KR101299526B1 - 열차운영 계획시스템 및 그 방법 - Google Patents
열차운영 계획시스템 및 그 방법 Download PDFInfo
- Publication number
- KR101299526B1 KR101299526B1 KR1020130060153A KR20130060153A KR101299526B1 KR 101299526 B1 KR101299526 B1 KR 101299526B1 KR 1020130060153 A KR1020130060153 A KR 1020130060153A KR 20130060153 A KR20130060153 A KR 20130060153A KR 101299526 B1 KR101299526 B1 KR 101299526B1
- Authority
- KR
- South Korea
- Prior art keywords
- train
- driving
- time
- calculating
- track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/12—Preparing schedules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/16—Trackside optimisation of vehicle or train operation
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
본 발명에 따르면, 열차운영계획을 자동화 시스템으로 구현하여 신뢰성 높은 열차운영계획을 수립하고, 자동화 기능으로 인한 작업시간 단축 및 열차운영계획의 정밀도 향상으로 운전취급시간 단축과 열차지연 예방이 이루어져 효율적인 열차운영이 가능하여, 수송혼란과 운영 관리적 철도사고를 감소시켜 고객의 편의성 향상과 미래 철도의 생산성 극대화가 가능한 효과가 있다.
Description
도 2는 본 발명의 일실시예에 따른 열차운영 계획방법을 도시한 플로우차트이며,
도 3은 본 발명의 일실시예에 따른 열차운영계획에서 열차의 제동성능 산정을 나타낸 예시도이며,
도 4는 본 발명의 일실시예에 따른 열차운영계획에서 감속도 관리를 나타낸 예시도이며,
도 5는 본 발명의 일실시예에 따른 열차운영계획에서 운전선도 작성관리를 나타낸 예시도이며,
도 6은 본 발명의 일실시예에 따른 열차운영계획에서 운전선도 실행관리를 나타낸 예시도이며,
도 7은 본 발명의 일실시예에 따른 열차운영계획에서 열차다이아 작성을 나타낸 예시도이며,
도 8은 본 발명의 일실시예에 따른 열차운영계획에서 열차운전시각표 관리를 나타낸 예시도이며,
도 9는 본 발명의 일실시예에 따른 열차운영계획의 지원시스템을 도시한 블록도이며,
도 10은 본 발명의 일실시예에 따른 열차운영계획시스템과 통합정보시스템 사이의 열차운전시각 데이터 전달을 설명하기 위하여 도시한 블록도이며,
도 11은 본 발명의 일실시예에 따른 열차운영계획에 이용되는 데이터의 예시를 나타낸 예시도이다.
150: 표준시간 산정부 170: 열차다이아 작성부
Claims (11)
- 열차의 견인중량, 가속성능 및 제동성능이 포함된 차량정보가 산정되는 차량정보 산정부(110);
상기 차량정보 산정부(110)를 통해 산정된 차량정보를 이용하여 열차 편성과 속도에 따른 주행 상황이 자동 산정되도록 하여 열차계획에 필요한 최소운전시간이 산출되는 운전선도 작성부(130);
상기 운전선도 작성부(130)를 통해 산출된 최소운전시간을 이용하여 열차운영에 적용이 가능한 운전시분을 산정하고 선로 및 구간별로 열차운행 목적과 패턴에 따른 표준운전시간이 산정되는 표준시간 산정부(150); 및
상기 표준시간 산정부(150)를 통해 산정된 표준운전시간을 이용하여 열차다이아가 작성되는 열차다이아 작성부(170)가 포함되어 구성된 것을 특징으로 한 열차운영계획시스템. - 제1항에 있어서, 상기 차량정보 산정부(110)는
열차편성, 선로조건 및 운행조건에 따른 동력차 견인중량이 산정되고, 운행구간별 견인정수와 견인특성 곡선이 산정되는 견인중량 산정부(111); 동력차 견인중량, 열차편성, 선로구배 및 신호조건에 따른 열차별 가속성능과 가속도 곡선이 산정되는 가속성능 산정부(113); 및 동력차, 객화차 제동형식, 열차편성, 선로구배 및 폐색구간에 따른 열차별 제동성능이 산정되고 감속도 곡선이 산정되는 제동성능 산정부(115)가 포함되어 구성된 것을 특징으로 한 열차운영계획시스템. - 제1항에 있어서, 상기 운전선도 작성부(130)는
상기 차량정보 산정부(110)를 통해 산정된 열차의 견인중량, 가속성능 및 제동성능과 열차의 운전상태, 운전속도, 운전시분, 주행거리, 동력소모량, 선로자료 및 신호자료의 상호 관계를 열차운행에 수반하여 변화하는 상태가 도시되는 것을 특징으로 한 열차운영계획시스템. - 제1항에 있어서, 상기 열차다이아 작성부(170)를 통해 작성된 열차다이아는 열차다이아 출력부(191)를 통하여 열차설정 작업내용이 포함된 출력물로 표출되거나, 열차시각표 출력부(193)를 통하여 열차시각설정 작업내용이 포함된 출력물로 표출되는 것을 특징으로 한 열차운영계획시스템.
- 제4항에 있어서, 상기 표준시간 산정부(150)와 열차시각표 출력부(193)를 통한 열차운전시간 자료를 이용하여 선로 및 구간에 대해 최적의 열차 설정능력을 출력시키는 선로용량 산정부(195)가 포함되는 것을 특징으로 한 열차운영계획시스템.
- (a) 차량정보 산정부(110)를 통해 열차의 가속성능 및 제동성능이 포함된 차량정보가 산정되는 차량정보 산정단계;
(b) 상기 차량정보 산정단계를 통해 산정된 차량정보를 이용하여 열차 편성과 속도에 따른 주행 상황이 운전선도 작성부(130)를 통해 자동 산정되도록 하여 열차계획에 필요한 최소운전시간이 산출되는 운전선도 작성단계;
(c) 상기 운전선도 작성단계를 통해 산출된 최소운전시간을 이용하여 열차운영에 적용이 가능한 운전시분을 산정하고 선로 및 구간별로 열차운행 목적과 패턴에 따른 표준운전시간이 표준시간 산정부(150)를 통해 산정되는 표준시간 산정단계; 및
(d) 상기 표준시간 산정단계에서 산정된 표준운전시간을 이용하여 열차다이아 작성부(170)를 통해 열차의 다이아가 작성되는 다이아 작성단계를 포함하는 열차운영 계획방법. - 제6항에 있어서, 상기 차량정보 산정단계에서는
견인중량 산정부(111)를 통해 동력차 형식, 선로조건 및 운행조건에 따른 동력차 견인중량이 산정되고, 운행구간별 견인정수와 견인특성 곡선이 산정되는 견인중량 산정단계와; 가속성능 산정부(113)를 통해 동력차 견인중량, 열차편성, 선로구배 및 신호조건에 따른 열차별 가속성능과 가속도 곡선이 산정되는 가속성능 산정단계와; 제동성능 산정부(115)를 통해 동력차, 객화차 제동형식, 열차편성, 선로구배 및 폐색방식에 따른 열차별 제동성능이 산정되고 감속도 곡선이 산정되는 제동성능 산정단계를 포함하는 것을 특징으로 하는 열차운영 계획방법. - 제6항에 있어서, 상기 운전선도 작성단계에서는
상기 차량정보 산정단계를 통해 산정된 열차의 가속성능 및 제동성능과 열차의 운전상태, 운전속도, 운전시분, 주행거리, 동력소모량, 선로자료 및 신호자료의 상호 관계를 열차운행에 수반하여 변화하는 상태가 도시되는 단계를 포함하는 것을 특징으로 하는 열차운영 계획방법. - 제6항에 있어서, 열차다이아 작성단계를 통해 작성된 열차다이아는
열차다이아 출력부(191)를 통하여 열차설정 작업내용이 포함된 출력물로 표출되는 단계 또는 열차시각표 출력부(193)를 통하여 열차시각설정 작업내용이 포함된 출력물로 표출되는 단계를 포함하는 것을 특징으로 하는 열차운영 계획방법. - 제9항에 있어서, 상기 표준시간 산정단계와 열차다이아 작성단계를 통한 열차운전시간 자료를 이용하여 선로 및 구간에 대해 최적의 열차 설정능력을 출력시키는 선로용량 산정단계를 포함하는 것을 특징으로 하는 열차운영 계획방법.
- 제6항 내지 제10항 중 어느 한 항의 열차운영 계획방법을 실행하는 프로그램이 기록되어 컴퓨터로 읽을 수 있는 기록매체.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020130060153A KR101299526B1 (ko) | 2013-05-28 | 2013-05-28 | 열차운영 계획시스템 및 그 방법 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020130060153A KR101299526B1 (ko) | 2013-05-28 | 2013-05-28 | 열차운영 계획시스템 및 그 방법 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR101299526B1 true KR101299526B1 (ko) | 2013-08-23 |
Family
ID=49221132
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020130060153A Active KR101299526B1 (ko) | 2013-05-28 | 2013-05-28 | 열차운영 계획시스템 및 그 방법 |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR101299526B1 (ko) |
Cited By (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20180049673A (ko) * | 2016-11-03 | 2018-05-11 | 한국철도시설공단 | 선로 배분 방법 및 선로 배분 시스템 |
| CN109625036A (zh) * | 2018-12-20 | 2019-04-16 | 交控科技股份有限公司 | 一种非通信车车次窗的推算处理方法 |
| CN110843870A (zh) * | 2019-11-21 | 2020-02-28 | 北京交通大学 | 一种非正常事件下高铁路网图定能力保持方法 |
| CN110901696A (zh) * | 2019-10-29 | 2020-03-24 | 北京全路通信信号研究设计院集团有限公司 | 一种基于车重的列车控制方法及装置 |
| CN110920692A (zh) * | 2019-11-22 | 2020-03-27 | 交控科技股份有限公司 | 本地人工筛选升级列车的方法及系统 |
| CN111152818A (zh) * | 2020-01-03 | 2020-05-15 | 中国铁道科学研究院集团有限公司通信信号研究所 | 一种运行图阶段计划逻辑检查方法 |
| CN112874589A (zh) * | 2021-02-18 | 2021-06-01 | 卡斯柯信号有限公司 | 一种列车计划运行图自动调整系统及方法 |
| CN113320577A (zh) * | 2021-06-21 | 2021-08-31 | 北京交通大学 | 一种面向单一运行交路的城轨列车运行图自动编制方法 |
| KR102351979B1 (ko) | 2021-10-15 | 2022-01-17 | (주)지오엔티 | 철도차량 운영 계획 시스템 |
| KR102397566B1 (ko) | 2021-10-15 | 2022-05-13 | (주)지오엔티 | 승무운영계획 시스템 |
| WO2022165195A1 (en) * | 2021-01-29 | 2022-08-04 | Union Pacific Railroad Company | Managing, monitoring, and validating train consists |
| CN114919632A (zh) * | 2022-06-14 | 2022-08-19 | 通号城市轨道交通技术有限公司 | 牵引计算仿真方法及装置 |
| CN115092216A (zh) * | 2022-07-19 | 2022-09-23 | 北京交大思诺科技股份有限公司 | 一种货运列车自动驾驶分布式控制系统 |
| CN116767315A (zh) * | 2023-06-08 | 2023-09-19 | 交控科技股份有限公司 | 客货列车坡道追踪运行的控制方法、装置、设备及介质 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20110118914A1 (en) * | 2009-11-13 | 2011-05-19 | Brooks James D | Method and system for independent control of vehicle |
| KR101037175B1 (ko) * | 2010-12-30 | 2011-05-26 | 대아티아이(주) | 열차운행정보분석장치를 활용한 열차운행 제어 시스템 및 그 방법 |
| JP2012201153A (ja) * | 2011-03-24 | 2012-10-22 | Toshiba Corp | ダイヤ作成装置およびダイヤ作成方法 |
| JP2013071575A (ja) * | 2011-09-27 | 2013-04-22 | Hitachi Ltd | 資源運用計画作成装置及びその方法、及びプログラム |
-
2013
- 2013-05-28 KR KR1020130060153A patent/KR101299526B1/ko active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20110118914A1 (en) * | 2009-11-13 | 2011-05-19 | Brooks James D | Method and system for independent control of vehicle |
| KR101037175B1 (ko) * | 2010-12-30 | 2011-05-26 | 대아티아이(주) | 열차운행정보분석장치를 활용한 열차운행 제어 시스템 및 그 방법 |
| JP2012201153A (ja) * | 2011-03-24 | 2012-10-22 | Toshiba Corp | ダイヤ作成装置およびダイヤ作成方法 |
| JP2013071575A (ja) * | 2011-09-27 | 2013-04-22 | Hitachi Ltd | 資源運用計画作成装置及びその方法、及びプログラム |
Cited By (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101881843B1 (ko) * | 2016-11-03 | 2018-08-24 | 한국철도시설공단 | 선로 배분 방법 및 선로 배분 시스템 |
| KR20180049673A (ko) * | 2016-11-03 | 2018-05-11 | 한국철도시설공단 | 선로 배분 방법 및 선로 배분 시스템 |
| CN109625036A (zh) * | 2018-12-20 | 2019-04-16 | 交控科技股份有限公司 | 一种非通信车车次窗的推算处理方法 |
| CN109625036B (zh) * | 2018-12-20 | 2020-12-18 | 交控科技股份有限公司 | 一种非通信车车次窗的推算处理方法 |
| CN110901696A (zh) * | 2019-10-29 | 2020-03-24 | 北京全路通信信号研究设计院集团有限公司 | 一种基于车重的列车控制方法及装置 |
| CN110843870A (zh) * | 2019-11-21 | 2020-02-28 | 北京交通大学 | 一种非正常事件下高铁路网图定能力保持方法 |
| CN110920692B (zh) * | 2019-11-22 | 2022-02-08 | 交控科技股份有限公司 | 本地人工筛选升级列车的方法及系统 |
| CN110920692A (zh) * | 2019-11-22 | 2020-03-27 | 交控科技股份有限公司 | 本地人工筛选升级列车的方法及系统 |
| CN111152818A (zh) * | 2020-01-03 | 2020-05-15 | 中国铁道科学研究院集团有限公司通信信号研究所 | 一种运行图阶段计划逻辑检查方法 |
| WO2022165195A1 (en) * | 2021-01-29 | 2022-08-04 | Union Pacific Railroad Company | Managing, monitoring, and validating train consists |
| US12060094B2 (en) | 2021-01-29 | 2024-08-13 | Union Pacific Railroad Company | Managing, monitoring, and validating train consists |
| CN112874589B (zh) * | 2021-02-18 | 2022-07-15 | 卡斯柯信号有限公司 | 一种列车计划运行图自动调整系统及方法 |
| CN112874589A (zh) * | 2021-02-18 | 2021-06-01 | 卡斯柯信号有限公司 | 一种列车计划运行图自动调整系统及方法 |
| CN113320577A (zh) * | 2021-06-21 | 2021-08-31 | 北京交通大学 | 一种面向单一运行交路的城轨列车运行图自动编制方法 |
| CN113320577B (zh) * | 2021-06-21 | 2022-05-13 | 北京交通大学 | 一种面向单一运行交路的城轨列车运行图自动编制方法 |
| KR102351979B1 (ko) | 2021-10-15 | 2022-01-17 | (주)지오엔티 | 철도차량 운영 계획 시스템 |
| KR102397566B1 (ko) | 2021-10-15 | 2022-05-13 | (주)지오엔티 | 승무운영계획 시스템 |
| CN114919632A (zh) * | 2022-06-14 | 2022-08-19 | 通号城市轨道交通技术有限公司 | 牵引计算仿真方法及装置 |
| CN115092216A (zh) * | 2022-07-19 | 2022-09-23 | 北京交大思诺科技股份有限公司 | 一种货运列车自动驾驶分布式控制系统 |
| CN115092216B (zh) * | 2022-07-19 | 2024-04-19 | 北京交大思诺科技股份有限公司 | 一种货运列车自动驾驶分布式控制系统 |
| CN116767315A (zh) * | 2023-06-08 | 2023-09-19 | 交控科技股份有限公司 | 客货列车坡道追踪运行的控制方法、装置、设备及介质 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101299526B1 (ko) | 열차운영 계획시스템 및 그 방법 | |
| Abril et al. | An assessment of railway capacity | |
| KR101326012B1 (ko) | 열차 운영 계획을 위한 지원 시스템 | |
| AU2014202460B2 (en) | Method and system for controlling energy demand of vehicles on a network | |
| KR100811453B1 (ko) | 지능형 철도건설지원시스템 및 그 운용방법. | |
| JPH10505036A (ja) | スケジューリングシステム及びその方法 | |
| US11402226B2 (en) | System and method for arranging transportation systems for travel | |
| Mitra et al. | Estimation of railroad capacity using parametric methods. | |
| Poliński et al. | Digitization in rail transport | |
| López et al. | A methodology for evaluating environmental impacts of railway freight transportation policies | |
| Litherland et al. | An alternative approach to railway asset management value analysis: framework development | |
| Li et al. | Reassessing the financial and social costs of public transport | |
| Valentinovic et al. | Railway line capacity methods analysis and their application in" Lithuanian Railways" justification | |
| Kovalenko et al. | Assessment of the Mitigation of Consequences Resulting from Incidents at the Railway | |
| Cuppi | Analysis of railway signalling systems to increase line and node capacity | |
| Dick et al. | Cost and Benefit Risk Framework for Modern Railway Electrification Options | |
| Smart et al. | HS2 railway, UK–route development to hybrid bill: technical and operational requirements | |
| Geiberger et al. | Monitoring energy usage of heavy-haul iron ore trains with on-board energy meter for improving energy efficiency | |
| Wardrop | Use of railway analysis tools from an Australian perspective | |
| Wirasinghe et al. | Optimal terminus location for a rail line with many to many travel demand | |
| GKOUMAS et al. | Rail transport research and innovation in Europe | |
| Zhuo et al. | The theory and method of design and optimization for Railway Intelligent Transportation Systems (RITS) | |
| Lytynskyi et al. | Analysis of the technical and operational indicators of rolling stock operation on route NO. 250E “Berkosa Street–Pivdennyi Railway Station Metro Station” | |
| Bratton et al. | Understanding the impact of driving styles on reactionary subthreshold delays on a fixed block signalling system | |
| Marik | Analysis of Resources for the Safety and Comfort of Railway Passenger Using Analytical Hierarchy Process |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| A302 | Request for accelerated examination | ||
| PA0302 | Request for accelerated examination |
St.27 status event code: A-1-2-D10-D17-exm-PA0302 St.27 status event code: A-1-2-D10-D16-exm-PA0302 |
|
| D13-X000 | Search requested |
St.27 status event code: A-1-2-D10-D13-srh-X000 |
|
| D14-X000 | Search report completed |
St.27 status event code: A-1-2-D10-D14-srh-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20160819 Year of fee payment: 4 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20170821 Year of fee payment: 5 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 5 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20180820 Year of fee payment: 6 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 6 |
|
| FPAY | Annual fee payment |
Payment date: 20190819 Year of fee payment: 7 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 7 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 8 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 9 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 10 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 11 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 12 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 13 |
|
| U11 | Full renewal or maintenance fee paid |
Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-OTH-PR1001 (AS PROVIDED BY THE NATIONAL OFFICE) Year of fee payment: 13 |