KR20200066174A - 주름관을 이용한 습식 중공 pc부재 생산장치 및 이를 이용한 생산방법 - Google Patents
주름관을 이용한 습식 중공 pc부재 생산장치 및 이를 이용한 생산방법 Download PDFInfo
- Publication number
- KR20200066174A KR20200066174A KR1020190141699A KR20190141699A KR20200066174A KR 20200066174 A KR20200066174 A KR 20200066174A KR 1020190141699 A KR1020190141699 A KR 1020190141699A KR 20190141699 A KR20190141699 A KR 20190141699A KR 20200066174 A KR20200066174 A KR 20200066174A
- Authority
- KR
- South Korea
- Prior art keywords
- corrugated pipe
- hollow
- plate
- concrete
- molding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/0068—Embedding lost cores
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/04—Producing shaped prefabricated articles from the material by tamping or ramming
- B28B1/045—Producing shaped prefabricated articles from the material by tamping or ramming combined with vibrating or jolting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/04—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
- B28B23/043—Wire anchoring or tensioning means for the reinforcements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/28—Cores; Mandrels
- B28B7/30—Cores; Mandrels adjustable, collapsible, or expanding
- B28B7/32—Cores; Mandrels adjustable, collapsible, or expanding inflatable
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
Description
도 2는 본 발명에 따른 주름관을 이용한 습식 중공 PC부재 생산장치의 결합블록을 도시한 정면도,
도 3 내지 도 6은 본 발명에 따른 주름관을 이용한 습식 중공 PC부재 생산장치를 이용하여 PC부재 제조방법을 도시한 참고도,
도 7은 본 발명에 따른 주름관을 이용한 습식 중공 PC부재 생산장치의 제2실시예를 도시한 측단면 구성도,
도 8 내지 도 10은 본 발명에 따른 주름관을 이용한 습식 중공 PC부재 생산장치의 제2 실시예에 따른 PC부재 제조방법을 도시한 참고도,
도 11은 본 발명에 따른 주름관을 이용한 습식 중공 PC부재 생산장치의 제3 실시예에 따른 성형틀의 모습을 도시한 참고도,
도 12는 본 발명에 따른 주름관을 이용한 습식 중공 PC부재 생산장치의 제3 실시예에 따른 성형틀의 개방된 일측에서 바라본 성형판의 내측면의 모습을 도시한 참고도,
도 13은 본 발명에 따른 주름관을 이용한 습식 중공 PC부재 생산장치의 제3 실시예에 따른 성형판 덮개의 일측면을 도시한 참고도,
도 14는 본 발명에 따른 주름관을 이용한 습식 중곡 PC부재 생산장치의 제3실시예에 따른 성형틀과 성형판 덮개의 결합을 도시한 참고도.
20. 주름관 21. 산부분
22. 골부분 23. 충진재
24. 제1 결합단관 25. 제2 결합단관
Claims (8)
- 상면이 개방된 성형틀(10)과,
상기 성형틀(10)의 내부에 측방향으로 연장되도록 배치되며 양단이 상기 성형틀(10)의 내부 양측에 고정된 주름관(20)을 포함하며,
상기 성형틀(10)은 바닥판(11)과,
상기 바닥판(11)의 둘레부에 상측으로 연장되도록 탈착가능하게 결합되는 측판(12)과,
상기 측판(12)의 내측면에 구비되며 상기 주름관(20)이 양단이 탈착가능하게 결합되는 결합블록(13)을 포함하여,
상기 성형틀(10)의 내부에 철근(2)을 배근하고, 상기 성형틀(10)의 내부에 상기 주름관(20)을 결합한 후, 상기 성형틀(10)의 내부에 콘크리트(3)를 타설 및 경화시켜 PC부재(1)를 제조할 수 있도록 된 것을 특징으로 하는 주름관을 이용한 습식 중공 PC부재 생산장치.
- 제 1 항에 있어서,
상기 주름관(20)의 외주면에는 외측으로 돌출된 산부분(21)과,
산부분(21)의 사이에 오목하게 형성된 골부분(22)이 번갈아가면서 형성되고,
상기 골부분(22)에는 탄성이 있는 충진재(23)가 충진되어, 상기 골부분(22)으로 콘크리트(3)가 유입되는 것을 방지함으로써,
상기 PC부재(1)를 제조한 후, 상기 PC부재(1)의 내부에 남아있는 주름관(20)을 일측으로 당겨 PC부재(1)로부터 분리할 수 있도록 된 것을 특징으로 하는 주름관을 이용한 습식 중공 PC부재 생산장치.
- 제 2 항에 있어서,
상기 충진재(23)는 상기 골부분(22)에 고무나 실리콘을 주입 및 경화시켜 구성된 것을 특징으로 하는 주름관을 이용한 습식 중공 PC부재 생산장치.
- 제 1 항에 있어서,
상기 성형틀(10)은,
측방향으로 연장되는 바닥판(11)과,
상기 바닥판(11)의 일측에서 상측으로 연장되도록 탈착가능하게 결합되고, 상기 바닥판(11)과 수평방향으로 일측이 개방된 터널 형태로 형성되며, 상면에 콘크리트가 주입되도록 형성된 복수의 관통홀(14a)과 관통홀(14a)을 막아주는 캡(14b)이 형성되고, 내측면에 형성된 돌출턱(14c)에 원형 또는 다각형 형상의 고정홈(14d)과 철근(2)이 고정될 수 있도록 복수의 철근 고정홈(14e)이 형성된 성형판(14)과,
상기 성형판(14)의 내측 면적보다 작고, 단면이 원형 또는 다각형의 기둥 형상으로 형성되어 바닥판(11)과 성형판(14)으로 이루어진 내측 공간에 삽입되고, 측면의 외측면에 돌출부(15a)가 형성된 중공 성형 부재(15)를 포함하는 것을 특징으로 하는 주름관을 이용한 습식 중공 PC부재 생산장치.
- 제 4 항에 있어서,
상기 바닥판(11)의 타측 상면에 구비되는 회전롤러(16)와,
상기 중공 성형 부재(15)의 돌출부(15a)와 연결되고 회전롤러(16)에 감겨지는 케이블(17)을 더 포함하는 것을 특징으로 하는 주름관을 이용한 습식 중공 PC부재 생산장치.
- 제 5 항에 있어서,
상기 성형판(14)의 개방된 일측에 결합되며, 사각판 형태로 형성되고, 중공 성형 부재(15)가 고정되는 고정홈(18d)과 성형판(14)과, 결합되는 면에 철근(2)이 고정되는 복수의 철근 고정홈(18e)이 형성된 성형판 덮개(18)를 더 포함하는 것을 특징으로 하는 주름관을 이용한 습식 중공 PC부재 생산장치.
- 제 6 항에 있어서,
상기 성형판(14)과 성형판 덮개(18)에 형성된 고정홈(14d,18d)에 중공 성형 부재(15)가 끼워지고, 철근 고정홈(14e,18e)에 철근(2)이 끼워진 상태로 성형판(14)의 일측이 성형판 덮개(18)에 의해 닫혀진 상태에서 성형판(14)의 상면에 형성된 캡(14b)를 제거하여 관통홀(14a)에 콘크리트가 타설되고, 미리 설정된 양생시간이 지나면 상기 성형판 덮개(18)를 성형판(14)으로부터 제거하고, 회전롤러(16)의 회전을 통해 케이블(17)이 감겨져 중공 성형 부재(15)를 성형판(14)의 일측으로 제거하도록 구성된 것을 특징으로 하는 주름관을 이용한 습식 중공 PC부재 생산장치. - 제 1 항 내지 제 7 항 중 어느 하나의 항에 따른 PC부재 제조장치를 이용하여 주름관을 이용한 습식 중공 PC부재를 생산하는 방법으로써,
상기 성형틀(10)의 내부에 철근(2)을 배근하는 배근단계와,
상기 성형틀(10)의 내부에 구비된 결합블록(13)에 상기 주름관(20)의 양단을 결합하거나, 성형틀(10)의 내부에 중공 성형 부재(15)를 설치하는 주름관 또는 중공 성형 부재 설치단계와,
상기 성형틀(10)의 내부에 콘크리트(3)를 타설하고 경화시키는 타설단계와,
상기 콘크리트(3)가 경화되면 성형틀(10)을 제거하는 탈형단계와,
상기 경화된 콘크리트(3)의 내부에 삽입된 주름관(20) 또는 중공 성형 부재를 제거하는 주름관 또는 중공 성형 부재 제거단계를 포함하는 것을 특징으로 하는 주름관을 이용한 습식 중공 PC부재 생산방법.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020180153158 | 2018-11-30 | ||
| KR20180153158 | 2018-11-30 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20200066174A true KR20200066174A (ko) | 2020-06-09 |
| KR102300325B1 KR102300325B1 (ko) | 2021-09-09 |
Family
ID=71082709
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020190141699A Active KR102300325B1 (ko) | 2018-11-30 | 2019-11-07 | 주름관을 이용한 습식 중공 pc부재 생산장치 및 이를 이용한 생산방법 |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR102300325B1 (ko) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102312288B1 (ko) * | 2021-01-05 | 2021-10-15 | 아이에스동서 주식회사 | 중공 슬래브 성형용 중공 파이프 |
| KR102312289B1 (ko) * | 2021-01-05 | 2021-10-15 | 아이에스동서 주식회사 | 몰드 적층 양생을 이용한 중공 슬래브 성형 방법 |
| CN113510837A (zh) * | 2021-06-03 | 2021-10-19 | 中铁大桥局上海工程有限公司 | 一种预制盖梁深埋锚固定模板和浇筑方法 |
| CN115476435A (zh) * | 2022-10-08 | 2022-12-16 | 南通龙纳模具有限公司 | 一种装配式建筑预制构件成型模具 |
| CN117211178A (zh) * | 2023-11-13 | 2023-12-12 | 中冶天工集团天津有限公司 | 一种方便固定现浇箱梁波纹管的装置及施工方法 |
| CN118081952A (zh) * | 2024-02-01 | 2024-05-28 | 深圳市鹏翔建筑科技有限公司 | 一种波形预制板的生产工艺 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0938934A (ja) * | 1995-07-26 | 1997-02-10 | Shinkai Kogyo Kk | コンクリート製品並びにこのコンクリート製品の成型方法及びその装置 |
| JPH10329125A (ja) * | 1997-06-04 | 1998-12-15 | Totsukuri:Kk | コンクリート型枠における中子型及び中子型の脱型方法 |
| JP2001040873A (ja) * | 1999-07-29 | 2001-02-13 | Kazuyoshi Morikawa | ボイド管 |
| KR20150043708A (ko) * | 2013-10-15 | 2015-04-23 | 백규호 | 중공형 콘크리트 충전 거더와 그 제작방법 |
| KR101713632B1 (ko) | 2016-05-31 | 2017-03-08 | (주)까뮤이앤씨 | 튜브형 고무몰드를 활용한 중공 피씨슬래브 및 이의 제조방법 |
-
2019
- 2019-11-07 KR KR1020190141699A patent/KR102300325B1/ko active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0938934A (ja) * | 1995-07-26 | 1997-02-10 | Shinkai Kogyo Kk | コンクリート製品並びにこのコンクリート製品の成型方法及びその装置 |
| JP2726399B2 (ja) * | 1995-07-26 | 1998-03-11 | 新貝工業株式会社 | コンクリート製品の成型方法及びその装置 |
| JPH10329125A (ja) * | 1997-06-04 | 1998-12-15 | Totsukuri:Kk | コンクリート型枠における中子型及び中子型の脱型方法 |
| JP2001040873A (ja) * | 1999-07-29 | 2001-02-13 | Kazuyoshi Morikawa | ボイド管 |
| KR20150043708A (ko) * | 2013-10-15 | 2015-04-23 | 백규호 | 중공형 콘크리트 충전 거더와 그 제작방법 |
| KR101713632B1 (ko) | 2016-05-31 | 2017-03-08 | (주)까뮤이앤씨 | 튜브형 고무몰드를 활용한 중공 피씨슬래브 및 이의 제조방법 |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102312288B1 (ko) * | 2021-01-05 | 2021-10-15 | 아이에스동서 주식회사 | 중공 슬래브 성형용 중공 파이프 |
| KR102312289B1 (ko) * | 2021-01-05 | 2021-10-15 | 아이에스동서 주식회사 | 몰드 적층 양생을 이용한 중공 슬래브 성형 방법 |
| CN113510837A (zh) * | 2021-06-03 | 2021-10-19 | 中铁大桥局上海工程有限公司 | 一种预制盖梁深埋锚固定模板和浇筑方法 |
| CN115476435A (zh) * | 2022-10-08 | 2022-12-16 | 南通龙纳模具有限公司 | 一种装配式建筑预制构件成型模具 |
| CN117211178A (zh) * | 2023-11-13 | 2023-12-12 | 中冶天工集团天津有限公司 | 一种方便固定现浇箱梁波纹管的装置及施工方法 |
| CN118081952A (zh) * | 2024-02-01 | 2024-05-28 | 深圳市鹏翔建筑科技有限公司 | 一种波形预制板的生产工艺 |
Also Published As
| Publication number | Publication date |
|---|---|
| KR102300325B1 (ko) | 2021-09-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR102300325B1 (ko) | 주름관을 이용한 습식 중공 pc부재 생산장치 및 이를 이용한 생산방법 | |
| KR101713632B1 (ko) | 튜브형 고무몰드를 활용한 중공 피씨슬래브 및 이의 제조방법 | |
| KR101986990B1 (ko) | 외단열 공법 및 그에 따른 외단열 벽체 | |
| JP6906340B2 (ja) | 中空pc用型枠装置、pc棒状材、コンクリート製柱用建材及びその製造方法 | |
| JP7139234B2 (ja) | 構造体の構築方法 | |
| KR102055012B1 (ko) | 프리캐스트 격자형보 몰드의 탈형 장치 | |
| KR20140115721A (ko) | 변단면을 가지는 중공피씨슬래브 및 이의 제작방법 | |
| CN105525749B (zh) | 变电站事故油池大模板浇筑施工方法 | |
| KR102105956B1 (ko) | 터널 천정부 라이닝 콘크리트의 진동다짐장치 및 이를 이용한 터널 라이닝 콘크리트용 거푸집 장치 | |
| CN102126248B (zh) | 一次成型箍筋外露柔性材料配合构件模具及构件加工方法 | |
| FI88952B (fi) | Foerfarande foer framstaellning av formelement foer ett mantelbetongbyggsaett och enligt foerfarandet framstaellda element | |
| KR101859287B1 (ko) | 콘크리트 거푸집 제거방법 | |
| KR20170111300A (ko) | 탈형 보조 판넬을 갖는 거푸집 판넬 | |
| KR200372305Y1 (ko) | 콘크리트 구조물 양생 거푸집 장치 | |
| KR101859398B1 (ko) | 철근 노출콘크리트 벽체를 적용한 건축 구조물 시공방법 | |
| CN214419115U (zh) | 一种用于制作空心楼板中活动芯肋的模具 | |
| JP2021004516A (ja) | 中空構造物の構築方法 | |
| JPH04155059A (ja) | 中空PCa部材の製造方法および装置 | |
| KR20040021388A (ko) | 보강 구조를 가지는 유로폼 타입 거푸집 및 그 제조방법 | |
| CN112388808B (zh) | 一种用于制作空心楼板中活动芯肋的模具及其应用 | |
| KR20200001199U (ko) | 타설막이 | |
| KR101244780B1 (ko) | 섬유가 노출되어 있는 연결면을 가지는 섬유보강 프리캐스트 콘크리트 부재의 제작방법 | |
| CN102888992A (zh) | 格子梁施工方法 | |
| JP6874051B2 (ja) | 溝の施工方法 | |
| CN121468772A (zh) | 中空柱形混凝土模壳预制方法、混凝土柱体及其施工方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| D13-X000 | Search requested |
St.27 status event code: A-1-2-D10-D13-srh-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-3-3-R10-R18-oth-X000 |
|
| D14-X000 | Search report completed |
St.27 status event code: A-1-2-D10-D14-srh-X000 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| T11-X000 | Administrative time limit extension requested |
St.27 status event code: U-3-3-T10-T11-oth-X000 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-3-3-R10-R18-oth-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| P14-X000 | Amendment of ip right document requested |
St.27 status event code: A-5-5-P10-P14-nap-X000 |
|
| P14-X000 | Amendment of ip right document requested |
St.27 status event code: A-5-5-P10-P14-nap-X000 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R14-asn-PN2301 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| P14-X000 | Amendment of ip right document requested |
St.27 status event code: A-5-5-P10-P14-nap-X000 |
|
| R18 | Changes to party contact information recorded |
Free format text: ST27 STATUS EVENT CODE: A-5-5-R10-R18-OTH-X000 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |