NO20015067L - Fremgangsmåte og anordning for utprövning av en brönn - Google Patents
Fremgangsmåte og anordning for utprövning av en brönnInfo
- Publication number
- NO20015067L NO20015067L NO20015067A NO20015067A NO20015067L NO 20015067 L NO20015067 L NO 20015067L NO 20015067 A NO20015067 A NO 20015067A NO 20015067 A NO20015067 A NO 20015067A NO 20015067 L NO20015067 L NO 20015067L
- Authority
- NO
- Norway
- Prior art keywords
- testing
- well
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
- E21B49/087—Well testing, e.g. testing for reservoir productivity or formation parameters
- E21B49/088—Well testing, e.g. testing for reservoir productivity or formation parameters combined with sampling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
- E21B49/081—Obtaining fluid samples or testing fluids, in boreholes or wells with down-hole means for trapping a fluid sample
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13058999P | 1999-04-22 | 1999-04-22 | |
| US09/512,438 US6330913B1 (en) | 1999-04-22 | 2000-02-25 | Method and apparatus for testing a well |
| PCT/US2000/010750 WO2000065200A1 (en) | 1999-04-22 | 2000-04-19 | Method and apparatus for testing a well |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| NO20015067D0 NO20015067D0 (no) | 2001-10-18 |
| NO20015067L true NO20015067L (no) | 2001-12-19 |
Family
ID=26828619
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| NO20015067A NO20015067L (no) | 1999-04-22 | 2001-10-18 | Fremgangsmåte og anordning for utprövning av en brönn |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US6330913B1 (no) |
| AU (1) | AU4478600A (no) |
| BR (1) | BR0009919B1 (no) |
| GB (1) | GB2368130B (no) |
| NO (1) | NO20015067L (no) |
| WO (1) | WO2000065200A1 (no) |
Families Citing this family (35)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NO990344L (no) * | 1999-01-26 | 2000-07-27 | Bjoern Dybdahl | FremgangsmÕte for bruk ved prøvetaking og/eller mÕling i reservoarvæske |
| US6340062B1 (en) * | 2000-01-24 | 2002-01-22 | Halliburton Energy Services, Inc. | Early formation evaluation tool |
| US7347272B2 (en) * | 2002-02-13 | 2008-03-25 | Schlumberger Technology Corporation | Formation isolation valve |
| US7296637B2 (en) * | 2004-04-06 | 2007-11-20 | Ed Gudac | Oil drilling tool |
| US7228900B2 (en) * | 2004-06-15 | 2007-06-12 | Halliburton Energy Services, Inc. | System and method for determining downhole conditions |
| US8620636B2 (en) * | 2005-08-25 | 2013-12-31 | Schlumberger Technology Corporation | Interpreting well test measurements |
| WO2009024545A1 (en) * | 2007-08-17 | 2009-02-26 | Shell Internationale Research Maatschappij B.V. | Method for controlling production and downhole pressures of a well with multiple subsurface zones and/or branches |
| US8037940B2 (en) * | 2007-09-07 | 2011-10-18 | Schlumberger Technology Corporation | Method of completing a well using a retrievable inflow control device |
| WO2009065793A1 (en) * | 2007-11-19 | 2009-05-28 | Shell Internationale Research Maatschappij B.V. | In-situ fluid compatibility testing using a wireline formation tester |
| WO2009146206A2 (en) * | 2008-04-18 | 2009-12-03 | Schlumberger Canada Limited | Subsea tree safety control system |
| US7878249B2 (en) * | 2008-10-29 | 2011-02-01 | Schlumberger Technology Corporation | Communication system and method in a multilateral well using an electromagnetic field generator |
| US8145429B2 (en) * | 2009-01-09 | 2012-03-27 | Baker Hughes Incorporated | System and method for sampling and analyzing downhole formation fluids |
| US8151888B2 (en) * | 2009-03-25 | 2012-04-10 | Halliburton Energy Services, Inc. | Well tool with combined actuation of multiple valves |
| US8336629B2 (en) * | 2009-10-02 | 2012-12-25 | Schlumberger Technology Corporation | Method and system for running subsea test tree and control system without conventional umbilical |
| GB2499593B8 (en) * | 2012-02-21 | 2018-08-22 | Tendeka Bv | Wireless communication |
| EP2994612B1 (en) * | 2013-05-07 | 2023-03-15 | Services Pétroliers Schlumberger | Closed chamber impulse test with downhole flow rate measurement |
| US20170175480A1 (en) * | 2013-12-05 | 2017-06-22 | Slim Drilling Servicos De Perfuracao S.A. | Fluid injection tubing with a collar for a test string, having a locking system by abutment against the drilling well head ram |
| US10267145B2 (en) | 2014-10-17 | 2019-04-23 | Halliburton Energy Services, Inc. | Increasing borehole wall permeability to facilitate fluid sampling |
| GB2567066B (en) | 2016-07-21 | 2021-08-04 | Landmark Graphics Corp | Method for slim hole single trip remedial or plug and abandonment cement barrier |
| US10871069B2 (en) | 2019-01-03 | 2020-12-22 | Saudi Arabian Oil Company | Flow testing wellbores while drilling |
| US12049821B2 (en) | 2019-01-28 | 2024-07-30 | Saudi Arabian Oil Company | Straddle packer testing system |
| US11506044B2 (en) | 2020-07-23 | 2022-11-22 | Saudi Arabian Oil Company | Automatic analysis of drill string dynamics |
| US11391146B2 (en) | 2020-10-19 | 2022-07-19 | Saudi Arabian Oil Company | Coring while drilling |
| US11867008B2 (en) | 2020-11-05 | 2024-01-09 | Saudi Arabian Oil Company | System and methods for the measurement of drilling mud flow in real-time |
| CN112340478B (zh) * | 2020-11-13 | 2025-08-05 | 中元汇吉生物技术股份有限公司 | 流速控制机构、流速控制方法及自动装载排序装置 |
| EP4006299B1 (en) | 2020-11-30 | 2025-07-09 | Services Pétroliers Schlumberger | Method and system for automated multi-zone downhole closed loop reservoir testing |
| US11434714B2 (en) | 2021-01-04 | 2022-09-06 | Saudi Arabian Oil Company | Adjustable seal for sealing a fluid flow at a wellhead |
| US11697991B2 (en) | 2021-01-13 | 2023-07-11 | Saudi Arabian Oil Company | Rig sensor testing and calibration |
| US11572752B2 (en) | 2021-02-24 | 2023-02-07 | Saudi Arabian Oil Company | Downhole cable deployment |
| US11727555B2 (en) | 2021-02-25 | 2023-08-15 | Saudi Arabian Oil Company | Rig power system efficiency optimization through image processing |
| US11846151B2 (en) | 2021-03-09 | 2023-12-19 | Saudi Arabian Oil Company | Repairing a cased wellbore |
| US12305449B2 (en) | 2021-05-21 | 2025-05-20 | Saudi Arabian Oil Company | Reamer drill bit |
| US11624265B1 (en) | 2021-11-12 | 2023-04-11 | Saudi Arabian Oil Company | Cutting pipes in wellbores using downhole autonomous jet cutting tools |
| US11867012B2 (en) | 2021-12-06 | 2024-01-09 | Saudi Arabian Oil Company | Gauge cutter and sampler apparatus |
| US12203366B2 (en) | 2023-05-02 | 2025-01-21 | Saudi Arabian Oil Company | Collecting samples from wellbores |
Family Cites Families (49)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3111169A (en) | 1959-06-19 | 1963-11-19 | Halliburton Co | Continuous retrievable testing apparatus |
| US3195633A (en) | 1960-08-26 | 1965-07-20 | Charles E Jacob | Method and apparatus for producing fresh water or petroleum from underground reservoir formations without contamination of underlying heavier liquid |
| US3294170A (en) | 1963-08-19 | 1966-12-27 | Halliburton Co | Formation sampler |
| US3305014A (en) | 1964-05-06 | 1967-02-21 | Schlumberger Technology Corp | Formation testing method |
| US3611799A (en) | 1969-10-01 | 1971-10-12 | Dresser Ind | Multiple chamber earth formation fluid sampler |
| US4009756A (en) | 1975-09-24 | 1977-03-01 | Trw, Incorporated | Method and apparatus for flooding of oil-bearing formations by downward inter-zone pumping |
| US4241787A (en) | 1979-07-06 | 1980-12-30 | Price Ernest H | Downhole separator for wells |
| US4434854A (en) | 1980-07-07 | 1984-03-06 | Geo Vann, Inc. | Pressure actuated vent assembly for slanted wellbores |
| US4296810A (en) | 1980-08-01 | 1981-10-27 | Price Ernest H | Method of producing oil from a formation fluid containing both oil and water |
| US4509604A (en) | 1982-04-16 | 1985-04-09 | Schlumberger Technology Corporation | Pressure responsive perforating and testing system |
| US4560000A (en) | 1982-04-16 | 1985-12-24 | Schlumberger Technology Corporation | Pressure-activated well perforating apparatus |
| US4535843A (en) | 1982-05-21 | 1985-08-20 | Standard Oil Company (Indiana) | Method and apparatus for obtaining selected samples of formation fluids |
| FR2558522B1 (fr) | 1983-12-22 | 1986-05-02 | Schlumberger Prospection | Dispositif pour prelever un echantillon representatif du fluide present dans un puits, et procede correspondant |
| EP0176410B1 (en) | 1984-09-07 | 1988-12-07 | Schlumberger Limited | Method for uniquely estimating permeability and skin factor for at least two layers of a reservoir |
| US4633945A (en) | 1984-12-03 | 1987-01-06 | Schlumberger Technology Corporation | Permanent completion tubing conveyed perforating system |
| EP0217684B1 (en) | 1985-07-23 | 1993-09-15 | Flopetrol Services, Inc. | Process for measuring flow and determining the parameters of multilayer hydrocarbon-producing formations |
| US4597439A (en) | 1985-07-26 | 1986-07-01 | Schlumberger Technology Corporation | Full-bore sample-collecting apparatus |
| FR2603331B1 (fr) | 1986-09-02 | 1988-11-10 | Elf Aquitaine | Dispositif de regulation du debit d'eau separee de son melange avec les hydrocarbures et reinjectee au fond du puits |
| US4745802A (en) | 1986-09-18 | 1988-05-24 | Halliburton Company | Formation testing tool and method of obtaining post-test drawdown and pressure readings |
| US4742459A (en) | 1986-09-29 | 1988-05-03 | Schlumber Technology Corp. | Method and apparatus for determining hydraulic properties of formations surrounding a borehole |
| US4766957A (en) | 1987-07-28 | 1988-08-30 | Mcintyre Jack W | Method and apparatus for removing excess water from subterranean wells |
| US4856585A (en) | 1988-06-16 | 1989-08-15 | Halliburton Company | Tubing conveyed sampler |
| US4860581A (en) | 1988-09-23 | 1989-08-29 | Schlumberger Technology Corporation | Down hole tool for determination of formation properties |
| US5006046A (en) | 1989-09-22 | 1991-04-09 | Buckman William G | Method and apparatus for pumping liquid from a well using wellbore pressurized gas |
| US5065619A (en) | 1990-02-09 | 1991-11-19 | Halliburton Logging Services, Inc. | Method for testing a cased hole formation |
| US5247829A (en) | 1990-10-19 | 1993-09-28 | Schlumberger Technology Corporation | Method for individually characterizing the layers of a hydrocarbon subsurface reservoir |
| CA2034444C (en) | 1991-01-17 | 1995-10-10 | Gregg Peterson | Method and apparatus for the determination of formation fluid flow rates and reservoir deliverability |
| US5170844A (en) | 1991-09-11 | 1992-12-15 | Halliburton Logging Services, Inc. | Pressure responsive below-packer valve apparatus |
| DE4204991A1 (de) | 1991-12-24 | 1993-07-01 | Ieg Ind Engineering Gmbh | Verfahren und einrichtung zur beeinflussung von im erdreich befindlicher fluessigkeit |
| US5361839A (en) | 1993-03-24 | 1994-11-08 | Schlumberger Technology Corporation | Full bore sampler including inlet and outlet ports flanking an annular sample chamber and parameter sensor and memory apparatus disposed in said sample chamber |
| US5655605A (en) | 1993-05-14 | 1997-08-12 | Matthews; Cameron M. | Method and apparatus for producing and drilling a well |
| US5353870A (en) | 1993-05-28 | 1994-10-11 | Harris Richard K | Well purging and sampling pump |
| US5425416A (en) | 1994-01-06 | 1995-06-20 | Enviro-Tech Tools, Inc. | Formation injection tool for down-bore in-situ disposal of undesired fluids |
| US5555945A (en) | 1994-08-15 | 1996-09-17 | Halliburton Company | Early evaluation by fall-off testing |
| US5540280A (en) | 1994-08-15 | 1996-07-30 | Halliburton Company | Early evaluation system |
| US5762149A (en) | 1995-03-27 | 1998-06-09 | Baker Hughes Incorporated | Method and apparatus for well bore construction |
| EP0777813B1 (en) | 1995-03-31 | 2003-09-10 | Baker Hughes Incorporated | Formation isolation and testing apparatus and method |
| US5878815A (en) | 1995-10-26 | 1999-03-09 | Marathon Oil Company | Assembly and process for drilling and completing multiple wells |
| EP0781893B8 (en) | 1995-12-26 | 2007-02-14 | HALLIBURTON ENERGY SERVICES, Inc. | Apparatus and method for early evaluation and servicing of a well |
| US6082452A (en) | 1996-09-27 | 2000-07-04 | Baker Hughes, Ltd. | Oil separation and pumping systems |
| US5826662A (en) | 1997-02-03 | 1998-10-27 | Halliburton Energy Services, Inc. | Apparatus for testing and sampling open-hole oil and gas wells |
| CA2280813A1 (en) | 1997-02-13 | 1998-08-20 | Baker Hughes Incorporated | Apparatus and methods for downhole fluid separation and control of water production |
| WO1998037307A1 (en) | 1997-02-25 | 1998-08-27 | Baker Hughes Incorporated | Apparatus for controlling and monitoring a downhole oil/water separator |
| NO305259B1 (no) | 1997-04-23 | 1999-04-26 | Shore Tec As | FremgangsmÕte og apparat til bruk ved produksjonstest av en forventet permeabel formasjon |
| US5887652A (en) | 1997-08-04 | 1999-03-30 | Halliburton Energy Services, Inc. | Method and apparatus for bottom-hole testing in open-hole wells |
| GB9721496D0 (en) | 1997-10-09 | 1997-12-10 | Ocre Scotland Ltd | Downhole valve |
| US6062073A (en) * | 1998-09-08 | 2000-05-16 | Westbay Instruments, Inc. | In situ borehole sample analyzing probe and valved casing coupler therefor |
| US6325146B1 (en) | 1999-03-31 | 2001-12-04 | Halliburton Energy Services, Inc. | Methods of downhole testing subterranean formations and associated apparatus therefor |
| AU2474201A (en) | 2000-01-06 | 2001-07-16 | Baker Hughes Incorporated | Method and apparatus for downhole production testing |
-
2000
- 2000-02-25 US US09/512,438 patent/US6330913B1/en not_active Expired - Lifetime
- 2000-04-19 AU AU44786/00A patent/AU4478600A/en not_active Abandoned
- 2000-04-19 BR BRPI0009919-8A patent/BR0009919B1/pt not_active IP Right Cessation
- 2000-04-19 GB GB0123608A patent/GB2368130B/en not_active Expired - Fee Related
- 2000-04-19 WO PCT/US2000/010750 patent/WO2000065200A1/en not_active Ceased
-
2001
- 2001-10-18 NO NO20015067A patent/NO20015067L/no unknown
Also Published As
| Publication number | Publication date |
|---|---|
| GB2368130B (en) | 2003-08-06 |
| GB0123608D0 (en) | 2001-11-21 |
| US6330913B1 (en) | 2001-12-18 |
| AU4478600A (en) | 2000-11-10 |
| WO2000065200A1 (en) | 2000-11-02 |
| NO20015067D0 (no) | 2001-10-18 |
| BR0009919B1 (pt) | 2009-01-13 |
| BR0009919A (pt) | 2002-03-26 |
| GB2368130A (en) | 2002-04-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NO20015067D0 (no) | Fremgangsmåte og anordning for testing av en brönn | |
| NO20006226D0 (no) | Fremgangsmåte og anordning for komplettering av en brönn | |
| NO20020753L (no) | Fremgangsmåte og anordning for bestemmelse av en tidsparameter | |
| GB2364726B (en) | Method and apparatus for continuously testing a well | |
| NO20004439L (no) | Fremgangsmåte og anordning for brönntesting | |
| NO20002908L (no) | Fremgangsmåte og anordning for borehullsundersökelser | |
| NO980604D0 (no) | Fremgangsmåte og anordning for komplettering av en underjordisk brönn | |
| NO20024946D0 (no) | Apparat og metode for utforming av en sidebrönn | |
| NO980603D0 (no) | Fremgangsmåte og anordning for komplettering av en underjordisk brönn | |
| NO980602D0 (no) | Fremgangsmåte og anordning for komplettering av en underjordisk brönn | |
| NO20033719D0 (no) | Fremgangsmåte og anordning for tilvirkning av en forfestet bleie | |
| NO20002584L (no) | Brønnreferanseapparat og fremgangsmÕte | |
| NO980591D0 (no) | Fremgangsmåte og anordning for komplettering av en underjordisk brönn | |
| NO20030668L (no) | Apparat og fremgangsmåte for telemetri | |
| NO20000188D0 (no) | Fremgangsmåte og anordning for sidebroenntilknytning | |
| NO20014717D0 (no) | Apparat og fremgangsmåte for akustisk logging | |
| NO20004924D0 (no) | FremgangsmÕte og innretning for forming av en mottakingsstrÕle | |
| NO20004426L (no) | Apparat og fremgangsmÕte for testing av formasjoner | |
| IS6325A (is) | Aðferð og búnaður til flokkunar hluta | |
| NO20012487D0 (no) | Anordning og fremgangsmåte for tilvirkning av gulvplanker | |
| NO982338L (no) | FremgangsmÕte og anordning for plassering av en plugg | |
| NO991577D0 (no) | FremgangsmÕte og system for testing av borehull | |
| NO20005740L (no) | Fremgangsmåte og anordning for anbringelse av akustiske innretninger i et borehull | |
| NO20011970L (no) | Fremgangsmåte og anordning for posisjonering av et tog | |
| NO983282D0 (no) | Anordning og fremgangsmate for trykkmÕling |