MX343973B - Metodo de uso de firmas de presion para predecir anomalias de pozo de inyeccion. - Google Patents
Metodo de uso de firmas de presion para predecir anomalias de pozo de inyeccion.Info
- Publication number
- MX343973B MX343973B MX2010002779A MX2010002779A MX343973B MX 343973 B MX343973 B MX 343973B MX 2010002779 A MX2010002779 A MX 2010002779A MX 2010002779 A MX2010002779 A MX 2010002779A MX 343973 B MX343973 B MX 343973B
- Authority
- MX
- Mexico
- Prior art keywords
- formation
- fracture behavior
- injection well
- pressure signature
- time period
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 5
- 238000002347 injection Methods 0.000 title abstract 3
- 239000007924 injection Substances 0.000 title abstract 3
- 230000015572 biosynthetic process Effects 0.000 abstract 6
- 239000000243 solution Substances 0.000 abstract 3
- 238000005520 cutting process Methods 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/06—Arrangements for treating drilling fluids outside the borehole
- E21B21/063—Arrangements for treating drilling fluids outside the borehole by separating components
- E21B21/065—Separating solids from drilling fluids
- E21B21/066—Separating solids from drilling fluids with further treatment of the solids, e.g. for disposal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/01—Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
- E21B41/0057—Disposal of a fluid by injection into a subterranean formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Processing Of Solid Wastes (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Measuring Fluid Pressure (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US97209207P | 2007-09-13 | 2007-09-13 | |
| PCT/US2008/075087 WO2009035884A1 (fr) | 2007-09-13 | 2008-09-03 | Procédé d'utilisation de signatures de pression pour prédire des anomalies de puits d'injection |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| MX2010002779A MX2010002779A (es) | 2010-04-07 |
| MX343973B true MX343973B (es) | 2016-11-30 |
Family
ID=40452407
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| MX2010002779A MX343973B (es) | 2007-09-13 | 2008-09-03 | Metodo de uso de firmas de presion para predecir anomalias de pozo de inyeccion. |
Country Status (12)
| Country | Link |
|---|---|
| US (1) | US20100314104A1 (fr) |
| EP (1) | EP2198115B1 (fr) |
| CN (2) | CN104265211A (fr) |
| AR (1) | AR068426A1 (fr) |
| AU (1) | AU2008299195B2 (fr) |
| BR (1) | BRPI0816851A2 (fr) |
| CA (1) | CA2699503C (fr) |
| CO (1) | CO6270163A2 (fr) |
| EA (1) | EA021727B1 (fr) |
| MX (1) | MX343973B (fr) |
| NO (1) | NO2198115T3 (fr) |
| WO (1) | WO2009035884A1 (fr) |
Families Citing this family (22)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EA017606B1 (ru) * | 2008-02-22 | 2013-01-30 | Эм-Ай Эл.Эл.Си. | Способ определения приемистости скважины по размещению отходов бурения |
| US8047284B2 (en) * | 2009-02-27 | 2011-11-01 | Halliburton Energy Services, Inc. | Determining the use of stimulation treatments based on high process zone stress |
| CA2852881A1 (fr) * | 2011-06-24 | 2012-12-27 | Board Of Regents, The University Of Texas System | Procede de determination d'espacement de fractures hydrauliques dans une formation rocheuse |
| WO2013008195A2 (fr) | 2011-07-11 | 2013-01-17 | Schlumberger Canada Limited | Système et procédé de réalisation d'opérations de stimulation de trou de forage |
| US20140231084A1 (en) * | 2011-11-09 | 2014-08-21 | Ramesh Varadaraj | Drill Cuttings Re-Injection |
| US10578766B2 (en) | 2013-08-05 | 2020-03-03 | Advantek International Corp. | Quantifying a reservoir volume and pump pressure limit |
| WO2015095557A1 (fr) * | 2013-12-18 | 2015-06-25 | Conocophillips Company | Procede pour la determination d'orientation et de dimension de fracture hydraulique |
| MX369007B (es) | 2014-06-11 | 2019-10-24 | Advantek Int Corporation | Cuantificación del volumen de un yacimiento y límite de presión de bomba. |
| CA2953727C (fr) | 2014-06-30 | 2021-02-23 | Advantek International Corporation | Reduction en coulis et mise au rebut de dechets par pompage sous pression dans une formation sous la surface |
| US10385670B2 (en) | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
| US10385686B2 (en) * | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
| CA2993949A1 (fr) * | 2015-08-31 | 2017-03-09 | Halliburton Energy Services, Inc. | Flux de travail integre pour une etude de faisabilite de reinjection de deblais en se basant sur une analyse geomecanique 3d |
| CN106371989A (zh) * | 2016-05-06 | 2017-02-01 | 北京中电华大电子设计有限责任公司 | 一种采用批处理方式的高效安全攻击故障注入方法 |
| GB2562752B (en) * | 2017-05-24 | 2021-11-24 | Geomec Eng Ltd | Improvements in or relating to injection wells |
| GB2578398B (en) | 2017-06-16 | 2021-11-17 | Advantek Waste Man Services Llc | Optimizing waste slurry disposal in fractured injection operations |
| CA3099731A1 (fr) | 2018-05-09 | 2019-11-14 | Conocophillips Company | Surveillance de fracture en temps reel omnipresente |
| CN108952700B (zh) * | 2018-08-21 | 2022-03-25 | 西南石油大学 | 一种各向异性地层井壁破裂压力确定方法 |
| CN112211622B (zh) * | 2019-07-11 | 2023-02-07 | 中国石油天然气股份有限公司 | 油藏压力场划分的方法和装置 |
| US11781418B2 (en) | 2019-11-21 | 2023-10-10 | Conocophillips Company | Well annulus pressure monitoring |
| US11790320B2 (en) * | 2020-06-25 | 2023-10-17 | Schlumberger Technology Corporation | Approaches to creating and evaluating multiple candidate well plans |
| US12486747B1 (en) | 2024-05-30 | 2025-12-02 | Halliburton Energy Services, Inc. | Well plug integrity |
| US12523143B2 (en) * | 2024-05-30 | 2026-01-13 | Halliburton Energy Services, Inc. | Addressing plug movement in hydraulic fracturing |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5050674A (en) * | 1990-05-07 | 1991-09-24 | Halliburton Company | Method for determining fracture closure pressure and fracture volume of a subsurface formation |
| US6002063A (en) * | 1996-09-13 | 1999-12-14 | Terralog Technologies Inc. | Apparatus and method for subterranean injection of slurried wastes |
| US6076046A (en) * | 1998-07-24 | 2000-06-13 | Schlumberger Technology Corporation | Post-closure analysis in hydraulic fracturing |
| US7440876B2 (en) * | 2004-03-11 | 2008-10-21 | M-I Llc | Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach |
| US8091625B2 (en) * | 2006-02-21 | 2012-01-10 | World Energy Systems Incorporated | Method for producing viscous hydrocarbon using steam and carbon dioxide |
| MX336561B (es) * | 2010-12-30 | 2016-01-25 | Schlumberger Technology Bv | Sistema y metodo para realizar operaciones de estimulacion en el fondo del pozo. |
-
2008
- 2008-09-03 CA CA2699503A patent/CA2699503C/fr active Active
- 2008-09-03 CN CN201410356336.1A patent/CN104265211A/zh active Pending
- 2008-09-03 MX MX2010002779A patent/MX343973B/es active IP Right Grant
- 2008-09-03 WO PCT/US2008/075087 patent/WO2009035884A1/fr not_active Ceased
- 2008-09-03 BR BRPI0816851 patent/BRPI0816851A2/pt active Search and Examination
- 2008-09-03 EA EA201070362A patent/EA021727B1/ru not_active IP Right Cessation
- 2008-09-03 AU AU2008299195A patent/AU2008299195B2/en not_active Ceased
- 2008-09-03 NO NO08799094A patent/NO2198115T3/no unknown
- 2008-09-03 EP EP08799094.1A patent/EP2198115B1/fr not_active Not-in-force
- 2008-09-03 US US12/677,719 patent/US20100314104A1/en not_active Abandoned
- 2008-09-03 CN CN200880107170A patent/CN101849080A/zh active Pending
- 2008-09-12 AR ARP080103969A patent/AR068426A1/es not_active Application Discontinuation
-
2010
- 2010-03-12 CO CO10029656A patent/CO6270163A2/es not_active Application Discontinuation
Also Published As
| Publication number | Publication date |
|---|---|
| EP2198115A1 (fr) | 2010-06-23 |
| AR068426A1 (es) | 2009-11-18 |
| US20100314104A1 (en) | 2010-12-16 |
| EP2198115B1 (fr) | 2017-08-02 |
| CN104265211A (zh) | 2015-01-07 |
| AU2008299195A1 (en) | 2009-03-19 |
| NO2198115T3 (fr) | 2017-12-30 |
| CN101849080A (zh) | 2010-09-29 |
| MX2010002779A (es) | 2010-04-07 |
| CA2699503A1 (fr) | 2009-03-19 |
| EA201070362A1 (ru) | 2010-10-29 |
| AU2008299195B2 (en) | 2012-08-23 |
| WO2009035884A1 (fr) | 2009-03-19 |
| CO6270163A2 (es) | 2011-04-20 |
| BRPI0816851A2 (pt) | 2015-03-17 |
| EP2198115A4 (fr) | 2015-12-02 |
| CA2699503C (fr) | 2015-05-05 |
| EA021727B1 (ru) | 2015-08-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| MX343973B (es) | Metodo de uso de firmas de presion para predecir anomalias de pozo de inyeccion. | |
| EA200870355A1 (ru) | Способ и устройство для гидравлического разрыва пласта и мониторинга | |
| MX2013012177A (es) | Determinacion de la integridad de pozos. | |
| MX2012004168A (es) | Planificacion y monitoreo de pruebas de formaciones. | |
| SA518392073B1 (ar) | أنظمة وطرق لاختبار الضغط العابر بآبار حقن بالماء لتحديد الأضرار بالخزان | |
| WO2007018858A3 (fr) | Modelisation de puits associee a l'extraction d'hydrocarbures a partir de formations souterraines | |
| EA200800434A1 (ru) | Моделирование скважины, связанное с добычей углеводородов из подземных формаций | |
| GB2476886A (en) | System and method for evaluation of structure-born sound | |
| UA104382C2 (ru) | Способ интерпретации распределенных температурных датчиков во время обработки ствола скважины | |
| MX2014011254A (es) | Metodo de analisis de riesgo de falla de sistema de perforacion. | |
| CA2876266C (fr) | Procedes et systemes connexes pour la modelisation et la prediction des resultats operationnels d'une operation de forage | |
| EA201390132A1 (ru) | Система и способ для определения характеристик коллектора | |
| MX367584B (es) | Método de calibración de la geometría de fractura a los eventos microsísmicos. | |
| EA201270525A1 (ru) | Способ и устройство для бурения, использующие вероятностный подход | |
| MX346613B (es) | Metodo y sistema para producción de presión de poro. | |
| MX2009001065A (es) | Metodo para diseñar un sello para dispositivo antierupcion utilizando analisis de elementos finitos. | |
| GB2476764A (en) | Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations | |
| EA201270259A1 (ru) | Спобобы оценки показателей вибраций на забое при бурении по результатам измерений на поверхности | |
| EA200970017A1 (ru) | Способ и система для проектирования и оптимизации операций бурения и заканчивания в углеводородных пластах - коллекторах | |
| MX2014005979A (es) | Deteccion y correcion de flujo de fluido no deseado ente zonas subterraneas. | |
| EA201101204A1 (ru) | Способ секвестрации флюидов в геологических формациях | |
| GB201207769D0 (en) | Method of drilling a subterranean borehole | |
| GB2469976A (en) | Method of estinmating well disposal capacity | |
| WO2010131113A3 (fr) | Système et procédé de réalisation d'opérations de confinement d'emplacement de puits | |
| MX390828B (es) | Deteccion dinamica de la superficie de cemento (toc) durante la cementacion de una tuberia de revestimiento en un pozo. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FG | Grant or registration |