MY143451A - Integrated reservoir optimization - Google Patents
Integrated reservoir optimizationInfo
- Publication number
- MY143451A MY143451A MYPI20023025A MY143451A MY 143451 A MY143451 A MY 143451A MY PI20023025 A MYPI20023025 A MY PI20023025A MY 143451 A MY143451 A MY 143451A
- Authority
- MY
- Malaysia
- Prior art keywords
- reservoir
- development plan
- monitor data
- rate monitor
- initial
- Prior art date
Links
- 238000005457 optimization Methods 0.000 title 1
- 238000012512 characterization method Methods 0.000 abstract 3
- PWPJGUXAGUPAHP-UHFFFAOYSA-N lufenuron Chemical compound C1=C(Cl)C(OC(F)(F)C(C(F)(F)F)F)=CC(Cl)=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F PWPJGUXAGUPAHP-UHFFFAOYSA-N 0.000 abstract 2
- 238000005259 measurement Methods 0.000 abstract 2
- 238000000034 method Methods 0.000 abstract 2
- 238000012544 monitoring process Methods 0.000 abstract 2
- 239000012530 fluid Substances 0.000 abstract 1
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
A METHOD OF MANAGING A FLUID OR A GAS RESERVOIR IS DISCLOSED WHICH ASSIMILATES DIVERSE DATA HAVING DIFFERENT ACQUISTION TIME SCALES AND SPATIAL SCALES OF COVERAGE FOR ITERATIVELY PRODUCING A RESERVOIR DEVELOPMENT PLAN THAT IS USED FOR OPTIMIZING AN AVERALL PERFORMANCE OF A RESERVOIR. THE METHOD INCLUDES: (A) GENERATING AN INITIAL RESERVOIR CHARACTERIZATION, (B) FROM THE INITIAL RESERVOIR CHARACTERIZATION, GENERATING AN INITIAL RESERVOIR DEVELOPMENT PLAN, (C) WHEN THE RESERVOIR DEVELOPMENT PLAN IS GENERATED, INCREMENTALLY ADVANCING AND GENERATING A CAPITAL SPENDING PROGRAM, (D) WHEN THE CAPITAL SPENDING PROGRAM IS GENERATED, MONITORING A PERFORMANCE OF THE RESERVOIR BY ACQUIRING HIGH RATE MONITOR DATA FROM A FIRST SET OF DATA MEASUREMENTS TAKEN IN THE RESERVOIR AND USING THE HIGH RATE MONITOR DATA TO PERFORM WELL-REGIONAL AND FIELD-RESERVOIR EVALUATIONS, (E) FURTHER MONITORING THE PERFORMANCE OF THE RESERVOIR BY ACQUIRING LOW RATE MONITOR DATA FROM A SECOND SET DATA MEASUREMENTS TAKEN IN THE RESERVOIR, (F) ASSIMILATING TOGETHER THE HIGH RATE MONITOR DATA AND THE LOW RATE MONITOR DATA, (G) FROM THE HIGH RATE MONITOR DATA AND THE LOW MONITOR DATA, DETERMINING WHEN IT IS NECESSARY TO UPDATE THE INITIAL RESERVOIR DEVELOPMENT PLAN TO PRODUCE THE NEWLY UPDATED RESERVOIR DEVELOPMENT PLAN, (H) WHEN NECESSARY, UPDATING THE INITIAL RESERVOIR DEVELOPMENT PLAN TO PRODUCE THE NEWLY UPDATED RESERVOIR DEVELOPMENT PLAN, AND (I) WHEN THE NEWLY UPDATED RESERVOIR DEVELOPMENT PLAN IS PRODUCED, REPEATING STEPS (C) THROUGH (H). A DETAILED DISCLOSURE IS PROVIDED HEREIN RELATING TO THE STEP (A) FOR GENERATING THE INITIAL RESERVOIR CHARACTERIZATION AND THE STEP (B) FOR GENERATING THE INITIAL RESERVOIR DEVELOPMENT PLAN.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| MYPI20023025 MY143451A (en) | 2002-08-15 | 2002-08-15 | Integrated reservoir optimization |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| MYPI20023025 MY143451A (en) | 2002-08-15 | 2002-08-15 | Integrated reservoir optimization |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| MY143451A true MY143451A (en) | 2011-05-13 |
Family
ID=45020803
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| MYPI20023025 MY143451A (en) | 2002-08-15 | 2002-08-15 | Integrated reservoir optimization |
Country Status (1)
| Country | Link |
|---|---|
| MY (1) | MY143451A (en) |
-
2002
- 2002-08-15 MY MYPI20023025 patent/MY143451A/en unknown
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| SG127743A1 (en) | Integrated reservoir optimization | |
| US10545260B2 (en) | Updating geological facies models using the Ensemble Kalman filter | |
| US12291964B2 (en) | Method for real-time interpretation of pressure transient test | |
| GB2585153A (en) | Petroleum reservoir behaviour prediction using a proxy flow model | |
| SA521430277B1 (en) | Method for dynamic calibration and simultaneous closed-loop inversion of simulation models of fractured reservoirs | |
| EP2727035B1 (en) | System and method for generating a geostatistical model of a geological volume of interest that is constrained by a process-based model of the geological volume of interest | |
| US8423338B2 (en) | Petroleum reservoir history matching method using local parametrizations | |
| US20140358510A1 (en) | System and method for characterizing uncertainty in subterranean reservoir fracture networks | |
| NO20090180L (en) | Dynamic reservoir technique | |
| NO20044864L (en) | Method for forming an optimal stochastic model of a heterogeneous subsurface area | |
| WO2001098797A3 (en) | Apparatus and methods for applying time lapse vsp to monitor a reservoir | |
| US9921338B2 (en) | Selecting and optimizing oil field controls for production plateau | |
| EP3126634B1 (en) | Well stimulation | |
| EP1441238A3 (en) | Modeling in-situ reservoirs with derivative constraints | |
| NO20065849L (en) | Procedure for updating a geological model with seismic data | |
| CN101379498A (en) | Methods, systems, and computer readable media for rapidly updating oil and gas field production models using physical and proxy simulators | |
| GB2472519A (en) | System and method for well test design, interpretation and test objectives verification | |
| ATE366421T1 (en) | METHOD FOR 3D PREDICTION OF REFLECTIONS ON THE FREE SURFACE | |
| US20170002631A1 (en) | Reservoir recovery simulation process and system | |
| EP3285043A1 (en) | Component deformation modeling system | |
| US20190138963A1 (en) | Method and system for self learning location selection and timing prediction | |
| MY143451A (en) | Integrated reservoir optimization | |
| WO2019175612A3 (en) | Methods and device to generate predictors for prognostic characterisation of coronary artery disease | |
| CN111963149B (en) | Post-fracturing stratum pressure solving method taking earth stagnation amount pressurization into consideration | |
| CN112241594A (en) | Rapid optimization method for side slope exploration drilling arrangement scheme |