NO20084606L - Fremgangsmate for a optimalisere produksjonen fra en gruppe bronner - Google Patents
Fremgangsmate for a optimalisere produksjonen fra en gruppe bronnerInfo
- Publication number
- NO20084606L NO20084606L NO20084606A NO20084606A NO20084606L NO 20084606 L NO20084606 L NO 20084606L NO 20084606 A NO20084606 A NO 20084606A NO 20084606 A NO20084606 A NO 20084606A NO 20084606 L NO20084606 L NO 20084606L
- Authority
- NO
- Norway
- Prior art keywords
- wells
- cluster
- production
- sources
- procedure
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 230000004907 flux Effects 0.000 abstract 1
- 230000000638 stimulation Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E21B41/0092—
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- General Engineering & Computer Science (AREA)
- Operations Research (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Feedback Control In General (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Steroid Compounds (AREA)
- Geophysics And Detection Of Objects (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Heat Treatment Of Steel (AREA)
- Forging (AREA)
Abstract
Den foreliggende oppfinnelsen vedrører en fremgangsmåte for å optimalisere produksjon fra en gruppe/klynge av brønner på grunnlaget av et anslag av bidragene fra individuelle brønner til produksjonen fra klyngen av brønner, tilpasset til de bestemte begrensninger og krav fra olje- og gassproduksjonsomgivelsene. Brønnene i klyngen kan avvike i beskaffenhet og flyt av deres utstrømninger og/eller virkemåte, stimulering og/eller manipulering. Brønnene kan også produsere fra flere soner eller grener i undergrunnen. Brønnhodene av brønnene i klyngen kan være lokalisert på land eller til sjøs, over overflaten av sjøen eller på sjøbunnen. Fremgangsmåten ifølge oppfinnelsen kan bli brukt til å fremstille én eller flere optimaliseringsmodeller, som bare tar med i beregningen betydelige, relevante karakteristikker og virkninger av brønnene og produksjonssystemet.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP06112401 | 2006-04-07 | ||
| EP06112440 | 2006-04-10 | ||
| PCT/EP2007/053348 WO2007116008A1 (en) | 2006-04-07 | 2007-04-05 | Method for optimising the production of a cluster of wells |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| NO20084606L true NO20084606L (no) | 2008-10-30 |
| NO341307B1 NO341307B1 (no) | 2017-10-02 |
Family
ID=38110150
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| NO20084606A NO341307B1 (no) | 2006-04-07 | 2008-10-30 | Fremgangsmåte for å optimalisere produksjonen fra en gruppe brønner |
Country Status (10)
| Country | Link |
|---|---|
| EP (1) | EP2004953B1 (no) |
| AT (1) | ATE445083T1 (no) |
| AU (1) | AU2007235959B2 (no) |
| BR (1) | BRPI0708835B1 (no) |
| CA (1) | CA2645902C (no) |
| DE (1) | DE602007002702D1 (no) |
| EA (1) | EA200802116A1 (no) |
| NO (1) | NO341307B1 (no) |
| NZ (1) | NZ571278A (no) |
| WO (1) | WO2007116008A1 (no) |
Families Citing this family (44)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AU2008290584B2 (en) | 2007-08-17 | 2011-09-15 | Shell Internationale Research Maatschappij B.V. | Method for virtual metering of injection wells and allocation and control of multi-zonal injection wells |
| WO2009024545A1 (en) | 2007-08-17 | 2009-02-26 | Shell Internationale Research Maatschappij B.V. | Method for controlling production and downhole pressures of a well with multiple subsurface zones and/or branches |
| CA2690992C (en) | 2007-08-24 | 2014-07-29 | Exxonmobil Upstream Research Company | Method for predicting well reliability by computer simulation |
| CA2690991C (en) | 2007-08-24 | 2013-12-24 | Exxonmobil Upstream Research Company | Method for multi-scale geomechanical model analysis by computer simulation |
| US8768672B2 (en) | 2007-08-24 | 2014-07-01 | ExxonMobil. Upstream Research Company | Method for predicting time-lapse seismic timeshifts by computer simulation |
| US8548782B2 (en) | 2007-08-24 | 2013-10-01 | Exxonmobil Upstream Research Company | Method for modeling deformation in subsurface strata |
| CN102007504A (zh) | 2007-11-10 | 2011-04-06 | 兰德马克绘图国际公司,哈里伯顿公司 | 工作流程自动化、自适应和集成的系统及方法 |
| EP3450679A1 (en) | 2009-11-30 | 2019-03-06 | Exxonmobil Upstream Research Company | Adaptive newton's method for reservoir simulation |
| BR112012025995A2 (pt) | 2010-04-30 | 2016-06-28 | Exxonmobil Upstream Res Co | método e sistema para simulação de fluxo de volume finito |
| CA2801382C (en) | 2010-06-29 | 2018-12-18 | Exxonmobil Upstream Research Company | Method and system for parallel simulation models |
| CA2803066A1 (en) | 2010-07-29 | 2012-02-02 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
| CA2803068C (en) | 2010-07-29 | 2016-10-11 | Exxonmobil Upstream Research Company | Method and system for reservoir modeling |
| AU2011283193B2 (en) | 2010-07-29 | 2014-07-17 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
| WO2012039811A1 (en) | 2010-09-20 | 2012-03-29 | Exxonmobil Upstream Research Company | Flexible and adaptive formulations for complex reservoir simulations |
| RU2457320C1 (ru) * | 2011-03-29 | 2012-07-27 | Общество С Ограниченной Ответственностью "Дискрит" | Способ эксплуатации скважины |
| BR112014005794A2 (pt) | 2011-09-15 | 2017-03-28 | Exxonmobil Upstream Res Co | operações matriciais e vetoriais otimizadas em algoritmos de instrução limitada que executam cálculos de equação de estado |
| US10036829B2 (en) | 2012-09-28 | 2018-07-31 | Exxonmobil Upstream Research Company | Fault removal in geological models |
| MY182084A (en) | 2012-12-21 | 2021-01-18 | Seabed Separation As | Inclined tubular separator for separating oil well substances |
| WO2014207568A2 (en) * | 2013-06-28 | 2014-12-31 | Sitepp Sistemas Y Tecnología Para El Petróleo, S.A. De C.V. | System and method for enhancing the production levels of wells |
| US9702243B2 (en) | 2013-10-04 | 2017-07-11 | Baker Hughes Incorporated | Systems and methods for monitoring temperature using a magnetostrictive probe |
| US9957781B2 (en) | 2014-03-31 | 2018-05-01 | Hitachi, Ltd. | Oil and gas rig data aggregation and modeling system |
| CA2948667A1 (en) | 2014-07-30 | 2016-02-04 | Exxonmobil Upstream Research Company | Method for volumetric grid generation in a domain with heterogeneous material properties |
| US10012059B2 (en) | 2014-08-21 | 2018-07-03 | Exxonmobil Upstream Research Company | Gas lift optimization employing data obtained from surface mounted sensors |
| EA036893B1 (ru) * | 2014-09-25 | 2021-01-12 | Тоталь С.А. | Добыча углеводородов с помощью тестового сепаратора |
| EP3198113B1 (fr) * | 2014-09-25 | 2020-05-06 | Total S.A. | Production d'hydrocarbures avec compteur métrique |
| AU2015339884B2 (en) | 2014-10-31 | 2018-03-15 | Exxonmobil Upstream Research Company | Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques |
| US11409023B2 (en) | 2014-10-31 | 2022-08-09 | Exxonmobil Upstream Research Company | Methods to handle discontinuity in constructing design space using moving least squares |
| US10101194B2 (en) | 2015-12-31 | 2018-10-16 | General Electric Company | System and method for identifying and recovering from a temporary sensor failure |
| US10401207B2 (en) | 2016-09-14 | 2019-09-03 | GE Oil & Gas UK, Ltd. | Method for assessing and managing sensor uncertainties in a virtual flow meter |
| US11940318B2 (en) | 2016-09-27 | 2024-03-26 | Baker Hughes Energy Technology UK Limited | Method for detection and isolation of faulty sensors |
| HUE064459T2 (hu) | 2016-12-23 | 2024-03-28 | Exxonmobil Technology & Engineering Company | Eljárás és rendszer stabil és hatékony tározó szimulációhoz stabilitási proxyk alkalmazásával |
| US10364655B2 (en) | 2017-01-20 | 2019-07-30 | Saudi Arabian Oil Company | Automatic control of production and injection wells in a hydrocarbon field |
| US11041976B2 (en) | 2017-05-30 | 2021-06-22 | Exxonmobil Upstream Research Company | Method and system for creating and using a subsurface model in hydrocarbon operations |
| US20190093474A1 (en) * | 2017-09-22 | 2019-03-28 | General Electric Company | System and method for determining production from a plurality of wells |
| EP3743783A4 (en) * | 2018-01-26 | 2021-10-27 | GE Inspection Technologies, LP | DETERMINATION OF VIRTUAL PROCESS PARAMETERS |
| US11180976B2 (en) | 2018-12-21 | 2021-11-23 | Exxonmobil Upstream Research Company | Method and system for unconventional gas lift optimization |
| US20200240259A1 (en) * | 2019-01-25 | 2020-07-30 | Ge Inspection Technologies, Lp | Flow network model analysis |
| US11591936B2 (en) | 2019-09-04 | 2023-02-28 | Saudi Arabian Oil Company | Systems and methods for proactive operation of process facilities based on historical operations data |
| CN113898323B (zh) * | 2020-06-22 | 2024-02-23 | 中国石油化工股份有限公司 | 海上油气田水下生产系统及其设计方法 |
| CN112580851B (zh) * | 2020-11-17 | 2024-06-18 | 西安中控天地科技开发有限公司 | 丛式井场抽油机井群错峰开井间抽运行调度方法 |
| CN113153281A (zh) * | 2021-03-29 | 2021-07-23 | 中国地质大学(北京) | 一种实现海上平台油气井协同生产的优化模型 |
| KR102599305B1 (ko) * | 2021-09-15 | 2023-11-07 | 광성지엠(주) | 유가스정 지중 생산 조건 및 장애 요소를 반영한 esp 및 튜빙 모니터링 시스템의 시험 방법(esp mapping and surging) |
| KR102599460B1 (ko) * | 2021-09-15 | 2023-11-07 | 광성지엠(주) | 유가스정 지중 생산 조건 및 장애 요소를 반영한 esp 및 튜빙 모니터링 시스템의 시험 방법(tubing leakage) |
| EP4476427A4 (en) * | 2022-02-09 | 2026-02-18 | Services Petroliers Schlumberger | INTEGRATED ASSET MODELING FOR ENERGY CONSUMPTION AND EMISSION |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6434435B1 (en) * | 1997-02-21 | 2002-08-13 | Baker Hughes Incorporated | Application of adaptive object-oriented optimization software to an automatic optimization oilfield hydrocarbon production management system |
| RU2274747C2 (ru) * | 2000-10-04 | 2006-04-20 | Шлюмбергер Текнолоджи Б.В. | Методика оптимизации добычи из многослойных смешанных пластов с использованием данных о динамике изменения дебита смешанных пластов и данных геофизических исследований в эксплуатационных скважинах |
-
2007
- 2007-04-05 AT AT07727816T patent/ATE445083T1/de not_active IP Right Cessation
- 2007-04-05 WO PCT/EP2007/053348 patent/WO2007116008A1/en not_active Ceased
- 2007-04-05 CA CA2645902A patent/CA2645902C/en active Active
- 2007-04-05 EP EP07727816A patent/EP2004953B1/en active Active
- 2007-04-05 DE DE602007002702T patent/DE602007002702D1/de not_active Expired - Fee Related
- 2007-04-05 EA EA200802116A patent/EA200802116A1/ru unknown
- 2007-04-05 BR BRPI0708835-3A patent/BRPI0708835B1/pt active IP Right Grant
- 2007-04-05 AU AU2007235959A patent/AU2007235959B2/en active Active
- 2007-04-05 NZ NZ571278A patent/NZ571278A/en unknown
-
2008
- 2008-10-30 NO NO20084606A patent/NO341307B1/no unknown
Also Published As
| Publication number | Publication date |
|---|---|
| EA200802116A1 (ru) | 2009-04-28 |
| AU2007235959B2 (en) | 2010-11-11 |
| WO2007116008A1 (en) | 2007-10-18 |
| EP2004953A1 (en) | 2008-12-24 |
| EP2004953B1 (en) | 2009-10-07 |
| NZ571278A (en) | 2011-08-26 |
| BRPI0708835B1 (pt) | 2017-09-26 |
| ATE445083T1 (de) | 2009-10-15 |
| CA2645902A1 (en) | 2007-10-18 |
| CA2645902C (en) | 2014-05-20 |
| DE602007002702D1 (de) | 2009-11-19 |
| BRPI0708835A2 (pt) | 2011-06-14 |
| NO341307B1 (no) | 2017-10-02 |
| AU2007235959A1 (en) | 2007-10-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NO20084606L (no) | Fremgangsmate for a optimalisere produksjonen fra en gruppe bronner | |
| MX346613B (es) | Metodo y sistema para producción de presión de poro. | |
| GB2468812A (en) | Optimizing drilling operations using petrotechnical data | |
| GB2445305A (en) | Method and system for integrated asset management utilizing multi-level modeling of oil field assets | |
| GB2457823A (en) | System and method for performing oilfield simulation operations | |
| NO20100029L (no) | Fremgangsmate, program og datasystem for a harmonisere modelldata for hydrokarbonreservoarer | |
| EA200970017A1 (ru) | Способ и система для проектирования и оптимизации операций бурения и заканчивания в углеводородных пластах - коллекторах | |
| WO2009126376A3 (en) | System and method for drilling multilateral wells using magnetic ranging while drilling | |
| MX2009006534A (es) | Soporte de datos con ventana transparente y metodo para producirlo. | |
| MX2008016220A (es) | Planificación y operación de pozos en yacimiento petrolífero. | |
| WO2008157706A3 (en) | System and method for performing oilfield simulation operations | |
| GB2455237A (en) | System and method for performing oilfield simulation operations | |
| EA200700100A1 (ru) | Способ разработки глубоких геотермальных резервуаров и отбора из них | |
| GB2460189A (en) | System and method for performing oilfield drilling operations using visualization techniques | |
| GB2509268A (en) | Modeling and simulation of complete drill strings | |
| BRPI0514155A (pt) | ferramenta para regular alcance magnético integrada | |
| WO2009080711A3 (en) | Method for producing hydrocarbons through a well or well cluster of which the trajectory is optimized by a trajectory optimisation algorithm | |
| WO2007089829A3 (en) | Methods, systems, and computer-readable media for fast updating of oil and gas field production models with physical and proxy simulators | |
| DE602007013530D1 (de) | Verfahren, systeme und computerlesbare medien zur öl- und gasfeldproduktionsoptimierung in echtzeit mit einem proxy-simulator | |
| MX2009013365A (es) | Metodo para recuperar petroleo crudo de una formacion subterranea. | |
| CO6620011A2 (es) | Método para mejorar la producción de un campo maduro de gas o de petróleo | |
| GB2464003B (en) | System and method for performing oilfield simulation operations | |
| NO20075972L (no) | Fremgangsmate, program og datamaskinsystem for paleokanalmodellering | |
| WO2010131113A3 (en) | System and method for performing wellsite containment operations | |
| NO20100886L (no) | Evaluering av syefraktureringsbehandlinger i et oljefelt |