JPS6466314A - Construction of building with underground floor - Google Patents

Construction of building with underground floor

Info

Publication number
JPS6466314A
JPS6466314A JP62222185A JP22218587A JPS6466314A JP S6466314 A JPS6466314 A JP S6466314A JP 62222185 A JP62222185 A JP 62222185A JP 22218587 A JP22218587 A JP 22218587A JP S6466314 A JPS6466314 A JP S6466314A
Authority
JP
Japan
Prior art keywords
pile
sheathing
column
piles
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP62222185A
Other languages
Japanese (ja)
Other versions
JPH05484B2 (en
Inventor
Hidefumi Okumoto
Yukiaki Ebuchi
Hisao Mukai
Kozo Nishikawa
Takeshi Idei
Nobuhiro Matsuoka
Ichiro Mukai
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP62222185A priority Critical patent/JPS6466314A/en
Publication of JPS6466314A publication Critical patent/JPS6466314A/en
Publication of JPH05484B2 publication Critical patent/JPH05484B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PURPOSE:To eliminate the need for foundation beam of great bearing forces by a method in which a main pile is set on the position of a column-line sheathing and used for sheathing in such a way that eccentric moment due to the deviation between the column center and the pile center is reduced. CONSTITUTION:Soil piles 1 are constructed to a deeper position than the final excavation bottom of an underground floor on the peripheral side of a construction site of building. A main pile A serving as sheathing, consisting of a steel tubular pile 2 of a length L similar to the pile 1 as an upper pile A1 and a PHC pile 3 as a lower pile A2 is set until the tip of the pile A2 reaches the bearing layer 4. A column-line sheathing B is consisting of the piles 1 between the main piles A is constructed, the inside ground of the sheathing B is excavated to construct an underground floor and also a terrestrial floor above the sheathing B. The need for foundation beam of great bearing force can thus be eliminated.
JP62222185A 1987-09-03 1987-09-03 Construction of building with underground floor Granted JPS6466314A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62222185A JPS6466314A (en) 1987-09-03 1987-09-03 Construction of building with underground floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62222185A JPS6466314A (en) 1987-09-03 1987-09-03 Construction of building with underground floor

Publications (2)

Publication Number Publication Date
JPS6466314A true JPS6466314A (en) 1989-03-13
JPH05484B2 JPH05484B2 (en) 1993-01-06

Family

ID=16778490

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62222185A Granted JPS6466314A (en) 1987-09-03 1987-09-03 Construction of building with underground floor

Country Status (1)

Country Link
JP (1) JPS6466314A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014181545A (en) * 2013-03-21 2014-09-29 Shimizu Corp Underground structure of building
CN113216161A (en) * 2021-06-17 2021-08-06 中国五冶集团有限公司 Cover plate for sealing pile hole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014181545A (en) * 2013-03-21 2014-09-29 Shimizu Corp Underground structure of building
CN113216161A (en) * 2021-06-17 2021-08-06 中国五冶集团有限公司 Cover plate for sealing pile hole

Also Published As

Publication number Publication date
JPH05484B2 (en) 1993-01-06

Similar Documents

Publication Publication Date Title
NZ223286A (en) Rolling steel piles on site immediately before placement
US3903662A (en) Method of securing structural support elements in soil
CN101793098B (en) Coordinated interactive combined rectification method
CN114411781A (en) Construction method of rock geological sheet pile cofferdam
JP2868651B2 (en) Earth retaining method above existing underground structure
JP3440169B2 (en) Artificial island ground and its construction method
SU1060762A2 (en) Foundation
JPH07158085A (en) Simple underground construction method
JPH063029B2 (en) Seismic retrofitting method for pile foundation structure
RU2303103C1 (en) Pile
JPH0796776B2 (en) Yamadome method
CN211571734U (en) Composite multi-row pile foundation pit supporting structure
JPS5664028A (en) Sheathing construction work by antecedent support framework
SU912837A1 (en) Pile foundation
RU28499U1 (en) Enclosing wall
JPH0776452B2 (en) Foundation building structure
JPH05306516A (en) Composite structure of soil cement continuous wall and core part
JPS57130622A (en) Construction of continuous underground wall
JP3449279B2 (en) Construction method of underwater substructure
JPH06173278A (en) Basic structure of building structure
WO1992000425A3 (en) Improved methods for providing foundations for building structures
RU2045620C1 (en) Dividing sheet piling
SU1288258A1 (en) Foundation constructing method
SU773191A1 (en) Pile
JPS6475714A (en) Site-driving concrete pile