NO320705B1 - Fremgangsmate for a overvake stabilitet under boring eller produksjon i en grunnformasjon som omgir et bronnhull - Google Patents
Fremgangsmate for a overvake stabilitet under boring eller produksjon i en grunnformasjon som omgir et bronnhull Download PDFInfo
- Publication number
- NO320705B1 NO320705B1 NO20016276A NO20016276A NO320705B1 NO 320705 B1 NO320705 B1 NO 320705B1 NO 20016276 A NO20016276 A NO 20016276A NO 20016276 A NO20016276 A NO 20016276A NO 320705 B1 NO320705 B1 NO 320705B1
- Authority
- NO
- Norway
- Prior art keywords
- rock
- parameters
- formation
- strength
- cavity
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/006—Measuring wall stresses in the borehole
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C39/00—Devices for testing in situ the hardness or other properties of minerals, e.g. for giving information as to the selection of suitable mining tools
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geophysics And Detection Of Objects (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB9914505A GB2351350B (en) | 1999-06-23 | 1999-06-23 | Cavity stability prediction method for wellbores |
| PCT/GB2000/002471 WO2001000962A1 (fr) | 1999-06-23 | 2000-06-22 | Procede permettant de prevoir la stabilite de cavite pour des puits de forage |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| NO20016276D0 NO20016276D0 (no) | 2001-12-20 |
| NO20016276L NO20016276L (no) | 2002-02-12 |
| NO320705B1 true NO320705B1 (no) | 2006-01-16 |
Family
ID=10855791
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| NO20016276A NO320705B1 (no) | 1999-06-23 | 2001-12-20 | Fremgangsmate for a overvake stabilitet under boring eller produksjon i en grunnformasjon som omgir et bronnhull |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US7066019B1 (fr) |
| AU (1) | AU5554200A (fr) |
| CA (1) | CA2377467C (fr) |
| GB (1) | GB2351350B (fr) |
| NO (1) | NO320705B1 (fr) |
| WO (1) | WO2001000962A1 (fr) |
Families Citing this family (54)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7200539B2 (en) * | 2001-02-21 | 2007-04-03 | Baker Hughes Incorporated | Method of predicting the on-set of formation solid production in high-rate perforated and open hole gas wells |
| CA2613817C (fr) * | 2005-07-27 | 2015-11-24 | Exxonmobil Upstream Research Company | Modelisation de puits associee a l'extraction d'hydrocarbures a partir de formations souterraines |
| CN101238465B (zh) * | 2005-07-27 | 2010-10-27 | 埃克森美孚上游研究公司 | 与从地下岩层抽取碳氢化合物相关的井建模 |
| CA2616816A1 (fr) * | 2005-07-27 | 2007-02-15 | Exxonmobil Upstream Research Company | Modelisation de puits associee a l'extraction d'hydrocarbures dans des formations souterraines |
| US7660670B2 (en) | 2006-10-27 | 2010-02-09 | Schlumberger Technology Corporation | Sanding advisor |
| US8622133B2 (en) | 2007-03-22 | 2014-01-07 | Exxonmobil Upstream Research Company | Resistive heater for in situ formation heating |
| BRPI0810590A2 (pt) | 2007-05-25 | 2014-10-21 | Exxonmobil Upstream Res Co | Método in situ de produzir fluidos de hidrocarboneto de uma formação rochosa rica em matéria orgânica |
| US7526385B2 (en) * | 2007-06-22 | 2009-04-28 | Schlumberger Technology Corporation | Method, system and apparatus for determining rock strength using sonic logging |
| US8265915B2 (en) * | 2007-08-24 | 2012-09-11 | Exxonmobil Upstream Research Company | Method for predicting well reliability by computer simulation |
| US8768672B2 (en) * | 2007-08-24 | 2014-07-01 | ExxonMobil. Upstream Research Company | Method for predicting time-lapse seismic timeshifts by computer simulation |
| US8548782B2 (en) * | 2007-08-24 | 2013-10-01 | Exxonmobil Upstream Research Company | Method for modeling deformation in subsurface strata |
| US8423337B2 (en) * | 2007-08-24 | 2013-04-16 | Exxonmobil Upstream Research Company | Method for multi-scale geomechanical model analysis by computer simulation |
| US20110087471A1 (en) * | 2007-12-31 | 2011-04-14 | Exxonmobil Upstream Research Company | Methods and Systems For Determining Near-Wellbore Characteristics and Reservoir Properties |
| US8914268B2 (en) | 2009-01-13 | 2014-12-16 | Exxonmobil Upstream Research Company | Optimizing well operating plans |
| US8387722B2 (en) * | 2009-04-17 | 2013-03-05 | Baker Hughes Incorporated | Strength (UCS) of carbonates using compressional and shear acoustic velocities |
| US8498853B2 (en) * | 2009-07-20 | 2013-07-30 | Exxonmobil Upstream Research Company | Petrophysical method for predicting plastic mechanical properties in rock formations |
| WO2011043862A1 (fr) | 2009-10-07 | 2011-04-14 | Exxonmobil Upstream Research Company | Modèles physiques discrets et simulations de régions souterraines, et leurs procédés de création et d'utilisation |
| US8863839B2 (en) | 2009-12-17 | 2014-10-21 | Exxonmobil Upstream Research Company | Enhanced convection for in situ pyrolysis of organic-rich rock formations |
| WO2011091367A1 (fr) * | 2010-01-25 | 2011-07-28 | CGGVeritas Services (U.S.) Inc. | Procédés et systèmes d'estimation de contraintes à l'aide de données sismiques |
| CA2845012A1 (fr) | 2011-11-04 | 2013-05-10 | Exxonmobil Upstream Research Company | Connexions electriques multiples pour l'optimisation du chauffage pour la pyrolyse in situ |
| CN102562052B (zh) * | 2012-02-26 | 2016-02-03 | 中国石油天然气集团公司 | 密井网浅层套损危害体识别方法 |
| WO2013165711A1 (fr) | 2012-05-04 | 2013-11-07 | Exxonmobil Upstream Research Company | Systèmes et procédés de détection d'une intersection entre un puits de forage et une structure souterraine qui comprend un matériau de marqueur |
| US9411071B2 (en) | 2012-08-31 | 2016-08-09 | Exxonmobil Upstream Research Company | Method of estimating rock mechanical properties |
| US10048403B2 (en) | 2013-06-20 | 2018-08-14 | Exxonmobil Upstream Research Company | Method and system for generation of upscaled mechanical stratigraphy from petrophysical measurements |
| WO2015060919A1 (fr) | 2013-10-22 | 2015-04-30 | Exxonmobil Upstream Research Company | Systèmes et procédés pour réguler un processus de pyrolyse in situ |
| US9394772B2 (en) | 2013-11-07 | 2016-07-19 | Exxonmobil Upstream Research Company | Systems and methods for in situ resistive heating of organic matter in a subterranean formation |
| AU2015350480A1 (en) | 2014-11-21 | 2017-05-25 | Exxonmobil Upstream Research Company | Mitigating the effects of subsurface shunts during bulk heating of a subsurface formation |
| CN105045977A (zh) * | 2015-07-01 | 2015-11-11 | 许昌学院 | 一种研究抗滑桩位的三维边坡模型建立方法 |
| CN106644351A (zh) * | 2015-10-30 | 2017-05-10 | 中石化石油工程技术服务有限公司 | 一种连续波脉冲发生器风洞实验装置 |
| CN106845086B (zh) * | 2016-12-30 | 2019-05-07 | 中国石油天然气集团公司 | 地层压力计算方法及装置 |
| US11041976B2 (en) | 2017-05-30 | 2021-06-22 | Exxonmobil Upstream Research Company | Method and system for creating and using a subsurface model in hydrocarbon operations |
| CN108535121B (zh) * | 2018-03-07 | 2020-10-23 | 华能澜沧江水电股份有限公司 | 一种新的岩石统计损伤本构模型的构建方法 |
| CN109356567B (zh) * | 2018-05-04 | 2022-04-08 | 中国石油集团海洋工程有限公司 | 深水浅部地层井壁稳定性预测方法 |
| US11578564B2 (en) | 2018-05-30 | 2023-02-14 | Saudi Arabian Oil Company | Systems and methods for predicting shear failure of a rock formation |
| CN108894768B (zh) * | 2018-06-25 | 2021-05-14 | 中国地质大学(武汉) | 一种基于蝙蝠算法和井壁稳定的钻进轨迹设计方法与系统 |
| CN110792418B (zh) * | 2018-08-03 | 2022-03-01 | 中国石油天然气股份有限公司 | 井筒工作液配方优化方法及装置 |
| CN109241651B (zh) * | 2018-09-25 | 2022-09-16 | 西安石油大学 | 一种通用的地层破裂压力预测方法 |
| CN112177598B (zh) * | 2019-07-01 | 2024-03-08 | 中国石油化工股份有限公司 | 一种考虑压裂液压缩性的地层起裂压力预测方法 |
| US11326447B2 (en) | 2019-07-15 | 2022-05-10 | Saudi Arabian Oil Company | Wellbore stability prediction |
| CN110346213B (zh) * | 2019-08-07 | 2021-09-10 | 安徽建筑大学 | 一种隧道下穿采空区围岩稳定性评价方法 |
| US20210040837A1 (en) * | 2019-08-08 | 2021-02-11 | Saudi Arabian Oil Company | Automated sand grain bridge stability simulator |
| US11339651B2 (en) | 2020-02-13 | 2022-05-24 | Saudi Arabian Oil Company | Systems and methods for generating continuous grain size logs from petrographic thin section images |
| CN111580166B (zh) * | 2020-05-21 | 2022-03-18 | 中国石油大学(华东) | 一种基于声波远探测和岩石力学的裂缝有效性评价方法 |
| US11591905B2 (en) * | 2020-05-21 | 2023-02-28 | Saudi Arabian Oil Company | Methods and systems for determining optimum pressure drawdown in a production well for a shale gas reservoir |
| CN112014213B (zh) * | 2020-09-02 | 2021-09-28 | 中南大学 | 一种岩石在三轴压缩条件下破坏准则的构建方法 |
| CN113340746B (zh) * | 2021-03-17 | 2022-12-13 | 中国石油大学(华东) | 一种水合物沉积物抗剪强度的计算方法 |
| CN113338921B (zh) * | 2021-06-22 | 2022-03-01 | 中国地质调查局油气资源调查中心 | 一种页岩油水平井井眼轨迹控制方法 |
| CN115522918B (zh) * | 2021-06-25 | 2025-10-31 | 中国石油天然气股份有限公司 | 深层砂岩油藏射孔井出砂压差剖面预测方法 |
| US11753926B2 (en) * | 2021-07-01 | 2023-09-12 | Saudi Arabian Oil Company | Method and system for predicting caliper log data for descaled wells |
| CN117235839B (zh) * | 2022-09-16 | 2024-04-19 | 中国葛洲坝集团三峡建设工程有限公司 | 基于自平衡应力场分析的井筒水泥环安全载荷计算方法 |
| CN115639604B (zh) * | 2022-10-26 | 2024-03-01 | 中国矿业大学(北京) | 地下洞室深浅层围岩损伤定量分析方法与系统 |
| CN116752968B (zh) * | 2023-06-07 | 2024-05-17 | 陕煤集团神木红柳林矿业有限公司 | 一种测定煤岩基本弹性力学参数的随钻装置及其使用方法 |
| CN116822971B (zh) * | 2023-08-30 | 2023-11-14 | 长江大学武汉校区 | 一种井壁风险等级预测方法 |
| CN119531863A (zh) * | 2023-08-30 | 2025-02-28 | 中国石油天然气股份有限公司 | 一种超高压气井生产过程中储层稳定性评价方法 |
Family Cites Families (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3907034A (en) * | 1974-01-28 | 1975-09-23 | Jr George O Suman | Method of drilling and completing a well in an unconsolidated formation |
| US4599904A (en) * | 1984-10-02 | 1986-07-15 | Nl Industries, Inc. | Method for determining borehole stress from MWD parameter and caliper measurements |
| US4951267A (en) | 1986-10-15 | 1990-08-21 | Schlumberger Technology Corporation | Method and apparatus for multipole acoustic logging |
| US4881208A (en) | 1987-07-07 | 1989-11-14 | Schlumberger Technology Corporation | Acoustic well logging method and apparatus |
| US4862991A (en) | 1988-09-13 | 1989-09-05 | Schlumberger Technology Corporation | Sonic well logging tool transmitter |
| US5353637A (en) * | 1992-06-09 | 1994-10-11 | Plumb Richard A | Methods and apparatus for borehole measurement of formation stress |
| US5497658A (en) * | 1994-03-25 | 1996-03-12 | Atlantic Richfield Company | Method for fracturing a formation to control sand production |
| US5619475A (en) * | 1994-03-30 | 1997-04-08 | Schlumberger Technology Corportion | Method of predicting mechanical failure in formation utilizing stress derivatives which measure formation nonlinearity |
| GB2293652B (en) * | 1994-08-31 | 1996-09-11 | Schlumberger Ltd | Methods of predicting mechanical failure in undergound formations |
| US5838633A (en) | 1997-01-27 | 1998-11-17 | Schlumberger Technology Corporation | Method for estimating formation in-situ stress magnitudes using a sonic borehole tool |
| US5789669A (en) | 1997-08-13 | 1998-08-04 | Flaum; Charles | Method and apparatus for determining formation pressure |
| US6098021A (en) * | 1999-01-15 | 2000-08-01 | Baker Hughes Incorporated | Estimating formation stress using borehole monopole and cross-dipole acoustic measurements: theory and method |
| US6386297B1 (en) * | 1999-02-24 | 2002-05-14 | Baker Hughes Incorporated | Method and apparatus for determining potential abrasivity in a wellbore |
| FR2800871B1 (fr) * | 1999-11-04 | 2002-01-25 | France Etat Ponts Chaussees | Procede et dispositif d'essai triaxial in situ |
| US7200539B2 (en) * | 2001-02-21 | 2007-04-03 | Baker Hughes Incorporated | Method of predicting the on-set of formation solid production in high-rate perforated and open hole gas wells |
| US7181380B2 (en) * | 2002-12-20 | 2007-02-20 | Geomechanics International, Inc. | System and process for optimal selection of hydrocarbon well completion type and design |
-
1999
- 1999-06-23 GB GB9914505A patent/GB2351350B/en not_active Expired - Fee Related
-
2000
- 2000-06-22 AU AU55542/00A patent/AU5554200A/en not_active Abandoned
- 2000-06-22 CA CA002377467A patent/CA2377467C/fr not_active Expired - Fee Related
- 2000-06-22 US US10/009,505 patent/US7066019B1/en not_active Expired - Fee Related
- 2000-06-22 WO PCT/GB2000/002471 patent/WO2001000962A1/fr not_active Ceased
-
2001
- 2001-12-20 NO NO20016276A patent/NO320705B1/no not_active IP Right Cessation
Also Published As
| Publication number | Publication date |
|---|---|
| GB2351350B (en) | 2001-09-12 |
| NO20016276D0 (no) | 2001-12-20 |
| AU5554200A (en) | 2001-01-31 |
| CA2377467A1 (fr) | 2001-01-04 |
| US7066019B1 (en) | 2006-06-27 |
| GB9914505D0 (en) | 1999-08-25 |
| CA2377467C (fr) | 2008-11-25 |
| GB2351350A (en) | 2000-12-27 |
| NO20016276L (no) | 2002-02-12 |
| WO2001000962A1 (fr) | 2001-01-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NO320705B1 (no) | Fremgangsmate for a overvake stabilitet under boring eller produksjon i en grunnformasjon som omgir et bronnhull | |
| Bradford et al. | Benefits of assessing the solids production risk in a North Sea reservoir using elastoplastic modelling | |
| Jeffrey et al. | Measuring hydraulic fracture growth in naturally fractured rock | |
| Gatens et al. | In-situ stress tests and acoustic logs determine mechanical properties and stress profiles in the Devonian shales | |
| US7774140B2 (en) | Method and an apparatus for detecting fracture with significant residual width from previous treatments | |
| US10344533B2 (en) | Predicting drillability based on electromagnetic emissions during drilling | |
| US20170067337A1 (en) | Apparatus and method using measurements taken while drilling to generate and map mechanical boundaries and mechanical rock properties along a borehole | |
| Acock et al. | Practical approaches to sand management | |
| CN101116009A (zh) | 用于采用作为有侧限抗压强度的函数的钻头特定滑动摩擦系数和机械效率预测穿透率的方法 | |
| Wang et al. | Cement sheath integrity during hydraulic fracturing: An integrated modeling approach | |
| Ewy et al. | Openhole stability and sanding predictions by 3D extrapolation from hole-collapse tests | |
| Gjønnes et al. | Leak-off tests for horizontal stress determination? | |
| CA2218087A1 (fr) | Procede permettant de controler la production de sable pour la rupture d'une formation | |
| Streit et al. | Building geomechanical models for the safe underground storage of carbon dioxide in porous rock | |
| EP3338116B1 (fr) | Modèle de fracture fondé sur des mécanismes pour géo-matériaux | |
| Moos et al. | Impact of rock properties on the relationship between wellbore breakout width and depth | |
| US20250270921A1 (en) | Method and system for determining wellbore breakdown pressures for hydraulic stimulation operations | |
| Zhang et al. | Geomechanical evaluation enabled successful stimulation of a HPHT tight gas reservoir in western China | |
| Han et al. | Principles of drilling and excavation | |
| Saberhosseini et al. | Stability analysis of a horizontal oil well in a strike-slip fault regime | |
| Jamaloei | A Coupled Flow–Geomechanical Modeling of Out-of-Sequence Fracturing Using a Dual-Lattice Implementation of Synthetic-Rock-Mass Approach | |
| Cuthill et al. | A New Technique for Rapid Estimation of Fracture Closure Stress When Using Propellants | |
| Fattahpour et al. | Building a mechanical earth model: a reservoir in Southwest Iran | |
| Abedifar et al. | A SENSITIVITY STUDY OF GEOMECHANICAL AND RESERVOIR PARAMETERS ON SAFE MUD WINDOW DURING DRILLING OPERATIONS. | |
| Ramirez et al. | Using breakouts for in situ stress estimation in tectonically active areas |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MM1K | Lapsed by not paying the annual fees |