|
EP1759226A1
(en)
|
2004-06-07 |
2007-03-07 |
ExxonMobil Upstream Research Company |
Method for solving implicit reservoir simulation matrix equation
|
|
US20060153005A1
(en)
*
|
2005-01-07 |
2006-07-13 |
Herwanger Jorg V |
Determination of anisotropic physical characteristics in and around reservoirs
|
|
US7716029B2
(en)
*
|
2006-05-15 |
2010-05-11 |
Schlumberger Technology Corporation |
Method for optimal gridding in reservoir simulation
|
|
GB2439571B
(en)
*
|
2006-06-28 |
2008-11-12 |
Schlumberger Holdings |
Method for updating a model of the earth using microseismic measurements
|
|
BRPI0714028A2
(pt)
*
|
2006-07-07 |
2012-12-18 |
Exxonmobil Upstream Res Co |
métodos para refinar uma propriedade fìsica e para produzir hidrocarbonetos a partir de uma região de subsolo
|
|
US8548782B2
(en)
*
|
2007-08-24 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method for modeling deformation in subsurface strata
|
|
US8768672B2
(en)
*
|
2007-08-24 |
2014-07-01 |
ExxonMobil. Upstream Research Company |
Method for predicting time-lapse seismic timeshifts by computer simulation
|
|
BRPI0820870A2
(pt)
|
2007-12-13 |
2015-06-16 |
Exxonmobil Upstream Res Co |
Método para simular um modelo de reservatório.
|
|
WO2009079123A1
(en)
*
|
2007-12-18 |
2009-06-25 |
Exxonmobil Upstream Research Company |
Determining connectivity architecture in 2-d and 3-d heterogeneous data
|
|
US8370122B2
(en)
|
2007-12-21 |
2013-02-05 |
Exxonmobil Upstream Research Company |
Method of predicting connectivity between parts of a potential hydrocarbon reservoir and analyzing 3D data in a subsurface region
|
|
US20100223039A1
(en)
*
|
2007-12-21 |
2010-09-02 |
Serguei Maliassov |
Modeling In Sedimentary Basins
|
|
EP2235566A1
(en)
*
|
2008-01-22 |
2010-10-06 |
Exxonmobil Upstream Research Company |
Dynamic connectivity analysis
|
|
WO2009114211A1
(en)
|
2008-03-10 |
2009-09-17 |
Exxonmobil Upstream Research Company |
Method for determing distinct alternative paths between two object sets in 2-d and 3-d heterogeneous data
|
|
US8285532B2
(en)
*
|
2008-03-14 |
2012-10-09 |
Schlumberger Technology Corporation |
Providing a simplified subterranean model
|
|
WO2009120409A1
(en)
*
|
2008-03-28 |
2009-10-01 |
Exxonmobil Upstream Research Company |
Computing a consistent velocity vector field from a set of fluxes
|
|
US7933750B2
(en)
*
|
2008-04-02 |
2011-04-26 |
Schlumberger Technology Corp |
Method for defining regions in reservoir simulation
|
|
WO2009137176A2
(en)
|
2008-05-05 |
2009-11-12 |
Exxonmobile Upstream Research Company |
Systems and methods for connectivity analysis using functional obejects
|
|
US10590762B2
(en)
|
2008-09-18 |
2020-03-17 |
Geoscale, Inc. |
N-phasic finite element method for calculating a fully coupled response of multiphase compositional fluid flow and a system for uncertainty estimation of the calculated reservoir response
|
|
US8255195B2
(en)
*
|
2008-09-18 |
2012-08-28 |
Geoscape Analytics, Inc |
N-phasic element method for calculating a fully coupled response of multiphase compositional fluid flow and a system for uncertainty estimation
|
|
EP2356611B1
(en)
*
|
2008-11-06 |
2018-08-29 |
Exxonmobil Upstream Research Company |
System and method for planning a drilling operation
|
|
US8374836B2
(en)
*
|
2008-11-12 |
2013-02-12 |
Geoscape Analytics, Inc. |
Methods and systems for constructing and using a subterranean geomechanics model spanning local to zonal scale in complex geological environments
|
|
US9552462B2
(en)
*
|
2008-12-23 |
2017-01-24 |
Exxonmobil Upstream Research Company |
Method for predicting composition of petroleum
|
|
US8908473B2
(en)
*
|
2008-12-23 |
2014-12-09 |
Schlumberger Technology Corporation |
Method of subsurface imaging using microseismic data
|
|
US8352228B2
(en)
*
|
2008-12-23 |
2013-01-08 |
Exxonmobil Upstream Research Company |
Method for predicting petroleum expulsion
|
|
EP2406663A1
(en)
|
2009-03-13 |
2012-01-18 |
Exxonmobil Upstream Research Company |
Method for predicting fluid flow
|
|
US8548783B2
(en)
*
|
2009-09-17 |
2013-10-01 |
Chevron U.S.A. Inc. |
Computer-implemented systems and methods for controlling sand production in a geomechanical reservoir system
|
|
GB2474275B
(en)
*
|
2009-10-09 |
2015-04-01 |
Senergy Holdings Ltd |
Well simulation
|
|
AU2010308495A1
(en)
|
2009-10-20 |
2012-05-10 |
Exxonmobil Upstream Research Company |
Method for quantitatively assessing connectivity for well pairs at varying frequencies
|
|
EP2317348B1
(en)
*
|
2009-10-30 |
2014-05-21 |
Services Pétroliers Schlumberger |
Method for building a depositional space corresponding to a geological domain
|
|
EP3450679A1
(en)
|
2009-11-30 |
2019-03-06 |
Exxonmobil Upstream Research Company |
Adaptive newton's method for reservoir simulation
|
|
CA2781868C
(en)
|
2010-02-03 |
2016-02-09 |
Exxonmobil Upstream Research Company |
Method for using dynamic target region for well path/drill center optimization
|
|
BR112012025995A2
(pt)
|
2010-04-30 |
2016-06-28 |
Exxonmobil Upstream Res Co |
método e sistema para simulação de fluxo de volume finito
|
|
US10083254B2
(en)
|
2010-06-15 |
2018-09-25 |
Exxonmobil Upstream Research Company |
Method and system for stabilizing formulation methods
|
|
CA2801382C
(en)
|
2010-06-29 |
2018-12-18 |
Exxonmobil Upstream Research Company |
Method and system for parallel simulation models
|
|
US8457940B2
(en)
*
|
2010-07-29 |
2013-06-04 |
Schlumberger Technology Corporation |
Model-consistent structural restoration for geomechanical and petroleum systems modeling
|
|
CA2803066A1
(en)
|
2010-07-29 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
|
CA2803068C
(en)
|
2010-07-29 |
2016-10-11 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
|
AU2011283193B2
(en)
|
2010-07-29 |
2014-07-17 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
|
WO2012021292A1
(en)
|
2010-08-09 |
2012-02-16 |
Conocophillips Company |
Reservoir upscaling method with preserved transmissibility
|
|
WO2012039811A1
(en)
|
2010-09-20 |
2012-03-29 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
|
WO2012045936A2
(fr)
*
|
2010-09-27 |
2012-04-12 |
Total Sa |
Simulation de karstification
|
|
US10338271B2
(en)
*
|
2010-12-09 |
2019-07-02 |
Schlumberger Technology Corporation |
Reservoir grid conversion for scaling strain
|
|
US9747393B2
(en)
|
2011-02-09 |
2017-08-29 |
Exxonmobil Upstream Research Company |
Methods and systems for upscaling mechanical properties of geomaterials
|
|
BR112014005794A2
(pt)
|
2011-09-15 |
2017-03-28 |
Exxonmobil Upstream Res Co |
operações matriciais e vetoriais otimizadas em algoritmos de instrução limitada que executam cálculos de equação de estado
|
|
AU2013201967B2
(en)
*
|
2012-03-30 |
2017-11-16 |
Dassault Systèmes Canada Inc. |
System and method for modeling a physical formation
|
|
US9595129B2
(en)
|
2012-05-08 |
2017-03-14 |
Exxonmobil Upstream Research Company |
Canvas control for 3D data volume processing
|
|
FR2992448B1
(fr)
*
|
2012-06-26 |
2014-06-27 |
IFP Energies Nouvelles |
Procede d'exploitation d'un reservoir geologique a partir d'un modele de reservoir cale au moyen d'un parametrage multi-echelles
|
|
NO339744B1
(no)
|
2012-08-10 |
2017-01-30 |
Schlumberger Technology Bv |
Hybrid, lokal ikke-avstemmende metode for flerfasestrømningssimuleringer i heterogent sprukne medier
|
|
US10036829B2
(en)
|
2012-09-28 |
2018-07-31 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
|
RU2586821C1
(ru)
*
|
2012-10-26 |
2016-06-10 |
Лэндмарк Графикс Корпорейшн |
Распространение петрографических фаций с использованием аналитического моделирования
|
|
US9171109B2
(en)
|
2012-11-09 |
2015-10-27 |
International Business Machines Corporation |
Method to couple fluid-flow and geomechanical models for integrated petroleum systems using known triggering events
|
|
US9390555B2
(en)
|
2012-11-09 |
2016-07-12 |
International Business Machines Corporation |
Method to assess the impact of existing fractures and faults for reservoir management
|
|
GB2512372B
(en)
*
|
2013-03-28 |
2020-07-29 |
Total Sa |
Method of modelling a subsurface volume
|
|
US10048403B2
(en)
|
2013-06-20 |
2018-08-14 |
Exxonmobil Upstream Research Company |
Method and system for generation of upscaled mechanical stratigraphy from petrophysical measurements
|
|
WO2015030754A1
(en)
|
2013-08-28 |
2015-03-05 |
Landmark Graphics Corporation |
Static earth model grid cell scaling and property re-sampling methods and systems
|
|
BR112016003986A2
(pt)
|
2013-08-29 |
2017-09-12 |
Landmark Graphics Corp |
métodos e sistemas de calibração de modelo de terra estático
|
|
US9638586B2
(en)
*
|
2014-03-04 |
2017-05-02 |
Underground Systems, Inc. |
Dynamic wide-area earth thermal properties and earth ambient temperature determination system
|
|
CA2948667A1
(en)
|
2014-07-30 |
2016-02-04 |
Exxonmobil Upstream Research Company |
Method for volumetric grid generation in a domain with heterogeneous material properties
|
|
US10101498B2
(en)
|
2014-09-05 |
2018-10-16 |
Schlumberger Technology Corporation |
Well survivability in multidimensional geomechanical space
|
|
US10802168B2
(en)
*
|
2014-10-27 |
2020-10-13 |
Cgg Services Sas |
Predicting hydraulic fracture treatment effectiveness and productivity in oil and gas reservoirs
|
|
US11409023B2
(en)
|
2014-10-31 |
2022-08-09 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space using moving least squares
|
|
AU2015339884B2
(en)
|
2014-10-31 |
2018-03-15 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
|
CN105095986B
(zh)
*
|
2015-06-23 |
2018-12-25 |
中国石油天然气股份有限公司 |
多层油藏整体产量预测的方法
|
|
US10248743B2
(en)
|
2016-06-13 |
2019-04-02 |
Saudi Arabian Oil Company |
Determining cumulative water flow on a grid-by-grid basis in a geocellular earth model
|
|
HUE064459T2
(hu)
|
2016-12-23 |
2024-03-28 |
Exxonmobil Technology & Engineering Company |
Eljárás és rendszer stabil és hatékony tározó szimulációhoz stabilitási proxyk alkalmazásával
|
|
US11126762B2
(en)
|
2018-02-28 |
2021-09-21 |
Saudi Arabian Oil Company |
Locating new hydrocarbon fields and predicting reservoir performance from hydrocarbon migration
|
|
WO2020178609A1
(en)
*
|
2019-03-05 |
2020-09-10 |
Total Sa |
Hydrocarbon flow simulation
|
|
US11200093B2
(en)
*
|
2019-07-15 |
2021-12-14 |
Baker Hughes Oilfield Operations Llc |
Management of a geomechanical workflow of a geomechanics application in a computer system
|
|
GB2599262B
(en)
*
|
2019-08-12 |
2023-10-11 |
Landmark Graphics Corp |
Integrated rock mechanics laboratory for predicting stress-strain behavior
|
|
CN119717027B
(zh)
*
|
2023-09-26 |
2025-10-17 |
中国石油化工集团有限公司 |
一种用于构建储层精细地层格架模型的方法及系统
|