Publication number
JPS64438Y2
JPS64438Y2 JP1984147917U JP14791784U JPS64438Y2 JP S64438 Y2 JPS64438 Y2 JP S64438Y2 JP 1984147917 U JP1984147917 U JP 1984147917U JP 14791784 U JP14791784 U JP 14791784U JP S64438 Y2 JPS64438 Y2 JP S64438Y2
Authority
JP
Japan
Prior art keywords
pile
supporter
bottom plate
tip supporter
tip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1984147917U
Other languages
Japanese (ja)
Other versions
JPS6162940U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1984147917U priority Critical patent/JPS64438Y2/ja
Publication of JPS6162940U publication Critical patent/JPS6162940U/ja
Application granted granted Critical
Publication of JPS64438Y2 publication Critical patent/JPS64438Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 本考案は、無騒音かつ薬剤等による土質汚染の
恐れのない基礎杭の打込みに使用する杭先端支持
器に関する。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a pile tip supporter used for driving foundation piles without noise and without fear of soil contamination by chemicals or the like.

〔従来の技術〕[Conventional technology]

従来、コンクリート杭を打ち込む際に発生する
騒音、振動等を無くした低公害工法の一つとし
て、セメントミルク工法がある。
Conventionally, the cement milk method is one of the low-pollution construction methods that eliminates the noise, vibration, etc. that occur when driving concrete piles.

ところが、このセメントミルク工法には、従来
の打ち込み工法に比較して、経費と時間が掛り過
ぎる、工法を行つている途中過程での支持力への
不安、地下水汚染等の欠点がある。
However, compared to the conventional pouring method, this cement milk construction method has drawbacks such as being too expensive and time consuming, concerns about support capacity during the construction process, and groundwater contamination.

このセメントミルク工法に代わる工法として、
予めオーガーでプレボーリングを行い、そこに挿
入したコンクリート杭の先端を打撃することによ
つて、騒音、振動を低減しようとする工法が、特
公昭47−8408号公報、特開昭55−52428号公報、
特公昭57−10244号公報、実開昭57−71543号公
報、特開昭58−58320号公報、特開昭58−58321号
公報等に開示されている。
As an alternative to this cement milk method,
Japanese Patent Publication No. 47-8408 and Japanese Patent Application Laid-Open No. 55-52428 disclose a construction method that attempts to reduce noise and vibration by pre-boring with an auger and then hitting the tip of the concrete pile inserted therein. Public notice,
It is disclosed in Japanese Patent Publication No. 57-10244, Japanese Utility Model Application Publication No. 57-71543, Japanese Patent Application Publication No. 58-58320, Japanese Patent Application Publication No. 58-58321, etc.

ところが、このようにプレボーリングによつて
生じたスラム部分に杭を打ち込む工法において
は、打ち込まれた杭の支持力が不足し、その支持
力が不足するために打設杭の数を多くして、個々
の杭の支持力不足を補う必要があり、経済的に大
きな無駄を生じる。
However, in this method of driving piles into the slum areas created by pre-boring, the bearing capacity of the driven piles is insufficient; , it is necessary to compensate for the lack of bearing capacity of each individual pile, resulting in large economic waste.

また、無騒音と支持力の増大とを狙つて、直接
杭先端部分を槌打ちする工法も特開昭54−132306
号公報に開示されてはいるが、同公報に開示され
ている工法は、杭打ち込み先端と連結した伝達棒
の上端を槌打ちするものであるので、実際上は騒
音の低減にはならないし、伝達棒そのものも槌打
ちに耐えるだけの強度を有するものである必要が
ある。さらに、その構造上、杭の先端をボルトで
止めるものであるので、硬い土中での作業の実施
には不向きである等、実現には種々の問題があ
る。
In addition, with the aim of reducing noise and increasing bearing capacity, a construction method in which the tip of the pile is hammered directly was published in Japanese Patent Laid-Open No. 54-132306.
However, the construction method disclosed in the same publication involves hammering the upper end of the transmission rod connected to the pile driving tip, so it does not actually reduce noise. The transmission rod itself must also be strong enough to withstand hammering. Furthermore, due to its structure, the tip of the pile is fixed with bolts, so there are various problems in realizing it, such as making it unsuitable for work in hard soil.

〔考案が解決しようとする課題〕[The problem that the idea aims to solve]

本考案において解決しようとする課題は、無騒
音、無公害の杭打ち込み法の実現のための装置を
提供することにある。
The problem to be solved by the present invention is to provide a device for realizing a noiseless and pollution-free pile driving method.

〔課題を解決するための手段〕[Means to solve the problem]

本考案は、杭の上端に荷重を加えつつ、杭の貫
通孔を通して杭先端支持器の底板を槌打ちする杭
打込みに使用する杭先端支持器として、杭の外径
よりも僅かに大きい内径と槌打ちストロークより
も長い底板付き管体からなり、さらに、同管体の
内壁に杭の外面と係止する複数個の係止突起を設
けたことによつて上記課題を解決したものであ
る。
This invention is designed to be used as a pile tip supporter for driving piles by hammering the bottom plate of the pile tip supporter through the through hole of the pile while applying a load to the upper end of the pile. The above-mentioned problem has been solved by comprising a tube with a bottom plate that is longer than the hammering stroke, and by providing a plurality of locking protrusions on the inner wall of the tube to lock with the outer surface of the pile.

〔実施例〕〔Example〕

第1図は本考案の杭先端支持器1を縦断して示
す正面断面図である。第2図は杭先端支持器1を
平面図で示すものである。
FIG. 1 is a front sectional view showing a pile tip supporter 1 of the present invention in longitudinal section. FIG. 2 shows the pile tip supporter 1 in a plan view.

第1図および第2図に示すように、本考案の杭
先端支持器1は、その内径が杭5の外径より僅か
に大きく、杭5がきつちり入る内径を有し、後述
の槌打ちのストロークよりも大きい長さを有する
管体3の底に、鋼板等により形成された底板2を
溶接等により槌打ちに耐えるだけの強さで固着さ
れている。また、同管体3の内壁には、打ち込み
杭5の外壁と係止する複数個の係止突部4が、管
体3の内周面に突設されている。これによつて、
杭5の先端部分に管体3を嵌合させたとき、杭5
を杭先端支持器1に係止させることができる構造
になつている。
As shown in FIGS. 1 and 2, the pile tip supporter 1 of the present invention has an inner diameter slightly larger than the outer diameter of the pile 5, an inner diameter that allows the pile 5 to fit tightly, and A bottom plate 2 made of a steel plate or the like is fixed by welding or the like to the bottom of a tube body 3 having a length larger than the stroke of the tube 3 with enough strength to withstand hammering. Further, a plurality of locking protrusions 4 that lock with the outer wall of the driven pile 5 are provided on the inner wall of the tube 3 so as to protrude from the inner peripheral surface of the tube 3 . By this,
When the pipe body 3 is fitted to the tip of the pile 5, the pile 5
It has a structure that allows it to be locked to the pile tip supporter 1.

第3図〜第5図は第1図および第2図に示す杭
先端支持器1を用いての杭打ち込みの状態を示す
図である。
FIGS. 3 to 5 are diagrams showing the state of pile driving using the pile tip supporter 1 shown in FIGS. 1 and 2.

第3図は本考案の杭先端支持器1を杭5の先端
に取付けて土中の穴8に設置した状態を示す切欠
断面図である。同図に示すように、本考案の杭先
端支持器1を杭5に取付けて基礎工事用の穴8の
底に設置した後、中空杭5の貫通孔6を通して、
モンケンハンマー7で前記杭先端支持器1の底板
2を上から槌打ちする。
FIG. 3 is a cutaway sectional view showing a state in which the pile tip supporter 1 of the present invention is attached to the tip of a pile 5 and installed in a hole 8 in the soil. As shown in the figure, after the pile tip supporter 1 of the present invention is attached to the pile 5 and installed at the bottom of the hole 8 for foundation work, it is passed through the through hole 6 of the hollow pile 5.
The bottom plate 2 of the pile tip supporter 1 is hammered from above using a hammer 7.

第4図はモンケンハンマー7により杭先端支持
器1の底板2を所要回数槌打ちした後の状態を示
す。同図に示すように、杭5に係止突部4によつ
て係止されていた杭先端支持器1は、モンケンハ
ンマー7による底板2への槌打ちにより、支持器
1の底板2と杭5の先端とが離間した状態で強制
的に土中に打ち込まれる。そして、杭5の上端に
は軽い槌打ちあるいは静荷重が負荷され、殆ど支
持器1の土中侵入に追随する状態で、支持器1内
を摺動沈下する。この作業を繰り返すことによつ
て、杭5を設計耐力が得られる深さまで打ち込
む。
FIG. 4 shows the state after the bottom plate 2 of the pile tip supporter 1 has been hammered a required number of times with the hammer 7. As shown in the figure, the pile end supporter 1, which was locked to the pile 5 by the locking protrusion 4, is removed from the bottom plate 2 of the supporter 1 by hammering the bottom plate 2 with the Monken hammer 7. It is forcibly driven into the soil with the tip of No. 5 separated. Then, a light hammering or a static load is applied to the upper end of the pile 5, and the pile slides and sinks within the supporter 1, almost following the penetration of the supporter 1 into the soil. By repeating this operation, the pile 5 is driven to a depth where the design strength is obtained.

第5図は杭5の打設後の状態を示す切欠断面図
である。
FIG. 5 is a cutaway sectional view showing the state of the pile 5 after it has been driven.

杭先端支持器1の管体3の長さは、モンケンハ
ンマー7による槌打ちのストロークよりも大きく
採る必要がある。この理由は、杭先端支持器1の
上端縁部が杭5の下端部と離間すると、その間隙
に土砂が入り上述した工法を実施できなくなるか
らである。
The length of the pipe body 3 of the pile tip supporter 1 needs to be longer than the stroke of hammering by the hammer 7. The reason for this is that if the upper end edge of the pile tip supporter 1 is separated from the lower end of the pile 5, earth and sand will enter the gap, making it impossible to implement the above-mentioned construction method.

このため杭先端支持器1の管体3の長さは、杭
の寸法および施工場所の土質等により適当に変化
させることができる。底板2の寸法および厚さ
は、穴8への挿入を妨げず且つ槌打ちによる著し
い変形を生じない程度であり、杭の寸法および要
求される耐力荷重により変化させる必要がある。
Therefore, the length of the pipe body 3 of the pile tip supporter 1 can be appropriately changed depending on the dimensions of the pile, the soil quality of the construction site, etc. The dimensions and thickness of the bottom plate 2 are such that they do not hinder insertion into the hole 8 and do not cause significant deformation due to hammering, and must be changed depending on the dimensions of the pile and the required proof load.

上記工法の実施に際しては、モンケンハンマー
7は、穴8の底に位置する杭先端支持器1の底板
2を杭5の貫通孔6を通して槌打ちすることにな
るので殆ど騒音を発生しない。
When carrying out the above construction method, the hammer 7 hammers the bottom plate 2 of the pile tip supporter 1 located at the bottom of the hole 8 through the through hole 6 of the pile 5, so almost no noise is generated.

そして、杭の打設後、必要な耐力荷重に達した
か否かの判断は、槌打ち時の負荷トン数から容易
に算出して知ることができる。
After driving the pile, it can be easily determined whether the required proof load has been reached or not by easily calculating from the tonnage load at the time of hammering.

上記の実施例においては、杭先端支持器1の底
板2は単なる板状体を使用したが、槌打ちの際の
横滑りを防止し杭の逃げを防止するために、底板
2の下面に横滑り防止突部を設けることができ
る。
In the above embodiment, the bottom plate 2 of the pile tip supporter 1 is a simple plate-shaped body, but in order to prevent sideslip during hammering and to prevent the pile from escaping, the bottom plate 2 has a sideslip prevention plate. A protrusion can be provided.

第6図〜第9図はこの横滑り防止突部9を杭先
端支持器1の底板2の下面に設けた例を示す。
FIGS. 6 to 9 show an example in which the sideslip prevention protrusion 9 is provided on the lower surface of the bottom plate 2 of the pile tip supporter 1.

第6図および第7図は、断面L字形の複数個の
形鋼材片を用いて横滑り防止突部9とした例を示
す。
FIG. 6 and FIG. 7 show an example in which the sideslip prevention protrusion 9 is formed by using a plurality of shaped steel pieces having an L-shaped cross section.

第8図および第9図の場合、底板2の底面に突
設された横滑り防止突部9は、中央部に頂部を有
して放射線状に十字形に一体形成されており、前
記実施例と同様に横滑りを防止することができ
る。
In the case of FIGS. 8 and 9, the sideslip prevention protrusion 9 protruding from the bottom surface of the bottom plate 2 is integrally formed in a radial cross shape with an apex in the center. Similarly, skidding can be prevented.

〔考案の効果〕[Effect of idea]

本考案の杭先端支持器によつて以下の効果を奏
することができる。
The pile tip supporter of the present invention can provide the following effects.

(1) 杭の上端に荷重を加えつつ、杭の貫通孔を通
して杭先端支持器の底板を槌打ちする杭打込み
法の実用化が可能となり、無騒音、土壌無汚染
の杭打設が可能となる。
(1) It has become possible to put into practical use a pile driving method in which the bottom plate of the pile end supporter is hammered through the through hole of the pile while applying a load to the top end of the pile, making it possible to drive piles without noise and soil contamination. Become.

(2) 杭打ち込み時に、杭の耐力荷重を知ることが
でき、必要な杭の本数を知ることができるの
で、余計な杭打ち込みが不用となる。
(2) When driving piles, it is possible to know the bearing capacity of the piles and the number of required piles, which eliminates the need for unnecessary pile driving.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は第2図−線における本考案杭先端
支持器の正面断面図、第2図は杭先端支持器の平
面図、第3〜5図は本考案杭先端支持器を用いた
杭の打設方法を示す概念図切欠断面図、第6図お
よび第7図は底板下面に横滑り防止突部を有する
杭先端支持器の他の1例正面図および底面図、第
8図および第9図は同じく他の1例正面図および
底面図である。 1:杭先端支持器、2:底板、3:管体、4:
係止突部、5:杭、6:貫通孔、7:モンケンハ
ンマー、8:穴、9:横滑り防止突部。
Figure 1 is a front cross-sectional view of the pile tip supporter of the present invention along the line shown in Figure 2, Figure 2 is a plan view of the pile tip supporter, and Figures 3 to 5 are a cross-sectional view of the pile tip supporter of the present invention. A conceptual diagram illustrating the driving method; FIGS. 6 and 7 are a front view and a bottom view of another example of a pile tip supporter having a sideslip prevention protrusion on the lower surface of the bottom plate; FIGS. 8 and 9 2 is a front view and a bottom view of another example. 1: Pile tip supporter, 2: Bottom plate, 3: Pipe body, 4:
Locking protrusion, 5: stake, 6: through hole, 7: monkey hammer, 8: hole, 9: skid prevention protrusion.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 杭5の上端に荷重を加えつつ、杭5の貫通孔6
を通して杭先端支持器1の底板2を槌打ちする杭
打込み工法に使用する杭先端支持器であつて、杭
5の外径よりも僅かに大きい内径と槌打ちストロ
ークよりも大きい長さとを有する底板2付き管体
3からなり、同管体3の内壁に杭5の外面と係止
する複数個の係止突起を設けたことを特徴とする
杭先端支持器。
While applying a load to the upper end of the pile 5, the through hole 6 of the pile 5 is
A pile tip supporter used in a pile driving method in which the bottom plate 2 of the pile tip supporter 1 is hammered through, and has an inner diameter slightly larger than the outer diameter of the pile 5 and a length larger than the hammering stroke. 1. A pile tip supporter comprising a tube 3 with two attachment points, and a plurality of locking protrusions that lock with the outer surface of a pile 5 on the inner wall of the tube 3.
JP1984147917U 1984-09-28 1984-09-28 Expired JPS64438Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1984147917U JPS64438Y2 (en) 1984-09-28 1984-09-28

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1984147917U JPS64438Y2 (en) 1984-09-28 1984-09-28

Publications (2)

Publication Number Publication Date
JPS6162940U JPS6162940U (en) 1986-04-28
JPS64438Y2 true JPS64438Y2 (en) 1989-01-06

Family

ID=30706144

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1984147917U Expired JPS64438Y2 (en) 1984-09-28 1984-09-28

Country Status (1)

Country Link
JP (1) JPS64438Y2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59144044U (en) * 1983-03-11 1984-09-26 旭化成株式会社 Pile tip shoe
JPS6110624A (en) * 1984-06-26 1986-01-18 Mitsui Concrete Kogyo Kk Pile erecting method

Also Published As

Publication number Publication date
JPS6162940U (en) 1986-04-28

Similar Documents

Publication Publication Date Title
JP2592079B2 (en) Small diameter steel pipe pile
JPS64438Y2 (en)
JP2001098542A (en) Soil cement synthetic taper pile
JP3135219B2 (en) Expanded steel pipe pile
CN212656218U (en) Heavy pile machine load underpinning structure
JP4202548B2 (en) Pile foundation
JPH0768707B2 (en) Open caisson method
JPH10219683A (en) Underground pile molding method and device therefor
JPS61134425A (en) Method of forming foundation pile
JP2881501B2 (en) Construction method for high strength cast-in-place concrete piles
JPS6052259B2 (en) Manhole construction method
JP4223781B2 (en) Ground improvement foundation method for soft ground.
JPS5819836B2 (en) Large-diameter vertical hole drilling method
JPH0121288B2 (en)
JPS6133934B2 (en)
JPH09125386A (en) Steel pipe pile construction method and steel pipe pile pressing-in device
JPH0240152Y2 (en)
JPH0354735B2 (en)
JPS6319390Y2 (en)
JP2551976Y2 (en) A recess forming tool for fitting a reinforcing bar into the top of a cast-in-place concrete pile
JPS6299510A (en) Construction of in-situ pile
JPS6110624A (en) Pile erecting method
JPH0137530B2 (en)
JP2003064699A (en) Method of reinforcing existing concrete pile and concrete pile strengthened by this reinforcing method
JPS6245364B2 (en)