NO20100016L - System and method for performing oil field simulation operations - Google Patents
System and method for performing oil field simulation operationsInfo
- Publication number
- NO20100016L NO20100016L NO20100016A NO20100016A NO20100016L NO 20100016 L NO20100016 L NO 20100016L NO 20100016 A NO20100016 A NO 20100016A NO 20100016 A NO20100016 A NO 20100016A NO 20100016 L NO20100016 L NO 20100016L
- Authority
- NO
- Norway
- Prior art keywords
- oil field
- simulators
- modeling
- field simulation
- simulation operations
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/10—Numerical modelling
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Oppfinnelsen relaterer seg til en fremgangsmåte for å simulere operasjoner for et oljefelt som har prosessfasiliteter og brønnsted operativt sammenkoblet, hvert brønnsted har en brønnboring som penetrerer en undergrunnsformasjon fora ekstrahere fluider fra et undergrunnsreservoar. Fremgangsmåtetrinnene inkluderer å velge simulatorer for modellering av oljefeltet der i det minste en av simulatorene har funksjonalitet for å modellere fluidinnsprøytning, selektivt å koble hver av simulatorene i henhold til en forhåndsdefinert konfigurasjon, og å modellere en innsprøytningsoperasjon for oljefeltet ved selektivt å kommunisere mellom simulatorene.The invention relates to a method for simulating operations for an oil field having process facilities and well site operatively interconnected, each well site having a wellbore penetrating a subsurface formation forums to extract fluids from a subsurface reservoir. The process steps include selecting oil field modeling simulators where at least one of the simulators has functionality for modeling fluid injection, selectively coupling each of the simulators according to a predefined configuration, and modeling an oil field injection operation by selectively communicating between the simulators.
Applications Claiming Priority (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US95820807P | 2007-07-02 | 2007-07-02 | |
| US11/929,921 US8352227B2 (en) | 2006-10-30 | 2007-10-30 | System and method for performing oilfield simulation operations |
| US11/929,811 US8818777B2 (en) | 2006-10-30 | 2007-10-30 | System and method for performing oilfield simulation operations |
| PCT/US2008/069031 WO2009006526A2 (en) | 2007-07-02 | 2008-07-02 | System and method for performing oilfield simulation operations |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| NO20100016L true NO20100016L (en) | 2010-03-26 |
| NO342368B1 NO342368B1 (en) | 2018-05-14 |
Family
ID=40226816
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| NO20100016A NO342368B1 (en) | 2007-07-02 | 2010-01-08 | System and method for performing oil field simulation operations |
Country Status (5)
| Country | Link |
|---|---|
| BR (1) | BRPI0812761A2 (en) |
| CA (1) | CA2691241C (en) |
| GB (1) | GB2464003B (en) |
| NO (1) | NO342368B1 (en) |
| WO (1) | WO2009006526A2 (en) |
Families Citing this family (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8352227B2 (en) | 2006-10-30 | 2013-01-08 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
| US8775141B2 (en) | 2007-07-02 | 2014-07-08 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
| US9228415B2 (en) | 2008-10-06 | 2016-01-05 | Schlumberger Technology Corporation | Multidimensional data repository for modeling oilfield operations |
| CA2871407C (en) | 2012-04-30 | 2018-04-10 | Landmark Graphics Corporation | System and method for reservoir simulation using on-demand data |
| CN103590807B (en) * | 2012-08-13 | 2016-06-08 | 中国石油天然气集团公司 | A kind of method determining heavy oil thermal recovery steam chamber state |
| US10578766B2 (en) | 2013-08-05 | 2020-03-03 | Advantek International Corp. | Quantifying a reservoir volume and pump pressure limit |
| GB2531982B (en) | 2014-06-11 | 2020-06-03 | Advantek Int Corporation | Quantifying a reservoir volume and pump pressure limit |
| CA2953727C (en) | 2014-06-30 | 2021-02-23 | Advantek International Corporation | Slurrification and disposal of waste by pressure pumping into a subsurface formation |
| US10013512B2 (en) * | 2014-08-29 | 2018-07-03 | Schlumberger Technology Corporation | Network flow model |
| CN104405356B (en) * | 2014-11-24 | 2017-01-11 | 中国石油大学(北京) | Horizontal well steam drive two-dimensional physical simulation experimental device for thin bed heavy oil reservoir |
| US20180202265A1 (en) * | 2015-08-21 | 2018-07-19 | Landmark Graphics Corporation | Method And Workflow For Accurate Modeling Of Near-Field Formation In Wellbore Simulations |
| CN111119810B (en) * | 2019-12-17 | 2020-09-22 | 东北石油大学 | Indoor comprehensive simulation device for underground fine separated injection |
| CN115898337B (en) * | 2021-08-26 | 2026-04-14 | 中国石油化工股份有限公司 | Sand-carrying oil extraction simulation test device and test method |
| EP4587678A1 (en) * | 2022-09-16 | 2025-07-23 | TotalEnergies OneTech | Process of determining an injection performance of a well when injecting a fluid into a geological formation |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4676313A (en) * | 1985-10-30 | 1987-06-30 | Rinaldi Roger E | Controlled reservoir production |
| US6230101B1 (en) * | 1999-06-03 | 2001-05-08 | Schlumberger Technology Corporation | Simulation method and apparatus |
| US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
| US6892812B2 (en) * | 2002-05-21 | 2005-05-17 | Noble Drilling Services Inc. | Automated method and system for determining the state of well operations and performing process evaluation |
-
2008
- 2008-07-02 CA CA2691241A patent/CA2691241C/en not_active Expired - Fee Related
- 2008-07-02 BR BRPI0812761-1A2A patent/BRPI0812761A2/en not_active Application Discontinuation
- 2008-07-02 GB GB0921738.1A patent/GB2464003B/en not_active Expired - Fee Related
- 2008-07-02 WO PCT/US2008/069031 patent/WO2009006526A2/en not_active Ceased
-
2010
- 2010-01-08 NO NO20100016A patent/NO342368B1/en not_active IP Right Cessation
Also Published As
| Publication number | Publication date |
|---|---|
| NO342368B1 (en) | 2018-05-14 |
| GB2464003B (en) | 2013-11-27 |
| CA2691241A1 (en) | 2009-01-08 |
| GB2464003A (en) | 2010-04-07 |
| CA2691241C (en) | 2014-03-25 |
| WO2009006526A2 (en) | 2009-01-08 |
| WO2009006526A3 (en) | 2009-02-19 |
| GB0921738D0 (en) | 2010-01-27 |
| BRPI0812761A2 (en) | 2014-11-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EA201070207A1 (en) | METHOD OF MANAGING THE PRODUCTION OF OIL AND GAS MANIFOLD IN REAL TIME | |
| GB2464003B (en) | System and method for performing oilfield simulation operations | |
| NO20091079L (en) | System and method for conducting simulations for operation of oil field | |
| US9316096B2 (en) | Enhanced oil recovery screening model | |
| EA200870537A1 (en) | METHODS OF HYDROCARBON EXTRACTION USING HORIZONTAL WELLS | |
| NO20084076L (en) | Source planning system and method | |
| MX2010003218A (en) | Method for completing tight oil and gas reservoirs. | |
| GB2455237A (en) | System and method for performing oilfield simulation operations | |
| GB2462974A (en) | Valuing future information under uncertainty | |
| MX2009013365A (en) | Method for recovering crude oil from a subterranean formation. | |
| WO2011143639A3 (en) | Materials and methods for temporarily obstructing portions of drilled wells | |
| MX346613B (en) | Method and system for pore pressure prediction. | |
| ATE529608T1 (en) | SYSTEM AND METHOD FOR MODELING BOREHOLE PATHS | |
| GB2509268A (en) | Modeling and simulation of complete drill strings | |
| EA200870227A1 (en) | METHOD AND DEVICE OF THE WELLS HARVEST FOR ENDING, EXTRACTION AND SUPPLY | |
| NO20081624L (en) | Method for drilling and production of hydrocarbons from underground formations | |
| WO2010104724A3 (en) | Method for integrating reservoir charge modeling and downhole fluid analysis | |
| CA3032706C (en) | Wellbore thermal, pressure, and stress analysis above end of operating string | |
| EA201270525A1 (en) | METHOD AND DEVICE FOR DRILLING USING A PROBABLE APPROACH | |
| CA2863796A1 (en) | Modeling and analysis of hydraulic fracture propagation to surface from a casing shoe | |
| ATE541109T1 (en) | COMMUNICATION TOOL FOR A BELOW-SURFACE SAFETY VALVE | |
| Jacobs | To “right size” fractures, producers adopt robust monitoring and custom completions | |
| NO20080225L (en) | Procedure for gravel or fracturing packing in a wellbore as well as monitoring the same | |
| EA201291419A1 (en) | SYSTEM AND METHOD FOR THE PASSAGE OF MATERIAL IN A FLOW CHANNEL | |
| NO20084628L (en) | Process for modifying an existing subsea oil well and a modified oil well |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MM1K | Lapsed by not paying the annual fees |