KR950008564Y1 - Boiler - Google Patents

Boiler Download PDF

Info

Publication number
KR950008564Y1
KR950008564Y1 KR2019930008161U KR930008161U KR950008564Y1 KR 950008564 Y1 KR950008564 Y1 KR 950008564Y1 KR 2019930008161 U KR2019930008161 U KR 2019930008161U KR 930008161 U KR930008161 U KR 930008161U KR 950008564 Y1 KR950008564 Y1 KR 950008564Y1
Authority
KR
South Korea
Prior art keywords
drum
fire
heating water
space
firebox
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR2019930008161U
Other languages
Korean (ko)
Other versions
KR940027242U (en
Inventor
이병덕
Original Assignee
이병덕
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이병덕 filed Critical 이병덕
Priority to KR2019930008161U priority Critical patent/KR950008564Y1/en
Publication of KR940027242U publication Critical patent/KR940027242U/en
Application granted granted Critical
Publication of KR950008564Y1 publication Critical patent/KR950008564Y1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/22Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating
    • F24H1/44Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating with combinations of two or more of the types covered by groups F24H1/24 - F24H1/40
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/02Casings; Cover lids; Ornamental panels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/18Arrangement or mounting of grates or heating means
    • F24H9/1809Arrangement or mounting of grates or heating means for water heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/22Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating
    • F24H1/34Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating with water chamber arranged adjacent to the combustion chamber or chambers, e.g. above or at side
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/22Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating
    • F24H1/40Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating with water tube or tubes
    • F24H1/403Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating with water tube or tubes the water tubes being arranged in one or more circles around the burner

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Supply (AREA)

Abstract

내용 없음.No content.

Description

보일러Boiler

제1도는 본 고안에 의한 보일러의 종단정면도.1 is a longitudinal sectional front view of the boiler according to the present invention.

제2도는 동 횡단평면도.2 is the same cross-sectional view.

제3도는 본 고안의 다른 실시예에 의한 보일러의 횡단평면도.3 is a cross-sectional view of a boiler according to another embodiment of the present invention.

제4도는 파형판에 의한 화기의 흐름을 나타낸 참고도.4 is a reference diagram showing the flow of fire by the corrugated plate.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

1 : 화실 4 : 내측 가열수관1: fire chamber 4: inner heating water pipe

5 : 외측 가열수관 6 : 덧살5: outer heating water pipe 6: extruding

7 : 파형판 9, 11 : 세라믹재 내화벽7: corrugated plate 9, 11: ceramic fireproof wall

10 : 공간 11a : 상층부10: space 11a: upper layer

11b : 하층부 41, 51 : 삽입단11b: lower layer 41, 51: insertion end

본 고안은 보일러의 상부에는 기수드럼을 그리고 하부에는 수드럼을 배치하고 이를 두 드럼간을 다수의 가열수관으로 연결한 수관식 보일러의 개량에 관한 것이며, 특히 내외측 가열수관에 의한 열회수율증대와 자연통풍방식에 의한 급기로화실의 열손실을 방지하고 더욱 높은 고온분위기로 완전연소를 이룰 수 있고 또한 내부구조도 단순화한 수관식 보일러에 관한 것이다.The present invention relates to the improvement of a water-pipe boiler in which a brackish drum is placed on the upper part of the boiler and a sod drum on the lower part of the boiler, and the two drums are connected by a plurality of heating water pipes. It is related to a water pipe boiler which prevents heat loss of the combustion chamber by the natural ventilation method and completely burns out at a higher temperature atmosphere and also simplifies the internal structure.

본 고안과 비교되는 보일러의 일례로서는 실용신안공고 제73-1038호가 있다.As an example of the boiler compared with this invention, there is a utility model notification 73-1038.

그러나, 이러한 구조방식의 선행기술은 수관으로 부터 강제로 열을 회수하는 것이라 가열수관의 기계적수명 단축을 촉진하는 결과를 초래할 뿐만 아니라 가열수관을 다중으로 설치하는데 비례하여 수드럼 및 기수드럼과의 용접개소도 늘어나기때문에 용접작업을 어렵게 만들고 대당 완성하기가지의 소요시간도 길어져 제작능률도 낮고 부피는 상대적으로 늘어날 수 밖에 없어 소용량 고성능의 보일러와는 거리가 멀다. 또, 연소가스가 수관을 이리저리 휘돌아 나가도록 유도하기 위해서 가열수관과는 별도의 칸막이를 설치하지만 이는 칸막이에 상응하는 만큼 제작원가의 상승이 불가피하고, 연소가스의 흐름마저도 곧은 흐름이어서 그 수열효과가 기대에 미치지 못했음은 물론 열손실 요인도 많아 화실의 고온화 및 고온분위기유지도 미흡한 홈이 있었다.However, the prior art of this structure method is forcibly recovering heat from the water pipes, which not only promotes shortening of the mechanical life of the water pipes, but also welds with the drums and brackish drums in proportion to the multiple installation of the water pipes. As the number of points increases, the welding work becomes difficult and the time required for the completion of the unit is long, so the production efficiency is low and the volume is inevitably increased, which is far from the small-capacity high-performance boiler. In addition, a separate partition from the heating water pipe is installed to induce the combustion gas to circulate around the water pipe. However, it is inevitable to increase the manufacturing cost as it corresponds to the partition, and even the flow of the combustion gas is a straight stream so that the hydrothermal effect Not only did it fail to meet expectations, but there were also many heat loss factors, resulting in a lack of high temperature and high temperature atmosphere in the firebox.

따라서, 본 고안의 목적은 화실과 가열수관 이외의 불필요한 내부공간을 가급적 축소함과 동시에 불필요하게 보이는 수관을 대폭 감축하여 보일러의 외형을 줄이면서도 가열수관에 의한 수열효과와 고온분위기는 오히려 높아지게 하므로서 증기생산량을 극대화할 수 있는 수관식 보일러를 제공하는 것이다.Therefore, the object of the present invention is to reduce the unnecessary internal spaces other than the firebox and the heating water pipe as much as possible, and to reduce the appearance of the boiler by greatly reducing the external appearance of the boiler while increasing the water heat effect and the high temperature atmosphere due to the heating water pipe. It is to provide a water tube boiler that can maximize the yield.

이같은 제안목적은 가열수관의 구조를 변경하고 화실내부의 단열구조를 개선함으로써 간단히 성취할 수가 있다. 즉, 수관식 보일러에서 흔히 볼 수 있듯이 하우에는 수드럼을 그리고 상위에는 기수드럼을 배치하고 이들 두 드럼을 호상으로 절곡한 복수의 가열수관으로 연결한 점은 예나 지금이나 마찬가지다. 다만, 가열수관은 동심원상에 단 2열만 배치하되 내측 가열수관은 배열방향으로 틈을 남기지 않을 정도로 거의 밀착에 가깝게 설치하여 화기유도용 칸막이를 겸하도록 하고, 외측 가열수관은 일정한 간격을 두고 배열하되 인접한 수관끼지 덧살로 연결하여 방사방향으로의 화기통로를 봉쇄하는 대신에 내외측 가열수관 사이로 흘러나가는 화기가 난류를 일으키게 하므로서 체공시간을 연장하는 결과를 얻고, 이에다라 수열효과를 높일 수 있게 한 것이다.This proposed objective can be achieved simply by changing the structure of the heated water pipe and improving the insulation structure inside the firebox. In other words, as is commonly seen in water-pipe boilers, it is the same as that of the case where a drum is placed in a howe, a radix drum is placed on top, and the two drums are connected by a plurality of heated water pipes bent into an arc. However, only two rows of heating water pipes should be arranged on concentric circles, but the inner heating water pipes should be installed close to close enough to not leave a gap in the arrangement direction so as to serve as a fire induction partition, and the outer heating water pipes should be arranged at regular intervals. Instead of blocking the fire passage in the radial direction by connecting the adjacent water pipes with the grate, the fire that flows between the inner and outer heating water pipes causes turbulent flow, resulting in the extension of the flight time, thereby increasing the hydrothermal effect. .

나아가, 상기와 같은 난류현상을 가속시키려고 내외측 가열수관 사이에 방사방향으로 파형 칸막이를 설치한 것과, 화실의 고온분위기 창출 및 완전연소를 도모하기 위하여 화실의 앞 뒷벽 내면에 세라믹재 내화벽을 구축한 것도 본 고안의 특징에 포함된다.Furthermore, in order to accelerate the turbulence as described above, a corrugated partition is installed in the radial direction between the inner and outer heating water pipes, and a ceramic fireproof wall is formed on the inner surface of the front and rear walls of the firebox in order to create a high temperature atmosphere and complete combustion of the firebox. One is also included in the features of the present invention.

이하, 본 고안을 첨부도면에 따라 구체적으로 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

화실(1)의 상, 하위에는 기수드럼(2)과 수드럼(3)이 배치되어 있고, 이들 두드럼(2, 3)은 호상으로 절곡해 만든 단 두줄의 가열수관(4, 5)에 의해 연결되어 있다. 가열수관(4, 5)은 동심원상으로 배치된다. 따라서 이들 가열수관(4)과 (5)사이에는 균일한 폭의 공간(10)이 남게 된다. 이 공간(10)은 나중에 화실(1)을 거쳐온 화기가 배출될때 그 통로구실을 하게 된다.Above and below the fire chamber 1, a radix drum 2 and a drum 3 are arranged, and these drums 2 and 3 are arranged in a single row of heated water pipes 4 and 5 formed by bending the arc. Are connected by. The heated water pipes 4 and 5 are arranged concentrically. Therefore, a space 10 of uniform width remains between these heated water pipes 4 and 5. The space 10 serves as a passageway when the fire that passed through the fire chamber 1 is discharged.

내측 가열수관(4)과 외측 가열수관(5)의 양단은 축경가공하여 기수드럼(2)과 수드럼(3)상에 뚫은 삽입공에 끼워 붙일 삽입단(41, 51)으로 활용한다. 정확히 말해서 삽입단(41, 51)의 외경은 기수드럼(2)과 수드럼(3)의 삽입공의 내경에 비해 기계적 허용공차만큼 작게하여 끼워 붙이기 쉽게 한다. 그리고, 상기 삽입공에 삽입단(41, 51)을 끼운 다음에는 그 바깥언저리를 용접 또는 확관장치를 이용해 확관시켜 밀착하는 방법으로 접속부가 수밀구조를 이루도록 결합한다.Both ends of the inner heating water pipe (4) and the outer heating water pipe (5) is used as the insertion end (41, 51) to be inserted into the insertion hole drilled on the radix drum 2 and the water drum (3) by the shaft diameter processing. In other words, the outer diameters of the insertion ends 41 and 51 are smaller than the inner diameters of the insertion holes of the nose drum 2 and the drum 3 by a mechanical tolerance so that they can be easily fitted. Then, after inserting the insertion end (41, 51) in the insertion hole is coupled to form a watertight structure by the outer edge is expanded by using a welding or expansion device to close contact.

또, 내측 가열수관(4)은 배열방향으로 거의 틈을 남기지 않게시리 밀착시키고 이에 맞춰 상기 삽입공을 뚫는 것은 당연하다. 반면에 외측 가열수단(5)은 배열방향으로 일정한 간격을 두고 배치하고 동시에 서로 인접한 외측 가열수단(5)끼리는 배열방향의 외면 중앙에 덧살(6)을 붙여서 일체화한다. 이런 형태로 내측가열수단(4)구 외측 가열수관(5)을 형성하여 설치함으로써 각 수관의 배열방향으로는 화기가 유통될 공간이 확보되지만 방사방향으로는 화기통로가 일절 구축되지 않는다.In addition, it is natural that the inner heating water pipe 4 closely adheres with little gap left in the arrangement direction and drills the insertion hole accordingly. On the other hand, the outer heating means 5 is arranged at regular intervals in the arrangement direction, and at the same time, the outer heating means 5 adjacent to each other are integrated by attaching a gushing 6 to the center of the outer surface in the arrangement direction. By forming and installing the inner heating means 4 and the outer heating water pipe 5 in this form, a space for discharging fire is secured in the arrangement direction of each water pipe, but the fire passage is not constructed at all in the radial direction.

따라서, 화기는 오로지 화실로 부터 내외측 가열수관(4, 5)사이에 형성된 공간(10)을 따라 보일러 밖으로 배출될 따름이고, 화기의 흐름도 순탄하게 흘러나가는 것이 아니라 공간(10)이 양측면이 일종의 파형벽을 이룸으로써 불규칙한 흐름 즉, 난류로 유도되어 빠져나가게 된다. 이러한 화기의 난류현상은 곧 공간(10)내에서의 체류시간도 연장하는 것과 다를바 없으므로 가열수관(4, 5)에 의한 열교환효율이 상대적으로 높아지고, 이로써 단시간에 고온증기를 생산할 수가 있다.Accordingly, the fire is only discharged out of the boiler along the space 10 formed between the inner and outer heating water pipes 4 and 5 from the fire chamber, and the flow of the fire is not flowed smoothly, but the space 10 is a kind of both sides. By forming a corrugated wall, it is induced by an irregular flow, that is, turbulence, and escapes. The turbulent phenomenon of such a fire is not different from the extension of the residence time in the space 10, so that the heat exchange efficiency by the heated water pipes 4 and 5 is relatively high, thereby producing high temperature steam in a short time.

상기 공간(10)내에는 화기통로를 형성할 칸막이는 설치하지 않는다. 다만, 방사방향에 복수개의 파형판(7)을 설치한다. 그러나 이 파형판(7)은 칸막이의 대용물이 아니다. 상기와 같은 난류현상을 더욱 활발히 이루기 위한 것이다. 즉, 내외측 가열수관(4, 5)은 공간(10)의 원주방향 안팎에서 화기의 난류현상을 유도하는데 대하여 파형판(7)은 공간(10)의 방사방향에서 화기의 난류를 유도한다. 이렇듯 사면에서 일어나는 화기의 난류현상은 공간(10)내에서의 체류시간을 더욱 연장시키고 또 구석구석 훌고 지나가면서 내외측 가열수관(4, 5)에게 열을 회수당하므로 더욱 짧은 시간안에 고온의 급탕생산이 가능해지는 것이다.In the space 10, a partition for forming a fire passage is not provided. However, a plurality of corrugated plates 7 are provided in the radial direction. However, this corrugated board 7 is not a substitute for a partition. The turbulent phenomenon as described above is to achieve more actively. That is, the inner and outer heating water pipes 4 and 5 induce turbulent phenomena of the fire in and around the circumferential direction of the space 10, while the corrugated plate 7 induces turbulence of the fire in the radial direction of the space 10. The turbulent phenomenon of fire that occurs on the slopes extends the residence time in the space 10 further, and the hot water is recovered by the inner and outer heating water pipes 4 and 5 while passing through every corner. Production is possible.

한편, 화실(1)의 앞벽과 여기에 설치된 화실문(13) 그리고 화실(1)의 뒷벽 안쪽에 세라믹재 내화벽(9, 11)이 구축되어 있다. 실시예처럼 뒷쪽 내화벽(11)이 평활한 수직벽으로 된 것은 화기가 일단 그 내화벽(11)에 부딪쳐 되돌아 나왔다가 공간(10)의 앞쪽으로 접어든 후에 챔버를 거쳐 대기중으로 확산되게 한 것으로, 소형 보일러(5톤 이하)에 적합한 구조이다.On the other hand, the ceramic fireproof walls 9 and 11 are built in the front wall of the fire chamber 1, the fire door 13 provided here, and the back wall of the fire chamber 1 inside. As in the embodiment, the rear fire wall 11 is a smooth vertical wall, which causes the fire to collide with the fire wall 11, come out, and then fold forward to the front of the space 10, and then spread through the chamber to the atmosphere. , Suitable for small boilers (5 tons or less).

또, 제3도에 예한 바와같이 뒷쪽 내화벽(11)만은 유달리 그 하반부(11b)를 상반부(11a)보다도 얇게 형성하여 자연스레 층이진 2단 내화벽으로 구축할 수도 있다. 5톤 이상의 대형보일러의 경우, 화실(8)내의 온도가 층에 따라 다소 차이가 나는 점을 고안한 것이다. 화실(1)의 규모가 크면 화실(1)의 고온분위기 중에서도 상층부의 온도보다는 하층부의 온도가 다소 낮게 나타나는 수가 있다.In addition, as shown in FIG. 3, only the rear fireproof wall 11 can form the lower half 11b thinner than the upper half 11a naturally, and can also be constructed as a two-stage fireproof wall naturally layered. In the case of a large boiler of 5 tons or more, the temperature in the fire chamber 8 is designed to be slightly different depending on the layers. If the size of the fire chamber 1 is large, the temperature of the lower layer may be somewhat lower than the temperature of the upper layer even in the high temperature atmosphere of the fire chamber 1.

그러면 상층부의 기류도 열을 빼앗기면 하층부로 내려갈 것이고, 일단 온도가 저하되면 될 수 있는한 빨리 화실(1)을 빠져나가게 하는 것이 이후의 열효율증대에 이롭다. 상기 뒷쪽 내화벽(11)에 단차를 둔 것은 바로 이같은 이유에서 상층부(11a)의 고온기류를 하층부(11b)로 부드럽게 유도하여 버너(12)쪽을 향해 회류하여 다시 상부 공간(10)으로 신속히 접어들도록 유도하기 위한 것이다.Then, the airflow of the upper layer will also go down to the lower layer when the heat is taken away, and once the temperature is lowered, it is advantageous to increase the thermal efficiency afterwards. It is for this reason that the step on the rear fire wall 11 smoothly induces the high temperature air flow of the upper layer 11a to the lower layer 11b to flow back toward the burner 12 and quickly folds back to the upper space 10 again. It is to induce it to lift.

또 세라믹재 내화벽(9, 11)은 지금까지 써온 고급단열재에 비해 저렴하고 수급도 수월할 뿐만아니라 고온형성에 이롭고 단열효과 및 내열성도 탁월하다. 자그마치 1100℃ 안팎의 온도까지, 보일러로서는 상상못할 고온에도 충분히 견뎌내는 물리적 특성과 열을 간직하는 능력을 갖고 있다. 본 고안은 이점을 이용한 것이다.In addition, the ceramic fireproof walls 9 and 11 are inexpensive and easy to supply and demand as well as the high-temperature insulation and excellent heat insulation effect and heat resistance compared to the high-grade insulation materials used up to now. At temperatures as low as 1100 ° C, they have the physical properties and heat to withstand high temperatures unimaginable for boilers. The present invention takes advantage of this.

다음으로, 화실문(13)에 설치된 자연풍방식의 예열공기생산구조에 대하여 서술한다. 화실문(13)의 안쪽에는 세라믹 내화벽(9)이 설치되어 있고, 또 안팎이 이중으로 된 가운데 속은 텅비어 있다. 이 공간(14)은 안으로는 버너(12)와 통하고 밖으로는 공간의 입구를 가리고 있는 송풍기(8)에 통해 있다. 그래서, 송풍기(8)에서 공급되는 공기를 받아 그곳에 간직하고 있던 잠열로 예열한 후에 버너(12)도 향하게 하므로서 잠열에 의한 화실문(13)의 과열로 예방함과 동시에 찬공기의 유입으로 화실(1)의 온도가 저하되는 것을, 더우기 보일러의 가동을 멈출때 화실(1)내의 온도가 급격히 저하되어 기수드럼(2)과 수드럼(3) 그리고 내외측 가열수관(4, 5)중 내부구성요소에 까지 악영향을 끼칠 것을 염려해 급수축현상에 따른 불이익을 당하지 않도록 방지하게 된다. 그러면서도 화실(1)의 온도를 빼앗는 일은 전혀 일어나지 않는다. 이런 점에서 상기 선행기술과는 확실히 구별된다. 나아가, 상기 화실문(13)은 적어도 외측 가열수단(5)의 내면도 훤희 들여다 보일 수 있는 규모로 형성한다. 그럼으로써 화실문(13)을 열고 외측 가열수관(5)의 내측면까지 용이하게 청소할 수가 있다.Next, the preheating air production structure of the natural wind system provided in the fire door 13 is demonstrated. Inside the fire door 13, a ceramic fireproof wall 9 is provided, and inside and outside are doubled, and the inside is hollow. The space 14 is through a blower 8 which communicates with the burner 12 inward and obstructs the entrance of the space. Thus, after receiving the air supplied from the blower 8 and preheating it with the latent heat stored therein, the burner 12 is also faced to prevent overheating of the fire door 13 due to the latent heat and at the same time, the inlet of the cold In addition, when the temperature of 1) decreases, the temperature inside the fire chamber 1 suddenly decreases when the boiler is stopped, and the internal structure of the radix drum 2, the drum 3, and the inner and outer heating water pipes 4 and 5 It is concerned that it will adversely affect the factor, thus preventing the disadvantages caused by water supply phenomena. Yet, taking away the temperature of the firebox 1 does not occur at all. In this respect it is clearly distinguished from the prior art. Furthermore, the fire door 13 is formed on a scale such that at least the inner surface of the outer heating means 5 can be seen. Thereby, the fire door 13 can be opened and the inside surface of the outer side heating water pipe 5 can be cleaned easily.

이상 설명한 바를 종합하면, 내측 가열수단과 외측 가열수관에 의해 구축된 공간과 이 공간내에 설치한 파형판에 의하여 화기의 배출시 흐름을 난류로 바꿔 체류시간을 연장하므로서 가열수관에 의한 열회수율이 종전보다 월등히 증대되고, 앞 뒷벽과 화실문의 안쪽에 시설한 세라믹재 내화벽의 물리적 특성에 따라 더욱 높은 고온분위기를 가져 완전연소를 이룩할 수 있는가 하면 화실문의 잠열을 이용하여 도입되는 외부공기를 자연통풍방식으로 예열하여 버너로 공급하므로서 화실의 열손실 및 화실문의 과열이 다함께 방지되며, 나아가 단두줄의 내외측 가열수관만을 갖추고도 그 이상의 열효율을 얻을 수 있어 보일러의 부피축소화가 실현가능해 소형에서도 대형 보일러에 버금가는 고성능을 발휘할 수 있고, 또 제작단가도 크게 낮춰서 염가에 보급하는 것이 가능함은 물론 내부청소도 용이하여 본디 주어진 기계적 수명을 다할때까지 보일러를 사용할 수가 있다.In summary, the heat recovery rate of the heating water pipes has been reduced by extending the residence time by changing the flow at the time of discharge of the fire into turbulence by the space formed by the inner heating means and the outer heating water pipe and the corrugated plate installed in the space. It is much more increased, and according to the physical characteristics of the ceramic fireproof wall installed on the front and back walls and inside of the fire door, it is possible to achieve complete combustion by having a higher temperature atmosphere, or the external air introduced by using the latent heat of the fire door. By preheating and supplying to burner, heat loss of firebox and overheating of firebox door are all prevented. Moreover, even more heat efficiency can be obtained even if only the inner and outer heating water pipe of single head line is provided. The high performance is comparable, and the production cost is significantly lowered. Class it is possible to have the number of course also easily be cleaned inside the boiler until the originally fulfill the given mechanical lifetime.

Claims (1)

화실(1)의 상, 하위에는 기수드럼(2)과 수드럼(3)이 배치하고, 이를 두 드럼(2, 3)을 호상으로 절곡한 가열수관을 여러 줄 배치하여 연결한 것에 있어서, 진원의 대략 절반길이로 절곡하고 그 양단부를 축경하여 삽입단(41, 51)으로 가공한 내측 가열수관(4)과 외측 가열수관(5)을 각기 한줄씩 그리고 이들 사이에 일정한 공간(10)을 남기도록 동심원상으로 배치하고 그 삽입단(41, 51)을 기수드럼(2)과 수드럼(3)의 삽입공에 접속하며, 내측 가열수단(4)은 그 배열방향으로 거의 틈을 남기지 않도록 각기 근접되게 설치하고 외측 가열수단(5)은 배열방향으로 일정한 간격을 두고 배열하되 서로 인접한 외측 가열수관끼리 판상 덧살(6)로 연결하며, 상기 공간(10)에는 복수개의 파형판(7)을 방사방향으로 설치하고, 화실(1)의 앞벽과 여기에 설치된 화실문(13) 그리고 화실의 뒷벽에는 세라믹재 내화벽(9, 10)을 구축한 것을 특징으로 하는 보일러.In the upper and lower parts of the firebox 1, the radix drum 2 and the sod drum 3 are arranged, and the heat drums in which the two drums 2 and 3 are bent into arcs are arranged in a row and connected. The inner heating water pipe (4) and the outer heating water pipe (5), each of which is bent to approximately half the length of the tube and reduced in diameter at both ends thereof, into the insertion ends (41, 51), leaving a constant space (10) therebetween. The insertion ends 41 and 51 are connected to the insertion holes of the nose drum 2 and the drum 3, and the inner heating means 4 are arranged so that there is almost no gap in the arrangement direction. Installed adjacently and the outer heating means (5) are arranged at regular intervals in the arrangement direction, but the adjacent heating water pipes are connected to each other by the plate-shaped glands (6), and radiates a plurality of corrugated plates (7) in the space (10) To the front wall of the firebox 1 and the firebox door 13 installed therein The back wall is a boiler characterized by the construction of a ceramic fireproof wall (9, 10).
KR2019930008161U 1993-05-15 1993-05-15 Boiler Expired - Fee Related KR950008564Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019930008161U KR950008564Y1 (en) 1993-05-15 1993-05-15 Boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019930008161U KR950008564Y1 (en) 1993-05-15 1993-05-15 Boiler

Publications (2)

Publication Number Publication Date
KR940027242U KR940027242U (en) 1994-12-09
KR950008564Y1 true KR950008564Y1 (en) 1995-10-11

Family

ID=19355310

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019930008161U Expired - Fee Related KR950008564Y1 (en) 1993-05-15 1993-05-15 Boiler

Country Status (1)

Country Link
KR (1) KR950008564Y1 (en)

Also Published As

Publication number Publication date
KR940027242U (en) 1994-12-09

Similar Documents

Publication Publication Date Title
CN101782270A (en) Condensing gas boiler
RU2069294C1 (en) Heat exchanger for gas burner
JPH0313482B2 (en)
EP2035531B1 (en) Advanced fired heater unit for use in refinery and petrochemical applications
CN109373301A (en) A kind of heat-exchange unit of modularization steam generating equipment
CN210165581U (en) Combustion heat exchange device with multistage heat insulation structure
KR101287693B1 (en) Hybrid Boiler
RU2386905C1 (en) Heat generator
JP2986982B2 (en) Small gas fired air heater
KR950008564Y1 (en) Boiler
KR200284927Y1 (en) High Efficiency Heat Recovery Apparatus
CN110678706B (en) Water storage boiler with vortex guide
JP4026023B2 (en) boiler
JP2010127513A (en) Heat exchanger and water heating apparatus
CN210602781U (en) Waste heat recovery energy-saving tubular heating furnace
KR102337850B1 (en) Boiler with condensing heat exchanger
KR200284723Y1 (en) Heat Exchanger of Gas Boiler for Home use
CN216011296U (en) Heat exchange pipe
KR100515636B1 (en) Structure of Heat Exchanger in Gas Boiler
KR101490975B1 (en) Heat exchanger of convection oven
RU2296919C2 (en) Hot-water water-tube boiler
US2241303A (en) Hot-air furnace
KR840001311Y1 (en) Boiler
JPS5844174B2 (en) bath kettle
KR20030082197A (en) Heat Exchanger of Boiler

Legal Events

Date Code Title Description
A201 Request for examination
R17-X000 Change to representative recorded

St.27 status event code: A-3-3-R10-R17-oth-X000

UA0108 Application for utility model registration

St.27 status event code: A-0-1-A10-A12-nap-UA0108

UA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-UA0201

UG1501 Laying open of application

St.27 status event code: A-1-1-Q10-Q12-nap-UG1501

UG1604 Publication of application

St.27 status event code: A-2-2-Q10-Q13-nap-UG1604

E701 Decision to grant or registration of patent right
UE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-UE0701

REGI Registration of establishment
UR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-UR0701

UR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-UR1002

Fee payment year number: 1

LAPS Lapse due to unpaid annual fee
UC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-UC1903

Not in force date: 19981012

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

UC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-UC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 19981012

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000