|
US6574565B1
(en)
*
|
1998-09-15 |
2003-06-03 |
Ronald R. Bush |
System and method for enhanced hydrocarbon recovery
|
|
US6853921B2
(en)
|
1999-07-20 |
2005-02-08 |
Halliburton Energy Services, Inc. |
System and method for real time reservoir management
|
|
FR2837947B1
(fr)
*
|
2002-04-02 |
2004-05-28 |
Inst Francais Du Petrole |
Methode pour quantifier les incertitudes liees a des parametres continus et discrets descriptifs d'un milieu par construction de plans d'experiences et analyse statistique
|
|
US7584165B2
(en)
|
2003-01-30 |
2009-09-01 |
Landmark Graphics Corporation |
Support apparatus, method and system for real time operations and maintenance
|
|
FR2855633B1
(fr)
*
|
2003-06-02 |
2008-02-08 |
Inst Francais Du Petrole |
Methode d'aide a la prise de decision pour la gestion d'un gisement petrolier en presence de parametres techniques et economiques incertains
|
|
FR2874706B1
(fr)
|
2004-08-30 |
2006-12-01 |
Inst Francais Du Petrole |
Methode de modelisation de la production d'un gisement petrolier
|
|
CA2616816A1
(en)
*
|
2005-07-27 |
2007-02-15 |
Exxonmobil Upstream Research Company |
Well modeling associated with extraction of hydrocarbons from subsurface formations
|
|
CN101238465B
(zh)
*
|
2005-07-27 |
2010-10-27 |
埃克森美孚上游研究公司 |
与从地下岩层抽取碳氢化合物相关的井建模
|
|
CA2613817C
(en)
*
|
2005-07-27 |
2015-11-24 |
Exxonmobil Upstream Research Company |
Well modeling associated with extraction of hydrocarbons from subsurface formations
|
|
GB0524134D0
(en)
*
|
2005-11-26 |
2006-01-04 |
Univ Edinburgh |
Improvements in and relating to hydrocarbon recovery from a hydrocarbon reservoir
|
|
EP1999492A4
(en)
|
2006-01-20 |
2011-05-18 |
Landmark Graphics Corp |
DYNAMIC PRODUCTION MANAGEMENT SYSTEM
|
|
US8504341B2
(en)
*
|
2006-01-31 |
2013-08-06 |
Landmark Graphics Corporation |
Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators
|
|
CN101379498B
(zh)
*
|
2006-01-31 |
2012-05-30 |
兰德马克绘图公司 |
使用物理和代理仿真器的用于快速更新油气田生产模型的方法和系统
|
|
CN101379271B
(zh)
*
|
2006-01-31 |
2012-11-07 |
兰德马克绘图公司 |
使用代理仿真器的用于实时油气田生产优化的方法、系统和计算机可读介质
|
|
US7486589B2
(en)
|
2006-02-09 |
2009-02-03 |
Schlumberger Technology Corporation |
Methods and apparatus for predicting the hydrocarbon production of a well location
|
|
EP1989396A4
(en)
*
|
2006-02-10 |
2014-08-27 |
Exxonmobil Upstream Res Co |
FLEXIBLE DRILLING COMPLETATIONS
|
|
CN101548264B
(zh)
|
2006-10-31 |
2015-05-13 |
埃克森美孚上游研究公司 |
使用物质平衡分组对储层系统的建模和管理
|
|
US8898018B2
(en)
*
|
2007-03-06 |
2014-11-25 |
Schlumberger Technology Corporation |
Methods and systems for hydrocarbon production
|
|
FR2919932B1
(fr)
*
|
2007-08-06 |
2009-12-04 |
Inst Francais Du Petrole |
Methode pour evaluer un schema de production d'un gissement souterrain en tenant compte des incertitudes
|
|
US8768672B2
(en)
*
|
2007-08-24 |
2014-07-01 |
ExxonMobil. Upstream Research Company |
Method for predicting time-lapse seismic timeshifts by computer simulation
|
|
US8423337B2
(en)
*
|
2007-08-24 |
2013-04-16 |
Exxonmobil Upstream Research Company |
Method for multi-scale geomechanical model analysis by computer simulation
|
|
US8548782B2
(en)
*
|
2007-08-24 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method for modeling deformation in subsurface strata
|
|
US8265915B2
(en)
*
|
2007-08-24 |
2012-09-11 |
Exxonmobil Upstream Research Company |
Method for predicting well reliability by computer simulation
|
|
US8396826B2
(en)
|
2007-12-17 |
2013-03-12 |
Landmark Graphics Corporation |
Systems and methods for optimization of real time production operations
|
|
CA2705277C
(en)
|
2007-12-18 |
2017-01-17 |
Exxonmobil Upstream Research Company |
Determining connectivity architecture in 2-d and 3-d heterogeneous data
|
|
EP2232406A4
(en)
|
2007-12-21 |
2017-10-18 |
Exxonmobil Upstream Research Company |
Method and apparatus for analyzing three-dimensional data
|
|
US20110087471A1
(en)
*
|
2007-12-31 |
2011-04-14 |
Exxonmobil Upstream Research Company |
Methods and Systems For Determining Near-Wellbore Characteristics and Reservoir Properties
|
|
EP2235566A1
(en)
*
|
2008-01-22 |
2010-10-06 |
Exxonmobil Upstream Research Company |
Dynamic connectivity analysis
|
|
WO2009114211A1
(en)
|
2008-03-10 |
2009-09-17 |
Exxonmobil Upstream Research Company |
Method for determing distinct alternative paths between two object sets in 2-d and 3-d heterogeneous data
|
|
CN102007459B
(zh)
*
|
2008-04-17 |
2015-01-07 |
埃克森美孚上游研究公司 |
用于储层开发计划的鲁棒性基于优化的决策支持工具
|
|
CN102007485B
(zh)
*
|
2008-04-18 |
2014-06-25 |
埃克森美孚上游研究公司 |
储层开发计划的基于markov决策过程的决策支持工具
|
|
WO2009131761A2
(en)
*
|
2008-04-21 |
2009-10-29 |
Exxonmobile Upstream Research Company |
Stochastic programming-based decision support tool for reservoir development planning
|
|
US9733388B2
(en)
|
2008-05-05 |
2017-08-15 |
Exxonmobil Upstream Research Company |
Systems and methods for connectivity analysis using functional objects
|
|
US8527203B2
(en)
|
2008-05-27 |
2013-09-03 |
Schlumberger Technology Corporation |
Method for selecting well measurements
|
|
BRPI0923412A2
(pt)
*
|
2008-12-16 |
2016-05-24 |
Exxonmobil Upstream Res Co |
método, e, produto de programa de computador.
|
|
US9552462B2
(en)
*
|
2008-12-23 |
2017-01-24 |
Exxonmobil Upstream Research Company |
Method for predicting composition of petroleum
|
|
US8352228B2
(en)
*
|
2008-12-23 |
2013-01-08 |
Exxonmobil Upstream Research Company |
Method for predicting petroleum expulsion
|
|
US8914268B2
(en)
|
2009-01-13 |
2014-12-16 |
Exxonmobil Upstream Research Company |
Optimizing well operating plans
|
|
EP2406663A1
(en)
|
2009-03-13 |
2012-01-18 |
Exxonmobil Upstream Research Company |
Method for predicting fluid flow
|
|
US20120130696A1
(en)
*
|
2009-08-12 |
2012-05-24 |
Exxonmobil Upstream Research Company |
Optimizing Well Management Policy
|
|
NO20101371A1
(no)
*
|
2009-10-05 |
2011-04-06 |
Logined Bv |
Fremgangsmate, system og apparat for modellering av usikkerhet i produksjonssystemnettverk
|
|
WO2011043862A1
(en)
|
2009-10-07 |
2011-04-14 |
Exxonmobil Upstream Research Company |
Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same
|
|
AU2010308495A1
(en)
|
2009-10-20 |
2012-05-10 |
Exxonmobil Upstream Research Company |
Method for quantitatively assessing connectivity for well pairs at varying frequencies
|
|
US8931580B2
(en)
|
2010-02-03 |
2015-01-13 |
Exxonmobil Upstream Research Company |
Method for using dynamic target region for well path/drill center optimization
|
|
US9594186B2
(en)
|
2010-02-12 |
2017-03-14 |
Exxonmobil Upstream Research Company |
Method and system for partitioning parallel simulation models
|
|
EP2545461A4
(en)
|
2010-03-12 |
2017-09-27 |
Exxonmobil Upstream Research Company |
Dynamic grouping of domain objects via smart groups
|
|
US8532968B2
(en)
*
|
2010-06-16 |
2013-09-10 |
Foroil |
Method of improving the production of a mature gas or oil field
|
|
US8412501B2
(en)
|
2010-06-16 |
2013-04-02 |
Foroil |
Production simulator for simulating a mature hydrocarbon field
|
|
US8855986B2
(en)
|
2010-09-03 |
2014-10-07 |
Chevron U.S.A. Inc. |
Iterative method and system to construct robust proxy models for reservoir simulation
|
|
EP2668641B1
(en)
|
2011-01-26 |
2020-04-15 |
Exxonmobil Upstream Research Company |
Method of reservoir compartment analysis using topological structure in 3d earth model
|
|
RU2014120155A
(ru)
|
2011-10-20 |
2015-11-27 |
Шлюмбергер Текнолоджи Б.В. |
Оптимизация модели с несколькими периодами для экономического оценивания регуляторов расхода
|
|
EP2811107A1
(en)
*
|
2013-06-06 |
2014-12-10 |
Repsol, S.A. |
Method for selecting and optimizing oil field controls for production plateau
|
|
EP3008281A2
(en)
|
2013-06-10 |
2016-04-20 |
Exxonmobil Upstream Research Company |
Interactively planning a well site
|
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
|
CN105388531B
(zh)
*
|
2015-10-19 |
2018-01-09 |
成都理工大学 |
一种基于支持向量回归机和核fisher分析的岩性识别方法
|
|
US20180082202A1
(en)
*
|
2016-09-20 |
2018-03-22 |
Public Engines, Inc. |
Device and method for generating a crime type combination based on historical incident data
|
|
US11041976B2
(en)
|
2017-05-30 |
2021-06-22 |
Exxonmobil Upstream Research Company |
Method and system for creating and using a subsurface model in hydrocarbon operations
|
|
US11634980B2
(en)
|
2019-06-19 |
2023-04-25 |
OspreyData, Inc. |
Downhole and near wellbore reservoir state inference through automated inverse wellbore flow modeling
|
|
US12410689B2
(en)
|
2019-10-31 |
2025-09-09 |
Landmark Graphics Corporation |
Flow simulator for generating reservoir management workflows and forecasts based on analysis of high-dimensional parameter data space
|
|
CN113962145B
(zh)
*
|
2021-10-08 |
2024-06-28 |
北京航空航天大学 |
一种区间数据样本条件下的参数不确定性量化建模方法
|
|
CN116464437B
(zh)
*
|
2023-04-23 |
2024-04-12 |
西南石油大学 |
一种碳酸盐岩气藏地层水产水量的预测方法
|