KR20140046111A - 피에스씨 빔 시공방법 - Google Patents
피에스씨 빔 시공방법 Download PDFInfo
- Publication number
- KR20140046111A KR20140046111A KR1020120112130A KR20120112130A KR20140046111A KR 20140046111 A KR20140046111 A KR 20140046111A KR 1020120112130 A KR1020120112130 A KR 1020120112130A KR 20120112130 A KR20120112130 A KR 20120112130A KR 20140046111 A KR20140046111 A KR 20140046111A
- Authority
- KR
- South Korea
- Prior art keywords
- fixing
- psc beam
- psc
- prestressing
- applying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/28—Concrete reinforced prestressed
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
본 발명은, 교량에 배치되었을 때 위쪽을 향하는 나사홈이 형성되고 하부는 막혀 있는 정착너트의 나사홈이 PSC 빔의 상면의 양쪽에 각각에 배치한 상태로 PSC 빔을 제작하는 PSC 빔 제작단계; 상기 PSC 빔 시공이 완료된 후에 긴장재를 정착하기 위한 정착수단이 포함된 정착부재를 고정하되, 상기 나사홈에 체결가능한 볼트부재를 상기 나사홈에 체결하여 상기 PSC 빔의 상면에 고정하는 정착부재 고정단계; 긴장재에 인장력을 가한 상태로 상기 정착수단에 양단부를 정착시켜 상기 PSC 빔에 자중 방향의 휨 모멘트와 압축력을 가하는 제1프리스트레싱 단계; 상기 PSC 빔에 형성된 쉬스관에 강연선을 삽입하고 인장력을 가한 후 정착시켜 자중 반대방향의 휨 모멘트와 압축력을 가하는 제2프리스트레싱 단계; 상기 제1프리스트레싱 단계와 제2프리스트레싱 단계가 완료된 후 상기 PSC 빔을 교량의 하부 구조에 거치하는 거치단계; 및, 상기 거치단계 이후에 상기 제1프리스트레싱 단계에서 정착된 긴장재의 긴장력을 해제하는 제1프리스트레싱 해제단계; 를 포함하는 것을 특징으로 하는 PSC 빔 시공방법을 제공한다.
Description
도 2는 본 발명의 하나의 실시예에 따른 PSC 빔 시공방법에 사용되는 정착너트를 도시한 도면.
도 3은 본 발명의 하나의 실시예에 따른 PSC 빔 시공방법에 사용되는 제1정착부재의 측면도.
도 4는 본 발명의 하나의 실시예에 따른 PSC 빔 시공방법에 사용되는 제2정착부재의 측면도.
도 5는 도 3에 도시된 제1정착부재와 도 4에 도시된 제2정착부재가 결합하여 정착부재를 이룬 상태를 도시한 도면.
도 6은 제1프리스트레싱을 위하여 정착부재가 정착너트에 고정된 상태를 도시한 도면.
도 7은 본 발명의 하나의 실시예에 따른 PSC 빔 시공방법의 각 단계를 설명하기 위한 도면.
도 8은 본 발명의 두 번째의 실시예에 따른 PSC 빔 시공방법의 각 단계를 설명하기 위한 도면.
도 9는 본 발명의 세 번째 실시예에 따른 PSC 빔 시공방법을 설명하기 위한 도면.
30 : 제2정착부재 40 : 긴장재
Claims (5)
- 교량에 배치되었을 때 위쪽을 향하는 나사홈이 형성되고 하부는 막혀 있는 정착너트의 나사홈이 PSC 빔의 상면의 양쪽에 각각에 배치한 상태로 PSC 빔을 제작하는 PSC 빔 제작단계;
상기 PSC 빔 시공이 완료된 후에 긴장재를 정착하기 위한 정착수단이 포함된 정착부재를 고정하되, 상기 나사홈에 체결가능한 볼트부재를 상기 나사홈에 체결하여 상기 PSC 빔의 상면에 고정하는 정착부재 고정단계;
긴장재에 인장력을 가한 상태로 상기 정착수단에 양단부를 정착시켜 상기 PSC 빔에 자중 방향의 휨 모멘트와 압축력을 가하는 제1프리스트레싱 단계;
상기 PSC 빔에 형성된 쉬스관에 강연선을 삽입하고 삽입된 강연선에 인장력을 가한 후 정착시켜 자중 반대방향의 휨 모멘트와 압축력을 가하는 제2프리스트레싱 단계;
상기 제1프리스트레싱 단계와 제2프리스트레싱 단계가 완료된 후 상기 PSC 빔을 교량의 하부 구조에 거치하는 거치단계; 및,
상기 거치단계 이후에 상기 제1프리스트레싱 단계에서 정착된 긴장재의 긴장력을 해제하는 제1프리스트레싱 해제단계; 를 포함하는 것을 특징으로 하는 피에스씨(PSC) 빔 시공방법.
- 교량에 배치되었을 때 위쪽을 향하는 나사홈이 형성되고 하부는 막혀 있는 정착너트의 나사홈이 PSC 빔의 상면의 양쪽에 각각에 배치한 상태로 PSC 빔을 제작하는 PSC 빔 제작단계;
상기 PSC 빔 시공이 완료된 후에 긴장재를 정착하기 위한 정착수단이 포함된 정착부재를 고정하되, 상기 나사홈에 체결가능한 볼트부재를 상기 나사홈에 체결하여 상기 PSC 빔의 상면에 고정하는 정착부재 고정단계;
상기 PSC 빔에 형성된 쉬스관에 강연선을 삽입하고 삽입된 강연선 중 일부의 강연선에 인장력을 가한 후 정착시켜 자중 반대방향의 휨 모멘트와 압축력을 가하는 제2-1프리스트레싱 단계;
인장력을 가한 상태로 상기 정착수단에 양단부를 정착시켜 상기 PSC 빔에 자중 방향의 휨 모멘트와 압축력을 가하는 제1프리스트레싱 단계;
상기 PSC 빔에 형성된 쉬스관에 삽입된 강연선 중 상기 제2-1프리스트레싱 단계에서 정착시킨 강연선을 제외한 나머지 강연선에 인장력을 가한 후 정착시켜 자중 반대방향의 휨 모멘트와 압축력을 가하는 제2-2프리스트레싱 단계;
상기 제1프리스트레싱 단계와 제2-1프리스트레싱 단계 및 제2-2프리스트레싱 단계가 완료된 후 상기 PSC 빔을 교량의 하부 구조에 거치하는 거치단계; 및,
상기 거치단계 이후에 상기 제1프리스트레싱 단계에서 정착된 긴장재의 긴장력을 해제하는 해제단계; 를 포함하는 것을 특징으로 하는 피에스씨(PSC) 빔 시공방법.
- 제1항 또는 제2항에 있어서,
상기 정착너트는 상기 거더의 양쪽에 각각 하나씩 마련되는 것을 특징으로 하는 피에스씨(PSC) 빔 시공방법.
- 제3항에 있어서,
상기 정착부재는 강판인 체결 플레이트와 상기 체결 플레이트에 중앙부에 고정되며 상기 나사홈에 체결가능한 나사산이 형성된 볼트부재와 상기 볼트부재와 동축적으로 배치되되 상기 볼트부재의 반대편에 배치되는 원기둥 형상의 체결돌기를 포함한 제1정착부재와,
상기 제1정착부재의 볼트부재의 회전축을 중심으로 상기 체결 플레이트에 대하여 회전가능하도록 상기 체결돌기와 결합하는 강판인 정착 플레이트와 상기 정착플레이트에 고정되어 상기 긴장재를 정착하는 정착구와, 상기 정착구를 지지하는 보강부재를 포함하는 제2정착부재를 포함하여 이루어지는 것을 특징으로 하는 피에스씨(PSC) 빔 시공방법.
- 제1항 또는 제2항에 있어서,
상기 정착너트의 외주면에는 상기 거더를 이루는 콘크리트와의 합성을 용이하게 하기 위한 스터드가 형성되는 것을 특징으로 하는 피에스씨(PSC) 빔 시공방법.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020120112130A KR101413974B1 (ko) | 2012-10-10 | 2012-10-10 | 피에스씨 빔 시공방법 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020120112130A KR101413974B1 (ko) | 2012-10-10 | 2012-10-10 | 피에스씨 빔 시공방법 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20140046111A true KR20140046111A (ko) | 2014-04-18 |
| KR101413974B1 KR101413974B1 (ko) | 2014-07-04 |
Family
ID=50653168
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020120112130A Expired - Fee Related KR101413974B1 (ko) | 2012-10-10 | 2012-10-10 | 피에스씨 빔 시공방법 |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR101413974B1 (ko) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU187902U1 (ru) * | 2018-11-27 | 2019-03-21 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Казанский государственный архитектурно-строительный университет" (КазГАСУ) | Плитное пролетное строение неразрезного моста из монолитного железобетона |
| KR20240083532A (ko) * | 2022-12-05 | 2024-06-12 | 현대건설(주) | 분리 설치형 강연선 정착구 구조체 및 이를 이용한 강연선 정착 방법 |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109208488B (zh) * | 2018-10-24 | 2021-01-15 | 中国水利水电第八工程局有限公司 | 一种高空组合压重的高桥墩预压装置及其施工方法 |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR200257224Y1 (ko) * | 2001-09-10 | 2001-12-24 | 강신량 | 와이어의 인장력을 이용한 건축물 보강장치 |
| KR100564732B1 (ko) * | 2002-01-21 | 2006-03-27 | 김선기 | 프리스트레스드 콘크리트 빔 |
| KR20110010014U (ko) * | 2010-04-16 | 2011-10-24 | 김옥형 | 교량구조물용 앵커소켓 |
-
2012
- 2012-10-10 KR KR1020120112130A patent/KR101413974B1/ko not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU187902U1 (ru) * | 2018-11-27 | 2019-03-21 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Казанский государственный архитектурно-строительный университет" (КазГАСУ) | Плитное пролетное строение неразрезного моста из монолитного железобетона |
| KR20240083532A (ko) * | 2022-12-05 | 2024-06-12 | 현대건설(주) | 분리 설치형 강연선 정착구 구조체 및 이를 이용한 강연선 정착 방법 |
Also Published As
| Publication number | Publication date |
|---|---|
| KR101413974B1 (ko) | 2014-07-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101286557B1 (ko) | 층고절감형 강합성보 및 이를 구비한 바닥판 구조 | |
| KR101045929B1 (ko) | 친환경 프리스트레스 장경간 경량 프리캐스트 콘크리트 패널 및 이의 시공방법 | |
| US20120023858A1 (en) | Truss-type shear reinforcement material having double anchorage functions at both top and bottom thereof | |
| JP6393170B2 (ja) | プレストレストコンクリート大梁の設計方法 | |
| KR20020071612A (ko) | 피에스에스씨 합성거더 | |
| WO2010021428A1 (en) | Opening steel composite girder and method for manufacturing the same | |
| KR100500156B1 (ko) | 프리스트레스 강합성 빔 및 그 제작방법 | |
| KR101413974B1 (ko) | 피에스씨 빔 시공방법 | |
| JP3877995B2 (ja) | 張弦桁橋の構築方法 | |
| KR101264577B1 (ko) | 철골 콘크리트 빔 및 그의 제작 방법 | |
| KR101283542B1 (ko) | 구근 형성 연결재를 구비한 반단면 프리캐스트 패널을 이용한 교량 시공방법 | |
| CN111155714A (zh) | 一种预制钢管束部分预应力混凝土梁及其施工方法 | |
| CN110409279A (zh) | 刚构桥结构及施工方法 | |
| KR200302128Y1 (ko) | 재긴장이 가능한 프리스트레스트 프리플렉스 강합성빔 | |
| JP2012132251A (ja) | 橋梁の閉合部施工方法 | |
| JP6089096B2 (ja) | プレキャスト桁のねじれ抑制方法及びプレキャスト桁の接合方法 | |
| KR100897060B1 (ko) | 프리스트레싱 강판을 구비한 연속 지점부 구조체 및 그시공방법 | |
| KR20130120096A (ko) | 교량용 프리 텐션 빔 거더 | |
| KR102077385B1 (ko) | 프리스트레스트 강합성 거더 | |
| JP2007270600A (ja) | プレキャストコンクリート部材間の間詰め部に対するプレストレス導入方法 | |
| KR20140059941A (ko) | 지점부에 강봉을 이용한 압축력이 도입된 거더 연속화 시공방법 및 이것을 이용한 교량 | |
| KR200291793Y1 (ko) | 피에스에스씨 합성거더 | |
| JP5039590B2 (ja) | プレキャストコンクリート梁 | |
| KR20110017068A (ko) | 슬래브 피에스씨 거더와 폐합단면부재를 이용한 피에스씨 거더교 시공방법 | |
| Feng et al. | Seismic performance of post-fire assembled exterior joints formed between H-steel precast concrete beams and concrete-encased concrete-filled steel tube columns |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| D13-X000 | Search requested |
St.27 status event code: A-1-2-D10-D13-srh-X000 |
|
| N231 | Notification of change of applicant | ||
| PN2301 | Change of applicant |
St.27 status event code: A-3-3-R10-R13-asn-PN2301 St.27 status event code: A-3-3-R10-R11-asn-PN2301 |
|
| D14-X000 | Search report completed |
St.27 status event code: A-1-2-D10-D14-srh-X000 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| E13-X000 | Pre-grant limitation requested |
St.27 status event code: A-2-3-E10-E13-lim-X000 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20170713 Year of fee payment: 4 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| FPAY | Annual fee payment |
Payment date: 20180420 Year of fee payment: 5 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 5 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R14-asn-PN2301 |
|
| S20-X000 | Security interest recorded |
St.27 status event code: A-4-4-S10-S20-lic-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| P14-X000 | Amendment of ip right document requested |
St.27 status event code: A-5-5-P10-P14-nap-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20190604 Year of fee payment: 6 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 6 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 7 |
|
| S22-X000 | Recordation of security interest cancelled |
St.27 status event code: A-4-4-S10-S22-lic-X000 |
|
| P14-X000 | Amendment of ip right document requested |
St.27 status event code: A-5-5-P10-P14-nap-X000 |
|
| PC1903 | Unpaid annual fee |
St.27 status event code: A-4-4-U10-U13-oth-PC1903 Not in force date: 20210626 Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE |
|
| PC1903 | Unpaid annual fee |
St.27 status event code: N-4-6-H10-H13-oth-PC1903 Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE Not in force date: 20210626 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |