MY158699A - Method for constructing boiler facility - Google Patents
Method for constructing boiler facilityInfo
- Publication number
- MY158699A MY158699A MYPI2013702398A MYPI2013702398A MY158699A MY 158699 A MY158699 A MY 158699A MY PI2013702398 A MYPI2013702398 A MY PI2013702398A MY PI2013702398 A MYPI2013702398 A MY PI2013702398A MY 158699 A MY158699 A MY 158699A
- Authority
- MY
- Malaysia
- Prior art keywords
- boiler
- installation process
- main column
- constructing
- top girder
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 238000011900 installation process Methods 0.000 abstract 8
- 238000010276 construction Methods 0.000 abstract 2
- 238000004904 shortening Methods 0.000 abstract 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/24—Supporting, suspending or setting arrangements, e.g. heat shielding
- F22B37/244—Supporting, suspending or setting arrangements, e.g. heat shielding for water-tube steam generators suspended from the top
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
PROVIDED IS A METHOD FOR CONSTRUCTING A BOILER FACILITY, RELATING TO CONSTRUCTION OF A LARGE-SIZED BOILER AND A BUILDING THEREOF, CAPABLE OF SHORTENING A CONSTRUCTION PERIOD FOR INSTALLING THE BOILER. THE METHOD FOR CONSTRUCTING A BOILER FACILITY INCLUDES: A MAIN COLUMN INSTALLATION PROCESS IN WHICH A MAIN COLUMN (14) POSITIONED IN FOUR DIRECTIONS OF A BOILER BUILDING IS INSTALLED; A TOP GIRDER INSTALLATION PROCESS IN WHICH A TOP GIRDER (22) IS HOISTED AND FIXED BETWEEN THE MAIN COLUMNS (14) USING & PLURALITY OF JACK DEVICES (40) PROVIDED IN AN UPPER PORTION OF THE MAIN COLUMN (14) AFTER THE MAIN COLUMN INSTALLATION PROCESS; A BOILER INSTALLATION PROCESS IN WHICH A BOILER MAIN BODY (30) IS HOISTED AND FIXED USING A PLURALITY OF JACK DEVICES (40) PROVIDED IN THE TOP GIRDER (22] AFTER THE TOP GIRDER INSTALLATION PROCESS; AND A FLOOR UNIT INSTALLATION PROCESS IN WHICH A FLOOR UNIT (14A) INCLUDED IN EACH FLOOR OF THE MAIN COLUMN (14) IS HOISTED AND FIXED USING A PLURALITY OF JACK DEVICES (40) PROVIDED IN AN UPPER PORTION OF THE MAIN COLUMN (14) SIMULTANEOUSLY WITH THE TOP GIRDER INSTALLATION PROCESS AND THE BOILER INSTALLATION PROCESS.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2011134508A JP5743205B2 (en) | 2011-06-16 | 2011-06-16 | Boiler facility construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| MY158699A true MY158699A (en) | 2016-11-15 |
Family
ID=47357079
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| MYPI2013702398A MY158699A (en) | 2011-06-16 | 2012-06-11 | Method for constructing boiler facility |
Country Status (4)
| Country | Link |
|---|---|
| JP (1) | JP5743205B2 (en) |
| MY (1) | MY158699A (en) |
| PL (1) | PL223560B1 (en) |
| WO (1) | WO2012173092A1 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2933555A1 (en) * | 2014-04-15 | 2015-10-21 | Alstom Technology Ltd | Method for erecting a boiler, module and boiler comprising the module |
| EP3086034A1 (en) * | 2015-04-20 | 2016-10-26 | General Electric Technology GmbH | Method for connecting heat exchanging surfaces to a main structure of a boiler, boiler and boiler module |
| US20160305111A1 (en) * | 2015-04-20 | 2016-10-20 | Alstom Technology Ltd | Method for erecting a boiler |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2648216B1 (en) * | 1989-06-07 | 1991-08-23 | Stein Industrie | METHOD FOR ASSEMBLING A VAPOR BOILER VAPOR PRODUCTION PLANT |
| JPH086897B2 (en) * | 1991-02-08 | 1996-01-29 | 三菱重工業株式会社 | Hanging boiler installation method |
| JP3389839B2 (en) * | 1997-09-05 | 2003-03-24 | 日立プラント建設株式会社 | Girder installation method and girder centering adjustment device |
| JP2002213707A (en) * | 2001-01-19 | 2002-07-31 | Mitsubishi Heavy Ind Ltd | Separate type boiler plant and its building method |
| JP5169549B2 (en) * | 2008-07-04 | 2013-03-27 | 株式会社日立プラントテクノロジー | Large beam block lifting method and jack-up stage used for it |
-
2011
- 2011-06-16 JP JP2011134508A patent/JP5743205B2/en active Active
-
2012
- 2012-06-11 PL PL406800A patent/PL223560B1/en unknown
- 2012-06-11 WO PCT/JP2012/064923 patent/WO2012173092A1/en not_active Ceased
- 2012-06-11 MY MYPI2013702398A patent/MY158699A/en unknown
Also Published As
| Publication number | Publication date |
|---|---|
| JP2013002739A (en) | 2013-01-07 |
| WO2012173092A1 (en) | 2012-12-20 |
| PL223560B1 (en) | 2016-10-31 |
| PL406800A1 (en) | 2014-07-21 |
| JP5743205B2 (en) | 2015-07-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| MY166367A (en) | Panelized structural system for building construction | |
| MX344044B (en) | Method and system of using standardized structural components. | |
| WO2014028561A3 (en) | Systems and methods for constructing temporary, re-locatable structures | |
| PH12015500868A1 (en) | Methods, systems and components for multi-storey building construction | |
| MX342375B (en) | Assembly process of a telescopic tower. | |
| MX2014003620A (en) | Tower erection system and method. | |
| WO2009017354A3 (en) | Multi-horizontal structure member forming method | |
| FR2994320B1 (en) | CRACKING CRACKING IN A NUCLEAR FACILITY SWIMMING POOL, USING A ROBOT. | |
| MY158699A (en) | Method for constructing boiler facility | |
| WO2010006164A3 (en) | Method of concrete building construction and system for concrete building construction | |
| CN203129355U (en) | Elevator shaft earthquake-resistant system suitable for earthquake-resistant project | |
| CN103291083A (en) | Repair method for old wooden tower | |
| MX2016005163A (en) | Boiler support structure. | |
| WO2013187803A3 (en) | Method for increasing the load-bearing capacity of a girderless monolithic reinforced-concrete framework | |
| MX2014010410A (en) | Method and apparatus for assembling field erected cooling tower frame. | |
| CN202645112U (en) | Mounting operation platform for 100m high-steel chimney | |
| WO2014023289A3 (en) | Device and method for constructing a multistorey building from prefabricated concrete parts | |
| CN103334592A (en) | Step-type sliding installation construction method for convex structure of high-rise building | |
| Kim et al. | A basic study of steel-joint connection method of composite precast concrete members | |
| PH22013000513U1 (en) | A portable modular building structure | |
| UA97211U (en) | Method of construction of buildings by lifting floor slabs | |
| UA62283U (en) | Unit of a frame metal skeleton of a high-rise building | |
| UA43395U (en) | Method to make steel and concrete girder under conditions of alteration work | |
| RU2012103074A (en) | METHOD FOR BUILDING A BUILDING FRAME WITH COLUMNS FROM PIPE CONCRETE ELEMENTS | |
| UA91267U (en) | Method for connection of reinforced-concrete panels of stiffening diaphragms in cap-less girderless buildings |