MX2020003213A - Metodo y sistema de estimulación mejorada de depósito. - Google Patents
Metodo y sistema de estimulación mejorada de depósito.Info
- Publication number
- MX2020003213A MX2020003213A MX2020003213A MX2020003213A MX2020003213A MX 2020003213 A MX2020003213 A MX 2020003213A MX 2020003213 A MX2020003213 A MX 2020003213A MX 2020003213 A MX2020003213 A MX 2020003213A MX 2020003213 A MX2020003213 A MX 2020003213A
- Authority
- MX
- Mexico
- Prior art keywords
- region
- wellbore
- stimulation method
- reservoir stimulation
- improved reservoir
- Prior art date
Links
- 230000000638 stimulation Effects 0.000 title abstract 3
- 239000012530 fluid Substances 0.000 abstract 3
- 230000015572 biosynthetic process Effects 0.000 abstract 2
- 230000004936 stimulating effect Effects 0.000 abstract 2
- 208000010392 Bone Fractures Diseases 0.000 abstract 1
- 206010017076 Fracture Diseases 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/60—Compositions for stimulating production by acting on the underground formation
- C09K8/62—Compositions for forming crevices or fractures
- C09K8/66—Compositions based on water or polar solvents
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/60—Compositions for stimulating production by acting on the underground formation
- C09K8/62—Compositions for forming crevices or fractures
- C09K8/66—Compositions based on water or polar solvents
- C09K8/68—Compositions based on water or polar solvents containing organic compounds
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/60—Compositions for stimulating production by acting on the underground formation
- C09K8/80—Compositions for reinforcing fractures, e.g. compositions of proppants used to keep the fractures open
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- External Artificial Organs (AREA)
- Apparatus Associated With Microorganisms And Enzymes (AREA)
- Percussion Or Vibration Massage (AREA)
Abstract
Un método para estimular una formación que contiene dos o más pozos, dicho método comprende: estimular simultáneamente una primera región de cada pozo utilizando un fluido de estimulación para crear una fractura primaria en dicha primera región de cada pozo, en donde dicha primera región comprende una primera abertura o aberturas que permiten la comunicación de fluido entre cada pozo y dicha formación, en donde dicha primera región tiene una primera longitud lateral estimulada y en donde el caudal de dicho fluido de estimulación a través de dicha primera abertura o aberturas es mayor que 1 barril por minuto por 30.48 cm (1 ft) de dicha primera longitud lateral estimulada.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15/712,899 US11098568B2 (en) | 2017-09-22 | 2017-09-22 | Reservoir stimulation method and system |
| PCT/NO2018/050231 WO2019059777A1 (en) | 2017-09-22 | 2018-09-14 | IMPROVED METHOD AND SYSTEM FOR RESERVOIR STIMULATION |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| MX2020003213A true MX2020003213A (es) | 2021-01-15 |
Family
ID=65806548
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| MX2020003213A MX2020003213A (es) | 2017-09-22 | 2018-09-14 | Metodo y sistema de estimulación mejorada de depósito. |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US11098568B2 (es) |
| CN (1) | CN111556913A (es) |
| AR (1) | AR113236A1 (es) |
| AU (1) | AU2018334987A1 (es) |
| BR (1) | BR112020005702A2 (es) |
| CA (1) | CA3076677A1 (es) |
| MX (1) | MX2020003213A (es) |
| WO (1) | WO2019059777A1 (es) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10590748B2 (en) * | 2017-09-22 | 2020-03-17 | Statoil Gulf Services LLC | Reservoir stimulation method and apparatus |
| CA3183440A1 (en) * | 2018-04-11 | 2019-10-17 | Fmc Technologies, Inc. | Well fracture systems and methods |
| US11585197B2 (en) * | 2018-11-21 | 2023-02-21 | Halliburton Energy Services, Inc. | Split flow pumping system configuration |
| NO347014B1 (en) | 2021-01-25 | 2023-04-03 | Interwell Norway As | Well tool device with injection fluid system |
Family Cites Families (32)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3224506A (en) * | 1963-02-18 | 1965-12-21 | Gulf Research Development Co | Subsurface formation fracturing method |
| US3225828A (en) * | 1963-06-05 | 1965-12-28 | American Coldset Corp | Downhole vertical slotting tool |
| US4119151A (en) * | 1977-02-25 | 1978-10-10 | Homco International, Inc. | Casing slotter |
| US4187185A (en) * | 1978-02-13 | 1980-02-05 | Texaco Development Corporation | Oil recovery process using oxyalkylated additives |
| NL8200866A (nl) * | 1982-03-03 | 1983-10-03 | Erland Robert Tegelberg | Werkwijze voor het in de bodem drijven van een hol buisvormig lichaam. |
| US5197543A (en) * | 1992-03-16 | 1993-03-30 | Oryx Energy Company | Horizontal well treatment method |
| US5398763A (en) * | 1993-03-31 | 1995-03-21 | Halliburton Company | Wireline set baffle and method of setting thereof |
| US6084009A (en) * | 1995-06-15 | 2000-07-04 | Mitsui Chemicals, Inc. | Powder paint compositions |
| US7401652B2 (en) * | 2005-04-29 | 2008-07-22 | Matthews H Lee | Multi-perf fracturing process |
| RU2484243C2 (ru) * | 2007-07-03 | 2013-06-10 | Шлюмберже Текнолоджи Б.В. | Способ гетерогенного размещения расклинивающего наполнителя в трещине гидроразрыва разрываемого слоя |
| US7621328B1 (en) * | 2008-05-07 | 2009-11-24 | Halliburton Energy Services, Inc. | Methods of pumping fluids having different concentrations of particulate with different concentrations of hydratable additive to reduce pump wear and maintenance in the forming and delivering of a treatment fluid into a wellbore |
| US9260921B2 (en) * | 2008-05-20 | 2016-02-16 | Halliburton Energy Services, Inc. | System and methods for constructing and fracture stimulating multiple ultra-short radius laterals from a parent well |
| US8469089B2 (en) * | 2010-01-04 | 2013-06-25 | Halliburton Energy Services, Inc. | Process and apparatus to improve reliability of pinpoint stimulation operations |
| PL2481490T3 (pl) * | 2011-01-31 | 2015-01-30 | Geosea Nv | Sposób i urządzenie do czyszczenia wydrążonych pali wprowadzonych w podłoże |
| WO2013009773A1 (en) * | 2011-07-12 | 2013-01-17 | Weatherford/Lamb, Inc. | Multi-zone screened frac system |
| US8783365B2 (en) * | 2011-07-28 | 2014-07-22 | Baker Hughes Incorporated | Selective hydraulic fracturing tool and method thereof |
| US8919443B2 (en) * | 2011-08-03 | 2014-12-30 | Halliburton Energy Services, Inc. | Method for generating discrete fracture initiation sites and propagating dominant planar fractures therefrom |
| IN2014CN03363A (es) * | 2011-10-12 | 2015-07-03 | Prad Res & Dev Ltd | |
| CN102606124B (zh) * | 2012-03-16 | 2015-07-29 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | 双水平井分段多簇同步体积压裂工艺技术 |
| CN105026684B (zh) * | 2012-10-04 | 2018-05-04 | 尼克森能源无限责任公司 | 斜井筒的改进水力压裂方法 |
| CN104373099A (zh) * | 2013-08-14 | 2015-02-25 | 微能地质科学工程技术有限公司 | 在地下多孔岩层中使用两口相邻井的目标定向断裂布置 |
| US20160053597A1 (en) * | 2014-08-22 | 2016-02-25 | Smith International, Inc. | Hydraulic fracturing while drilling and/or tripping |
| US9879514B2 (en) * | 2014-08-26 | 2018-01-30 | Gas Technology Institute | Hydraulic fracturing system and method |
| AR102531A1 (es) * | 2014-11-04 | 2017-03-08 | Schlumberger Technology Bv | Método para terminación de pozos |
| US20160215581A1 (en) * | 2015-01-22 | 2016-07-28 | Schlumberger Technology Corporation | Method and apparatus for well completion |
| US10030497B2 (en) * | 2015-02-10 | 2018-07-24 | Statoil Gulf Services LLC | Method of acquiring information of hydraulic fracture geometry for evaluating and optimizing well spacing for multi-well pad |
| US10119378B2 (en) * | 2015-03-05 | 2018-11-06 | Schlumberger Technology Corporation | Well operations |
| US20160326853A1 (en) * | 2015-05-08 | 2016-11-10 | Schlumberger Technology Corporation | Multiple wellbore perforation and stimulation |
| US9644463B2 (en) * | 2015-08-17 | 2017-05-09 | Lloyd Murray Dallas | Method of completing and producing long lateral wellbores |
| US20170175470A1 (en) * | 2015-12-16 | 2017-06-22 | Schlumberger Technology Corporation | Method and apparatus for operating a shifting tool |
| CN106894416A (zh) * | 2017-03-23 | 2017-06-27 | 中铁建设集团有限公司 | 一种旋挖式掏桩芯简易工具及施工方法 |
| CA3002949C (en) * | 2017-05-02 | 2022-04-05 | Advanced Completions Asset Corporation | Tool assembly with collet and shiftable valve and process for directing fluid flow in a wellbore |
-
2017
- 2017-09-22 US US15/712,899 patent/US11098568B2/en not_active Expired - Fee Related
-
2018
- 2018-09-14 BR BR112020005702-9A patent/BR112020005702A2/pt active Search and Examination
- 2018-09-14 MX MX2020003213A patent/MX2020003213A/es unknown
- 2018-09-14 CN CN201880075673.XA patent/CN111556913A/zh active Pending
- 2018-09-14 CA CA3076677A patent/CA3076677A1/en active Pending
- 2018-09-14 AU AU2018334987A patent/AU2018334987A1/en not_active Abandoned
- 2018-09-14 WO PCT/NO2018/050231 patent/WO2019059777A1/en not_active Ceased
- 2018-09-21 AR ARP180102720A patent/AR113236A1/es active IP Right Grant
Also Published As
| Publication number | Publication date |
|---|---|
| US20190093465A1 (en) | 2019-03-28 |
| AU2018334987A1 (en) | 2020-04-16 |
| CA3076677A1 (en) | 2019-03-28 |
| AR113236A1 (es) | 2020-02-19 |
| WO2019059777A1 (en) | 2019-03-28 |
| CN111556913A (zh) | 2020-08-18 |
| BR112020005702A2 (pt) | 2020-10-20 |
| US11098568B2 (en) | 2021-08-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| MX2020003213A (es) | Metodo y sistema de estimulación mejorada de depósito. | |
| SA522440280B1 (ar) | بئر متعدد الجوانب يتم حفره باستخدام الحفر غير المتوازن بالأنابيب الملتفة ويتم تحفيزه باستخدام مواد تفاعل طاردة للحرارة | |
| SA518400682B1 (ar) | تصدع هيدروليكي في تكوينات غير تقليدية غنية بالكيروجين | |
| SA520411576B1 (ar) | تصدع هيدروليكي نبضي مع مائع ناقل سيليكا نانو | |
| MX2017007495A (es) | Composiciones y metodos para mejorar una red de fracturas hidraulicas. | |
| SA115370068B1 (ar) | تصديع تكوينات جوفية ضيق بتركيبة أسمنت | |
| GB2541306A (en) | Forming multilateral wells | |
| GB2536527A (en) | Wettability altering fluids during downhole operations | |
| GB2520585A (en) | Multi-interval wellbore treatment method | |
| MX367583B (es) | Sincronización de pulsos en ubicación de fracturaciones heterogéneas. | |
| MY195014A (en) | Method of Enhancing Conductivity from Post Frac Channel Formation | |
| MX2012013137A (es) | Métodos para estimulación de manera no convencional de un yacimiento de gas con descarga de tensión para la conectividad de la red de fracturas. | |
| MX2017015001A (es) | Fracturacion de caudal bajo inducida termicamente. | |
| DK201670992A1 (en) | Compound cluster placement in fractures | |
| GB2544664A (en) | Enhancing complex fracture networks in subterranean formations | |
| MX2016003267A (es) | Metodos para el tratamiento de una formacion subterranea. | |
| GB2547128A (en) | Determining depth of loss zones in subterranean formations | |
| GB2559490A (en) | Ethoxylated amines for use in subterranean formations | |
| WO2014140727A3 (en) | Method and apparatus for stimulating a geothermal well | |
| GB2561298A (en) | Hydrophobically-treated particulates for improved fluid rheology | |
| MX2018014106A (es) | Sistema y metodo de fractura hidraulica. | |
| MX2020003040A (es) | Aparato de estimulacion de pozo y un metodo para usar el mismo. | |
| GB2534293A (en) | Sand control assemblies including flow rate regulators | |
| SA518391198B1 (ar) | دقائق معالجة خالية من المادة الحاملة للاستخدام في تكوينات جوفية | |
| MX389421B (es) | Desviador de gas para pozo y estimulacion de yaciemiento. |