NO20063848L - Fremgangsmater for bygging av reservoarmodeller - Google Patents
Fremgangsmater for bygging av reservoarmodellerInfo
- Publication number
- NO20063848L NO20063848L NO20063848A NO20063848A NO20063848L NO 20063848 L NO20063848 L NO 20063848L NO 20063848 A NO20063848 A NO 20063848A NO 20063848 A NO20063848 A NO 20063848A NO 20063848 L NO20063848 L NO 20063848L
- Authority
- NO
- Norway
- Prior art keywords
- framework
- procedures
- reservoir models
- building reservoir
- building
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Injection Moulding Of Plastics Or The Like (AREA)
- Toys (AREA)
- Instructional Devices (AREA)
- Supply Devices, Intensifiers, Converters, And Telemotors (AREA)
- Transmission Of Braking Force In Braking Systems (AREA)
Abstract
Det er beskrevet forskjellige fremgangsmåter for å generere reservoarmodeller. Minst en av fremgangsmåtene inkluderer å fremskaffe et første rammeverk som har en rekke celler, hvor det første rammeverket er et reservoarrammeverk og fremskaffer et andre rammeverk som har en rekke celler, hvor volumet av det første rammeverket er større enn volumet av det andre rammeverk.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US54079404P | 2004-01-30 | 2004-01-30 | |
| PCT/US2005/003103 WO2005074592A2 (en) | 2004-01-30 | 2005-01-24 | Reservoir model building methods |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| NO20063848L true NO20063848L (no) | 2006-10-30 |
| NO337139B1 NO337139B1 (no) | 2016-01-25 |
Family
ID=34837425
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| NO20063848A NO337139B1 (no) | 2004-01-30 | 2006-08-29 | Fremgangsmåter for bygging av reservoarmodeller |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US7844430B2 (no) |
| EP (1) | EP1714230B1 (no) |
| CN (1) | CN1898675A (no) |
| CA (1) | CA2543801C (no) |
| NO (1) | NO337139B1 (no) |
| WO (1) | WO2005074592A2 (no) |
Families Citing this family (41)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1763737B1 (en) | 2004-01-30 | 2013-09-04 | ExxonMobil Upstream Research Company | Reservoir evaluation methods |
| US7716028B2 (en) * | 2006-05-24 | 2010-05-11 | Schlumberger Technology Corporation | Method for modeling a reservoir using a 3D wettability map generated from a wettability logging tool |
| BRPI0820732A2 (pt) * | 2007-12-21 | 2015-06-16 | Exxonmobil Upstream Res Co | Método para modelar uma região física, produto de programa de computador, e, método para modelar uma bacia geológica subsuperficial em um computador |
| WO2009137181A1 (en) * | 2008-05-05 | 2009-11-12 | Exxonmobil Upstream Research Company | Modeling dynamic systems by visualizing and narrowing a parameter space |
| MX2010013221A (es) * | 2008-06-09 | 2011-04-05 | Landmark Graphics Corp | Distribucion de propiedades en un modelo volumetrico tridimensional utilizando un campo de continuidad maxima. |
| US8355898B2 (en) * | 2008-06-17 | 2013-01-15 | Chevron U.S.A. Inc. | System and method for modeling flow events responsible for the formation of a geological reservoir |
| WO2010056427A1 (en) | 2008-11-14 | 2010-05-20 | Exxonmobil Upstream Research Company | Forming a model of a subsurface region |
| US8185313B2 (en) | 2009-02-25 | 2012-05-22 | Exxonmobil Upstream Research Company | Classifying potential hydrocarbon reservoirs using electromagnetic survey information |
| US8350851B2 (en) * | 2009-03-05 | 2013-01-08 | Schlumberger Technology Corporation | Right sizing reservoir models |
| US8339396B2 (en) * | 2009-03-05 | 2012-12-25 | Schlumberger Technology Corporation | Coarsening and splitting techniques |
| US20100299123A1 (en) * | 2009-05-21 | 2010-11-25 | Schlumberger Technology Corporation | Well placement in a volume |
| EP2464824B1 (en) * | 2009-08-14 | 2018-10-03 | BP Corporation North America Inc. | Reservoir architecture and connectivity analysis |
| US8949173B2 (en) * | 2009-10-28 | 2015-02-03 | Schlumberger Technology Corporation | Pay zone prediction |
| US8355872B2 (en) * | 2009-11-19 | 2013-01-15 | Chevron U.S.A. Inc. | System and method for reservoir analysis background |
| BR112012017278A2 (pt) | 2010-02-12 | 2016-04-26 | Exxonmobil Upstream Res Co | método e sistema para criar modelos de simulação de ajuste de histórico |
| US8274859B2 (en) * | 2010-02-22 | 2012-09-25 | Landmark Graphics Corporation | Systems and methods for modeling 3D geological structures |
| US9134454B2 (en) | 2010-04-30 | 2015-09-15 | Exxonmobil Upstream Research Company | Method and system for finite volume simulation of flow |
| US10087721B2 (en) | 2010-07-29 | 2018-10-02 | Exxonmobil Upstream Research Company | Methods and systems for machine—learning based simulation of flow |
| AU2011283196B2 (en) | 2010-07-29 | 2014-07-31 | Exxonmobil Upstream Research Company | Method and system for reservoir modeling |
| CA2805446C (en) | 2010-07-29 | 2016-08-16 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
| EP2599031A4 (en) | 2010-07-29 | 2014-01-08 | Exxonmobil Upstream Res Co | METHOD AND SYSTEMS FOR A FLOW SIMULATION BASED ON MACHINERY LEARNING |
| BR112013002114A2 (pt) | 2010-09-20 | 2016-05-17 | Exxonmobil Upstream Res Co | formulações flexíveis e adaptáveis para simulações de reservatório complexas |
| CN103282915A (zh) * | 2010-12-30 | 2013-09-04 | 埃克森美孚上游研究公司 | 用于地下储层模拟的系统和方法 |
| FR2979724B1 (fr) * | 2011-09-06 | 2018-11-23 | Ifp Energies Now | Procede d'exploitation d'un gisement petrolier a partir d'une technique de selection des positions des puits a forer |
| BR112014005794A2 (pt) | 2011-09-15 | 2017-03-28 | Exxonmobil Upstream Res Co | operações matriciais e vetoriais otimizadas em algoritmos de instrução limitada que executam cálculos de equação de estado |
| CA2850838A1 (en) * | 2011-10-18 | 2013-04-25 | Saudi Arabian Oil Company | Reservoir modeling with 4d saturation models and simulation models |
| US20130132052A1 (en) * | 2011-11-18 | 2013-05-23 | Chevron U.S.A. Inc. | System and method for assessing heterogeneity of a geologic volume of interest with process-based models and dynamic heterogeneity |
| EP2826002A2 (en) * | 2012-03-14 | 2015-01-21 | Sigram Schindler Beteiligungsgesellschaft mbH | An innovation expert system, ies, and its ptr data structure, ptr-ds |
| EP2901363A4 (en) | 2012-09-28 | 2016-06-01 | Exxonmobil Upstream Res Co | ERROR REMOVAL IN GEOLOGICAL MODELS |
| WO2015023970A1 (en) | 2013-08-16 | 2015-02-19 | Landmark Graphics Corporation | Converting reserve estimates in a reservoir model to a standard format for dynamic comparison |
| DE112013007359T5 (de) * | 2013-08-23 | 2016-05-25 | Landmark Graphics Corporation | Lokales Aktualisieren eines geozellulären 3D-Modells |
| CA2948667A1 (en) | 2014-07-30 | 2016-02-04 | Exxonmobil Upstream Research Company | Method for volumetric grid generation in a domain with heterogeneous material properties |
| US10803534B2 (en) | 2014-10-31 | 2020-10-13 | Exxonmobil Upstream Research Company | Handling domain discontinuity with the help of grid optimization techniques |
| CA2963092C (en) | 2014-10-31 | 2021-07-06 | Exxonmobil Upstream Research Company | Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares |
| WO2018118374A1 (en) | 2016-12-23 | 2018-06-28 | Exxonmobil Upstream Research Company | Method and system for stable and efficient reservoir simulation using stability proxies |
| CN108729911A (zh) * | 2017-04-24 | 2018-11-02 | 通用电气公司 | 用于资源生产系统的优化装置、系统和方法 |
| CN109356557B (zh) * | 2018-12-12 | 2020-01-03 | 燕山大学 | 三维油藏水驱模拟模型制备方法及动态监测可视化装置 |
| US12117582B2 (en) | 2019-10-01 | 2024-10-15 | ExxonMobil Technology and Engineering Company | Model for coupled porous flow and geomechanics for subsurface simulation |
| US20230088307A1 (en) * | 2019-12-20 | 2023-03-23 | Exxonmobil Upstream Research Company | Hierarchical Building and Conditioning of Geological Models with Machine Learning Parameterized Templates and Methods for Using the Same |
| US11680465B2 (en) * | 2019-12-23 | 2023-06-20 | Saudi Arabian Oil Company | Systems and methods for multiscale sector hydrocarbon reservoir simulation |
| US20240192400A1 (en) * | 2022-12-12 | 2024-06-13 | Landmark Graphics Corporation | Gridless volumetric computation |
Family Cites Families (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5018112A (en) | 1982-10-18 | 1991-05-21 | Conoco Inc. | Method for hydrocarbon reservoir identification |
| US5757663A (en) | 1995-09-26 | 1998-05-26 | Atlantic Richfield Company | Hydrocarbon reservoir connectivity tool using cells and pay indicators |
| US5835883A (en) | 1997-01-31 | 1998-11-10 | Phillips Petroleum Company | Method for determining distribution of reservoir permeability, porosity and pseudo relative permeability |
| US5835882A (en) * | 1997-01-31 | 1998-11-10 | Phillips Petroleum Company | Method for determining barriers to reservoir flow |
| US6106561A (en) * | 1997-06-23 | 2000-08-22 | Schlumberger Technology Corporation | Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator |
| FR2765692B1 (fr) | 1997-07-04 | 1999-09-10 | Inst Francais Du Petrole | Methode pour modeliser en 3d l'impedance d'un milieu heterogene |
| US6662146B1 (en) | 1998-11-25 | 2003-12-09 | Landmark Graphics Corporation | Methods for performing reservoir simulation |
| US6754588B2 (en) | 1999-01-29 | 2004-06-22 | Platte River Associates, Inc. | Method of predicting three-dimensional stratigraphy using inverse optimization techniques |
| AU3229900A (en) | 1999-02-12 | 2000-08-29 | Prange, Michael | Uncertainty constrained subsurface modeling |
| US6826520B1 (en) | 1999-06-24 | 2004-11-30 | Exxonmobil Upstream Research Company | Method of upscaling permeability for unstructured grids |
| US6826483B1 (en) | 1999-10-13 | 2004-11-30 | The Trustees Of Columbia University In The City Of New York | Petroleum reservoir simulation and characterization system and method |
| GB2357097A (en) | 1999-12-08 | 2001-06-13 | Norske Stats Oljeselskap | Method of assessing positional uncertainty in drilling a well |
| US6980940B1 (en) | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
| US6302221B1 (en) | 2000-05-31 | 2001-10-16 | Marathon Oil Company | Method for predicting quantitative values of a rock or fluid property in a reservoir using seismic data |
| US6792354B1 (en) | 2000-11-13 | 2004-09-14 | O'meara, Jr. Daniel J. | Method for determining reservoir fluid volumes, fluid contacts, compartmentalization, and permeability in geological subsurface models |
| FR2823877B1 (fr) * | 2001-04-19 | 2004-12-24 | Inst Francais Du Petrole | Methode pour contraindre par des donnees dynamiques de production un modele fin representatif de la repartition dans le gisement d'une grandeur physique caracteristique de la structure du sous-sol |
| US6694264B2 (en) | 2001-12-19 | 2004-02-17 | Earth Science Associates, Inc. | Method and system for creating irregular three-dimensional polygonal volume models in a three-dimensional geographic information system |
| US6807486B2 (en) | 2002-09-27 | 2004-10-19 | Weatherford/Lamb | Method of using underbalanced well data for seismic attribute analysis |
| US6950751B2 (en) | 2003-03-31 | 2005-09-27 | Conocophillps Company | Method and apparatus for the assimilation and visualization of information from 3D data volumes |
| EP1763737B1 (en) | 2004-01-30 | 2013-09-04 | ExxonMobil Upstream Research Company | Reservoir evaluation methods |
-
2005
- 2005-01-24 CN CNA2005800013640A patent/CN1898675A/zh active Pending
- 2005-01-24 US US10/573,089 patent/US7844430B2/en active Active
- 2005-01-24 CA CA2543801A patent/CA2543801C/en not_active Expired - Fee Related
- 2005-01-24 EP EP05712518A patent/EP1714230B1/en not_active Ceased
- 2005-01-24 WO PCT/US2005/003103 patent/WO2005074592A2/en not_active Ceased
-
2006
- 2006-08-29 NO NO20063848A patent/NO337139B1/no not_active IP Right Cessation
Also Published As
| Publication number | Publication date |
|---|---|
| US20070061117A1 (en) | 2007-03-15 |
| CA2543801C (en) | 2014-03-04 |
| EP1714230A2 (en) | 2006-10-25 |
| EP1714230A4 (en) | 2007-05-02 |
| EP1714230B1 (en) | 2010-04-14 |
| NO337139B1 (no) | 2016-01-25 |
| CN1898675A (zh) | 2007-01-17 |
| WO2005074592A2 (en) | 2005-08-18 |
| CA2543801A1 (en) | 2005-08-18 |
| WO2005074592A3 (en) | 2006-04-27 |
| US7844430B2 (en) | 2010-11-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NO20063848L (no) | Fremgangsmater for bygging av reservoarmodeller | |
| NO20063849L (no) | Fremgangsmater for evaluering av reservoarer | |
| NO20093357L (no) | Neuralnett for bruk i boresimulering | |
| MY144160A (en) | A system and associated methods for network aware dynamic power management | |
| TWI315946B (en) | Codebook generation system and associated methods | |
| NO20045475L (no) | Modellering av geologiske objekter i formasjoner med forkastninger | |
| NO20060501L (no) | Fremgangsmater og system for a forsta meningen av en kunnskapsenhet ved bruk av informasjon tilknyttet kunnskapsenheten | |
| GB2445305A (en) | Method and system for integrated asset management utilizing multi-level modeling of oil field assets | |
| AR056136A1 (es) | Metodo y aparato para el control de admision de datos en una red de mallas | |
| EP2399201A4 (en) | STORAGE NETWORK PROCESS, DEVICE AND SYSTEMS | |
| DE602007010152D1 (de) | Mehrstufige schicht | |
| WO2006057994A3 (en) | Film grain simulation technique for use in media playback devices | |
| DE502006008589D1 (de) | Datenübertragungssystem in Verbindung mit einem Implantat | |
| TW200601745A (en) | Method to manage medium access for a mixed wireless network | |
| NO20053897L (no) | Sustem og fremgangsmate for automatisert plattformgenerering | |
| NO20073680L (no) | Fremgangsmate for a analysere data som har felles og saerskilte egenskaper | |
| DE602006019115D1 (de) | Nem verbundkommunikationsdienst | |
| WO2007044568A3 (en) | Generating words and names using n-grams of phonemes | |
| WO2008094341A3 (en) | Methods and apparatus for designing a fiber-optic network | |
| NO20060775L (no) | Muskarine acetylkolinreseptorantagonister | |
| ATE519170T1 (de) | Automatisierter vorlagenerzeugungsalgorithmus für eine implantierbare einrichtung | |
| DK1743029T3 (da) | Cellefremstilling | |
| ECSP066923A (no) | ||
| NO20061684L (no) | Fjerning av virkninger av skulderlag | |
| Tedeschi et al. | A New Common Knowledge in Agronomics: the network of the European Agrarian Reviews and Congresses during the first half of the 19th century |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MM1K | Lapsed by not paying the annual fees |