OA21012A - Shunting operation management and control method and system. - Google Patents

Shunting operation management and control method and system. Download PDF

Info

Publication number
OA21012A
OA21012A OA1202200412 OA21012A OA 21012 A OA21012 A OA 21012A OA 1202200412 OA1202200412 OA 1202200412 OA 21012 A OA21012 A OA 21012A
Authority
OA
OAPI
Prior art keywords
shunting
route
control system
traffic control
centralized traffic
Prior art date
Application number
OA1202200412
Inventor
Kenan Liu
Meihong Wang
Lijun Wang
Jianxin Chen
jiangxi Liu
Original Assignee
Crsc Research & Design Institute Group Co., Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Crsc Research & Design Institute Group Co., Ltd filed Critical Crsc Research & Design Institute Group Co., Ltd
Publication of OA21012A publication Critical patent/OA21012A/en

Links

Abstract

The present disclosure provides a shunting operation management and control method and system, including: acquiring, by a shunting train protection system, a shunting route handling request, and sending the shunting route handling request to the centralized traffic control system; handling, by the centralized traffic control system, a route according to the shunting route handling request and a route sequence, and sending a route handling result to the shunting train protection to start operation; and sending, by the centralized traffic control system, a trip point report after each trip operation is completed to the station management information system, so as to implement shunting operation management and control. The shunting operation management and control method and system open up connections among the station management information system shunting operation list, the centralized traffic control system route handling, the radio shunting locomotive signal and the shunting route request, which is a complete solution for the shunting operation flow. The solution takes full consideration of a multi-yard station shunting management mode, and implements one-point control and multi-yard interlocking.

Description

DETAILED DESCRIPTION
[0039] In order to make objectives, technical details and advantages of the embodiments of the présent disclosure apparent, the technical solutions according to the embodiments of the présent disclosure will be described in a clearly and fully understandable way in connection with drawings of the embodiments of the présent disclosure. It is obvious that the described embodiments are just a part but not ail of the embodiments of the présent disclosure. Based on the described embodiments herein, those ordinarily skilled in the art can acquire other embodiment(s), without any inventive operation, which should be within the scope of the présent disclosure.
[0040] The présent disclosure proposes a shunting operation management and control solution based on the CTC3.0 system, which is used to standardize a shunting operation flow, improve operation safety, and achieve a purpose of integrating management and control.
[0041] The présent disclosure evolves procedures such as téléphoné communication, route détermination, and route button sélection in the shunting operation into respective flow links of the system; automatically generates a route sequence, according to a Station Management Information System (SMIS) shunting plan (i.e., a shunting operation list), so that it is only necessary to trigger the route sequence when handling the route; allows an outdoor shunting driver to send a shunting route handling request to the CTC through a Shunting Train Protection (STP) system, so that the CTC automatically handles the route after receiving the request; further calculâtes conflicts between each trip operation and a train plan in real time, to provide a route preview function so that conflicts are predicted in advance; and summarizes shunting plans for uniform management to distribute to respective yards for execution, so as to implement effects of one shunting locomotive, one plan, and multi-yard operations, which may be seen globally. The présent disclosure further feeds back actual execution progress of shunting operation to an SMIS planning terminal in real time, to replace the original manual recording mode, and implement intégration of management and control.
[0042] An embodiment of the présent disclosure provides a shunting operation management and control method; FIG. 1 shows a flow chart of a shunting operation management and control method according to an embodiment of the présent disclosure; and in FIG. 1, the method includes steps of:
[0043] Acquiring, by a station management information System, a shunting operation list, and sending the shunting operation list to a centralized traffic control System;
[0044] Receiving, by the centralized traffic control System, the shunting operation list, confirming a tum-back point according to the shunting operation list, and generating a route sequence to distribute to respective sub-yard terminais;
[0045] Acquiring, by a shunting train protection System, a shunting route handling request, and sending the shunting route handling request to the centralized traffic control System;
[0046] Handling, by the centralized traffic control System, a route according to the shunting route handling request, and sending a route handling resuit to the shunting train protection to start operation; and
[0047] Sending, by the centralized traffic control System, a trip point report after each trip operation is completed to the station management information System, so as to implement shunting operation management and control.
[0048] In the embodiment of the présent disclosure, a connection diagram of shunting operation performed by the personnel and the System cooperatively is provided; train shunting operation is managed and controlled through coopération between the spécifie personnel and the System. In an actual application process, the personnel may also be a terminal System, etc., and not limited to a spécial type of personnel; terminais, devices, etc., as long as they can complété the management and control operation of the présent disclosure, are ail within the protection scope of the embodiment of the présent disclosure.
[0049] As shown in FIG. 2, FIG. 2 shows a schematic diagram of connections between shunting operation rôles according to an embodiment of the présent disclosure;
wherein, the rôles include operators and system devices, and respective connection lines represent normal actions of the rôles.
[0050] When the personnel and the system according to the présent disclosure cooperate to manage and control the shunting operation:
[0051] Step 1: a station dispatcher formulâtes a shunting operation plan in the SMIS according to a daily shift plan, that is, formulâtes a shunting operation list;
[0052] Step 2: the SMIS sends the shunting operation list to the CTC;
[0053] Step 3: a station duty officer receives the SMIS shunting operation list at the
CTC, confirms the tum-back point according to the shunting operation list and generates a route sequence; and after previewing the entire route list and confirming correctness thereof, the CTC distributes the same to signalmen/attendants of respective sub-yards;
[0054] Step 4: the shunting driver initiâtes a shunting route handling request to the STP device;
[0055] Step 5: the STP forwards the driver’s shunting route handling request to the CTC;
[0056] Step 6: under normal circumstances, the CTC automatically handles the route after receiving the request; and the sub-yard attendant only needs to monitor that the shunting route is handled correctly; under spécial circumstances where the route cannot be automatically triggered according to the driver’s shunting route handling request, the sub-yard attendant needs to intervene manually to complété route handling;
[0057] Step 7: the CTC feeds back a route handling State and a handling resuit to the STP, and the shunting driver confirms that a route signal is ready and start operation;
[0058] Step 8: after completion of each trip operation, the CTC sends a completion time point (briefly referred to as a trip point report) to the SMIS, and the SMIS couverts the shunting plan to actual performance according to the trip point report, so as to implement intégration of management and control.
[0059] Specifically, when the sub-yard attendant manually intervenes to trigger the route, he/she may preview the route; when manually triggering the route, he/she may preview the handled route path and a conflict situation between the route and the train plan; when there is a conflict situation, in order to enhance flexibility and availability of the System, the
System provides the user with a set of change routes, and the change route may be selected manually by changing the tum-back point and selecting the change button.
[0060] The présent disclosure designs the “1+N” mode to solve the multi-yard shunting operation management and control problem, so as to implement effects of one shunting locomotive, one plan, and multi-yard operations, which may be seen globally. There is 1 master shunting plan management terminal, which is responsible for unified management of shunting plans of respective shunting locomotives. The duty officer is responsible for receipt and confirmation of trip plans, including checking trip plans, controlling an inter-yard train order, confirming a shunting tum-back point, coordinating train shunting conflicts, maintaining an accurate exécutable trip plan and distributing the same to N sub-yard signalman terminais. Signalman terminais of respective yards may view details and execution situations of all operation lists, timely understand a location and operation progress of the shunting locomotive, make préparation in advance when the shunting locomotive is to operate in the présent yard, and complété confirmation and handling of the route path of the présent yard. On the premise of not changing the plan, the signalman may adjust a basic route to a change route, and may adjust the tum-back point if necessary; and adjusted route information may be displayed on each terminal synchronously.
[0061] Specifically, N in the 1+N mode may be 0, which represents that there is only one attendant at the station to control the shunting route; at this time, the attendant has full authority, that is, when there is only one attendant at the station, the attendant has authorities of previewing the handled route path and a conflict situation between the route and the train plan when manually triggering the route, and directly changing the conflicting route, so as to enhance flexibility and availability of the System.
[0062] In the embodiment of the présent disclosure, the CTC may also perform: shunting operation list receiving and processing, tum-back point calculation, route search, route preview, route triggering, trip point report, shunting operation list management, etc.
[0063] In the embodiment of the présent disclosure, when the CTC receives the shunting operation list, the CTC and the SMIS belong to two independent Systems; in order to avoid communication obstacles due to different data définitions thereof during signal transmission between the CTC and the SMIS, in the embodiment of the présent disclosure, an
SMIS data dictionary is converted into a CTC data dictionary, which mainly includes information such as station code, yard number, head-tail direction, and operation track, etc.; such conversion is necessary for background calculation, but the operation list information displayed to the user remains consistent with the original operation list, because naming of the SMIS is more in line with production habits, while CTC continues naming of an interlocking signal System, which is standardized and rigorous, but inconsistent with customary naming, and is not favorable for communication.
[0064] In the embodiment of the présent disclosure, when the CTC calculâtes the tum-back point: one sheet of shunting operation list contains a plurality of trip operation plans; the CTC finds out a most suitabîe tum-back point C according to beginning track A, head-tail direction, and ending track B of each trip plan; meanwhile, since the tum-back point may be changed during manual triggering according to the présent disclosure, the CTC further provides a set of ail optional tum-back points for manual sélection. The tum-back point refers to that after the shunting locomotive moves out from A, a direction needs to be changed at the tum-back point so as to reach B. The optimal tum-back point C and other optional tum-back points need to be determined by the train personnel according to actual operation habits on site, and then entered into the System after confirmation. There are a huge number of combinations of beginning tracks and ending tracks, so an effective and feasible tum-back point calculation method must be found.
[0065] The présent disclosure adopts a mode of configuring the tum-back point according to a single track, to configure a turn-back point priority for each track according to a rôle of an ending track. From A to B, it is only necessary to select a turn-back point from the tum-back point set in B according to a priority order; if there is a communicative shunting route from A to the turn-back point, then the tum-back point is the optimal tum-back point C. Such a mode not only satisfies functional requirements, but also simplifies a tum-back point configuration strategy, and also reduces communication costs with the train personnel.
[0066] Route search is calculated according to the tum-back point; in the embodiment of the présent disclosure, after the tum-back point C is determined, shunting routes from A to C and C to B are determined; the CTC System generates a basic route by default; in order to enhance flexibility and availability of the System, the System provides the user with a set of change routes; and the change route may be selected manually by changing the tum-back point and selecting a change button.
[0067] Specifically, when changing the route, one sheet of operation list contains a plurality of trip operations. When each trip operation is completed, the System generates a time point to indicate that the trip operation is completed. One trip plan generally generates 1 to 2 routes. The route génération logic is as follows:
[0068] Step a: finding out a beginning terminal button B1 of a first route according to A and the head-tail direction;
[0069] Step b: finding out an ending terminal button E2 of a second route according to B;
[0070] Step c: checking whether there is a route in the buttons of the beginning terminal B1 and the ending terminal E2; if there is, search is completed, and taking the route as a generated route;
[0071] Step d: finding out a set of ail routes with the beginning terminal button B1 as the beginning terminal from the route table, traversing each route R, and checking whether there is a route R2 at the ending terminal of R and the ending terminal E2 of the second route; [0072] Step e: if there is not R2, judging whether R is a long shunting route: if R is a long shunting route, checking whether there is a route R3 in the button on each short shunting route section contained and E2; if there is, adding R and R3 to the route sequence; if R is a short shunting route, check whether there is a route R3 in the button on the route section and E2; if there is, adding R and R3 to the route sequence;
[0073] Step f: if there is R2, adding both R and R2 to the route sequence, and checking whether there is a route R3 in the button on the R section and E2; if there is, adding R3 to the route sequence.
[0074] The route triggering according to the embodiment of the présent disclosure includes two modes: manual triggering and automatic triggering:
[0075] Automatic triggering: the shunting driver sends a shunting route handling request through the STP terminal, the CTC automatically triggers the route after receiving the request; and if the route carmot be triggered temporarily or only a portion of the route may be triggered temporarily, the remaining route will be automatically triggered when trigger il conditions are met. Manual triggering: trigger timing is selected manually, and the System tries to handle once.
[0076] In the embodiment of the présent disclosure, a midway tum-back situation during the triggering process is also described, and a triggering rule of a midway tum-back route is disclosed: when handling the shunting route, a mode of moving out to a farthest end is generally adopted to prevent an excessively short route from affecting shunting operation. In such a mode, a situation that the shunting locomotive tums back midway without taking a complété path often occurs. In the case of midway tum back, the System recalculâtes a route that can be triggered according to an occupied position of the shunting locomotive and complétés triggering. Complété shunting sub-routes from the occupied position to the ending track or the destination tum-back point are triggered one by one; if the shunting locomotive occupies a portion of the route, so that the route does not meet the interlocking conditions and cannot be triggered, in order to make up for the signal, the System will automatically perform single look on the switch of the route and automatically unlock after the shunting operation is completed. For the sake of safety, in the case of midway tum back, it must be ensured that the switch position occupied by the shunting locomotive is consistent with the switch position of the retum route; otherwise, route triggering and automatic single look operation on the switch cannot be performed.
[0077] The CTC may implement preview of shunting route; the CTC has functions of entire list automatic preview and designated trip preview; and may preview the handled route path and a conflict situation between the route and the train plan when manually triggering the route; which “discovers in advance and corrects in time”, and effectively reduces the mishandling problem that may be caused by “confirming while executing”.
[0078] Specifically, in the embodiment of the présent disclosure, the CTC further generates and processes the trip point report. After each trip operation is completed, the CTC timely notifies the SMIS of the completion time point, which is taken as the shunting trip point report, indicating that the trip plan has been converted into actual performance. Due to frequent midway tum back during the shunting operation, unlike the train route, it is impossible to judge an operation completion state through a route unlocking State. The CTC according to the présent disclosure takes an execution State of a route of a next trip as a judgment basis, automatically sets a previous trip as a completed State, and takes the moment as trip point report information to send to the SMIS. With respect to a last trip operation, manual point report is adopted and execution of the entire list plan is completed after point report.
[0079] The embodiment of the présent disclosure further provides a shunting operation management and control system, the system including:
[0080] A station management information system, configured to acquire a shunting operation list, and send the shunting operation list to a centralized traffic control System;
[0081] A centralized traffic control system, connected with the station management information system, and configured to receive the shunting operation list, confirm a tum-back point according to the shunting operation list, and generate a route sequence to distribute to respective sub-yard terminais;
[0082] A shunting train protection System, connected with the centralized traffic control system, and configured to acquire a shunting route handling request, and send the shunting route handling request to the centralized traffic control System;
[0083] The centralized traffic control system is further configured to handle a route according to the shunting route handling request, and send a route handling resuit to the shunting train protection System to start operation;
[0084] The centralized traffic control system is further configured to sending a trip point report after each trip operation is completed to the station management information system, so as to implement shunting operation management and control.
[0085] Specifically, the centralized traffic control system is further configured to handle the route according to the shunting route handling request, including automatically triggering the route and manually triggering the route; the centralized traffic control system is further configured to perform automatic route preview on the route sequence generated after confirming the tum-back point; and the centralized traffic control system is further configured to adopt a single-track configuration mode to confirm the tum-back point, wherein, a tum-back point priority is configured for each track according to a rôle of an ending track.
[0086] Although the présent disclosure is explained in detail with reference to the foregoing embodiments, those ordinarily skilled in the art will readily appreciate that many modifications are possible in the foregoing respective embodiments, or équivalent substitutions are made for part of technical features; however, these modifications or substitutions are not intended to make the essences of the corresponding technical solutions départ from the spirit and the scope of the technical solutions of the respective embodiments of the présent disclosure.

Claims (12)

1. A shunting operation management and control method according to a shunting route request, comprising:
acquiring, by a shunting train protection System, a shunting route handling request, and sending the shunting route handling request to a centralized traffic control System;
handling, by the centralized traffic control System, a route according to the shunting route handling request and a route sequence, and sending a route handling resuit to the shunting train protection System to start operation; and sending, by the centralized traffic control System, a trip point report after each trip operation is completed to a station management information System, so as to implement shunting operation management and control.
2. A shunting operation management and control method, comprising:
acquiring, by a station management information System, a shunting operation list, and sending the shunting operation list to a centralized traffic control System;
receiving, by the centralized traffic control System, the shunting operation list, confirming a tum-back point according to the shunting operation list, and generating a route sequence to distribute to respective sub-yard terminais;
acquiring, by a shunting train protection System, a shunting route handling request, and sending the shunting route handling request to the centralized traffic control System;
handling, by the centralized traffic control System, a route according to the shunting route handling request and the route sequence, and sending a route handling resuit to the shunting train protection System to start operation; and sending, by the centralized traffic control System, a trip point report after each trip operation is completed to the station management information System, so as to implement shunting operation management and control.
3. The shunting operation management and control method according to claim 2, wherein, the handling, by the centralized traffic control System, a route according to the shunting route handling request, comprises automatically triggering the route and manually triggering the route.
4. The shunting operation management and control method according to claim 3, wherein, the manually triggering the route comprises a step of route designated trip preview:
the designated trip preview comprises a handled route path, and conflict situations between the handled route path and a train plan.
5. The shunting operation management and control method according to claim 3 or 4, wherein, after the centralized traffic control system confirms a tum-back point and generates the route sequence, the method further comprises a step of automatic route preview, after previewing the entire route list and confirming correctness thereof, the centralized traffic control system distributes the same to respective sub-yard terminais.
6. The shunting operation management and control method according to claim 2 or 4, wherein, the centralized traffic control system adopts a single-track configuration mode to confirm the tum-back point, wherein, a tum-back point priority is confïgured for each track according to a rôle of an ending track.
7. The shunting operation management and control method according to claim 4, wherein, after the manually triggering the route designated trip preview, the method further comprises a step of changing the route; and the method for changing the route comprises: changing the tum-back point and selecting a change button.
8. A shunting operation management and control system according to a shunting route request, comprising:
a shunting train protection system, confïgured to acquire a shunting route handling request, and send the shunting route handling request to a centralized traffic control System;
a centralized traffic control system, connected with the shunting train protection system, and confïgured to handle a route according to the shunting route handling request and a route sequence, and send a route handling resuit to the shunting train protection system to start operation;
wherein, the centralized traffic control system is connected with a station management information System, and is confïgured to send a trip point report after each trip operation is completed to the station management information system, so as to implement shunting operation management and control.
9. A shunting operation management and control system, comprising:
a station management information System, configured to acquire a shunting operation list, and send the shunting operation list to a centralized traffic control System;
a centralized traffic control System, connected with the station management information System, and configured to receive the shunting operation list, confirm a tum-back point according to the shunting operation list, and generate a route sequence to distribute to respective sub-yard terminais;
a shunting train protection System, connected with the centralized traffic control System, and configured to acquire a shunting route handling request, and send the shunting route handling request to the centralized traffic control System;
wherein, the centralized traffic control system is further configured to handle a route according to the shunting route handling request and the route sequence, and send a route handling resuit to the shunting train protection System to start operation;
the centralized traffic control system is further configured to sending a trip point report after each trip operation is completed to the station management information system, so as to implement shunting operation management and control.
10. The shunting operation management and control System according to claim 9, wherein, the centralized traffic control system is further configured to handle a route according to the shunting route handling request, comprising automatically triggering the route and manually triggering the route.
11. The shunting operation management and control system according to claim 10, wherein, the centralized traffic control system is further configured to perform automatic route preview on the route sequence generated after confirming the tum-back point.
12. The shunting operation management and control system according to claim 9 or 10, wherein, the centralized traffic control system is further configured to adopt a single-track configuration mode to confirm the tum-back point, wherein, a tum-back point priority is configured for each track according to a rôle of an ending track.
OA1202200412 2021-11-04 2022-08-05 Shunting operation management and control method and system. OA21012A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111296684.0 2021-11-04

Publications (1)

Publication Number Publication Date
OA21012A true OA21012A (en) 2023-08-24

Family

ID=

Similar Documents

Publication Publication Date Title
EP4324722A1 (en) Shunting operation management and control method and system
US20190359238A1 (en) Railway yard integrated control system
CN109649435B (en) A new train operation control system based on train-to-vehicle communication
CN108528477B (en) A comprehensive automation system for subway depot/parking lot
CN112519836B (en) Automatic train operation system switching method and system
CN109677449B (en) Vehicle-mounted ATP system compatible with C2ATO and CBTC
CN109591858B (en) Method and device for handling locomotive hanging change operation based on CTC3.0 system
CN113562037B (en) A Decentralized Self-discipline Scheduling Centralized System Supporting Multiple Turnback Functions
CN107284471A (en) A kind of CBTC systems based on truck traffic
CN106926871A (en) A kind of train operation control system perceived based on full information
CN107831713B (en) A kind of locomotive based on multistation field/railcar Dynamic Tracking and system
CN108749859B (en) Train dispatching centralized control system and control method
EP2607199B1 (en) Decentralized interlocking
CN116080721B (en) Efficient shunting control module and intelligent shunting method
CN117227793A (en) A train autonomous route operation control system and its evaluation method
WO2025020367A1 (en) System for implementing interconnection and intercommunication of tacs and cbtc system, method and medium
CN108327747A (en) A kind of interface method of MTU depot controlled central system and signal system
CN109471748A (en) A kind of Urban Rail Transit Signal mobile unit Intelligence Diagnosis method and device thereof
OA21012A (en) Shunting operation management and control method and system.
JP3183783B2 (en) Train operation management system
CN118372863A (en) TACS mode train control method, device, electronic equipment and medium
WO2024021668A1 (en) Train operation control method and system
CN119821475B (en) Cluster scheduling system and method for cross-line operation
CN103171591B (en) Information display method and industrial train transportation system
CN115107836A (en) Degraded train path handover method and system