MY143451A - Integrated reservoir optimization - Google Patents

Integrated reservoir optimization

Info

Publication number
MY143451A
MY143451A MYPI20023025A MY143451A MY 143451 A MY143451 A MY 143451A MY PI20023025 A MYPI20023025 A MY PI20023025A MY 143451 A MY143451 A MY 143451A
Authority
MY
Malaysia
Prior art keywords
reservoir
development plan
monitor data
rate monitor
initial
Prior art date
Application number
Inventor
Omer M Gurpinar
David J Rossi
Vidya B Verma
Philip W Pantella
Original Assignee
Schlumberger Technology Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Technology Corp filed Critical Schlumberger Technology Corp
Priority to MYPI20023025 priority Critical patent/MY143451A/en
Publication of MY143451A publication Critical patent/MY143451A/en

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

A METHOD OF MANAGING A FLUID OR A GAS RESERVOIR IS DISCLOSED WHICH ASSIMILATES DIVERSE DATA HAVING DIFFERENT ACQUISTION TIME SCALES AND SPATIAL SCALES OF COVERAGE FOR ITERATIVELY PRODUCING A RESERVOIR DEVELOPMENT PLAN THAT IS USED FOR OPTIMIZING AN AVERALL PERFORMANCE OF A RESERVOIR. THE METHOD INCLUDES: (A) GENERATING AN INITIAL RESERVOIR CHARACTERIZATION, (B) FROM THE INITIAL RESERVOIR CHARACTERIZATION, GENERATING AN INITIAL RESERVOIR DEVELOPMENT PLAN, (C) WHEN THE RESERVOIR DEVELOPMENT PLAN IS GENERATED, INCREMENTALLY ADVANCING AND GENERATING A CAPITAL SPENDING PROGRAM, (D) WHEN THE CAPITAL SPENDING PROGRAM IS GENERATED, MONITORING A PERFORMANCE OF THE RESERVOIR BY ACQUIRING HIGH RATE MONITOR DATA FROM A FIRST SET OF DATA MEASUREMENTS TAKEN IN THE RESERVOIR AND USING THE HIGH RATE MONITOR DATA TO PERFORM WELL-REGIONAL AND FIELD-RESERVOIR EVALUATIONS, (E) FURTHER MONITORING THE PERFORMANCE OF THE RESERVOIR BY ACQUIRING LOW RATE MONITOR DATA FROM A SECOND SET DATA MEASUREMENTS TAKEN IN THE RESERVOIR, (F) ASSIMILATING TOGETHER THE HIGH RATE MONITOR DATA AND THE LOW RATE MONITOR DATA, (G) FROM THE HIGH RATE MONITOR DATA AND THE LOW MONITOR DATA, DETERMINING WHEN IT IS NECESSARY TO UPDATE THE INITIAL RESERVOIR DEVELOPMENT PLAN TO PRODUCE THE NEWLY UPDATED RESERVOIR DEVELOPMENT PLAN, (H) WHEN NECESSARY, UPDATING THE INITIAL RESERVOIR DEVELOPMENT PLAN TO PRODUCE THE NEWLY UPDATED RESERVOIR DEVELOPMENT PLAN, AND (I) WHEN THE NEWLY UPDATED RESERVOIR DEVELOPMENT PLAN IS PRODUCED, REPEATING STEPS (C) THROUGH (H). A DETAILED DISCLOSURE IS PROVIDED HEREIN RELATING TO THE STEP (A) FOR GENERATING THE INITIAL RESERVOIR CHARACTERIZATION AND THE STEP (B) FOR GENERATING THE INITIAL RESERVOIR DEVELOPMENT PLAN.
MYPI20023025 2002-08-15 2002-08-15 Integrated reservoir optimization MY143451A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
MYPI20023025 MY143451A (en) 2002-08-15 2002-08-15 Integrated reservoir optimization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
MYPI20023025 MY143451A (en) 2002-08-15 2002-08-15 Integrated reservoir optimization

Publications (1)

Publication Number Publication Date
MY143451A true MY143451A (en) 2011-05-13

Family

ID=45020803

Family Applications (1)

Application Number Title Priority Date Filing Date
MYPI20023025 MY143451A (en) 2002-08-15 2002-08-15 Integrated reservoir optimization

Country Status (1)

Country Link
MY (1) MY143451A (en)

Similar Documents

Publication Publication Date Title
SG127743A1 (en) Integrated reservoir optimization
US10545260B2 (en) Updating geological facies models using the Ensemble Kalman filter
US12291964B2 (en) Method for real-time interpretation of pressure transient test
GB2585153A (en) Petroleum reservoir behaviour prediction using a proxy flow model
SA521430277B1 (en) Method for dynamic calibration and simultaneous closed-loop inversion of simulation models of fractured reservoirs
EP2727035B1 (en) System and method for generating a geostatistical model of a geological volume of interest that is constrained by a process-based model of the geological volume of interest
US8423338B2 (en) Petroleum reservoir history matching method using local parametrizations
US20140358510A1 (en) System and method for characterizing uncertainty in subterranean reservoir fracture networks
NO20090180L (en) Dynamic reservoir technique
NO20044864L (en) Method for forming an optimal stochastic model of a heterogeneous subsurface area
WO2001098797A3 (en) Apparatus and methods for applying time lapse vsp to monitor a reservoir
US9921338B2 (en) Selecting and optimizing oil field controls for production plateau
EP3126634B1 (en) Well stimulation
EP1441238A3 (en) Modeling in-situ reservoirs with derivative constraints
NO20065849L (en) Procedure for updating a geological model with seismic data
CN101379498A (en) Methods, systems, and computer readable media for rapidly updating oil and gas field production models using physical and proxy simulators
GB2472519A (en) System and method for well test design, interpretation and test objectives verification
ATE366421T1 (en) METHOD FOR 3D PREDICTION OF REFLECTIONS ON THE FREE SURFACE
US20170002631A1 (en) Reservoir recovery simulation process and system
EP3285043A1 (en) Component deformation modeling system
US20190138963A1 (en) Method and system for self learning location selection and timing prediction
MY143451A (en) Integrated reservoir optimization
WO2019175612A3 (en) Methods and device to generate predictors for prognostic characterisation of coronary artery disease
CN111963149B (en) Post-fracturing stratum pressure solving method taking earth stagnation amount pressurization into consideration
CN112241594A (en) Rapid optimization method for side slope exploration drilling arrangement scheme