NO20081335L - Fremgangsmate og apparatur knyttet til stimuleringsbehandlinger for bronner - Google Patents
Fremgangsmate og apparatur knyttet til stimuleringsbehandlinger for bronnerInfo
- Publication number
- NO20081335L NO20081335L NO20081335A NO20081335A NO20081335L NO 20081335 L NO20081335 L NO 20081335L NO 20081335 A NO20081335 A NO 20081335A NO 20081335 A NO20081335 A NO 20081335A NO 20081335 L NO20081335 L NO 20081335L
- Authority
- NO
- Norway
- Prior art keywords
- pump system
- well
- apparatus related
- stimulation treatment
- stimulation treatments
- Prior art date
Links
- 230000000638 stimulation Effects 0.000 title abstract 4
- 238000011282 treatment Methods 0.000 title abstract 4
- 238000000034 method Methods 0.000 title abstract 3
- 239000012530 fluid Substances 0.000 abstract 2
- 229930195733 hydrocarbon Natural products 0.000 abstract 1
- 150000002430 hydrocarbons Chemical class 0.000 abstract 1
- 238000005086 pumping Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/255—Methods for stimulating production including the injection of a gaseous medium as treatment fluid into the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Earth Drilling (AREA)
- External Artificial Organs (AREA)
- Electrotherapy Devices (AREA)
- Extraction Or Liquid Replacement (AREA)
- Infusion, Injection, And Reservoir Apparatuses (AREA)
Abstract
En fremgangsmåte og apparatur knyttet til produksjonen av hydrokarboner. I én utførelsesform beskriver fremgangsmåten kopling av multiple brønner til et pumpesystem for et stimuleringsfluid via en pumpesystem-manifold. Pumpesystem-manifolden justeres for å tilveiebringe en første brønnstrømningsvei fra pumpesystemet for stimuleringsfluidet til en første brønn. Deretter pumpes en første stimuleringsbehandling inn i den første brønnen. Samtidig med pumping av den første stimuleringsbehandlingen, forberedes en andre brønn for en andre stimuleringsbehandling
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US70958605P | 2005-08-19 | 2005-08-19 | |
| PCT/US2006/028608 WO2007024383A2 (en) | 2005-08-19 | 2006-07-24 | Method and apparatus associated with stimulation treatments for wells |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| NO20081335L true NO20081335L (no) | 2008-05-16 |
| NO335837B1 NO335837B1 (no) | 2015-03-02 |
Family
ID=35660402
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| NO20081335A NO335837B1 (no) | 2005-08-19 | 2008-03-13 | Fremgangsmåte knyttet til stimuleringsbehandlinger for brønner |
Country Status (12)
| Country | Link |
|---|---|
| US (1) | US8490685B2 (no) |
| EP (1) | EP1929123B1 (no) |
| CN (1) | CN101243240A (no) |
| AU (1) | AU2006284417B2 (no) |
| BR (1) | BRPI0614312B1 (no) |
| CA (1) | CA2618277C (no) |
| DK (1) | DK1929123T3 (no) |
| EA (1) | EA012893B1 (no) |
| MX (1) | MX2008001435A (no) |
| NO (1) | NO335837B1 (no) |
| UA (1) | UA100837C2 (no) |
| WO (1) | WO2007024383A2 (no) |
Families Citing this family (86)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6907936B2 (en) | 2001-11-19 | 2005-06-21 | Packers Plus Energy Services Inc. | Method and apparatus for wellbore fluid treatment |
| US8167047B2 (en) | 2002-08-21 | 2012-05-01 | Packers Plus Energy Services Inc. | Method and apparatus for wellbore fluid treatment |
| US7841394B2 (en) | 2005-12-01 | 2010-11-30 | Halliburton Energy Services Inc. | Method and apparatus for centralized well treatment |
| US7946340B2 (en) | 2005-12-01 | 2011-05-24 | Halliburton Energy Services, Inc. | Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center |
| US7836949B2 (en) | 2005-12-01 | 2010-11-23 | Halliburton Energy Services, Inc. | Method and apparatus for controlling the manufacture of well treatment fluid |
| US7711487B2 (en) | 2006-10-10 | 2010-05-04 | Halliburton Energy Services, Inc. | Methods for maximizing second fracture length |
| US7740072B2 (en) | 2006-10-10 | 2010-06-22 | Halliburton Energy Services, Inc. | Methods and systems for well stimulation using multiple angled fracturing |
| US20070201305A1 (en) * | 2006-02-27 | 2007-08-30 | Halliburton Energy Services, Inc. | Method and apparatus for centralized proppant storage and metering |
| US7931082B2 (en) | 2007-10-16 | 2011-04-26 | Halliburton Energy Services Inc., | Method and system for centralized well treatment |
| US8899339B2 (en) * | 2008-02-29 | 2014-12-02 | Exxonmobil Upstream Research Company | Systems and methods for regulating flow in a wellbore |
| US8757273B2 (en) | 2008-04-29 | 2014-06-24 | Packers Plus Energy Services Inc. | Downhole sub with hydraulically actuable sleeve valve |
| US20110067871A1 (en) * | 2008-05-22 | 2011-03-24 | Burdette Jason A | Methods For Regulating Flow In Multi-Zone Intervals |
| US20110030963A1 (en) * | 2009-08-04 | 2011-02-10 | Karl Demong | Multiple well treatment fluid distribution and control system and method |
| CA3077883C (en) | 2010-02-18 | 2024-01-16 | Ncs Multistage Inc. | Downhole tool assembly with debris relief, and method for using same |
| WO2011149597A1 (en) | 2010-05-26 | 2011-12-01 | Exxonmobil Upstream Research Company | Assembly and method for multi-zone fracture stimulation of a reservoir using autonomous tubular units |
| CA2819364C (en) | 2010-12-17 | 2018-06-12 | Exxonmobil Upstream Research Company | Autonomous downhole conveyance system |
| EP2652262B1 (en) | 2010-12-17 | 2019-10-16 | Exxonmobil Upstream Research Company | Method for automatic control and positioning of autonomous downhole tools |
| WO2012161854A2 (en) | 2011-05-23 | 2012-11-29 | Exxonmobil Upstream Research Company | Safety system for autonomous downhole tool |
| US9004104B2 (en) * | 2011-07-08 | 2015-04-14 | Fmc Technologies, Inc. | Manifold trailer with multiple articulating arm assemblies |
| RU2629182C9 (ru) * | 2011-07-08 | 2017-11-29 | ЭфЭмСи ТЕКНОЛОДЖИЗ, ИНК. | Прицеп с манифольдом с несколькими шарнирными компоновками отводов |
| US9068450B2 (en) | 2011-09-23 | 2015-06-30 | Cameron International Corporation | Adjustable fracturing system |
| US8978763B2 (en) | 2011-09-23 | 2015-03-17 | Cameron International Corporation | Adjustable fracturing system |
| CN103174401B (zh) * | 2011-12-21 | 2016-01-20 | 中国海洋石油总公司 | 射孔压裂测试系统的地面装置 |
| US8839867B2 (en) | 2012-01-11 | 2014-09-23 | Cameron International Corporation | Integral fracturing manifold |
| US8931559B2 (en) | 2012-03-23 | 2015-01-13 | Ncs Oilfield Services Canada, Inc. | Downhole isolation and depressurization tool |
| US9322239B2 (en) | 2012-11-13 | 2016-04-26 | Exxonmobil Upstream Research Company | Drag enhancing structures for downhole operations, and systems and methods including the same |
| US9893500B2 (en) | 2012-11-16 | 2018-02-13 | U.S. Well Services, LLC | Switchgear load sharing for oil field equipment |
| US11449018B2 (en) | 2012-11-16 | 2022-09-20 | U.S. Well Services, LLC | System and method for parallel power and blackout protection for electric powered hydraulic fracturing |
| US10407990B2 (en) | 2012-11-16 | 2019-09-10 | U.S. Well Services, LLC | Slide out pump stand for hydraulic fracturing equipment |
| US10232332B2 (en) | 2012-11-16 | 2019-03-19 | U.S. Well Services, Inc. | Independent control of auger and hopper assembly in electric blender system |
| US11476781B2 (en) | 2012-11-16 | 2022-10-18 | U.S. Well Services, LLC | Wireline power supply during electric powered fracturing operations |
| US9995218B2 (en) | 2012-11-16 | 2018-06-12 | U.S. Well Services, LLC | Turbine chilling for oil field power generation |
| US9745840B2 (en) | 2012-11-16 | 2017-08-29 | Us Well Services Llc | Electric powered pump down |
| US20140151043A1 (en) | 2012-12-03 | 2014-06-05 | Schlumberger Technology Corporation | Stabilized fluids in well treatment |
| US9546534B2 (en) * | 2013-08-15 | 2017-01-17 | Schlumberger Technology Corporation | Technique and apparatus to form a downhole fluid barrier |
| US9587477B2 (en) | 2013-09-03 | 2017-03-07 | Schlumberger Technology Corporation | Well treatment with untethered and/or autonomous device |
| US9631468B2 (en) | 2013-09-03 | 2017-04-25 | Schlumberger Technology Corporation | Well treatment |
| US9085958B2 (en) | 2013-09-19 | 2015-07-21 | Sas Institute Inc. | Control variable determination to maximize a drilling rate of penetration |
| US9163497B2 (en) | 2013-10-22 | 2015-10-20 | Sas Institute Inc. | Fluid flow back prediction |
| RU2658400C1 (ru) * | 2014-10-03 | 2018-06-21 | Эксонмобил Апстрим Рисерч Компани | Способ устранения условий выпадения проппанта во время заканчивания скважины |
| CA2908276C (en) | 2014-10-14 | 2022-11-01 | Us Well Services Llc | Parallel power and blackout protection for electric hydraulic fracturing |
| CN105822279B (zh) * | 2015-01-05 | 2019-07-05 | 中国石油天然气股份有限公司 | 压裂方法和系统 |
| US10370829B2 (en) * | 2015-11-05 | 2019-08-06 | Timothy Al Andrzejak | Articles comprising a surface spreading agent, oilfield water storage systems employing the same, and methods of managing the oilfield water storage systems |
| US10323475B2 (en) | 2015-11-13 | 2019-06-18 | Cameron International Corporation | Fracturing fluid delivery system |
| US12078110B2 (en) | 2015-11-20 | 2024-09-03 | Us Well Services, Llc | System for gas compression on electric hydraulic fracturing fleets |
| US12027831B2 (en) | 2016-04-15 | 2024-07-02 | U.S. Well Services, LLC | Switchgear load sharing for oil field equipment |
| CN106050212B (zh) * | 2016-08-17 | 2018-10-26 | 中石化四机石油机械有限公司 | 一种压裂船作业系统 |
| US10837267B2 (en) * | 2016-11-29 | 2020-11-17 | Saudi Arabian Oil Company | Well kickoff systems and methods |
| CA2987665C (en) | 2016-12-02 | 2021-10-19 | U.S. Well Services, LLC | Constant voltage power distribution system for use with an electric hydraulic fracturing system |
| RU178513U1 (ru) * | 2017-03-13 | 2018-04-06 | Антон Павлович Щербак | Блок манифольдов трейлерного типа с манифольдом низкого давления, выполненного в качестве рамы, предназначенный для гидравлического разрыва пласта |
| CA3084607A1 (en) | 2017-12-05 | 2019-06-13 | U.S. Well Services, LLC | High horsepower pumping configuration for an electric hydraulic fracturing system |
| CA3084596A1 (en) | 2017-12-05 | 2019-06-13 | U.S. Well Services, LLC | Multi-plunger pumps and associated drive systems |
| US11867023B2 (en) * | 2017-12-14 | 2024-01-09 | Downing Wellhead Equipment, Llc | Intelligently controlled fluid systems |
| US10808512B2 (en) | 2018-06-14 | 2020-10-20 | Bobby Lee Koricanek | Manifold assembly for delivery of fracture fluid |
| WO2019241783A1 (en) | 2018-06-15 | 2019-12-19 | U.S. Well Services, Inc. | Integrated mobile power unit for hydraulic fracturing |
| US10648270B2 (en) | 2018-09-14 | 2020-05-12 | U.S. Well Services, LLC | Riser assist for wellsites |
| CA3115650A1 (en) | 2018-10-09 | 2020-04-23 | U.S. Well Services, LLC | Electric powered hydraulic fracturing pump system with single electric powered multi-plunger pump fracturing trailers, filtration units, and slide out platform |
| RU2704402C1 (ru) * | 2018-11-30 | 2019-10-28 | Отто Гуйбер | Установка для хранения и дозированной подачи рабочих агентов в продуктивный пласт |
| US11668174B2 (en) | 2019-01-10 | 2023-06-06 | Halliburton Energy Services, Inc. | Simulfrac pulsed treatment |
| US10612355B1 (en) | 2019-02-11 | 2020-04-07 | Saudi Arabian Oil Company | Stimulating u-shape wellbores |
| US11035212B2 (en) * | 2019-02-11 | 2021-06-15 | Saudi Arabian Oil Company | Stimulating U-shape wellbores |
| US11578577B2 (en) | 2019-03-20 | 2023-02-14 | U.S. Well Services, LLC | Oversized switchgear trailer for electric hydraulic fracturing |
| US11280164B2 (en) * | 2019-04-01 | 2022-03-22 | Baker Hughes Oilfield Operations Llc | Real time productivity evaluation of lateral wells for construction decisions |
| US11091993B2 (en) | 2019-06-17 | 2021-08-17 | Oil States Energy Services, L.L.C. | Zipper bridge |
| US10570692B1 (en) | 2019-06-17 | 2020-02-25 | Oil States Energy Services, L.L.C. | Zipper bridge |
| US10858902B2 (en) | 2019-04-24 | 2020-12-08 | Oil States Energy Services, L.L.C. | Frac manifold and connector |
| US11728709B2 (en) | 2019-05-13 | 2023-08-15 | U.S. Well Services, LLC | Encoderless vector control for VFD in hydraulic fracturing applications |
| AR119134A1 (es) | 2019-06-10 | 2021-11-24 | U S Well Services Llc | Calentador integrado de gas de combustión para equipos móviles de acondicionamiento de combustible |
| US11459863B2 (en) | 2019-10-03 | 2022-10-04 | U.S. Well Services, LLC | Electric powered hydraulic fracturing pump system with single electric powered multi-plunger fracturing pump |
| CA3161918A1 (en) | 2019-12-27 | 2021-07-01 | Alexander CHRISTINZIO | Systems and methods for fluid end health monitoring |
| US11009162B1 (en) | 2019-12-27 | 2021-05-18 | U.S. Well Services, LLC | System and method for integrated flow supply line |
| US11885206B2 (en) | 2019-12-30 | 2024-01-30 | U.S. Well Services, LLC | Electric motor driven transportation mechanisms for fracturing blenders |
| US11492886B2 (en) | 2019-12-31 | 2022-11-08 | U.S. Wells Services, LLC | Self-regulating FRAC pump suction stabilizer/dampener |
| US11460330B2 (en) | 2020-07-06 | 2022-10-04 | Saudi Arabian Oil Company | Reducing noise in a vortex flow meter |
| US11384876B2 (en) | 2020-07-07 | 2022-07-12 | Safoco, Inc. | Fluid conduit connector system |
| US11530601B2 (en) | 2020-07-07 | 2022-12-20 | Safoco, Inc. | Fluid conduit connector system |
| US11519536B2 (en) | 2020-07-07 | 2022-12-06 | Safoco, Inc. | Fluid conduit connector system |
| US11542815B2 (en) | 2020-11-30 | 2023-01-03 | Saudi Arabian Oil Company | Determining effect of oxidative hydraulic fracturing |
| US11649702B2 (en) | 2020-12-03 | 2023-05-16 | Saudi Arabian Oil Company | Wellbore shaped perforation assembly |
| US12071814B2 (en) | 2020-12-07 | 2024-08-27 | Saudi Arabian Oil Company | Wellbore notching assembly |
| BR102021009961A2 (pt) | 2021-05-21 | 2022-11-29 | Petróleo Brasileiro S.A. - Petrobras | Sistema e método para aproveitamento da água de injeção dessulfatada de plataformas marítimas para utilização em squeezes de inibição |
| US11506032B1 (en) | 2021-06-23 | 2022-11-22 | Halliburton Energy Services, Inc. | Method to reduce peak treatment constituents in simultaneous treatment of multiple wells |
| US11619127B1 (en) | 2021-12-06 | 2023-04-04 | Saudi Arabian Oil Company | Wellhead acoustic insulation to monitor hydraulic fracturing |
| US20240141761A1 (en) * | 2022-06-03 | 2024-05-02 | Borehole Seismic, Llc. | Monitoring and Perforating System and Method Combining Plug and Perforation Operation with Distributed Acoustic Sensing |
| US12553316B2 (en) * | 2023-08-30 | 2026-02-17 | Schlumberger Technology Corporation | Corrosion inhibitor compositions for reducing corrosion, and related methods of operating a wellbore |
| US12454882B1 (en) * | 2024-04-30 | 2025-10-28 | Halliburton Energy Services, Inc. | Method to reduce peak treatment constituents in simultaneous treatment of multiple wells |
Family Cites Families (22)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3444927A (en) * | 1967-11-21 | 1969-05-20 | Exxon Production Research Co | Servicing of wells |
| US4305463A (en) * | 1979-10-31 | 1981-12-15 | Oil Trieval Corporation | Oil recovery method and apparatus |
| GB2028400B (en) | 1978-08-16 | 1982-08-11 | Otis Eng Corp | Production from and servicing of wells |
| US4339002A (en) * | 1979-08-09 | 1982-07-13 | Halliburton Company | Sea buoy discharge manifold system |
| US4616700A (en) | 1984-09-18 | 1986-10-14 | Hydril Company | Automatic well test system and method |
| US5589642A (en) * | 1994-09-13 | 1996-12-31 | Agar Corporation Inc. | High void fraction multi-phase fluid flow meter |
| US5732776A (en) | 1995-02-09 | 1998-03-31 | Baker Hughes Incorporated | Downhole production well control system and method |
| US5706896A (en) | 1995-02-09 | 1998-01-13 | Baker Hughes Incorporated | Method and apparatus for the remote control and monitoring of production wells |
| US5531270A (en) | 1995-05-04 | 1996-07-02 | Atlantic Richfield Company | Downhole flow control in multiple wells |
| US5680899A (en) | 1995-06-07 | 1997-10-28 | Halliburton Energy Services, Inc. | Electronic wellhead apparatus for measuring properties of multiphase flow |
| US5555934A (en) * | 1995-06-12 | 1996-09-17 | R. E. Wright Environmental, Inc. | Multiple well jet pump apparatus |
| US6279658B1 (en) * | 1996-10-08 | 2001-08-28 | Baker Hughes Incorporated | Method of forming and servicing wellbores from a main wellbore |
| DE19882627T1 (de) | 1997-08-26 | 2000-09-28 | Exxonmobil Upstream Res Co | Stimulation linsenförmiger Erdgasformationen |
| CA2327098C (en) | 1998-03-30 | 2007-11-06 | Kellogg Brown & Root, Inc. | Extended reach tie-back system |
| CA2353900C (en) | 1998-12-21 | 2005-03-08 | Baker Hughes Incorporated | Closed loop chemical injection and monitoring system for oilfield operations |
| US6186230B1 (en) | 1999-01-20 | 2001-02-13 | Exxonmobil Upstream Research Company | Completion method for one perforated interval per fracture stage during multi-stage fracturing |
| US6394184B2 (en) | 2000-02-15 | 2002-05-28 | Exxonmobil Upstream Research Company | Method and apparatus for stimulation of multiple formation intervals |
| DZ3387A1 (fr) | 2000-07-18 | 2002-01-24 | Exxonmobil Upstream Res Co | Procede pour traiter les intervalles multiples dans un trou de forage |
| CA2349234C (en) * | 2001-05-31 | 2004-12-14 | Imperial Oil Resources Limited | Cyclic solvent process for in-situ bitumen and heavy oil production |
| US6672405B2 (en) | 2001-06-19 | 2004-01-06 | Exxonmobil Upstream Research Company | Perforating gun assembly for use in multi-stage stimulation operations |
| US6575247B2 (en) | 2001-07-13 | 2003-06-10 | Exxonmobil Upstream Research Company | Device and method for injecting fluids into a wellbore |
| US6745838B2 (en) * | 2001-09-24 | 2004-06-08 | Richard R. Watson | Chemical injection control system and method for multiple wells |
-
2006
- 2006-07-24 CN CNA2006800301214A patent/CN101243240A/zh active Pending
- 2006-07-24 AU AU2006284417A patent/AU2006284417B2/en active Active
- 2006-07-24 BR BRPI0614312A patent/BRPI0614312B1/pt active IP Right Grant
- 2006-07-24 DK DK06788265.4T patent/DK1929123T3/da active
- 2006-07-24 EA EA200800621A patent/EA012893B1/ru not_active IP Right Cessation
- 2006-07-24 EP EP06788265A patent/EP1929123B1/en active Active
- 2006-07-24 CA CA2618277A patent/CA2618277C/en active Active
- 2006-07-24 MX MX2008001435A patent/MX2008001435A/es active IP Right Grant
- 2006-07-24 UA UAA200803424A patent/UA100837C2/ru unknown
- 2006-07-24 US US11/990,480 patent/US8490685B2/en active Active
- 2006-07-24 WO PCT/US2006/028608 patent/WO2007024383A2/en not_active Ceased
-
2008
- 2008-03-13 NO NO20081335A patent/NO335837B1/no unknown
Also Published As
| Publication number | Publication date |
|---|---|
| AU2006284417B2 (en) | 2011-05-26 |
| EA012893B1 (ru) | 2009-12-30 |
| EP1929123A2 (en) | 2008-06-11 |
| MX2008001435A (es) | 2008-04-04 |
| EP1929123A4 (en) | 2011-03-09 |
| UA100837C2 (ru) | 2013-02-11 |
| US8490685B2 (en) | 2013-07-23 |
| US20090114392A1 (en) | 2009-05-07 |
| AU2006284417A1 (en) | 2007-03-01 |
| EP1929123B1 (en) | 2013-01-02 |
| CN101243240A (zh) | 2008-08-13 |
| CA2618277C (en) | 2013-08-20 |
| WO2007024383A2 (en) | 2007-03-01 |
| WO2007024383A3 (en) | 2007-12-27 |
| CA2618277A1 (en) | 2007-03-01 |
| NO335837B1 (no) | 2015-03-02 |
| BRPI0614312B1 (pt) | 2017-04-25 |
| BRPI0614312A2 (pt) | 2012-11-20 |
| EA200800621A1 (ru) | 2008-06-30 |
| DK1929123T3 (da) | 2013-04-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NO20081335L (no) | Fremgangsmate og apparatur knyttet til stimuleringsbehandlinger for bronner | |
| NO20072059L (no) | Fremgangsmate for a produsere fluider fra syrebehandlede og konsoliderte partier av underjordiske formasjoner | |
| NO20083840L (no) | Fremgangsmate ved frakturering av underjordiske formasjoner med blanding omfattende organisk syre | |
| NO20091209L (no) | Fremgangsmate for a kontrollere rate av syredannende forbindelse ved syrebehandling | |
| WO2009001256A3 (en) | Methods of producing flow-through passages in casing, and methods of using such casing | |
| NO20053403L (no) | Viskositetsokte behandlingsvaesker basert pa saltvann samt tilhorende framgangsmote | |
| SA523442027B1 (ar) | تحسين موصلية كسر حمضي | |
| WO2013134622A3 (en) | System and method for delivering treatment fluid | |
| WO2005071219A3 (en) | Methods and compositions for reducing the production of water and stimulating hydrocarbon production from a subterranean formation | |
| DE502007002879D1 (de) | Blutbehandlungsgerät und verfahren zum entleeren eines blutschlauchsatzes eines blutbehandlungsgerätes | |
| EA200901198A1 (ru) | Аппарат и способ гидроразрыва пласта | |
| RU2014132555A (ru) | Элементы протирающей цементировочной пробки и способы обработки окружающей скважину среды для интенсификации притока | |
| MX2014002073A (es) | Proceso de fracturacion para mejorar la distribucion de materiales de apoyo para aumentar al maximo la conectividad entre la formacion y el sondeo. | |
| EA200700535A1 (ru) | Способы снижения потерь жидкости | |
| MX2008013499A (es) | Metodo de estimulacion. | |
| NO20052014L (no) | Prosess og system for behandling av bronner | |
| NO20091059L (no) | Fremgangsmate for produksjon av olje og/eller gass | |
| MX2012013137A (es) | Métodos para estimulación de manera no convencional de un yacimiento de gas con descarga de tensión para la conectividad de la red de fracturas. | |
| NO20090824L (no) | Biocid for bronnstimulering og behandlingsfluider | |
| MX357568B (es) | Metodos para minimizar el sobredesplazamiento de apuntalante en tratamientos de fracturas. | |
| NO20093240L (no) | Pressemetode for reaktivering av bronnbehandlingsfluider som inneholder kiselgur | |
| MX2010008053A (es) | Uso de modificadores de permeabilidad relativa en el tratamiento de las formaciones subterraneas. | |
| NO20071845L (no) | Fremgangsmate for a bedre dekning og fortrengning av behandlingsvaesker i underjordiske formasjoner | |
| NO20083073L (no) | Fremgangsmate for a kontrollere en undervanns syklonseparator | |
| NZ718569A (en) | Well treatment fluids containing a zirconium crosslinker and methods of using the same |