KR102673473B1 - Concrete retaining wall construction method using mixed blocks of self-supporting fill blocks and hollow blocks - Google Patents
Concrete retaining wall construction method using mixed blocks of self-supporting fill blocks and hollow blocks Download PDFInfo
- Publication number
- KR102673473B1 KR102673473B1 KR1020240011777A KR20240011777A KR102673473B1 KR 102673473 B1 KR102673473 B1 KR 102673473B1 KR 1020240011777 A KR1020240011777 A KR 1020240011777A KR 20240011777 A KR20240011777 A KR 20240011777A KR 102673473 B1 KR102673473 B1 KR 102673473B1
- Authority
- KR
- South Korea
- Prior art keywords
- filling
- block
- blocks
- hole
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0266—Retaining or protecting walls characterised by constructional features made up of preformed elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0283—Retaining or protecting walls characterised by constructional features of mixed type
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/30—Miscellaneous comprising anchoring details
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Retaining Walls (AREA)
Abstract
Description
본 발명은 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법에 관한 것으로서, 보다 상세하게는 옹벽을 형성시키는 속빈 블록과 채움 블록의 내부에 채움홀과 관통홀을 형성시키고, 시공과정에서 보강층을 지지하는 채움 블록들의 채움홀에만 충진재를 충진하여 지지력을 향상시킴으로써, 블록들이 경량화되어 이송 및 보관이 용이하고, 보강층을 지지하지 않는 속빈 블록의 관통홀에는 충진재를 충진하지 않아 시공시간을 단축시킬 수 있으며, 블록의 제조비용이 절감될 수 있는 효과가 있는 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법에 관한 것이다.The present invention relates to a method of constructing a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks. More specifically, filling holes and through holes are formed inside the hollow blocks and filling blocks forming the retaining wall, and construction In the process, the bearing capacity is improved by filling only the filling holes of the filling blocks that support the reinforcing layer, making the blocks lighter and easier to transport and store, and the through-holes of the hollow blocks that do not support the reinforcing layer are not filled with filler, thus reducing construction time. It relates to a construction method for a concrete retaining wall using a mixed block of self-supporting filled blocks and hollow blocks, which can shorten the block and reduce the manufacturing cost of the block.
일반적으로 신축 아파트, 주택 단지 또는 노변 등에 형성된 절개지, 경사벽, 경사면 등의 법면(法面) 등은 그대로 방치될 경우 우수나 지진 등에 의해 붕괴되면서 2차 피해를 발생시킬 우려가 있기 때문에 이러한 지형 장소에는 토사의 붕괴를 방지하기 위한 방법으로 옹벽과 같은 별도의 토목 구조물을 구축하여 시공하고 있다.In general, if left unattended, slopes such as cutouts, sloping walls, and slopes formed in newly built apartments, housing complexes, or roadsides have the risk of collapsing due to rain or earthquakes, causing secondary damage. In order to prevent soil collapse, separate civil engineering structures such as retaining walls are being constructed.
이러한 옹벽 구조물은 토압에 저항하여 배후의 토사가 무너지지 못하도록 만들어지는 벽체 구조물로서, 지표 지반을 안정된 경사각(안식각) 보다 가파른 경사로 하였을 경우에 일어나는 지반 붕괴를 막기 위해 설치되는 것이다.This retaining wall structure is a wall structure that resists earth pressure and prevents the soil behind it from collapsing, and is installed to prevent ground collapse that occurs when the ground surface is steeper than the stable slope angle (angle of repose).
이와 같은 옹벽 구조물로서 기존에는 콘크리트 블록을 다단으로 쌓거나 콘크리트를 타설함으로써 이루어지는 것으로, 이러한 옹벽은 지면으로부터 일정높이 수직하게 시공되는 수직벽체와, 그 후면에 채워지는 뒷채움 토사로 이루어지는 것이다.Such a retaining wall structure is conventionally made by stacking concrete blocks in multiple stages or pouring concrete. Such a retaining wall is made up of a vertical wall constructed vertically at a certain height from the ground and backfill soil filled at the rear.
그러나, 종래의 옹벽 구조물에 사용되는 콘크리트 블록은 콘크리트재로 이루어지며 속이 채워진 블록구조로 이루어져 있어, 중량에 의해 이송 및 보관이 어려운 문제점이 있으며, 뒷채움 토사를 지지하지 않은 옹벽 구조물의 상부에 배치되는 콘크리트 블록도 속이 채워진 블록으로 형성시키게 되므로, 공사비용과 공사시간이 늘어나게 되는 문제점이 있고, 속이 채워진 중량의 블록을 상부로 이동시키는 과정에서 안전사고가 발생될 수 있는 문제점이 있었다.However, the concrete blocks used in conventional retaining wall structures are made of concrete and have a filled block structure, so they are difficult to transport and store due to their weight, and are placed on the upper part of the retaining wall structure that does not support backfill soil. Since concrete blocks are also formed as filled blocks, there is a problem that construction costs and construction time increase, and there is a problem that safety accidents can occur in the process of moving heavy filled blocks to the top.
전술한 발명은 본 발명이 속하는 기술분야의 배경기술을 의미하며, 종래 기술을 의미하는 것은 아니다.The above-described invention refers to the background art of the technical field to which the present invention pertains, and does not mean prior art.
본 발명은 상기한 종래의 문제점을 해결하기 위해 안출된 것으로서, 본 발명의 목적은 옹벽을 형성시키는 속빈 블록과 채움 블록의 내부에 채움홀과 관통홀을 형성시키고, 시공과정에서 보강층을 지지하는 채움 블록들의 채움홀에만 충진재를 충진하여 지지력을 향상시킴으로써, 블록들이 경량화되어 이송 및 보관이 용이하고, 보강층을 지지하지 않는 속빈 블록의 관통홀에는 충진재를 충진하지 않아 시공시간을 단축시킬 수 있으며, 블록의 제조비용이 절감될 수 있는 효과가 있는 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법을 제공하는데 그 목적이 있다.The present invention was devised to solve the above-described conventional problems. The purpose of the present invention is to form filling holes and through holes inside the hollow blocks and filling blocks that form the retaining wall, and to provide filling to support the reinforcing layer during the construction process. By filling only the filling holes of the blocks with filler to improve the bearing capacity, the blocks become lighter and easier to transport and store, and the construction time can be shortened by not filling the through-holes of hollow blocks that do not support the reinforcing layer with filler. The purpose is to provide a construction method for a concrete retaining wall using mixed blocks of self-supporting fill blocks and hollow blocks, which has the effect of reducing manufacturing costs.
상기 과제를 달성하기 위하여 본 발명은In order to achieve the above task, the present invention
지반에 형성되는 지지면을 지지하도록 설치되는 옹벽의 시공 공법으로서,A construction method for a retaining wall installed to support a support surface formed on the ground,
상기 지지면을 지지하는 옹벽이 설치될 지면의 이물질을 제거하고 평탄화시키는 지면평탄화단계;A ground leveling step of removing foreign substances and leveling the ground on which the retaining wall supporting the support surface is to be installed;
상기 지면에 채움 블록들을 적층시켜 채움 블록벽체를 형성시키는 채움 블록벽체 형성단계; A fill block wall forming step of forming a fill block wall by stacking fill blocks on the ground;
상기 채움 블록벽체의 상부에 속빈 블록들을 적층시켜 속빈 블록벽체를 형성시키는 속빈 블록벽체 형성단계; 및A hollow block wall forming step of forming a hollow block wall by stacking hollow blocks on top of the filled block wall; and
상기 채움 블록벽체와 상기 지반의 지지면 사이에 형성되는 충진공간에 보강토를 충진하여 보강층을 형성시키는 충진공간 보강토 충진단계로 이루어진 것을 특징으로 하는 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법을 제공한다. A concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks, characterized in that it consists of a filling space reinforcement soil filling step of forming a reinforcement layer by filling the filling space formed between the filling block wall and the supporting surface of the ground with reinforcing soil. Provides construction methods.
본 발명의 일 실시예에 있어서, In one embodiment of the present invention,
상기 충진공간 보강토 충진단계 이후에는,After the filling space reinforcement soil filling step,
상기 속빈 블록벽체와 상기 지반의 지지면 사이에 형성되는 상부충진공간에 보강토를 충진하여 상부 보강층을 형성시키는 상부충진공간 보강토충진단계가 더 추가되는 것을 특징으로 한다. It is characterized in that an upper filling space reinforcing soil filling step is further added to form an upper reinforcing layer by filling reinforcing soil in the upper filling space formed between the hollow block wall and the support surface of the ground.
또한, 본 발명의 일 실시예에 있어서,Additionally, in one embodiment of the present invention,
상기 채움 블록은 충진블록본체와, The filling block includes a filling block body,
상기 충진블록본체의 상면과 저면을 연결하며 형성되는 채움홀과,A filling hole formed by connecting the upper and lower surfaces of the filling block body,
상기 충진블록본체에 형성되는 채움홀에 충진되는 충진재로 이루어진 것을 특징으로 한다. It is characterized in that it is made of a filler that is filled into the filling hole formed in the filling block main body.
이때, 상기 채움 블록에는,At this time, in the filling block,
상기 충진블록본체의 채움홀에 베이스마감패널이 더 체결되며,A base finishing panel is further fastened to the filling hole of the filling block body,
상기 베이스마감패널은 상기 채움홀의 하측에 배치되어, 상기 채움홀에 충진되는 상기 충진재를 지지하도록 된 것을 특징으로 한다. The base finishing panel is disposed below the filling hole to support the filling material filled in the filling hole.
또한, 본 발명의 일 실시예에 있어서, Additionally, in one embodiment of the present invention,
상기 속빈 블록은 공간블록본체와, The hollow block includes a space block body,
상기 공간블록본체의 상면과 저면을 연결하며 형성되는 관통홀로 이루어진 것을 특징으로 한다. It is characterized by consisting of a through hole formed by connecting the upper and lower surfaces of the space block main body.
이때, 상기 속빈 블록에는, At this time, in the hollow block,
상기 공간블록본체의 관통홀에 탑마감패널이 더 체결되며,A top finishing panel is further fastened to the through hole of the space block body,
상기 탑마감패널은 상기 관통홀의 상측에 배치되어, 상기 관통홀의 상부로 이물질이나 흙이 유입되는 것을 차단하도록 된 것을 특징으로 한다. The top finishing panel is disposed on the upper side of the through hole to block foreign substances or dirt from flowing into the upper part of the through hole.
본 발명인 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법에 따르면, 옹벽을 형성시키는 속빈 블록과 채움 블록의 내부에 채움홀과 관통홀을 형성시키고, 시공과정에서 보강층을 지지하는 채움 블록들의 채움홀에만 충진재를 충진하여 지지력을 향상시킴으로써, 블록들이 경량화되어 이송 및 보관이 용이하고, 보강층을 지지하지 않는 속빈 블록의 관통홀에는 충진재를 충진하지 않아 시공시간을 단축시킬 수 있으며, 블록의 제조비용이 절감될 수 있는 효과가 있다. According to the present invention's construction method of a concrete retaining wall using a mixed block of self-weighted fill blocks and hollow blocks, fill holes and through holes are formed inside the hollow blocks and fill blocks that form the retaining wall, and a reinforcement layer is supported during the construction process. By improving the bearing capacity by filling only the filling holes of filled blocks, the blocks are lighter and easier to transport and store, and the construction time can be shortened by not filling the through-holes of hollow blocks that do not support the reinforcing layer with filler. This has the effect of reducing the manufacturing cost of blocks.
도 1은 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 옹벽을 나타낸 설치상태도이다.
도 2는 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 옹벽을 나타낸 단면도이다.
도 3은 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 옹벽을 나타낸 정면도이다.
도 4는 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 속빈블록을 나타낸 도면이다.
도 5는 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 채움블록을 나타낸 도면이다.
도 6은 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 옹벽을 나타낸 단면도이다.
도 7은 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 다른 실시예를 나타낸 도면이다.Figure 1 is an installation state diagram showing a retaining wall in the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention.
Figure 2 is a cross-sectional view showing a retaining wall in the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention.
Figure 3 is a front view showing a retaining wall in the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention.
Figure 4 is a diagram showing a hollow block in the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention.
Figure 5 is a diagram showing a fill block for the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention.
Figure 6 is a cross-sectional view showing a retaining wall in the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention.
Figure 7 is a diagram showing another embodiment of the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention.
본 발명에 관한 설명은 구조적 내지 기능적 설명을 위한 실시예에 불과하므로, 본 발명의 권리범위는 본문에 설명된 실시예에 의하여 제한되는 것으로 해석되어서는 아니 된다. 즉, 실시예는 다양한 변경이 가능하고 여러 가지 형태를 가질 수 있으므로 본 발명의 권리범위는 기술적 사상을 실현할 수 있는 균등물들을 포함하는 것으로 이해되어야 한다.Since the description of the present invention is only an example for structural or functional explanation, the scope of the present invention should not be construed as limited by the examples described in the text. In other words, since the embodiment can be modified in various ways and can have various forms, the scope of rights of the present invention should be understood to include equivalents that can realize the technical idea.
한편, 본 발명에서 서술되는 용어의 의미는 다음과 같이 이해되어야 할 것이다.Meanwhile, the meaning of the terms described in the present invention should be understood as follows.
"제1", "제2" 등의 용어는 하나의 구성요소를 다른 구성요소로부터 구별하기 위한 것으로, 이들 용어들에 의해 권리범위가 한정되어서는 아니 된다. 예를 들어, 제1 구성요소는 제2 구성요소로 명명될 수 있고, 유사하게 제2구성요소도 제1 구성요소로 명명될 수 있다.Terms such as “first” and “second” are used to distinguish one component from another component, and the scope of rights should not be limited by these terms. For example, a first component may be named a second component, and similarly, the second component may also be named a first component.
어떤 구성요소가 다른 구성요소에 "연결되어"있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결될 수 도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어"있다고 언급된 때에는 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다. 한편, 구성요소들 간의 관계를 설명하는 다른 표현들, 즉 "~사이에"와 "바로 ~사이에" 또는 "~에 이웃하는"과 "~에 직접 이웃하는" 등도 마찬가지로 해석되어야 한다.When a component is said to be “connected” to another component, it should be understood that it may be directly connected to the other component, but that other components may also exist in between. On the other hand, when a component is said to be “directly connected” to another component, it should be understood that there are no other components in between. Meanwhile, other expressions that describe the relationship between components, such as “between” and “immediately between” or “neighboring to” and “directly neighboring to”, should be interpreted similarly.
단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한 복수의 표현을 포함하는 것으로 이해되어야 하고, "포함하다"또는 "가지다" 등의 용어는 실시된 특징, 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이며, 하나 또는 그 이상의 다른 특징이나 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.Singular expressions should be understood to include plural expressions unless the context clearly indicates otherwise, and terms such as “comprise” or “have” refer to implemented features, numbers, steps, operations, components, parts, or them. It is intended to specify the existence of a combination, and should be understood as not excluding in advance the possibility of the presence or addition of one or more other features, numbers, steps, operations, components, parts, or combinations thereof.
각 단계들에 있어 식별부호(예를 들어, a, b, c 등)는 설명의 편의를 위하여 사용되는 것으로 식별부호는 각 단계들의 순서를 설명하는 것이 아니며, 각 단계들은 문맥상 명백하게 특정 순서를 기재하지 않는 이상 명기된 순서와 다르게 일어날 수 있다. 즉, 각 단계들은 명기된 순서와 동일하게 일어날 수도 있고 실질적으로 동시에 수행될 수도 있으며 반대의 순서대로 수행될 수도 있다.For each step, identification codes (e.g., a, b, c, etc.) are used for convenience of explanation. The identification codes do not explain the order of each step, and each step clearly follows a specific order in context. Unless specified, events may occur differently from the specified order. That is, each step may occur in the same order as specified, may be performed substantially simultaneously, or may be performed in the opposite order.
여기서 사용되는 모든 용어들은 다르게 정의되지 않는 한, 본 발명이 속하는 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가진다. 일반적으로 사용되는 사전에 정의되어 있는 용어들은 관련 기술의 문맥상 가지는 의미와 일치하는 것으로 해석되어야 하며, 본 발명에서 명백하게 정의하지 않는 한 이상적이거나 과도하게 형식적인 의미를 지니는 것으로 해석될 수 없다.All terms used herein, unless otherwise defined, have the same meaning as commonly understood by a person of ordinary skill in the field to which the present invention pertains. Terms defined in commonly used dictionaries should be interpreted as consistent with the meaning they have in the context of the related technology, and cannot be interpreted as having an ideal or excessively formal meaning unless clearly defined in the present invention.
도 1은 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 옹벽을 나타낸 설치상태도이다. 도 2는 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 옹벽을 나타낸 단면도이다. 도 3은 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 옹벽을 나타낸 정면도이다. 도 4는 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 속빈블록을 나타낸 도면이다. 도 5는 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 채움블록을 나타낸 도면이다. 도 6은 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 옹벽을 나타낸 단면도이다. 도 7은 본 발명에 따른 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법의 다른 실시예를 나타낸 도면이다.Figure 1 is an installation state diagram showing a retaining wall in the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention. Figure 2 is a cross-sectional view showing a retaining wall in the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention. Figure 3 is a front view showing a retaining wall in the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention. Figure 4 is a diagram showing a hollow block in the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention. Figure 5 is a diagram showing a fill block for the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention. Figure 6 is a cross-sectional view showing a retaining wall in the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention. Figure 7 is a diagram showing another embodiment of the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks according to the present invention.
도면에 도시된 바와 같이 본 발명인 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법(이하에서는 설명의 편의상 '옹벽의 시공 공법'이라 명명함)는 지반(100)에 형성되는 지지면을 지지하도록 설치되는 옹벽의 시공 공법으로서, 본 발명에 따른 옹벽의 시공 공법은 지면평탄화단계(S1)와 채움 블록벽체 형성단계(S2)와 속빈 블록벽체 형성단계(S3)와 충진공간 보강토 충진단계(S4)를 포함하여 구성된다. As shown in the drawing, the present invention's construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks (hereinafter referred to as 'retaining wall construction method' for convenience of explanation) is a method of constructing a concrete retaining wall using a mixture of self-supporting fill blocks and hollow blocks. As a construction method of a retaining wall installed to support a surface, the construction method of a retaining wall according to the present invention includes a ground leveling step (S1), a filling block wall forming step (S2), a hollow block wall forming step (S3), and filling space reinforcement soil. It consists of step S4.
상기 지면평탄화단계(S1)는 지지면을 지지하는 옹벽이 설치될 지면의 이물질을 제거하고 평탄화시키는 단계이다.The ground leveling step (S1) is a step of removing and leveling foreign substances on the ground where the retaining wall supporting the support surface is to be installed.
상기 지면평탄화단계(S1)에서는 용벽이 설치된 지면의 이물질을 제거하고 롤러로 다져 평편하게 평탄화시키는 단계이다.In the ground leveling step (S1), foreign substances on the ground where the wall is installed are removed and compacted with a roller to flatten the surface.
상기 용벽이 설치될 지면을 일정깊이로 판 후 평탄화시키는 것도 가능하다.It is also possible to dig the ground where the wall is to be installed to a certain depth and then flatten it.
상기 채움 블록벽체 형성단계(S2)는 지면에 채움 블록(11)들을 적층시켜 채움 블록벽체(10)를 형성시키는 단계이다.The filling block wall forming step (S2) is a step of forming a filling block wall (10) by stacking filling blocks (11) on the ground.
상기 채움 블록벽체 형성단계(S2)에서는 상기 지면에 채움 블록들을 적충시켜 채움 블록벽체(10)를 형성시키게 된다. In the filling block wall forming step (S2), the filling block wall 10 is formed by filling the ground with filling blocks.
상기 채움 블록(11)들은 길이 쌓기 방식으로 적층되게 쌓아 상기 채움 블록벽체(10)를 형성시키게 된다.The filling blocks 11 are stacked in a lengthwise manner to form the filling block wall 10.
이때, 상기 채움 블록벽체(10)는 전체 옹벽의 높이의 절반 부분에 해당하는 높이로 상기 채움 블록벽체(10)를 형성시고, 나머지 절반 높이는 속빈 블록(21)벽체(20)로 형성시킬 수 있다.At this time, the filled block wall 10 is formed at a height corresponding to half of the height of the entire retaining wall, and the remaining half height can be formed as a hollow block 21 wall 20. .
다르게는, 후술될 보강토가 충진되는 높이까지 상기 채움 블록(11)벽체(10)를 형성시켜, 상기 보강토를 지지하도록 하고, 상기 보강토가 충진되지 않는 부분에는 상기 속빈 블록벽체(20)를 형성시킬 수 있다. Alternatively, the filling block 11 wall 10 is formed to a height at which the reinforced soil, which will be described later, is filled, to support the reinforced soil, and the hollow block wall 20 is formed in the portion where the reinforced soil is not filled. You can.
즉, 속빈 블록(21)은 상기 채움 블록(11)보다 상대적으로 보강토가 충진 되지 않는 부분에 형성시키도록 함으로써, 속빈 블록의 내부를 충진재(50)로 채우는 과정이 불필요하게 되므로, 시공시간을 단축시킬 수 있게 되고, 시공비용을 절감할 수 있다.In other words, the hollow block 21 is formed in an area relatively less filled with reinforced soil than the filling block 11, so that the process of filling the inside of the hollow block with the filler 50 is unnecessary, thereby shortening the construction time. This can be done and construction costs can be reduced.
또한, 속빈 블록(21)과 채움 블록(11)의 내부에 채움홀(112)과 관통홀(212)에 의해 채움홀(112)과 관통홀(212)이 없는 블록에 비해 경량화되어, 이송 및 보관이 용이하게 되고 시공과정에서 안전성 및 작업의 효율성을 향상시킬 수 있다.In addition, the filling hole 112 and the through hole 212 inside the hollow block 21 and the filling block 11 make it lighter than the block without the filling hole 112 and the through hole 212, allowing for transport and It makes storage easier and improves safety and work efficiency during the construction process.
상기 채움 블록(11)은 콘크리트재로 이루어진 충진 블록본체(111)와, 상기 충진 블록본체(111)의 상면과 저면을 연결하며 형성되는 채움홀(112)과,상기 충진 블록본체(111)에 형성되는 채움홀(112)에 충진되는 충진재(50)로 이루어질 수 있다.The filling block 11 includes a filling block body 111 made of concrete, a filling hole 112 formed by connecting the upper and lower surfaces of the filling block body 111, and a filling block body 111. It may be made of a filler 50 filled in the formed filling hole 112.
이때, 상기 충진재(50)는 흙이나 자갈로 이루어질 수 있다.At this time, the filler 50 may be made of soil or gravel.
상기 채움 블록(11)에는, 상기 충진 블록본체(111)의 채움홀(112)에 베이스마감패널(30)이 더 체결되며, 상기 베이스마감패널(30)은 상기 채움홀(112)의 하측에 배치되어, 상기 채움홀(112)에 충진되는 상기 충진재(50)를 지지하도록 구성된다.In the filling block 11, a base finishing panel 30 is further fastened to the filling hole 112 of the filling block body 111, and the base finishing panel 30 is located on the lower side of the filling hole 112. It is arranged to support the filler 50 filled in the filling hole 112.
상기 베이스마감패널(30)은 합성수지재 또는 석재로 이루어지며, 상기 체움홀의 하측에 끼움된 후 상기 체움홀의 내면에 부착되거나 나사체결하여 고정시키게 된다.The base finishing panel 30 is made of synthetic resin or stone, is inserted into the lower side of the filling hole, and is then attached to the inner surface of the filling hole or fixed by screwing.
상기 베이스마감패널(30)에 의해 상기 채움홀(112)에 충진재(50)를 충진하는 과정에서 유출되는 것을 방지하게 되고, 신속하고 균일한 충진이 가능하게 된다.The base finishing panel 30 prevents the filler 50 from leaking out during the process of filling the filling hole 112, thereby enabling rapid and uniform filling.
상기 채움홀(112)에는 내면에 합성수지재로 이루어진 지지핀들의 일단을 더 나사체결하거나 부착하여 고정시켜, 상기 지지핀들이 상기 채움홀(112)에 충진되는 충진재(50)에 인서트되어 지지되도록 함으로써, 지지력을 향상시키고 충진재(50)가 외력에 의해 이동되는 것을 방지할 수 있다. In the filling hole 112, one end of support pins made of synthetic resin material is further screwed or attached to the inner surface to be fixed, so that the support pins are supported by being inserted into the filler 50 filled in the filling hole 112. , it is possible to improve the bearing capacity and prevent the filler 50 from being moved by external force.
상기 속빈 블록벽체 형성단계(S3)는 채움 블록(11)벽체(10)의 상부에 속빈 블록들을 적층시켜 속빈 블록벽체(20)를 형성시키는 단계이다.The hollow block wall forming step (S3) is a step of forming a hollow block wall (20) by stacking hollow blocks on the upper part of the filling block (11) wall (10).
상기 속빈 블록벽체 형성단계(S3)에서는 상기 채움 블록(11)벽체(10)의 상부에 속빈 블록(21)들을 적층시켜 속빈 블록벽체(20)를 형성시킨다.In the hollow block wall forming step (S3), hollow blocks 21 are stacked on the upper part of the filling block 11 wall 10 to form a hollow block wall 20.
상기 속빈 블록(21)들은 길이 쌓기 방식으로 적층되게 쌓아 상기 속빈 블록벽체(20)를 형성시킨다.The hollow blocks 21 are stacked in a lengthwise manner to form the hollow block wall 20.
상기 속빈 블록벽체(20)를 보강토를 지지하지 않는 구간(높이)에 형성시킨다.The hollow block wall 20 is formed in a section (height) that does not support reinforced soil.
상기 속빈 블록(21)은 콘크리트재로 이루어진 공간블록본체(211)와, 상기 공간블록본체(211)의 상면과 저면을 연결하며 형성되는 관통홀(212)로 이루어진다.The hollow block 21 consists of a space block body 211 made of concrete, and a through hole 212 formed by connecting the upper and lower surfaces of the space block body 211.
상기 속빈 블록(21)에는, 상기 공간블록본체(211)의 관통홀(212)에 탑마감패널(40)이 더 체결될 수 있다.In the hollow block 21, a top finishing panel 40 may be further fastened to the through hole 212 of the space block main body 211.
상기 탑마감패널(40)은 합성수지재 또는 석재로 형성될 수 있다. The top finishing panel 40 may be made of synthetic resin or stone.
상기 관통홀(212)의 하측에 끼움된 후 상기 관통홀(212)의 내면에 부착되거나 나사체결하여 고정될 수 있다. After being fitted into the lower side of the through hole 212, it may be attached to the inner surface of the through hole 212 or fixed by screwing.
상기 탑마감패널(40)에 의해 상기 관통홀(212)의 상부로 이물질이나 흙이 유입되는 것을 차단하도록 구성될 수 있다. The top finishing panel 40 may be configured to block foreign substances or dirt from entering the upper part of the through hole 212.
상기 베이스마감패널(30)에는 통수홀들을 더 형성하여, 상기 충진 블록본체(111)의 채움홀(112)로 우수가 유입시 상기 통수홀을 통해 배출되도록 함으로써, 상기 베이스마감패널(30) 상면 또는 채움홀(112)에 우수가 고이거나 충진되는 것을 방지할 수 있다. Water flow holes are further formed in the base finishing panel 30 so that when rainwater flows into the filling hole 112 of the filling block body 111, it is discharged through the water flow holes, so that the upper surface of the base finishing panel 30 Alternatively, it is possible to prevent rainwater from accumulating or filling the filling hole 112.
상기 탑마감패널(40)에는 우수홀들을 더 형성시켜, 상기 우수홀을 통해 우수를 배출시키도록 함으로써, 상기 탑마감패널의 상면에 우수가 고이는 것을 방지할 수 있다.By further forming rainwater holes in the top finishing panel 40 to discharge rainwater through the rainwater holes, it is possible to prevent rainwater from accumulating on the upper surface of the top finishing panel.
상기 충진공간 보강토 충진단계(S4)는 채움 블록벽체(10)와 상기 지반(100)의 지지면 사이에 형성되는 충진공간(200)에 보강토를 충진하여 보강층(300)을 형성시키는 단계이다.The filling space reinforcing soil filling step (S4) is a step of forming a reinforcing layer 300 by filling the filling space 200 formed between the filling block wall 10 and the support surface of the ground 100 with reinforcing soil.
상기 충진공간(200) 보강토 충진단계(S4)는 채움 블록(11)벽체(10)와 상기 지반(100)의 지지면 사이에 형성되는 충진공간(200)에 보강토를 충진한후 충진된 보강포의 상면을 롤러나 다짐기로 다져 상기 지반(100) 및 상기 지지면을 지지하도록 보강층(300)을 형성시킬 수 있다. The reinforcing soil filling step (S4) of the filling space 200 is performed by filling the reinforcing soil in the filling space 200 formed between the filling block 11 wall 10 and the supporting surface of the ground 100, and then filling the filled reinforcing foam with the reinforcing soil. The upper surface of can be compacted with a roller or compactor to form a reinforcement layer 300 to support the ground 100 and the support surface.
상기 탑마감패널(40)의 저면에는 지지샤프트의 상단부를 나사체결하여 고정시키고, 상기 지지샤프트의 외면에 보강샤프트의 일단을 나사체결하여 고정시키고, 상기 보강샤프트의 타단을 상기 관통홀(212)의 내면에 나사체결하여 고정시킴으로써, 상기 탑마감패널(40)의 저면을 지지하여 지지력을 향상시키고, 하중 및 외력에 의해 상기 탑마감패널(40)이 처지거나 파손되는 것을 방지할 수 있다. The upper end of the support shaft is screwed and fixed to the bottom of the top finishing panel 40, one end of the reinforcement shaft is screwed and fixed to the outer surface of the support shaft, and the other end of the reinforcement shaft is connected to the through hole 212. By screwing and fixing the inner surface of the top finish panel 40, the bottom surface of the top finish panel 40 can be supported to improve the bearing capacity, and the top finish panel 40 can be prevented from sagging or being damaged due to load or external force.
상기 채움홀(112)에는 내면에 바이브레이터인 진동기를 더 나사체결하여 고정시키도록 함으로써, 상기 진동기의 진동이 상기 충진 블록본체(111) 및 충진되는 충진재(50)에 전달되어, 상기 채움홀(112)에 충진되는 충진재(흙)의 공극의 줄여 충진효울을 높이도록 할 수 있다. By further screwing and fixing a vibrator, which is a vibrator, to the inner surface of the filling hole 112, the vibration of the vibrator is transmitted to the filling block body 111 and the filling material 50, thereby forming the filling hole 112. ), the filling efficiency can be increased by reducing the voids in the filler (soil) filled in the area.
상기 충진 블록본체(111)에는 채움홀(112)에 콘크리트재로 이루어진 체결블록을 끼워 지지력을 향상시키도록 함으로써, 흙으로 이루어진 충진재(50)를 채움홀(112)에 충진하는 것에 비해 시간을 충진시간을 단축시킬 수 있게 되고, 균일한 무게로 충진 블록본체(111)를 형성시킬 수 있게 되며, 시공시간을 단축시킬 수 있도록 할 수 있다. In the filling block body 111, a fastening block made of concrete is inserted into the filling hole 112 to improve the bearing capacity, thereby saving time compared to filling the filling hole 112 with a filler 50 made of soil. The time can be shortened, the filling block body 111 can be formed with a uniform weight, and the construction time can be shortened.
상기 체결블록은 상기 채움홀(112)에 끼움시 상기 베이스마감패널(30)에 지지되고, 현장에서 끼움될 수 있다.The fastening block is supported on the base finishing panel 30 when inserted into the filling hole 112, and can be fitted in the field.
상기 체결블록은 외면이 하향으로 갈수록 내측으로 테이퍼지게 테이퍼안내면이 더 형성되어, 상기 체결블록이 상기 채움홀(112)에 끼움되는 과정에서 걸림되는 것을 방지할 수 있다.The fastening block further has a tapered guide surface formed so that the outer surface tapers inward as the outer surface goes downward, thereby preventing the fastening block from becoming caught in the process of fitting into the filling hole 112.
상기 충진 블록본체(111)의 채움홀(112)에는 탄성을 갖는 합성수지재로 이루어진 탄성완충관을 끼운 후 상기 채움홀(112)의 내면에 상기 탄성완충관의 외면을 부착하여 고정시키고, 상기 탄성완충관에 상기 체결블록을 끼움으로써, 상기 탄성완충관의 탄성에 의해 상기 체결블록이 지지되어, 외력에 의해 이동되는 것을 방지하게 됨과 아울러 상기 채움홈의 내면과 충돌 및 마찰되는 것을 방지할 수 있다.An elastic buffer tube made of an elastic synthetic resin material is inserted into the filling hole 112 of the filling block body 111, and then the outer surface of the elastic buffer tube is attached and fixed to the inner surface of the filling hole 112, and the elastic buffer tube is fixed. By inserting the fastening block into the buffer pipe, the fastening block is supported by the elasticity of the elastic buffer pipe, preventing it from moving due to external force, and also preventing collision and friction with the inner surface of the filling groove. .
상기 충진공간 보강토 충진단계(S4) 이후에는, 상기 속빈 블록벽체(20)와 상기 지반(100)의 지지면 사이에 형성되는 상부충진공간(200)에 보강토를 충진하여 상부 보강층(300)을 형성시키는 상부충진공간 보강토충진단계(S4-1)가 더 추가될 수 있다.After the filling space reinforcing soil filling step (S4), the upper filling space 200 formed between the hollow block wall 20 and the supporting surface of the ground 100 is filled with reinforcing soil to form an upper reinforcing layer 300. An additional top filling space reinforcement soil filling step (S4-1) may be added.
즉, 상기 속빈 블록벽체(20)와 상기 지반(100)의 지지면 사이에 형성되는 상부충진공간(200)에 보강토를 충진할 경우 상기 속빈 블록벽체(20)에서 받는 토압이 상기 채움 블록벽체(10)보다 적어, 상부충진공간(200)에 충진되는 보강층(300)을 지지할 수 있다.That is, when filling the upper filling space 200 formed between the hollow block wall 20 and the support surface of the ground 100 with reinforced soil, the earth pressure received from the hollow block wall 20 is the filled block wall ( 10), it is possible to support the reinforcement layer 300 filled in the upper filling space 200.
이상, 본 발명에 대해서 도면을 참조하여 상세히 설명하였으나, 그 과정에서 언급한 실시예는 예시적인 것일 뿐이며, 한정적인 것이 아님을 분명히 하고, 본 발명은 이하의 특허청구범위에 의해 제공되는 본 발명의 기술적 사상이나 분야를 벗어나지 않는 범위내에서, 균등하게 대처될 수 있는 정도의 구성요소 변경은 본 발명의 범위에 속한다 할 것이다.Above, the present invention has been described in detail with reference to the drawings, but it is clear that the embodiments mentioned in the process are only illustrative and not limiting, and that the present invention is provided by the following claims. Changes to components to the extent that they can be handled equally within the scope of the technical idea or field will be considered to fall within the scope of the present invention.
10 : 채움 블록벽체 11 : 채움 블록
111 : 충진 블록본체 112 : 채움홀
20 : 속빈 블록벽체 21 : 속빈 블록
211 : 공간블록본체 212 : 관통홀
30 : 베이스마감패널 40 : 탑마감패널
50 : 충진재
100 : 지반 200 : 충진공간
300 : 보강층
S1 : 지면평탄화단계 S2 : 채움 블록벽체 형성단계
S3 : 속빈 블록벽체 형성단계 S4 : 충진공간 보강토 충진단계
S4-1 : 상부충진공간 보강토충진단계10: Filling block wall 11: Filling block
111: Filling block body 112: Filling hole
20: hollow block wall 21: hollow block
211: space block body 212: through hole
30: Base finishing panel 40: Top finishing panel
50: Filler
100: Ground 200: Filling space
300: Reinforcement layer
S1: Ground leveling step S2: Filling block wall forming step
S3: Hollow block wall formation step S4: Filling space reinforced soil filling step
S4-1: Upper filling space reinforcement soil filling stage
Claims (6)
상기 지지면을 지지하는 옹벽이 설치될 지면의 이물질을 제거하고 평탄화시키는 지면평탄화단계;
상기 지면에 채움 블록들을 적층시켜 채움 블록벽체를 형성시키는 채움 블록벽체 형성단계;
상기 채움 블록벽체의 상부에 속빈 블록들을 적층시켜 속빈 블록벽체를 형성시키는 속빈 블록벽체 형성단계; 및
상기 채움 블록벽체와 상기 지반의 지지면 사이에 형성되는 충진공간에 보강토를 충진하여 보강층을 형성시키는 충진공간 보강토 충진단계로 이루어진 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법에 있어서,
상기 채움 블록은 충진블록본체와,
상기 충진블록본체의 상면과 저면을 연결하며 형성되는 채움홀과,
상기 충진블록본체에 형성되는 채움홀에 충진되는 충진재로 이루어지고,
상기 채움 블록에는,
상기 충진블록본체의 채움홀에 베이스마감패널이 더 체결되며,
상기 베이스마감패널은 상기 채움홀의 하측에 배치되어, 상기 채움홀에 충진되는 상기 충진재를 지지하도록 되고,
상기 채움홀에는 내면에 합성수지재로 이루어진 지지핀들의 일단을 더 고정시켜, 상기 지지핀들이 상기 채움홀에 충진되는 충진재에 인서트되도록 하고,
상기 속빈 블록은 공간블록본체와, 상기 공간블록본체의 상면과 저면을 연결하며 형성되는 관통홀로 이루어지며,
상기 속빈 블록에는 상기 공간블록본체의 관통홀에 탑마감패널이 더 체결되며, 상기 탑마감패널은 상기 관통홀의 상측에 배치되어 상기 관통홀의 상부로 이물질이나 흙이 유입되는 것을 차단하도록 된 것을 특징으로 하고,
상기 탑마감패널의 저면에는 지지샤프트의 상단부를 나사체결하여 고정시키고, 상기 지지샤프트의 외면에 보강샤프트의 일단을 나사체결하여 고정시키고, 상기 보강샤프트의 타단을 상기 관통홀의 내면에 나사체결하여 고정시킴으로써, 상기 탑마감패널의 저면을 지지하여 지지력을 향상시키고, 하중 및 외력에 의해 상기 탑마감패널이 처지는 것을 방지하도록 된 것을 특징으로 하는 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법.
A construction method for a retaining wall installed to support a support surface formed on the ground,
A ground leveling step of removing foreign substances and leveling the ground on which the retaining wall supporting the support surface is to be installed;
A fill block wall forming step of forming a fill block wall by stacking fill blocks on the ground;
A hollow block wall forming step of forming a hollow block wall by stacking hollow blocks on top of the filled block wall; and
In the construction method of a concrete retaining wall using a mixed block of self-supporting fill blocks and hollow blocks, which consists of a filling space reinforcement soil filling step to form a reinforcement layer by filling the filling space formed between the filling block wall and the supporting surface of the ground, Because,
The filling block includes a filling block body,
A filling hole formed by connecting the upper and lower surfaces of the filling block body,
It is made of a filler that is filled into the filling hole formed in the filling block body,
In the filling block,
A base finishing panel is further fastened to the filling hole of the filling block body,
The base finishing panel is disposed below the filling hole to support the filling material filled in the filling hole,
One end of support pins made of synthetic resin material is further fixed to the inner surface of the filling hole, so that the support pins are inserted into the filling material filled in the filling hole,
The hollow block consists of a space block body and a through hole formed by connecting the upper and lower surfaces of the space block body,
A top finishing panel is further fastened to the through hole of the space block body in the hollow block, and the top finishing panel is disposed on the upper side of the through hole to block foreign substances or dirt from entering the upper part of the through hole. do,
The upper end of the support shaft is screwed and fixed to the bottom of the top finishing panel, one end of the reinforcement shaft is screwed and fixed to the outer surface of the support shaft, and the other end of the reinforcement shaft is screwed and fixed to the inner surface of the through hole. By supporting the bottom of the top finishing panel, the bearing capacity is improved and the top finishing panel is prevented from sagging due to load and external force. A concrete retaining wall using a mixed block of self-weighted fill blocks and hollow blocks. Construction method.
상기 충진공간 보강토 충진단계 이후에는,
상기 속빈 블록벽체와 상기 지반의 지지면 사이에 형성되는 상부충진공간에 보강토를 충진하여 상부 보강층을 형성시키는 상부충진공간 보강토충진단계가 더 추가되는 것을 특징으로 하는 자중식 채움 블록 및 속빈 블록의 혼합 블록을 이용한 콘크리트 옹벽의 시공 공법.
According to claim 1,
After the filling space reinforcement soil filling step,
A mixture of self-supporting fill blocks and hollow blocks, characterized in that an upper filling space reinforcing soil filling step is further added to form an upper reinforcing layer by filling reinforcing soil in the upper filling space formed between the hollow block wall and the support surface of the ground. Construction method of concrete retaining wall using blocks.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020240011777A KR102673473B1 (en) | 2024-01-25 | 2024-01-25 | Concrete retaining wall construction method using mixed blocks of self-supporting fill blocks and hollow blocks |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020240011777A KR102673473B1 (en) | 2024-01-25 | 2024-01-25 | Concrete retaining wall construction method using mixed blocks of self-supporting fill blocks and hollow blocks |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR102673473B1 true KR102673473B1 (en) | 2024-06-10 |
Family
ID=91482845
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020240011777A Active KR102673473B1 (en) | 2024-01-25 | 2024-01-25 | Concrete retaining wall construction method using mixed blocks of self-supporting fill blocks and hollow blocks |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR102673473B1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR200499884Y1 (en) | 2025-07-25 | 2025-12-31 | 금산콘크리트 주식회사 | Self-weighting concrete blocks |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2005095718A1 (en) * | 2004-04-01 | 2005-10-13 | Modalco Pty Ltd | A reinforced soil retaining wall system and method of construction |
| JP2007016584A (en) * | 2005-06-09 | 2007-01-25 | Kyokado Eng Co Ltd | Reinforced earth method |
| KR20070031295A (en) * | 2004-04-01 | 2007-03-19 | 모달코 피티와이 엘티디 | Reinforced soil retaining wall system and construction method |
| KR101119017B1 (en) * | 2011-06-27 | 2012-03-12 | (주) 태평양지질 | Retaining wall structure of block integrative and it's construction method |
| KR101591812B1 (en) | 2013-12-24 | 2016-02-04 | (주)에스오씨산업 | Block-type reinforced earth retaining wall construction method and steel rod grid reinforcing material is installed |
| KR101673285B1 (en) * | 2016-08-22 | 2016-11-08 | 주식회사 코뉴 | Retaining wall construction method using a variable structure and soil nailing |
| KR20210048148A (en) * | 2019-10-23 | 2021-05-03 | 전상배 | Self-retained wall sructures and construction method thereof |
| KR102478622B1 (en) * | 2022-04-01 | 2022-12-15 | 박정식 | Structure of retaining wall block |
| KR102555858B1 (en) * | 2022-07-26 | 2023-07-13 | 장형석 | Concrete block for city battle and war game treasure and its operation system |
-
2024
- 2024-01-25 KR KR1020240011777A patent/KR102673473B1/en active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2005095718A1 (en) * | 2004-04-01 | 2005-10-13 | Modalco Pty Ltd | A reinforced soil retaining wall system and method of construction |
| KR20070031295A (en) * | 2004-04-01 | 2007-03-19 | 모달코 피티와이 엘티디 | Reinforced soil retaining wall system and construction method |
| JP2007016584A (en) * | 2005-06-09 | 2007-01-25 | Kyokado Eng Co Ltd | Reinforced earth method |
| KR101119017B1 (en) * | 2011-06-27 | 2012-03-12 | (주) 태평양지질 | Retaining wall structure of block integrative and it's construction method |
| KR101591812B1 (en) | 2013-12-24 | 2016-02-04 | (주)에스오씨산업 | Block-type reinforced earth retaining wall construction method and steel rod grid reinforcing material is installed |
| KR101673285B1 (en) * | 2016-08-22 | 2016-11-08 | 주식회사 코뉴 | Retaining wall construction method using a variable structure and soil nailing |
| KR20210048148A (en) * | 2019-10-23 | 2021-05-03 | 전상배 | Self-retained wall sructures and construction method thereof |
| KR102478622B1 (en) * | 2022-04-01 | 2022-12-15 | 박정식 | Structure of retaining wall block |
| KR102555858B1 (en) * | 2022-07-26 | 2023-07-13 | 장형석 | Concrete block for city battle and war game treasure and its operation system |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR200499884Y1 (en) | 2025-07-25 | 2025-12-31 | 금산콘크리트 주식회사 | Self-weighting concrete blocks |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106522270A (en) | Pile foundation and retaining wall anti-earthquake retaining structure comprising EPS buffer layers and construction method | |
| KR102673473B1 (en) | Concrete retaining wall construction method using mixed blocks of self-supporting fill blocks and hollow blocks | |
| CN112502161A (en) | Deep foundation pit supporting system and construction method thereof | |
| KR102290076B1 (en) | The construction method using a exterio wall of undergound structure | |
| KR20110136258A (en) | Construction method of underground composite exterior wall structure and underground composite exterior wall structure constructed thereby | |
| KR100849226B1 (en) | Earthquake temporary facility by ClP and this construction method | |
| KR102408334B1 (en) | The construction method of underground structure using foundation of existing undergound structure | |
| KR20050115012A (en) | Construction method of reinforced earth abutment in post tensioning system | |
| CN211665773U (en) | Unloading plate support structure | |
| CN111254909B (en) | Construction process of composite pile foundation of soft soil area foundation | |
| CN210439151U (en) | Steel box girder support system and bridge | |
| KR20130087669A (en) | Down-up method of underground structure | |
| KR101203289B1 (en) | Reinforced retaining wall with curb element and its construction method | |
| CN114934518B (en) | A deep foundation pit reinforcement method combining backfilling, decompression and grouting | |
| KR102490872B1 (en) | Reinforced earth retaining wall and construction method using tensile force of steel rod piles | |
| KR101144505B1 (en) | Stabilization of Structure Foundation by unite peg top and a steel pipe | |
| CN205636830U (en) | Take light -duty well point and vibration prevention plate's damping trench | |
| KR20190142546A (en) | Construction method of subsurface structure using outer shell suspension | |
| CN212026286U (en) | Retaining structure of anti-slide pile and structural pile | |
| KR102181416B1 (en) | method of constructing earthquake-proof ALC house | |
| CN211228589U (en) | Retaining structure | |
| KR102420947B1 (en) | Retaining wall construction method using gravity block | |
| KR102761864B1 (en) | Guide apparatus for retaining wall, method for constructing the same, and retaining wall using the same | |
| KR200293048Y1 (en) | shoring structure using prestressed retaining wall | |
| CN112609731A (en) | Flexible permeable cutting retaining wall and construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20240125 |
|
| PA0201 | Request for examination | ||
| PA0302 | Request for accelerated examination |
Patent event date: 20240404 Patent event code: PA03022R01D Comment text: Request for Accelerated Examination Patent event date: 20240125 Patent event code: PA03021R01I Comment text: Patent Application |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20240501 Patent event code: PE09021S01D |
|
| E90F | Notification of reason for final refusal | ||
| PE0902 | Notice of grounds for rejection |
Comment text: Final Notice of Reason for Refusal Patent event date: 20240521 Patent event code: PE09021S02D |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20240601 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20240604 Patent event code: PR07011E01D |
|
| PR1002 | Payment of registration fee |
Payment date: 20240604 End annual number: 3 Start annual number: 1 |
|
| PG1601 | Publication of registration |