Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meier Schenk AgfiledCriticalMeier Schenk Ag
Publication of LU83182A1publicationCriticalpatent/LU83182A1/fr
F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
Landscapes
Engineering & Computer Science
(AREA)
General Engineering & Computer Science
(AREA)
Mechanical Engineering
(AREA)
Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage
(AREA)
Sewage
(AREA)
Joints Allowing Movement
(AREA)
Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves
(AREA)
LU83182A1980-03-041981-03-03Procede et dispositif de compensation des mouvements d'allongement d'une canalisation
LU83182A1
(fr)
Gaine de chemisage pour la renovation de canalisations d'eaux usees defectueuses comprenant une couche de renforcement a bande de traction longitudinale integrale
Procede pour reparer ou restaurer sur place un troncon d'une canalisation ou d'une enceinte destinee a contenir ou contenant un fluide sous pression, et dispositif pour la mise en óoeuvre de ce procede.
Procédé de construction de conduites telles que des canalisations de produits pétroliers en mer, tuyaux et dispositifs de raccordement de tuyaux pour la mise en Óoeuvre de ce procédé.