NO20084076L - Bronnplanleggingssystem og -fremgangsmate - Google Patents

Bronnplanleggingssystem og -fremgangsmate

Info

Publication number
NO20084076L
NO20084076L NO20084076A NO20084076A NO20084076L NO 20084076 L NO20084076 L NO 20084076L NO 20084076 A NO20084076 A NO 20084076A NO 20084076 A NO20084076 A NO 20084076A NO 20084076 L NO20084076 L NO 20084076L
Authority
NO
Norway
Prior art keywords
geoscientific
extracted
well
trajectory
user program
Prior art date
Application number
NO20084076A
Other languages
English (en)
Inventor
Kris Givens
Daan Veeningen
James Brady
Original Assignee
Logined Bv
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Logined Bv filed Critical Logined Bv
Publication of NO20084076L publication Critical patent/NO20084076L/no

Links

Classifications

    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00—Administration; Management
    • G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063—Operations research, analysis or management
    • G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00—Administration; Management
    • G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Extraction Or Liquid Replacement (AREA)
  • Earth Drilling (AREA)

Abstract

Det er beskrevet en fremgangsmåte for gjennomføring av oljefeltoperasjoner på et oljefelt som har en underjordisk formasjon med et undergrunnsreservoar i seg, idet oljefeltet har i det minste et brønnsted med oljefeltutstyr for å utvinne fluid fra undergrunnsreservoaret, og som omfatter at data som omfatter fremdriftsbane og jordegenskaper knyttet til en planlagt brønn samles inn for et geovitenskapelig brukerprogram for å oppnå en geovitenskapelig modell, idet et brønnplanleggingssystem integrert med det geovitenskapelige brukerprogram påkalles, og fremdriftsbanen og jordegenskapene trekkes ut fra den geovitenskapelige modell for å oppnå en uttrukket fremdriftsbane og uttrukne jordegenskaper, og hvor i det minste en parameter for den planlagte brønn bestemmes på grunnlag av den uttrukne fremdriftsbane og de uttrukne jordegenskaper, og i det minste en parameter knyttet til det planlagte brønn vises frem innen en geologisk sammenheng av det geovitenskapelige brukerprogram for å muliggjøre foredling av den planlagte brønn med hensyn til effektiv fluidutvinning fra undergrunnsreservoaret.
NO20084076A 2006-02-27 2008-09-24 Bronnplanleggingssystem og -fremgangsmate NO20084076L (no)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US77714306P 2006-02-27 2006-02-27
US11/708,861 US8812334B2 (en) 2006-02-27 2007-02-21 Well planning system and method
PCT/US2007/004804 WO2007100703A2 (en) 2006-02-27 2007-02-23 Well planning system and method

Publications (1)

Publication Number Publication Date
NO20084076L true NO20084076L (no) 2008-11-27

Family

ID=38335683

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20084076A NO20084076L (no) 2006-02-27 2008-09-24 Bronnplanleggingssystem og -fremgangsmate

Country Status (9)

Country Link
US (1) US8812334B2 (no)
AR (1) AR059630A1 (no)
AU (1) AU2007221158B2 (no)
CA (3) CA2643834C (no)
EA (1) EA013660B1 (no)
MX (1) MX2008010963A (no)
NO (1) NO20084076L (no)
TW (1) TWI382122B (no)
WO (1) WO2007100703A2 (no)

Families Citing this family (143)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2007225358B2 (en) 2006-03-02 2012-11-15 Exxonmobil Upstream Research Company Method for quantifying reservoir connectivity using fluid travel times
US7992642B2 (en) * 2007-05-23 2011-08-09 Schlumberger Technology Corporation Polished bore receptacle
US20100191516A1 (en) * 2007-09-07 2010-07-29 Benish Timothy G Well Performance Modeling In A Collaborative Well Planning Environment
US8892221B2 (en) * 2007-09-18 2014-11-18 Groundswell Technologies, Inc. Integrated resource monitoring system with interactive logic control for well water extraction
US20090076873A1 (en) * 2007-09-19 2009-03-19 General Electric Company Method and system to improve engineered system decisions and transfer risk
MX2010006240A (es) * 2007-12-07 2010-06-30 Landmark Graphics Corp Sistemas y metodos para utilizar resultados de simulacion de flujo a base de celda para calcular trayectorias de linea de corriente.
EP2223157A4 (en) 2007-12-13 2016-12-07 Exxonmobil Upstream Res Co ITERATIVE TANK SURVEILLANCE
US9638830B2 (en) * 2007-12-14 2017-05-02 Westerngeco L.L.C. Optimizing drilling operations using petrotechnical data
US7894991B2 (en) * 2008-02-01 2011-02-22 Schlumberger Technology Corp. Statistical determination of historical oilfield data
US8073665B2 (en) * 2008-03-07 2011-12-06 Schlumberger Technology Corporation Analyzing an oilfield network for oilfield production
CA2717353C (en) 2008-04-22 2016-06-21 Exxonmobil Upstream Research Company Functional-based knowledge analysis in a 2d and 3d visual environment
US8185311B2 (en) * 2008-04-22 2012-05-22 Schlumberger Technology Corporation Multiuser oilfield domain analysis and data management
US8499829B2 (en) * 2008-08-22 2013-08-06 Schlumberger Technology Corporation Oilfield application framework
WO2010039317A1 (en) * 2008-10-01 2010-04-08 Exxonmobil Upstream Research Company Robust well trajectory planning
US8306842B2 (en) * 2008-10-16 2012-11-06 Schlumberger Technology Corporation Project planning and management
AU2009311619B2 (en) * 2008-11-06 2015-10-01 Exxonmobil Upstream Research Company System and method for planning a drilling operation
WO2010056427A1 (en) * 2008-11-14 2010-05-20 Exxonmobil Upstream Research Company Forming a model of a subsurface region
US20100193254A1 (en) * 2009-01-30 2010-08-05 Halliburton Energy Services, Inc. Matrix Drill Bit with Dual Surface Compositions and Methods of Manufacture
US20110093309A1 (en) * 2009-08-24 2011-04-21 Infosys Technologies Limited System and method for predictive categorization of risk
GB2515411B (en) * 2009-10-09 2015-06-10 Senergy Holdings Ltd Well simulation
CN102640163B (zh) 2009-11-30 2016-01-20 埃克森美孚上游研究公司 用于储层模拟的适应性牛顿法
US8818779B2 (en) * 2009-12-21 2014-08-26 Baker Hughes Incorporated System and methods for real-time wellbore stability service
US20110155463A1 (en) * 2009-12-31 2011-06-30 Sergey Khromov System and apparatus for directing a survey of a well
AU2010345083B2 (en) 2010-02-03 2016-03-10 Exxonmobil Upstream Research Company Method for using dynamic target region for well path/drill center optimization
EP2534605B1 (en) 2010-02-12 2020-06-17 Exxonmobil Upstream Research Company Method and system for partitioning parallel simulation models
US8731872B2 (en) * 2010-03-08 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
WO2011112221A1 (en) 2010-03-12 2011-09-15 Exxonmobil Upstream Research Company Dynamic grouping of domain objects via smart groups
US8731887B2 (en) 2010-04-12 2014-05-20 Exxonmobile Upstream Research Company System and method for obtaining a model of data describing a physical structure
US8727017B2 (en) 2010-04-22 2014-05-20 Exxonmobil Upstream Research Company System and method for obtaining data on an unstructured grid
US8731873B2 (en) 2010-04-26 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
BR112012025995A2 (pt) 2010-04-30 2016-06-28 Exxonmobil Upstream Res Co método e sistema para simulação de fluxo de volume finito
EP2588952A4 (en) 2010-06-29 2017-10-04 Exxonmobil Upstream Research Company Method and system for parallel simulation models
AU2011283193B2 (en) 2010-07-29 2014-07-17 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
US10087721B2 (en) 2010-07-29 2018-10-02 Exxonmobil Upstream Research Company Methods and systems for machine—learning based simulation of flow
CA2803068C (en) 2010-07-29 2016-10-11 Exxonmobil Upstream Research Company Method and system for reservoir modeling
EP2601642B1 (en) 2010-08-04 2018-06-13 Exxonmobil Upstream Research Company System and method for summarizing data on an unstructured grid
US8731875B2 (en) 2010-08-13 2014-05-20 Exxonmobil Upstream Research Company System and method for providing data corresponding to physical objects
AU2011293804B2 (en) 2010-08-24 2016-08-11 Exxonmobil Upstream Research Company System and method for planning a well path
CA2807300C (en) 2010-09-20 2017-01-03 Exxonmobil Upstream Research Company Flexible and adaptive formulations for complex reservoir simulations
US20120182205A1 (en) * 2011-01-18 2012-07-19 Schlumberger Technology Corporation Context driven heads-up display for efficient window interaction
AU2011356658B2 (en) 2011-01-26 2017-04-06 Exxonmobil Upstream Research Company Method of reservoir compartment analysis using topological structure in 3D earth model
WO2012106347A1 (en) * 2011-02-01 2012-08-09 Halliburton Energy Services, Inc. Drilling optimization
US20120203591A1 (en) * 2011-02-08 2012-08-09 General Electric Company Systems, methods, and apparatus for determining pipeline asset integrity
CA2826854C (en) * 2011-02-08 2016-02-02 Schlumberger Canada Limited Three-dimensional modeling of parameters for oilfield drilling
US9874648B2 (en) 2011-02-21 2018-01-23 Exxonmobil Upstream Research Company Reservoir connectivity analysis in a 3D earth model
AU2011360239B2 (en) * 2011-02-23 2014-10-23 Landmark Graphics Corporation Method and systems of determining viable hydraulic fracture scenarios
US8854373B2 (en) 2011-03-10 2014-10-07 Baker Hughes Incorporated Graph to analyze drilling parameters
US9618652B2 (en) 2011-11-04 2017-04-11 Schlumberger Technology Corporation Method of calibrating fracture geometry to microseismic events
CA2915625C (en) 2011-03-11 2021-08-03 Schlumberger Canada Limited Method of calibrating fracture geometry to microseismic events
US9043154B2 (en) * 2011-06-21 2015-05-26 Baker Hughes Incorporated Computer-based method for real-time three-dimensional geological model calculation and reservoir navigation
WO2013006226A1 (en) 2011-07-01 2013-01-10 Exxonmobil Upstream Research Company Plug-in installer framework
RU2634677C2 (ru) * 2011-07-28 2017-11-02 Шлюмбергер Текнолоджи Б.В. Система и способ выполнения скважинных операций гидроразрыва
CN103959233B (zh) 2011-09-15 2017-05-17 埃克森美孚上游研究公司 在执行eos计算的指令受限算法中最优化矩阵和向量运算
CA2852044C (en) 2011-10-11 2020-05-12 Schlumberger Canada Limited System and method for performing stimulation operations
EP2774066B1 (en) 2011-11-04 2019-05-01 Services Petroliers Schlumberger Modeling of interaction of hydraulic fractures in complex fracture networks
US10422208B2 (en) 2011-11-04 2019-09-24 Schlumberger Technology Corporation Stacked height growth fracture modeling
AU2012378288B2 (en) * 2012-04-25 2016-07-07 Halliburton Energy Services, Inc. Systems and methods for anonymizing and interpreting industrial activities as applied to drilling rigs
WO2013169429A1 (en) 2012-05-08 2013-11-14 Exxonmobile Upstream Research Company Canvas control for 3d data volume processing
EP3872295B1 (en) * 2012-07-20 2023-07-12 Merlin Technology Inc. Inground operations, system, communications and associated apparatus
EP2870534A4 (en) 2012-08-23 2016-01-20 Landmark Graphics Corp WORK FLOW SYSTEM FOR PLANTING DRILLING WORK, METHOD AND COMPUTER PROGRAM PRODUCT
CN104685153A (zh) * 2012-08-24 2015-06-03 普拉德研究及开发股份有限公司 用于执行增产作业的系统和方法
AU2013324162B2 (en) 2012-09-28 2018-08-09 Exxonmobil Upstream Research Company Fault removal in geological models
US20140149174A1 (en) * 2012-11-26 2014-05-29 International Business Machines Corporation Financial Risk Analytics for Service Contracts
US20140209317A1 (en) * 2013-01-31 2014-07-31 Halliburton Energy Services, Inc. Mobile workflow orchestration and job execution for hydrocarbon recovery operations
US20140214476A1 (en) * 2013-01-31 2014-07-31 Halliburton Energy Services, Inc. Data initialization for a subterranean operation
MX2015009661A (es) * 2013-02-27 2016-03-21 Landmark Graphics Corp Metodo y sistema para predecir eventos de perforacion.
US10048396B2 (en) 2013-03-14 2018-08-14 Exxonmobil Upstream Research Company Method for region delineation and optimal rendering transform of seismic attributes
US9896923B2 (en) * 2013-05-28 2018-02-20 Schlumberger Technology Corporation Synchronizing pulses in heterogeneous fracturing placement
WO2014200685A2 (en) 2013-06-10 2014-12-18 Exxonmobil Upstream Research Company Interactively planning a well site
US8996396B2 (en) * 2013-06-26 2015-03-31 Hunt Advanced Drilling Technologies, LLC System and method for defining a drilling path based on cost
MX368203B (es) * 2013-07-02 2019-09-24 Schlumberger Technology Bv Método para calibrar la geometría de una fractura para eventos microsísmicos.
CN105765581A (zh) * 2013-09-30 2016-07-13 界标制图有限公司 用于针对规划和实时的整体套管设计的方法和分析
US9864098B2 (en) 2013-09-30 2018-01-09 Exxonmobil Upstream Research Company Method and system of interactive drill center and well planning evaluation and optimization
AU2013402485B2 (en) 2013-10-08 2017-05-18 Halliburton Energy Services, Inc. Integrated well survey management and planning tool
WO2015053747A1 (en) 2013-10-08 2015-04-16 Halliburton Energy Services, Inc. Integrated well survey management and planning tool
US20150185363A1 (en) * 2013-12-26 2015-07-02 Baker Hughes Incorporated Data visualization in borehole systems
EP3072075A4 (en) * 2014-01-24 2017-01-11 Landmark Graphics Corporation Determining appraisal locations in a reservoir system
WO2015131016A1 (en) * 2014-02-28 2015-09-03 Schlumberger Canada Limited Automatic method for three-dimensional structural interpretation of borehole images acquired in high-angle and horizontal wells
US9638032B2 (en) * 2014-02-28 2017-05-02 Halliburton Energy Services, Inc. Interactive wellbore design management
US9934481B2 (en) * 2014-03-13 2018-04-03 Schlumberger Technology Corporation Planning drilling operations using models and rig market databases
CN103953854B (zh) * 2014-04-02 2017-07-28 中国石油大学(北京) 含蜡原油管道运行参数确定方法及装置
AU2014390009B2 (en) * 2014-04-09 2017-02-02 Landmark Graphics Corporation Parameter measurement refinement in oil exploration operations
US10062044B2 (en) * 2014-04-12 2018-08-28 Schlumberger Technology Corporation Method and system for prioritizing and allocating well operating tasks
US10450841B2 (en) * 2014-05-16 2019-10-22 Apache Corporation Methods for statistical prediction of well production and reserves
US10319143B2 (en) 2014-07-30 2019-06-11 Exxonmobil Upstream Research Company Volumetric grid generation in a domain with heterogeneous material properties
US10861110B2 (en) * 2014-08-04 2020-12-08 Schlumberger Technology Corporation Collaborative system and method for performing wellsite tasks
US11125017B2 (en) * 2014-08-29 2021-09-21 Landmark Graphics Corporation Directional driller quality reporting system and method
US10331288B2 (en) * 2014-10-02 2019-06-25 Schlumberger Technology Corporation Method and system for generating oilfield objects
US10221659B2 (en) * 2014-10-08 2019-03-05 Chevron U.S.A. Inc. Automated well placement for reservoir evaluation
WO2016069171A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
AU2015339883B2 (en) 2014-10-31 2018-03-29 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
US10036233B2 (en) * 2015-01-21 2018-07-31 Baker Hughes, A Ge Company, Llc Method and system for automatically adjusting one or more operational parameters in a borehole
US20180045031A1 (en) * 2015-02-18 2018-02-15 Schlumberger Technology Corporation Integrated well completions
BR112017019151B1 (pt) * 2015-03-06 2023-01-31 Hartford Steam Boiler Inspection And Insurance Company Método para avaliação de risco para completação de poço, aparelho para estimativa de tempos parados reais para operações de perfuração e sistema
WO2016161295A1 (en) 2015-04-03 2016-10-06 Schlumberger Technology Corporation Wellsite system services
CN106156389A (zh) 2015-04-17 2016-11-23 普拉德研究及开发股份有限公司 用于自动执行的井规划
WO2016168617A1 (en) * 2015-04-17 2016-10-20 Schlumberger Technology Corporation Well plan system
WO2016172038A1 (en) * 2015-04-19 2016-10-27 Schlumberger Technology Corporation Wellsite report system
WO2016168957A1 (en) 2015-04-19 2016-10-27 Prad Research And Development Limited Automated trajectory and anti-collision for well planning
US10513920B2 (en) * 2015-06-19 2019-12-24 Weatherford Technology Holdings, Llc Real-time stuck pipe warning system for downhole operations
US20180209249A1 (en) * 2015-07-21 2018-07-26 Schlumberger Technology Corporation Well Placement Plan Optimization
WO2017070025A1 (en) * 2015-10-18 2017-04-27 Schlumberger Technology Corporation Rig operations information system
US20170138181A1 (en) * 2015-11-16 2017-05-18 Sure Shot Wireline Inc. Method and system for logging a well
US10883346B2 (en) * 2015-12-18 2021-01-05 Schlumberger Technology Corporation Method of performing a perforation using selective stress logging
US10210638B2 (en) * 2016-04-14 2019-02-19 Schlumberger Technology Corporation Visualization integration of graphical logging content
US10423915B2 (en) * 2016-06-02 2019-09-24 Ge Oil & Gas Esp, Inc. System and method for well lifecycle planning visualization
WO2017206182A1 (en) * 2016-06-03 2017-12-07 Schlumberger Technology Corporation Detecting events in well reports
RU2637464C1 (ru) * 2016-06-30 2017-12-04 ФЕДЕРАЛЬНОЕ ГОСУДАРСТВЕННОЕ КАЗЕННОЕ ВОЕННОЕ ОБРАЗОВАТЕЛЬНОЕ УЧРЕЖДЕНИЕ ВЫСШЕГО ОБРАЗОВАНИЯ "Военная академия Ракетных войск стратегического назначения имени Петра Великого" МИНИСТЕРСТВА ОБОРОНЫ РОССИЙСКОЙ ФЕДЕРАЦИИ Устройство моделирования сценариев развития ситуации
US10794134B2 (en) * 2016-08-04 2020-10-06 Baker Hughes, A Ge Company, Llc Estimation of optimum tripping schedules
US10872183B2 (en) * 2016-10-21 2020-12-22 Baker Hughes, A Ge Company, Llc Geomechanical risk and hazard assessment and mitigation
US11423493B2 (en) * 2016-12-09 2022-08-23 Schlumberger Technology Corporation Combinatorial solver and logic solver planner
TWI626622B (zh) * 2017-07-04 2018-06-11 財團法人中興工程顧問社 System and method for stereoscopic imaging of underground rock formation characteristics
WO2019023520A1 (en) 2017-07-27 2019-01-31 The Hartford Steam Boiler Inspection And Insurance Company MANAGING A EQUIPMENT-BASED RISK ON THE USE OF ASSET-BASED ENERGY DATA USING DYNAMICALLY ADJUSTABLE AND SENSOR-CONTROLLED FEEDBACK LOOPS
US11346215B2 (en) 2018-01-23 2022-05-31 Baker Hughes Holdings Llc Methods of evaluating drilling performance, methods of improving drilling performance, and related systems for drilling using such methods
DE112019001243T5 (de) 2018-03-09 2020-11-26 Schlumberger Technology B.V. Integrierte Bohrlochkonstruktionssystem-Betriebsvorgänge
CN115993991A (zh) * 2018-05-31 2023-04-21 创新先进技术有限公司 一种业务决策方法、装置及设备
US12366152B2 (en) 2018-06-04 2025-07-22 Schlumberger Technology Corporation Well construction workstation and control
US11299964B2 (en) * 2018-07-03 2022-04-12 Baker Hughes, A Ge Company, Llc Drilling productive wells
CN109063285B (zh) * 2018-07-18 2022-12-02 南昌大学 一种土坡钻孔布置方案设计方法
RU2687668C1 (ru) * 2018-10-16 2019-05-15 Общество с ограниченной ответственностью "Геонавигационные технологии" Способ и система комбинированного сопровождения процесса бурения скважины
US10808517B2 (en) 2018-12-17 2020-10-20 Baker Hughes Holdings Llc Earth-boring systems and methods for controlling earth-boring systems
US11242746B2 (en) 2019-01-16 2022-02-08 Schlumberger Technology Corporation Well planning using geomechanics nudge
GB2593627B (en) 2019-02-13 2022-11-09 Landmark Graphics Corp Planning a well configuration using geomechanical parameters
CN110145286B (zh) * 2019-05-22 2021-10-01 西南石油大学 一种低渗透油藏或气藏完井工程的设计方法
RU2720859C1 (ru) * 2019-05-29 2020-05-13 Общество с ограниченной ответственностью "Газпром добыча Кузнецк" Способ выбора конструкции горизонтальной метаноугольной скважины
US11200093B2 (en) * 2019-07-15 2021-12-14 Baker Hughes Oilfield Operations Llc Management of a geomechanical workflow of a geomechanics application in a computer system
CA3159346A1 (en) * 2019-10-28 2021-05-06 Schlumberger Canada Limited Drilling activity recommendation system and method
US20220170361A1 (en) * 2019-11-13 2022-06-02 China University Of Petroleum Risk assessment-based design method for deep complex formation wellbore structure
US11282011B2 (en) * 2020-04-01 2022-03-22 Chevron U.S.A. Inc. Task management interface for well operations
RU2745152C1 (ru) * 2020-06-17 2021-03-22 Общество с ограниченной ответственностью «Геонавигационные технологии» Способ объединения модели геологической проводки скважины с оперативной петрофизической интерпретацией данных гис в режиме реального времени и система, реализующая способ
CN111734391B (zh) * 2020-07-30 2023-03-21 国兴汇金(深圳)科技有限公司 油气井井深与温度的在线校准方法、系统及存储介质
CN112819198B (zh) * 2020-12-31 2023-11-14 中国石油大学(北京) 一种基于成本分析模型的工厂化钻井优化配置方法和系统
CN115387298B (zh) * 2021-05-06 2024-09-20 新疆云智润科技有限公司 一种基于底坡的量测水装置及底坡坡度确定方法
US11680480B2 (en) 2021-05-25 2023-06-20 Saudi Arabian Oil Company Multi-layer gas reservoir field development system and method
US12086053B1 (en) 2021-06-03 2024-09-10 Wells Fargo Bank, N.A. Model validation as a service
US12031423B2 (en) 2021-08-17 2024-07-09 Landmark Graphics Corporation Well construction optimization techniques
US12421829B2 (en) 2021-09-21 2025-09-23 Saudi Arabian Oil Company Combined carbon dioxide disposal and freshwater production from a saline aquifer
US11976237B2 (en) 2021-10-08 2024-05-07 Halliburton Energy Services, Inc. Alkali-silica reaction for expanding cement in a wellbore
US20230175355A1 (en) * 2021-12-08 2023-06-08 Saudi Arabian Oil Company Well Location Optimizer for High Inclination Complex Well Trajectories
US12271957B2 (en) 2022-07-29 2025-04-08 Chevron U.S.A. Inc. Well operation task management interface
CN117670014A (zh) * 2022-08-19 2024-03-08 中国石油天然气股份有限公司 一种天然气开采环保管控监督系统
US12509981B2 (en) 2022-09-09 2025-12-30 Saudi Arabian Oil Company Parametric attribute of pore volume of subsurface structure from structural depth map
EP4627189A1 (en) * 2022-12-19 2025-10-08 Services Pétroliers Schlumberger Topological wellbore design

Family Cites Families (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5139094A (en) 1991-02-01 1992-08-18 Anadrill, Inc. Directional drilling methods and apparatus
WO1996018118A1 (en) 1994-12-08 1996-06-13 Noranda Inc. Method for real time location of deep boreholes while drilling
US5899958A (en) 1995-09-11 1999-05-04 Halliburton Energy Services, Inc. Logging while drilling borehole imaging and dipmeter device
US6612382B2 (en) 1996-03-25 2003-09-02 Halliburton Energy Services, Inc. Iterative drilling simulation process for enhanced economic decision making
US5992519A (en) 1997-09-29 1999-11-30 Schlumberger Technology Corporation Real time monitoring and control of downhole reservoirs
GB9904101D0 (en) 1998-06-09 1999-04-14 Geco As Subsurface structure identification method
US6313837B1 (en) 1998-09-29 2001-11-06 Schlumberger Technology Corporation Modeling at more than one level of resolution
US6266619B1 (en) 1999-07-20 2001-07-24 Halliburton Energy Services, Inc. System and method for real time reservoir management
US6853921B2 (en) 1999-07-20 2005-02-08 Halliburton Energy Services, Inc. System and method for real time reservoir management
US6980940B1 (en) 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
US8224783B1 (en) * 2000-09-26 2012-07-17 Conocophillips Company Information management system
US7003439B2 (en) 2001-01-30 2006-02-21 Schlumberger Technology Corporation Interactive method for real-time displaying, querying and forecasting drilling event and hazard information
US7248259B2 (en) 2001-12-12 2007-07-24 Technoguide As Three dimensional geological model construction
US7523024B2 (en) 2002-05-17 2009-04-21 Schlumberger Technology Corporation Modeling geologic objects in faulted formations
US20040050590A1 (en) 2002-09-16 2004-03-18 Pirovolou Dimitrios K. Downhole closed loop control of drilling trajectory
EA008321B1 (ru) 2002-11-23 2007-04-27 Шлумбергер Текнолоджи Корпорейшн Способ и устройство для объединённых моделирований пластов-коллекторов и поверхностных сетей трубопроводов производственного оборудования
US7546228B2 (en) 2003-04-30 2009-06-09 Landmark Graphics Corporation Stochastically generating facility and well schedules
US7539625B2 (en) 2004-03-17 2009-05-26 Schlumberger Technology Corporation Method and apparatus and program storage device including an integrated well planning workflow control system with process dependencies
US7698148B2 (en) 2003-09-12 2010-04-13 Raytheon Company Web-based risk management tool and method
US20050209886A1 (en) 2004-02-05 2005-09-22 Corkern Robert S System and method for tracking patient flow
US7832500B2 (en) 2004-03-01 2010-11-16 Schlumberger Technology Corporation Wellbore drilling method
US7258175B2 (en) 2004-03-17 2007-08-21 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for automatic drill bit selection based on earth properties and wellbore geometry
US7653563B2 (en) 2004-03-17 2010-01-26 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for automatic qualitative and quantitative risk assessment based on technical wellbore design and earth properties
US7630914B2 (en) * 2004-03-17 2009-12-08 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties
US7546884B2 (en) 2004-03-17 2009-06-16 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for automatic drill string design based on wellbore geometry and trajectory requirements
US7155239B2 (en) 2004-05-28 2006-12-26 Symbol Technologies, Inc. Method and system for radio map filtering via adaptive clustering

Also Published As

Publication number Publication date
TW200802149A (en) 2008-01-01
WO2007100703A2 (en) 2007-09-07
CA2894737A1 (en) 2007-09-07
EA013660B1 (ru) 2010-06-30
CA2838468A1 (en) 2007-09-07
AU2007221158B2 (en) 2010-12-16
AR059630A1 (es) 2008-04-16
CA2643834C (en) 2015-10-13
TWI382122B (zh) 2013-01-11
US8812334B2 (en) 2014-08-19
WO2007100703A3 (en) 2007-11-08
AU2007221158A1 (en) 2007-09-07
MX2008010963A (es) 2009-01-07
US20070199721A1 (en) 2007-08-30
EA200870303A1 (ru) 2009-02-27
CA2643834A1 (en) 2007-09-07

Similar Documents

Publication Publication Date Title
EA200870303A1 (ru) Система и способ для планирования скважины
GB2460189A (en) System and method for performing oilfield drilling operations using visualization techniques
NO20051106L (no) System og fremgangsmate for bronnboring
GB2464003B (en) System and method for performing oilfield simulation operations
ATE529608T1 (de) System und verfahren zum modellieren von bohrlochverläufen
NO20101009L (no) Visualiseringsteknikker for oljefeltoperasjoner
NO20091079L (no) System og fremgangsmate for a utfore simuleringer for drift av oljefelt
EA201070207A1 (ru) Способ управления добычей из нефтегазоносного коллектора в режиме реального времени
MX2010003218A (es) Metodo para completar depositos de petroleo y gas hermeticos.
MX346613B (es) Metodo y sistema para producción de presión de poro.
NO20091092L (no) Fremgangsmate og system for planlegging hydrokarbonutvinning fra en hydrokarbonformasjon
EA200870537A1 (ru) Способы извлечения углеводородов с использованием горизонтальных скважин
DK1317679T3 (da) System og fremgangsmåde til at vedhæfte boreinformation til tredimensionelle visualisering af jordmodeller
WO2013152073A3 (en) Drilling control and information system
NO20090492L (no) Fremgangsmåter for å oppdage, forhindre og bøte på tapt sirkulasjonsfluid
GB2462974A (en) Valuing future information under uncertainty
NO20084280L (no) Fremgangsmate og apparatur for a perforere og frakturere en underjordisk formasjon
GB201120916D0 (en) Method for assessing the performance of a drill bit configuration, and for comparing the performance of different drill bit configurations for drilling
GB2462227A (en) System and method for performing a drilling operation in an oilfield
EP2848964A3 (en) Combining downhole fluid analysis and petroleum systems modeling
FI20085848A7 (fi) Menetelmä porasoijan käsittelemiseksi, kallionporauslaitteen pölynkeruujärjestelmä sekä vaihdinyksikkö
MX2008016220A (es) Planificación y operación de pozos en yacimiento petrolífero.
WO2009014821A3 (en) Method for recovering crude oil from a subterranean formation
WO2010010455A3 (en) System and method for automating exploration of production of subterranean resources
WO2011058307A3 (en) Downhole tractor

Legal Events

Date Code Title Description
FC2A Withdrawal, rejection or dismissal of laid open patent application