of steel roof
JP2618171B2 (en) Telescopic strut
JPH0932120A (en) Method of construction of structure
JPH09242191A (en) Construction of large span structure
JPH06101348A (en) How to build a tower
JP2590671B2 (en) Construction method of steel frame using overhead crane frame
JPH0539637A (en) Construction method for domed roof and heavy hoist therefor
JP2634271B2 (en) Jack-up method and device
KR100198702B1 (en) Manufacturing process of canopy
JPH0431412Y2 (en)
JP2671967B2 (en) High-rise building construction method and construction beam assembly equipment
JP2994205B2 (en) Structural assembly method
JPS61196072A (en) Disassembling of iron tower
JPH09228690A (en) Steel tower construction method
JPH0548348B2 (en)
JPS5942155B2 (en) Building extension method
JPS60184169A (en) Anchoring of large container
JPH07233647A (en) How to dismantle a temporary shed for building structures
JPH11324306A (en) Work stage device for steel tower construction and steel tower construction method
JPH0718246B2 (en) How to build a frame