KR20200037581A - 작업구를 형성하는 강관의 압입 시공방법 - Google Patents
작업구를 형성하는 강관의 압입 시공방법 Download PDFInfo
- Publication number
- KR20200037581A KR20200037581A KR1020180116984A KR20180116984A KR20200037581A KR 20200037581 A KR20200037581 A KR 20200037581A KR 1020180116984 A KR1020180116984 A KR 1020180116984A KR 20180116984 A KR20180116984 A KR 20180116984A KR 20200037581 A KR20200037581 A KR 20200037581A
- Authority
- KR
- South Korea
- Prior art keywords
- exterior
- ground
- work tool
- inner tube
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 21
- 239000010959 steel Substances 0.000 title claims abstract description 21
- 238000000034 method Methods 0.000 title claims abstract description 14
- 239000002689 soil Substances 0.000 claims abstract description 15
- 238000003780 insertion Methods 0.000 claims description 8
- 230000037431 insertion Effects 0.000 claims description 8
- 238000003466 welding Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 20
- 238000009412 basement excavation Methods 0.000 abstract description 13
- 238000007599 discharging Methods 0.000 abstract description 3
- 238000009434 installation Methods 0.000 abstract description 3
- 239000011435 rock Substances 0.000 abstract description 3
- 238000005553 drilling Methods 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000008685 targeting Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/06—Lining shafts; Linings therefor with iron or steel
- E21D5/10—Lining shafts; Linings therefor with iron or steel in the form of tubbing or of rings composed of profile elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/03—Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/12—Accessories for making shaft linings, e.g. suspended cradles, shutterings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
도 2는 시공된 작업구를 통해 터널을 굴착하는 상태의 예시 단면도
Claims (1)
- 작업구(100)를 형성할 지면(1)을 수직 방향으로 강관의 직경보다 크게 굴착하여 일정깊이의 외관삽입홈(2)을 형성하여 이에 외관(3)을 삽입하는 1단계와; 상기 1단계에서 삽입된 외관(3)과 지면(1)과의 사이를 메움토(4)로서 메우고 외관(3)의 상면에 외관(3)의 길이에 대응하는 연결외관(3')을 용접하여 굴착할 지중으로 연결외관(3')의 상단부를 남겨두고 추진장비로서 내부의 토사를 반출시키면서 관입시키는 제2단계와; 상기 제2단계를 통해 내부가 빈 외관(3)의 내부에 이보다 직경이 작은 내관(5)을 삽입하는 제3단계와; 외관(3)은 고정한 상태에서 외관(3)의 내부에 삽입된 내관(5)을 굴착할 지중으로 토사를 반출하면서 관입하되 내관(5)의 상단에 작업구(100)의 계획심도에 대응하는 길이의 연결내관(5')을 용접하여 지중으로 계획심도까지 관입하는 제4단계와; 내관(5)을 계획심도까지 완전 삽입한 상태에서 외관(3)을 취출하여 내관(5)으로 이루어진 작업구(100)를 형성하는 제5단계로 구성됨을 특징으로 하는 작업구를 형성하는 강관의 압입 시공방법.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020180116984A KR20200037581A (ko) | 2018-10-01 | 2018-10-01 | 작업구를 형성하는 강관의 압입 시공방법 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020180116984A KR20200037581A (ko) | 2018-10-01 | 2018-10-01 | 작업구를 형성하는 강관의 압입 시공방법 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR20200037581A true KR20200037581A (ko) | 2020-04-09 |
Family
ID=70275756
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020180116984A Ceased KR20200037581A (ko) | 2018-10-01 | 2018-10-01 | 작업구를 형성하는 강관의 압입 시공방법 |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR20200037581A (ko) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115387847A (zh) * | 2022-09-06 | 2022-11-25 | 广州金土岩土工程技术有限公司 | 地铁隧道分离式泵房结构及基于全回旋全套管的施工方法 |
-
2018
- 2018-10-01 KR KR1020180116984A patent/KR20200037581A/ko not_active Ceased
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115387847A (zh) * | 2022-09-06 | 2022-11-25 | 广州金土岩土工程技术有限公司 | 地铁隧道分离式泵房结构及基于全回旋全套管的施工方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100984883B1 (ko) | 비개착식 터널 구조물의 시공방법 | |
| KR101069705B1 (ko) | 강관압입식 지하터널 구조물 형성공법에 있어서의 강관연결용 방수철판의 설치방법 | |
| KR101179778B1 (ko) | 비개착식 지하구조물 시공방법 | |
| KR20180061630A (ko) | 세미실드 공법의 작업구 공간을 확장하는 추진잭 설치 방법 | |
| KR20170102397A (ko) | 사각관을 이용한 비개착식 터널굴착공법 | |
| KR102540940B1 (ko) | 확공과 강관 연결을 통한 파이프 루프공법 및 이를 이용한 구조물 | |
| KR101021867B1 (ko) | 비개착식 터널 구조물 시공용 선단헤드 | |
| CN100523435C (zh) | 安装地下套管的方法 | |
| KR101381325B1 (ko) | 다단식 소구경 강관을 이용한 비개착식 터널공법 | |
| KR101090755B1 (ko) | 비개착식 터널 구조물의 시공방법 | |
| CN101092878B (zh) | 铺设隧道构造物的主管道施工方法 | |
| KR100639789B1 (ko) | 터널 형성용 터널구조물을 설치하기 위한 메인관 시공방법및 그 시공구조 | |
| KR20200037581A (ko) | 작업구를 형성하는 강관의 압입 시공방법 | |
| KR101156613B1 (ko) | 비개착식 장거리 터널 구조물의 시공공법 | |
| KR101368999B1 (ko) | 관거매설공의 보강이 가능한 관거 추진장치 및 이를 이용한 관거 시공 공법 | |
| KR101289392B1 (ko) | 비개착식 터널굴착공법 | |
| KR20200074412A (ko) | 해체를 용이하게 하는 작업구용 강관의 구조 | |
| KR100999880B1 (ko) | 강관 압입 장치 및 이를 이용한 우물통 기초 시공 공법 | |
| KR200296444Y1 (ko) | 배노트 공법에 의해 설치된 현장타설 대구경 파일을이용한 지중연속벽체 | |
| KR20230047673A (ko) | 추진관의 투입을 용이하게 하는 발진 작업구의 개량 구조 및 이의 형성방법 | |
| CN115749836A (zh) | 中短程地下管线顶管隧道施工方法 | |
| KR101772276B1 (ko) | 비개착식 터널굴착용 선단구조체 | |
| KR102191503B1 (ko) | 상부 및 하부 사각관을 이용한 비개착식 터널굴착공법 | |
| KR102951039B1 (ko) | 개방형 강관 밀대를 이용한 강관압입공법 | |
| JP2007332559A (ja) | 既設地中杭の撤去方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20181001 |
|
| PA0201 | Request for examination | ||
| PA0302 | Request for accelerated examination |
Patent event date: 20190523 Patent event code: PA03022R01D Comment text: Request for Accelerated Examination Patent event date: 20181001 Patent event code: PA03021R01I Comment text: Patent Application |
|
| PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20190625 Patent event code: PE09021S01D |
|
| PE0601 | Decision on rejection of patent |
Patent event date: 20191010 Comment text: Decision to Refuse Application Patent event code: PE06012S01D Patent event date: 20190625 Comment text: Notification of reason for refusal Patent event code: PE06011S01I |
|
| PJ0201 | Trial against decision of rejection |
Patent event date: 20191210 Comment text: Request for Trial against Decision on Refusal Patent event code: PJ02012R01D Patent event date: 20191010 Comment text: Decision to Refuse Application Patent event code: PJ02011S01I Appeal kind category: Appeal against decision to decline refusal Appeal identifier: 2019101004069 Request date: 20191210 |
|
| PG1501 | Laying open of application | ||
| J301 | Trial decision |
Free format text: TRIAL NUMBER: 2019101004069; TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20191210 Effective date: 20200916 |
|
| PJ1301 | Trial decision |
Patent event code: PJ13011S01D Patent event date: 20200916 Comment text: Trial Decision on Objection to Decision on Refusal Appeal kind category: Appeal against decision to decline refusal Request date: 20191210 Decision date: 20200916 Appeal identifier: 2019101004069 |