KR101773473B1 - 조립형 직선접속재 시공 방법 - Google Patents
조립형 직선접속재 시공 방법 Download PDFInfo
- Publication number
- KR101773473B1 KR101773473B1 KR1020150109070A KR20150109070A KR101773473B1 KR 101773473 B1 KR101773473 B1 KR 101773473B1 KR 1020150109070 A KR1020150109070 A KR 1020150109070A KR 20150109070 A KR20150109070 A KR 20150109070A KR 101773473 B1 KR101773473 B1 KR 101773473B1
- Authority
- KR
- South Korea
- Prior art keywords
- cable
- conductor
- line
- layer
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01B—CABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
- H01B13/00—Apparatus or processes specially adapted for manufacturing conductors or cables
- H01B13/012—Apparatus or processes specially adapted for manufacturing conductors or cables for manufacturing wire harnesses
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01B—CABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
- H01B13/00—Apparatus or processes specially adapted for manufacturing conductors or cables
- H01B13/012—Apparatus or processes specially adapted for manufacturing conductors or cables for manufacturing wire harnesses
- H01B13/01209—Details
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01B—CABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
- H01B13/00—Apparatus or processes specially adapted for manufacturing conductors or cables
- H01B13/016—Apparatus or processes specially adapted for manufacturing conductors or cables for manufacturing co-axial cables
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01B—CABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
- H01B13/00—Apparatus or processes specially adapted for manufacturing conductors or cables
- H01B13/22—Sheathing; Armouring; Screening; Applying other protective layers
- H01B13/225—Screening coaxial cables
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01B—CABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
- H01B7/00—Insulated conductors or cables characterised by their form
- H01B7/17—Protection against damage caused by external factors, e.g. sheaths or armouring
- H01B7/28—Protection against damage caused by moisture, corrosion, chemical attack or weather
- H01B7/282—Preventing penetration of fluid, e.g. water or humidity, into conductor or cable
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Cable Accessories (AREA)
Abstract
Description
도 2 내지 도 21은 본 발명의 일 실시예에 따른 조립형 직선접속재 시공 방법을 설명하기 위한 도면.
도 22는 본 발명의 일 실시예에 따른 조립형 직선접속재 시공 방법에 따라 접속이 완료된 모습을 보여주는 도면.
도 23은 조립형 직선접속재를 보여주는 도면.
도 24는 도체 압착 슬리브를 보여주는 도면.
도 25는 중성선 압착 슬리브를 보여주는 도면.
도 26은 자기수축형 외피튜브의 리드선 제거 전과 리드선 제거 후를 보여주는 도면.
도 27은 본 발명의 일 실시예에 따른 조립형 직선접속재 시공 방법에 따라 접속이 완료된 후 13.2kv 인가 시 전계분포 해석 결과를 보여주는 도면.
도 28은 본 발명의 일 실시예에 따른 조립형 직선접속재 시공 방법에 따라 접속이 완료된 후 13.2kv 인가 시 등전위 분포도.
도 29은 본 발명의 일 실시예에 따른 조립형 직선접속재 시공 방법에 따라 접속이 완료된 후 13.2kv 인가 시 등전위선도.
도 30은 본 발명의 일 실시예에 따른 조립형 직선접속재 시공 방법에 따라 접속이 완료된 후 13.2kv 인가 시 전계분포도.
11: 외피층 12: 중성선
13: 외부 반도전층 14: 차수 테이프
15: 절연층 16: 도체
100: 조립형 직선접속재 200: 연동선
300: 자기수축형 외피튜브 310: 리드선
400: 도체 압착 슬리브 500: 차폐 테이프
600: 중성선 압착 슬리브
S01: 외피층제거 단계 S02: 제1연동선고정 단계
S03: 중성선펼침 단계 S04: 연마 단계
S05: 제1방수처리 단계 S06: 제2연동선고정 단계
S07: 임시고정 단계 S08: 반도전층제거 단계
S09: 연필깍이 단계 S10: 세척 단계
S11: 제1구리스도포 단계 S12: 직선접속재끼움 단계
S13: 도체손질 단계 S14: 외피튜브삽입 단계
S15: 슬리브압착 단계 S16: 제2구리스도포 단계
S17: 직선접속재정위치 단계 S18: 제2방수처리 단계
S19: 중성선고정 단계 S20: 차폐테이프감기 단계
S21: 외피튜브수축 단계 S22: 제3방수처리 단계
S23: 케이블마감 단계 S24: 중성선압착 단계
Claims (5)
- 지중배전선로에 사용되는 제1케이블(10a) 및 제2케이블(10b) 간의 연결을 조립형 직선접속재(100)를 이용하여 연결하는 조립형 직선접속재 시공 방법에 있어서,
제1케이블(10a) 및 제2케이블(10b)이 일정부분 겹치도록 배치한 다음, 제1케이블(10a) 및 제2케이블(10b)의 외피층(11)을 미리 결정된 치수에 맞게 절단하여 제거하는 외피층제거 단계(S01);
제1케이블(10a)의 외피층(11) 절단면 끝단 부분의 중성선(12)을 연동선(200)으로 고정하는 제1연동선고정 단계(S02);
중성선(12)을 펼친 후, 제1케이블(10a)의 차수 테이프(14)는 벗긴 후 제거하고, 제2케이블(10b)의 차수 테이프(14)는 벗겨 늘어뜨리는 중성선펼침 단계(S03);
제1케이블(10a) 외피층(11) 절단면에서 일정부분까지 사포로 연마한 후, 닦아주는 연마 단계(S04);
제1케이블(10a) 연마 부위를 방수 테이프 반 겹쳐 감기를 2-3회 실시하여 방수 처리하는 제1방수처리 단계(S05);
제1케이블(10a)의 중성선(12)을 뒤로 젖혀, 방수처리된 부분에 밀착되도록 누른 후, 연동선(200)으로 중성선(12)을 고정하는 제2연동선고정 단계(S06);
제1케이블(10a)의 중성선(12) 끝 부위를 자기수축형 외피튜브(300)의 삽입이 용이하도록 테이프로 임시 고정하는 임시고정 단계(S07);
제1케이블(10a)의 외부 반도전층(13) 및 제2케이블(10b)의 외부 반도전층(13)을 미리 결정된 치수에 맞게 절단하여 제거하는 반도전층제거 단계(S08);
제1케이블(10a) 및 제2케이블(10b) 절연층(15)이 손상되지 않도록 외부 반도전층(13)의 일부를 절단 하여 제거함으로써 절연층(15)을 노출시키고, 절연층(15)의 일부를 절단 하여 제거함으로써 도체(16)를 노출시키며, 절연층(15) 끝과 외부 반도전층(13) 끝을 연필깎이 하는 연필깍이 단계(S09);
제2케이블(10b)의 절연층(15)을 세척포를 사용하여 도체(16)에서 외부 반도전층(13) 방향으로 닦아주는 세척 단계(S10);
실리콘 구리스를 제2케이블(10b)의 절연층(15)과 외부 반도전층(13) 외부에 도포하여 절연층(15)과 외부 반도전층(13) 경계면에 공극이 발생되지 않도록 하는 제1구리스도포 단계(S11);
제2케이블(10b)에 조립형 직선접속재(100)를 돌리면서 절연층(15)이 보이도록 밀어 끼우는 직선접속재끼움 단계(S12);
제1케이블(10a) 및 제2케이블(10b) 도체(16)의 산화막 및 수밀 테이프를 제거하는 도체손질 단계(S13);
제1케이블(10a)에 자기수축형 외피튜브(300)를 삽입하는 외피튜브삽입 단계(S14);
도체 압착 슬리브(400)와 도체(16)에 산화방지제가 균일하게 도포되도록 가볍게 돌려준 후, 미리 결정된 압착 순서에 따라 압착하는 슬리브압착 단계(S15);
제1케이블(10a)의 절연층(15)을 세척포를 사용하여 도체(16)에서 외부 반도전층(13) 방향으로 닦아준 후, 실리콘 구리스를 도체 압착 슬리브(400)와 제1케이블(10a)의 절연층(15) 및 외부 반도전층(13) 외부에 도포하는 제2구리스도포 단계(S16);
제2케이블(10b)에 끼워진 조립형 직선접속재(100)를 도체 압착 슬리브(400)의 정중앙으로부터 일정부분까지 돌리면서 밀어 끼우는 직선접속재정위치 단계(S17);
제2케이블(10b)에 도포된 실리콘 구리스를 닦아내고, 차수 테이프(14)를 원상태로 일정부분 까지 감아주고, 상기 조립형 직선접속재(100)의 일 부분부터 원복된 차수 테이프(14)의 일정 부분 까지 방수처리 하는 제2방수처리 단계(S18);
케이블 중성선(12)을 원래대로 고르게 펼쳐 연동선(200)으로 고정한 후, 제2케이블(10b)의 고정된 중성선 위에서부터 케이블 외피 끝 지점에 일정 길이 연마 하고, 방수처리 한 다음, 중성선(12)을 접어서 연동선(200)으로 조립형 직선접속재(100)의 끝단으로부터 일정 거리 이격된 지점을 묶어주는 중성선고정 단계(S19);
차폐 테이프(500)를 제1케이블(10a)의 중성선(12) 겹친 부분 일정 지점으로부터 제2케이블(10b)의 중성선(12) 겹친 부분 일정 지점까지 반겹쳐 당겨 감는 차폐테이프감기 단계(S20);
자기수축형 외피튜브(300)의 중앙을 조립형 직선접속재(100)의 중앙 부분으로 옮긴 후, 조립형 직선접속재(100) 끝단에서 일정 지점에 자기수축형 외피튜브(300)를 위치시키고 리드선(PE)(310)을 잡아당겨 자기수축형 외피튜브(300)를 수축시키는 외피튜브수축 단계(S21);
조립형 직선접속재(100)의 양쪽 끝 부분에서 조립형 직선접속재(100) 중앙쪽 일정 부분 까지 방수처리 하는 제3방수처리 단계(S22);
케이블(10a, 10b)양쪽 끝을 테이프로 3회 이상 반 겹쳐 감는 케이블마감 단계(S23); 및
양쪽 중성선(12)을 모으고 중성선 압착 슬리브(600)로 압착하는 중성선압착 단계(S24);를 포함하며,
상기 슬리브압착 단계(S15)의 도체 압착 슬리브(400)는 중앙 일정 부분이 막혀있고, 중앙 일정 부분이 막혀있는 부분의 중앙에 도체(16)가 삽입될 홈이 형성되며,
상기 슬리브압착 단계(S15)의 도체 압착 슬리브(400)의 압착은 압착슬리브의 중앙측으로 경사지도록 압착함으로써 도체 압착 슬리브(400)의 압착된 끝단이 도체(15)가 도체 압착 슬리브(400)로부터 빠져나가지 못하게 하는 것을 특징으로 하는 조립형 직선접속재 시공 방법.
- 삭제
- 삭제
- 삭제
- 제1항에 있어서,
상기 슬리브압착 단계(S15)는
도체 압착 슬리브(400)를 압착한 압착 표면을 다듬질하는 것을 특징으로 하는 조립형 직선접속재 시공 방법.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020150109070A KR101773473B1 (ko) | 2015-07-31 | 2015-07-31 | 조립형 직선접속재 시공 방법 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020150109070A KR101773473B1 (ko) | 2015-07-31 | 2015-07-31 | 조립형 직선접속재 시공 방법 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20170014968A KR20170014968A (ko) | 2017-02-08 |
| KR101773473B1 true KR101773473B1 (ko) | 2017-08-31 |
Family
ID=58155683
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020150109070A Active KR101773473B1 (ko) | 2015-07-31 | 2015-07-31 | 조립형 직선접속재 시공 방법 |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR101773473B1 (ko) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR200484835Y1 (ko) * | 2017-09-11 | 2017-10-31 | 씨피케이 주식회사 | 알루미늄 아머드 케이블의 직선 연결 유닛 |
| KR102634463B1 (ko) | 2021-11-15 | 2024-02-06 | 김병준 | 비대면 신분증 사진 촬영장치 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007318945A (ja) | 2006-05-26 | 2007-12-06 | Exsym Corp | 電力ケーブル用接続部 |
| JP2009152012A (ja) | 2007-12-19 | 2009-07-09 | Sumitomo Wiring Syst Ltd | 電線の止水方法及び該止水方法で形成された止水部を有する電線 |
| KR100925841B1 (ko) * | 2008-02-18 | 2009-11-09 | 주식회사 평일 | 콘택트링을 갖는 직선접속재 |
| JP2015133777A (ja) * | 2014-01-09 | 2015-07-23 | スリーエム イノベイティブ プロパティズ カンパニー | 電力ケーブルの接続方法、及び電力ケーブルの接続構造 |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR200340047Y1 (ko) | 2003-10-28 | 2004-01-28 | 한국전력공사 | 가공 케이블용 직선 접속재 |
-
2015
- 2015-07-31 KR KR1020150109070A patent/KR101773473B1/ko active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007318945A (ja) | 2006-05-26 | 2007-12-06 | Exsym Corp | 電力ケーブル用接続部 |
| JP2009152012A (ja) | 2007-12-19 | 2009-07-09 | Sumitomo Wiring Syst Ltd | 電線の止水方法及び該止水方法で形成された止水部を有する電線 |
| KR100925841B1 (ko) * | 2008-02-18 | 2009-11-09 | 주식회사 평일 | 콘택트링을 갖는 직선접속재 |
| JP2015133777A (ja) * | 2014-01-09 | 2015-07-23 | スリーエム イノベイティブ プロパティズ カンパニー | 電力ケーブルの接続方法、及び電力ケーブルの接続構造 |
Also Published As
| Publication number | Publication date |
|---|---|
| KR20170014968A (ko) | 2017-02-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US3787607A (en) | Coaxial cable splice | |
| CN101346862B (zh) | 电缆连接方法和连接部、电缆连接部的套管及制造方法 | |
| TWI429155B (zh) | 纜線之管狀終端 | |
| CN107181211A (zh) | 一种电缆分支接头的制作方法 | |
| KR101773475B1 (ko) | 자기수축형 직선접속재 시공 방법 | |
| EP2510582B1 (en) | Biasing connector | |
| US9270031B2 (en) | Processes for manufacturing jointing assemblies for medium or high voltage electrical cables and jointing assemblies obtainable by the processes | |
| US7498515B2 (en) | Tubular cable adapter for joining or terminating a medium-voltage cable | |
| CN102623946A (zh) | 一种电缆预制式中间接头及其导体屏蔽罩的安装方法 | |
| KR20230099232A (ko) | 전선용 도체의 절연방수모듈 | |
| KR20170014968A (ko) | 조립형 직선접속재 시공 방법 | |
| CN108429223B (zh) | 预制式三分支中间接头及其装配方法 | |
| US20130341087A1 (en) | Jointing assemblies for electrical cables | |
| CN105207134A (zh) | 应用半导体涂覆的高压电缆头制作方法 | |
| US9786412B2 (en) | Cable moisture seal assemblies, systems and methods | |
| RU2190913C1 (ru) | Соединительная муфта для силового кабеля с изоляцией из сшитого полиэтилена и способ монтажа муфты | |
| CN105226582A (zh) | 35kV热缩式电力电缆终端头制作工艺方法 | |
| CN107275913A (zh) | 一种聚酰亚胺薄膜绕包屏蔽电线电缆端头处理方法 | |
| CN112490700A (zh) | 一种多股芯线两段式电连接器及其连接方法 | |
| CN108879119B (zh) | 电缆驳接组件及电缆驳接方法 | |
| CN117080988A (zh) | 一种三芯高压交联聚乙烯绝缘电缆冷缩终端头制作方法 | |
| KR100952900B1 (ko) | 자기수축형 케이블 접속재, 자기수축형 케이블 접속유니트및 이를 사용한 케이블 접속방법 | |
| CN102709865A (zh) | 插拔式高压终端头制作方法 | |
| RU2558669C2 (ru) | Соединитель экрана для электрических кабелей и соединительная сборка, содержащая упомянутый соединитель экрана | |
| CN105207135A (zh) | 一种高压电缆头中间芯线的处理方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| D13-X000 | Search requested |
St.27 status event code: A-1-2-D10-D13-srh-X000 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-3-3-R10-R18-oth-X000 |
|
| D14-X000 | Search report completed |
St.27 status event code: A-1-2-D10-D14-srh-X000 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| E13-X000 | Pre-grant limitation requested |
St.27 status event code: A-2-3-E10-E13-lim-X000 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20200610 Year of fee payment: 4 |
|
| P14-X000 | Amendment of ip right document requested |
St.27 status event code: A-5-5-P10-P14-nap-X000 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| FPAY | Annual fee payment |
Payment date: 20210730 Year of fee payment: 5 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 5 |
|
| FPAY | Annual fee payment |
Payment date: 20220822 Year of fee payment: 6 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 6 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 7 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 8 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 9 |
|
| U11 | Full renewal or maintenance fee paid |
Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-OTH-PR1001 (AS PROVIDED BY THE NATIONAL OFFICE) Year of fee payment: 9 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 10 |
|
| U11 | Full renewal or maintenance fee paid |
Free format text: ST27 STATUS EVENT CODE: A-4-4-U10-U11-OTH-PR1001 (AS PROVIDED BY THE NATIONAL OFFICE) Year of fee payment: 10 |