NO20091041L - Anriket multipunkts fluksapproksimasjon - Google Patents

Anriket multipunkts fluksapproksimasjon

Info

Publication number
NO20091041L
NO20091041L NO20091041A NO20091041A NO20091041L NO 20091041 L NO20091041 L NO 20091041L NO 20091041 A NO20091041 A NO 20091041A NO 20091041 A NO20091041 A NO 20091041A NO 20091041 L NO20091041 L NO 20091041L
Authority
NO
Norway
Prior art keywords
enriched
flux approximation
multipoint
reservoir
multipoint flux
Prior art date
Application number
NO20091041A
Other languages
English (en)
Other versions
NO343912B1 (no
Inventor
Qian-Yong Chen
Richard T Mifflin
Jing Wan
Yahan Yang
Original Assignee
Exxonmobil Upstream Res Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Exxonmobil Upstream Res Co filed Critical Exxonmobil Upstream Res Co
Publication of NO20091041L publication Critical patent/NO20091041L/no
Publication of NO343912B1 publication Critical patent/NO343912B1/no

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06F—ELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00—Computer-aided design [CAD]
    • G06F30/20—Design optimisation, verification or simulation
    • G06F30/23—Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06F—ELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00—Details relating to CAD techniques
    • G06F2111/10—Numerical modelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Theoretical Computer Science (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Measuring Fluid Pressure (AREA)
  • Complex Calculations (AREA)
  • Separation Using Semi-Permeable Membranes (AREA)
  • Medicines Containing Material From Animals Or Micro-Organisms (AREA)

Abstract

Fremgangsmåte og systemer for å redusere eller eliminere numeriske oscillasjoner i løsninger som forekommer når det anvendes konvensjonell MPFA, når det tilveiebringes modellering av strømning i et reservoar. Teknikken kan refereres til som anriket multipunkts fluksapproksimasjon (EMPFA) og kan brukes til å forbedre konsistensen og nøyaktigheten i å bygge opp trykkinterpolasj onene i celler for formålet av å bestemme fluksligningen brukt i å predikere strømning i et reservoar.
NO20091041A 2006-08-14 2009-03-10 Anriket multipunkts fluksapproksimasjon NO343912B1 (no)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US83749906P 2006-08-14 2006-08-14
PCT/US2007/012223 WO2008020906A2 (en) 2006-08-14 2007-05-18 Enriched multi-point flux approximation

Publications (2)

Publication Number Publication Date
NO20091041L true NO20091041L (no) 2009-03-10
NO343912B1 NO343912B1 (no) 2019-07-08

Family

ID=37429250

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20091041A NO343912B1 (no) 2006-08-14 2009-03-10 Anriket multipunkts fluksapproksimasjon

Country Status (7)

Country Link
US (1) US7983883B2 (no)
EP (1) EP2057577A4 (no)
CN (1) CN101501700B (no)
BR (1) BRPI0714972A2 (no)
CA (1) CA2660444C (no)
NO (1) NO343912B1 (no)
WO (1) WO2008020906A2 (no)

Families Citing this family (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8204690B2 (en) * 2008-06-03 2012-06-19 Los Alamos National Security, Llc Analytical effective tensor for flow-through composites
EP2321756A2 (en) * 2008-09-02 2011-05-18 Chevron U.S.A. Incorporated Indirect-error-based, dynamic upscaling of multi-phase flow in porous media
US8301429B2 (en) * 2008-10-09 2012-10-30 Chevron U.S.A. Inc. Iterative multi-scale method for flow in porous media
US8350851B2 (en) * 2009-03-05 2013-01-08 Schlumberger Technology Corporation Right sizing reservoir models
US8339396B2 (en) * 2009-03-05 2012-12-25 Schlumberger Technology Corporation Coarsening and splitting techniques
FR2947345B1 (fr) * 2009-06-26 2011-07-15 Inst Francais Du Petrole Methode pour modifier des proportions de facies lors du calage d'historique d'un modele geologique
US8532967B2 (en) * 2009-08-14 2013-09-10 Schlumberger Technology Corporation Executing a utility in a distributed computing system based on an integrated model
US8428922B2 (en) * 2010-02-05 2013-04-23 Seiko Epson Corporation Finite difference level set projection method on multi-staged quadrilateral grids
NO2556462T3 (no) 2010-04-06 2018-03-24
US8727017B2 (en) * 2010-04-22 2014-05-20 Exxonmobil Upstream Research Company System and method for obtaining data on an unstructured grid
CA2801386A1 (en) * 2010-06-15 2011-12-22 Exxonmobil Upstream Research Company Method and system for stabilizing formulation methods
US10198535B2 (en) 2010-07-29 2019-02-05 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
EP2599029A4 (en) 2010-07-29 2014-01-08 Exxonmobil Upstream Res Co METHODS AND SYSTEMS FOR AUTOMATIC LEARNING FLOW SIMULATION
CA2803068C (en) * 2010-07-29 2016-10-11 Exxonmobil Upstream Research Company Method and system for reservoir modeling
WO2012071090A1 (en) * 2010-11-23 2012-05-31 Exxonmobil Upstream Research Company Variable discretization method for flow simulation on complex geological models
US20140324399A1 (en) * 2011-04-26 2014-10-30 University Of Windsor Method and System for Determining Fluid Flow of Compressible and Non-Compressible Liquids
US9268887B2 (en) * 2011-04-26 2016-02-23 University Of Windsor System and method for determining fluid flow of compressible and non-compressible liquids
WO2013162849A1 (en) * 2012-04-24 2013-10-31 Conocophillips Company An efficient data mapping technique for simulation coupling using least squares finite element method
AU2013274734B2 (en) * 2012-06-15 2016-08-25 Landmark Graphics Corporation Methods and systems for non-physical attribute management in reservoir simulation
GB2543183B (en) * 2014-07-23 2021-05-19 Iruiz Tech Ltd Improvements related to forecasting systems
US11106987B2 (en) 2014-07-23 2021-08-31 Iruiz Technologies Ltd. Forecasting systems
GB2533847B (en) * 2014-11-06 2017-04-05 Logined Bv Local layer geometry engine with work zone generated from buffer defined relative to a wellbore trajectory
GB2544098B (en) * 2015-11-06 2021-02-24 Solution Seeker As Assessment of flow networks
US10215014B2 (en) * 2016-07-03 2019-02-26 Reveal Energy Services, Inc. Mapping of fracture geometries in a multi-well stimulation process
WO2018064366A1 (en) 2016-09-28 2018-04-05 Schlumberger Technology Corporation Enhanced two point flux approximation scheme for reservoir simulation
US10521524B2 (en) * 2016-12-30 2019-12-31 Schlumberger Technology Corporation Methods and systems for bounding box clipping
US10557344B2 (en) 2017-03-08 2020-02-11 Reveal Energy Services, Inc. Determining geometries of hydraulic fractures
US10513923B2 (en) 2017-07-24 2019-12-24 Reveal Energy Services, Inc. Dynamically modeling a hydraulic fracture
US10851643B2 (en) 2017-11-02 2020-12-01 Reveal Energy Services, Inc. Determining geometries of hydraulic fractures
CA3155410C (en) 2020-07-20 2025-12-23 Reveal Energy Services, Inc. Determining fracture driven interactions between wellbores
CN116956670B (zh) * 2023-07-17 2024-01-23 长江大学 一种基于tpfa与mfd混合方法的投影嵌入式离散裂缝模型

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4821164A (en) * 1986-07-25 1989-04-11 Stratamodel, Inc. Process for three-dimensional mathematical modeling of underground geologic volumes
US6018497A (en) 1997-02-27 2000-01-25 Geoquest Method and apparatus for generating more accurate earth formation grid cell property information for use by a simulator to display more accurate simulation results of the formation near a wellbore
US6106561A (en) * 1997-06-23 2000-08-22 Schlumberger Technology Corporation Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator
US6826520B1 (en) * 1999-06-24 2004-11-30 Exxonmobil Upstream Research Company Method of upscaling permeability for unstructured grids
US6928399B1 (en) * 1999-12-03 2005-08-09 Exxonmobil Upstream Research Company Method and program for simulating a physical system using object-oriented programming
AU1586500A (en) 1999-12-06 2001-06-12 Sun Microsystems, Inc. Computer arrangement using non-refreshed dram
US7006951B2 (en) * 2000-06-29 2006-02-28 Object Reservoir, Inc. Method for solving finite element models using time slabbing
US7054749B1 (en) * 2000-11-13 2006-05-30 O'meara Jr Daniel J Method for determining reservoir fluid volumes, fluid contacts, compartmentalization, and permeability in geological subsurface models
US6823297B2 (en) * 2003-03-06 2004-11-23 Chevron U.S.A. Inc. Multi-scale finite-volume method for use in subsurface flow simulation
US7496488B2 (en) 2003-03-06 2009-02-24 Schlumberger Technology Company Multi-scale finite-volume method for use in subsurface flow simulation
US7031841B2 (en) * 2004-01-30 2006-04-18 Schlumberger Technology Corporation Method for determining pressure of earth formations
US20080167849A1 (en) * 2004-06-07 2008-07-10 Brigham Young University Reservoir Simulation
US7480206B2 (en) * 2004-09-13 2009-01-20 Chevron U.S.A. Inc. Methods for earth modeling and seismic imaging using interactive and selective updating
FR2875305B1 (fr) * 2004-09-16 2006-10-27 Inst Francais Du Petrole Methode pour generer un modele de reservoir sur maillage flexible
US7707018B2 (en) 2004-12-14 2010-04-27 Schlumberger Technology Corporation Finite volume method system and program storage device for linear elasticity involving coupled stress and flow in a reservoir simulator
FR2886743B1 (fr) * 2005-06-02 2007-07-27 Inst Francais Du Petrole Methode pour simuler les ecoulements de fluides au sein d'un reservoir a l'aide d'une discretisation de type chimere
US20070150245A1 (en) * 2005-12-28 2007-06-28 Caterpillar Inc. Method and apparatus for solving transport equations in multi-cell computer models of dynamic systems
US7542890B2 (en) * 2005-12-28 2009-06-02 Convergent Thinking, Llc Method and apparatus for implementing multi-grid computation for multi-cell computer models with embedded cells
CA2655232C (en) * 2006-07-07 2015-11-24 Exxonmobil Upstream Research Company Upscaling of reservoir models by reusing flow solutions from geologic models
FR2930350B1 (fr) * 2008-04-17 2011-07-15 Inst Francais Du Petrole Procede pour rechercher des hydrocarbures dans un bassin geologiquement complexe,au moyen d'une modelisation de bassin

Also Published As

Publication number Publication date
WO2008020906A3 (en) 2008-04-03
EP2057577A4 (en) 2009-07-22
US7983883B2 (en) 2011-07-19
CA2660444C (en) 2017-07-11
NO343912B1 (no) 2019-07-08
US20090281776A1 (en) 2009-11-12
WO2008020906A2 (en) 2008-02-21
CA2660444A1 (en) 2008-02-21
CN101501700A (zh) 2009-08-05
BRPI0714972A2 (pt) 2012-12-25
CN101501700B (zh) 2014-06-18
EP2057577A2 (en) 2009-05-13

Similar Documents

Publication Publication Date Title
WO2008020906A3 (en) Enriched multi-point flux approximation
IS8709A (is) Aðferð til þess að búa til himnu með gljúpum förum.
WO2010129754A3 (en) Systems, computer implemented methods, and computer readable program products to compute approximate well drainage pressure for a reservoir simulator
NO20093298L (no) Simulering av fluidstromning i reservoar med modifisert gitter
NO20076545L (no) Utvikling av et stromnings-reguleringssystem for en bronn
WO2011017419A3 (en) Systems and methods for monitoring corrosion in a well
TW200606625A (en) System and method of power management
WO2004077023A3 (en) High-throughput structure and electron density determination
EA200970281A1 (ru) Способ оптимизации добычи, используемый в системе добычи нефти и/или газа
ATE506709T1 (de) Betriebsverfahren zum zeitpunkt der lastverringerung eines brennstoffzellensystems
WO2009095906A3 (en) Method, system and computer program product for manipulating a graphic entity
CN202248088U (zh) 一种智能供水系统
MX2018000150A (es) Modulo de membraba de separacion de gas para servicio de gas reactivo.
CN205559241U (zh) 一种恒压控制消防泵
EA200970264A1 (ru) Способ определения состояния риформера в системе топливных элементов
CN201883534U (zh) 一种可旋转固定卡件
Jie et al. Application of analytical hierarchy process in the comprehensive safety assessment system of Yangtze River levee
CN205116504U (zh) 叠层点式幕墙的连接结构
CN205276600U (zh) 一种防火幕墙转接系统
Liang et al. Application of geomembrane in temporary treatment of extrusion damage of dam face slab
CN203200823U (zh) 一种阶梯水压供水系统
CN204343492U (zh) 一种建筑用砖面墙
Andrews-Hanna et al. Early Mars hydrology: Valley networks and evaporites
CN207063049U (zh) 一种高层楼宇给水设备
CN205116281U (zh) 用户端分时供水自动控制系统

Legal Events

Date Code Title Description
MM1K Lapsed by not paying the annual fees