PL100150B1 - METHOD OF PROTECTING FIELD PATHS WHEN USING STRONG SLOPES AND STEEP COAL SIDES WITH LONG CHAMBER SYSTEM - Google Patents

METHOD OF PROTECTING FIELD PATHS WHEN USING STRONG SLOPES AND STEEP COAL SIDES WITH LONG CHAMBER SYSTEM Download PDF

Info

Publication number
PL100150B1
PL100150B1 PL18941076A PL18941076A PL100150B1 PL 100150 B1 PL100150 B1 PL 100150B1 PL 18941076 A PL18941076 A PL 18941076A PL 18941076 A PL18941076 A PL 18941076A PL 100150 B1 PL100150 B1 PL 100150B1
Authority
PL
Poland
Prior art keywords
field
holes
anchors
long
coal
Prior art date
Application number
PL18941076A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL18941076A priority Critical patent/PL100150B1/en
Publication of PL100150B1 publication Critical patent/PL100150B1/en

Links

Landscapes

  • Emergency Lowering Means (AREA)

Description

Przedmiotem wynalazku jest sposób zabezpie¬ czania chodników polowych przy eksploatacji silnie nachylonych i stromych pokladów wegla o gru¬ bosci do 6-ciu metrów i nachyleniu do 90° syste¬ mem dlugich komór, urabianych metoda strzelania dlugimi otworami, na zawal, podsadzke sucha i plynna.The subject of the invention is a security method traversing field pavements with heavy use inclined and steep coal seams with a thickness of bending up to 6 meters and inclination up to 90 ° of the system meme of long chambers, shot method with long holes, for a collapse, dry filling and smooth.

Z wielu znanych sposób eksploatacji pokladów silnie nachylonych i stromych, najlepsze wyniki koncentracji wydobycia i wydajnosci zapewniaja systemy dlugich komór, umozliwiajace urabianie tych pokladów z przygotowawczych chodników po¬ lowych metoda strzelania dlugimi otworami. Pro¬ wadzenie chodników polowych, ulozenie dlugich komór i kolejnosc ich wybierania, zalezne sa od rodzaju eksploatacji — zawal, podsadzka sucha i plynna. We wszystkich tych przypadkach ko¬ nieczne jest zastosowanie odpowiedniej obudowy chodników polowych, uniemozliwiajacej ich szyb¬ kie niszczenie nad eksploatowana komora oraz po¬ prawiajacej stabilnosc stropu w komorze, tak aby w przodku mozna bylo swobodnie wybierac od¬ strzelony wegiel.From many known methods of deck exploitation steep and steep slopes for best results extraction concentration and efficiency ensure long chamber systems to enable cutting these decks from preparatory pavements long hole shooting method. Pro driving field pavements, laying long ones chambers and the order in which they are selected depend on type of exploitation - collapse, dry filling and smooth. In all these cases, the horse it is not necessary to use a suitable housing field pavements, preventing their speed destruction over the exploited chamber and po improving the stability of the ceiling in the chamber, so that in the forehead it was possible to choose freely shot coal.

Dotychczas brak jest takiego sposobu zabezpie¬ czania chodników polowych przy eksploatacji sil¬ nie nachylonych i stromych pokladów, który by odpowiadal obecnym wymogom koncentracji, wy¬ dajnosci i bezpieczenstwa pracy. Ze wzgledu na to, kopalnie, mimo ze posiadaja udostepnione znaczne zasoby wegla w pokladach silnie nachylo- nych i stromych rezygnuja z eksploatacji tych po¬ kladów lub prowadza ja lokalnie w niewielkim za¬ kresie.So far, there is no such security method of field pavements during engine operation no sloping and steep decks that was corresponded to the current requirements of concentration, productivity and safety at work. Because it, the mines, although they have access to it significant carbon deposits in strongly sloping decks steep and steep, they give up the exploitation of these fires clades or runs it locally in a small area end.

Celem wynalazku jest usuniecie powyzszych wad i niedogodnosci oraz zapewnienie rytmicznej i bez¬ piecznej eksploatacji pokladów silnie nachylonych i stromych.The object of the invention is to remedy the above drawbacks and inconvenience, and to provide rhythmic and without safe operation of steeply inclined decks and steep.

Cel ten zostal osiagniety za pomoca sposobu za¬ bezpieczania chodników polowych wedlug wyna¬ lazku, przy eksploatacji silnie nachylonych i stro¬ mych pokladów wegla systemem dlugich komór.This aim was achieved by means of the method of operation securing field walkways according to inventions the chair, when operating on very inclined and steep slopes my carbon decks with a system of long chambers.

Istota wynalazku polega na tym, ze najpierw wier¬ ci sie kilka rozbieznych otworów w ociosach chod¬ ników polowych wyznaczajacych od dolu i od gó¬ ry przeznaczona do urabiania partie pokladu wegla.The essence of the invention consists in the fact that the poem you have several divergent holes in the sides walking field markers from below and above rice intended for mining lots of coal deck.

Nastepnie umieszcza sie w tych otworach zabez¬ pieczajace ociosy kotwie, zakladajac jednoczesnie stropnice pomiedzy kotwiami osadzonymi w otwo¬ rach usytuowanych przy weglowych stropach wspomnianych polowych chodników. Ponadto w weglowym stropie górnego polowego chodnika mozna równiez wiercic otwory równolegle do ocio¬ sów tego chodnika oraz umieszczac w nich kotwie dodatkowo mocujace stropnice, najkorzystniej w polowie odleglosci pomiedzy kotwiami usytuowa¬ nymi przy tym weglowym istropie. Przed kazdym strzelaniem dlugimi otworami, usuwa sie w kolej¬ nych zabiorach stropnice dolnego polowego chod¬ nika.Then a safety guard is placed in these holes sealant hews the anchors, assuming at the same time canopies between the anchors embedded in the hole located at the carbon ceilings the aforementioned field walkways. Moreover, in carbon ceiling of the upper field walkway it is also possible to drill holes parallel to the sawdust the owls of this pavement and place the anchors in them additionally securing canopies, most preferably w halfway between the anchors at the same time a carbon footprint. Before everyone by shooting long holes, it is removed in turn the roof rails of the lower field walk nika.

Taki sposób zabezpieczania chodników polowych 1001503 100 150 4 wedlug wynalazku uniezaleznia obudowe od wy¬ bierania wegla w pokladzie oraz nie dopuszcza do szybkiego niszczenia chodnika polowego nad eksploatowana komora i poprawia stabilnosc stro¬ pu w komorze, tak aby w przodku mozna bylo swobodnie wybrac odstrzelony wegiel. Mocowanie stropnic z kotwiami, gestosc kotwi w stropie i ocio¬ sach, sa uzaleznione od lokalnych warunków i po¬ siadanych przez kopalnie srodków. Kotwie moga byc stalowe, drewniane, z tworzyw sztucznych lub mieszane, klinowe, rozpierajace lub klejone, za¬ leznie od lokalnych warunków i uznania kopalni.This way of securing field pavements 1001503 100 150 4 According to the invention, the housing is made independent of the circuit breaker taking coal on board and preventing rapid destruction of the field pavement over used chamber and improves the stability of the sides pu in the chamber so that the face can be freely select the blasted coal. Fastening canopy with anchors, density of anchors in the ceiling and sawdust yes, they are dependent on local conditions and circumstances Means sat down by mines. Anchors can be steel, wooden, plastic or mixed, wedge-shaped, spreading or glued, incl depends on local conditions and mine recognition.

Przedmiot wynalazku jest uwidoczniony w przy¬ kladowym wykonaniu na rysunku, na którym fig. 1 przedstawia zabezpieczone kotwiami chodniki po¬ lowe w przekroju podluznym, a fig. 2 — przekrój wzdluz linii A-A zaznaczonej- na fig. 1.The subject matter of the invention is illustrated in example the clade embodiment in the drawing in which Fig. 1 presents pavements secured with anchors longitudinal section, and Fig. 2 is a sectional view along the line A-A in Fig. 1.

W partii pokladu stromego przeznaczonego do eksploatacji wydziela sie odpowiednie pola," które dzieli sie chodnikami polowymi 1, 2 na odpowied¬ nie pasy. weglowe, tak zwane komory 3 i nastep¬ nie eksploatuje sie je w kierunku do granicy pola.In the steep deck lot intended for of exploitation, appropriate fields are separated, "which divided by field galleries 1, 2 per equivalent no stripes. carbon, the so-called chambers 3 et seq they are not operated towards the field boundary.

Prowadzenie chodników polowych 1, 2, ulozenie dlugich komór 3 i kolejnosc ich wybierania, zalez¬ ne sa od rodzaju eksploatacji — zawal podsadzka sucha lub plynna. Niezaleznie od rodzaju eksplo¬ atacji chodniki polowe 1, 2 zabezpiecza sie sposo¬ bem wedlug wynalazku. Sposób ten polega na tym, ze najpierw wierci sie kilka rozbieznych otworów 4, 5 w ociosach 6 chodników polowych 1. 2, a na¬ stepnie umieszcza sie w tych otworach zabezpie¬ czajace ociosy 6 kotwie 7, 8. Jednoczesnie, pomie¬ dzy kotwiami 7 osadzonymi w otworach 4 usytu¬ owanych przy weglowych stropach 9 polowych chodników 1, 2 zaklada sie stropnice 10. Ponadto w weglowym stropie 9 górnego polowego chodnika 1 wierci sie otwory 11 równolegle do ociosów 6 te¬ go chodnika oraz umieszcza sie w nich kotwie 12 dodatkowo mocujace stropnice 10 w polowie odle¬ glosci pomiedzy kotwiami usytuowanymi przy tym weglowym stropie 9.Running field sidewalks 1, 2, layout 3 long chambers and their order of selection, depends They are different from the type of exploitation - collapsing filling dry or liquid. Regardless of the type of explosion access, field walkways 1, 2 is secured by a method I am according to the invention. This method consists in that several divergent holes are drilled first 4, 5 in the side walls of 6 field pavements 1. 2, and na¬ steppes are placed in these holes for protection looming hews 6 bolts 7, 8. Simultaneously, room between the anchors 7 embedded in the holes 4 situated at 9-bay coal ceilings sidewalks 1, 2 are assumed roof rails 10. Moreover in the carbon 9 ceiling of the upper field walkway 1, holes 11 are drilled parallel to the sides 6 on the pavement and the anchors 12 are placed in them additionally, attaching the canopies 10 in the middle of the distance the volume between the anchors located at it carbon ceiling 9.

Przed kazdym strzelaniem dlugimi otworami 13, usuwa sie w kolejnych zabiorach 14 stropnice 10 dolnego polowego chodnika 2. Odstrzelony urobek stacza sie na dolny polowy chodnik 2 i za po¬ moca odpowiedniej ladowarki, kombajnu chodni¬ kowego lub przesuwnej zsuwni 16 ladowany jest na odstawczy przenosnik 17. Miejsce wybierania odstrzelonego urobku 15 jest dostatecznie zabez- pieczone obudowa górnego chodnika polowego 1 wzmacniajacymi kotwiami 7, 8 na obu chodnikach 1, 2. Po wybraniu urobku 15 odstrzeliwuje sie na¬ stepny zabiór 18 i zaladowuje wegiel.Before each shooting with 13 long holes, 14 roof rails 10 are removed in the following Zabrze lower field sidewalk 2. Blown off material rolls onto lower halfway 2 and over the power of a suitable loader, combine harvester the sliding chute 16 is loaded on the holding conveyor 17. Pick point the shot material 15 is sufficiently protected baked top field walkway 1 with reinforcing anchors 7, 8 on both sidewalks 1, 2. After selecting the spoil 15, the shot is shot on Stepny Zabór 18 and will load coal.

Eksploatacja komory 3 przygotowanej do wybie¬ rania chodnikami polowymi 1, 2 zabezpieczonymi sposobem wedlug wynalazku, polega tylko na strzelaniu i ladowaniu odpowiednich zabiorów we¬ gla. Eliminuje sie tutaj pracochlonne wykonywanie obudowy, zajmujace zalodze przecietnie 70% cza¬ su. W efekcie eksploatacja systemem dlugich ko¬ mór z chodnikami zabezpieczonymi sposobem we¬ dlug wynalazku kilkakrotnie zwieksza koncentra¬ cje wydobycia i wydajnosc w stosunku do znanych systemów eksploatacji w pokladach stromych.Operation of chamber 3 prepared for bleed-out wounds with field walkways 1, 2 secured method according to the invention consists only in shooting and loading the appropriate zabiorów in¬ gla. Labor-intensive execution is eliminated here housing, occupying an average of 70% of the time su. As a result, exploitation with the system of long horses a sea with pavements secured by the method of the debt of the invention increases the concentration several times extraction rates and efficiency in relation to known operating systems in steep decks.

Claims (2)

Zastrzezenia patentowePatent claims 1. Sposób zabezpieczania chodników polowych: przy eksploatacji silnie nachylonych i stromych pokladów wegla systemem dlugich komór, urabia¬ nych metoda strzelania dlugimi otworami, znamien¬ ny tym, ze najpierw wierci sie kilka rozbieznych otworów (4, 5) w ociosach (6) chodników polowych (1, 2) wyznaczajacych od dolu i od góry przeznaczo¬ na do urabiania partie pokladu wegla, a nastepnie umieszcza w tych otworach zabezpieczajace ociosy (6) kotwie (7, 8), zakladajac jednoczesnie stropnice (10) pomiedzy kotwiami (7) osadzonymi w otworach (4) usytuowanych przy weglowych stropach (9) wspomnianych polowych chodników (1, 2), przy czym przed kazdym strzelaniem dlugimi otworami (13), usuwa sie w kolejnych zabiorach (14, 18) strop¬ nice (10) dolnego polowego chodnika (2).1. Method of securing field sidewalks: when exploiting strongly inclined and steep coal seams with a system of long chambers, worked by the method of shooting with long holes, characterized by first drilling several divergent holes (4, 5) in the sides (6) of the pavements field (1, 2) defining the bottom and top parts of the coal deck intended for mining, and then places in these holes securing the sides (6) of the bolts (7, 8), at the same time installing the canopies (10) between the bolts (7) embedded in the openings (4) located at the coal ceilings (9) of the above-mentioned field sidewalks (1, 2), with the long holes (13) being removed in successive flanges (14, 18) of the lower roofs (10) the field walkway (2). 2. Sposób wedlug zastrz. 1, znamienny tym, ze w weglowym stropie (9) górnego polowego chodni¬ ka (1) wierci sie otwory (11) równolegle do ociosów (6) tego chodnika oraz umieszcza sie w nich kotwie (12) dodatkowo mocujace stropnice (10), najkorzyst¬ niej w polowie odleglosci pomiedzy kotwiami (7> usytuowanymi przy tym weglowym stropie (9). 15 20 25 30 35 40100 150 9 1 S_ . W 7 82. The method according to claim A method according to claim 1, characterized in that holes (11) are drilled in the carbon roof (9) of the upper half-way walkway (1) parallel to the side walls (6) of the pavement, and anchors (12) are placed in them to additionally fix the canopy (10), most preferably at half the distance between the anchors (7> located on this carbon ceiling (9). 15 20 25 30 35 40 100 150 9 1 S_. W 7 8
PL18941076A 1976-05-07 1976-05-07 METHOD OF PROTECTING FIELD PATHS WHEN USING STRONG SLOPES AND STEEP COAL SIDES WITH LONG CHAMBER SYSTEM PL100150B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL18941076A PL100150B1 (en) 1976-05-07 1976-05-07 METHOD OF PROTECTING FIELD PATHS WHEN USING STRONG SLOPES AND STEEP COAL SIDES WITH LONG CHAMBER SYSTEM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL18941076A PL100150B1 (en) 1976-05-07 1976-05-07 METHOD OF PROTECTING FIELD PATHS WHEN USING STRONG SLOPES AND STEEP COAL SIDES WITH LONG CHAMBER SYSTEM

Publications (1)

Publication Number Publication Date
PL100150B1 true PL100150B1 (en) 1978-09-30

Family

ID=19976760

Family Applications (1)

Application Number Title Priority Date Filing Date
PL18941076A PL100150B1 (en) 1976-05-07 1976-05-07 METHOD OF PROTECTING FIELD PATHS WHEN USING STRONG SLOPES AND STEEP COAL SIDES WITH LONG CHAMBER SYSTEM

Country Status (1)

Country Link
PL (1) PL100150B1 (en)

Similar Documents

Publication Publication Date Title
RU2462593C1 (en) Method of development of thick steep coal bed in straps downstream
RU2178526C1 (en) Method of mining flat and inclined coal seams
RU2354829C1 (en) Method of thick flat coal bed development
PL100150B1 (en) METHOD OF PROTECTING FIELD PATHS WHEN USING STRONG SLOPES AND STEEP COAL SIDES WITH LONG CHAMBER SYSTEM
RU2132950C1 (en) Method for combination development of deposits
RU2326244C1 (en) Thick flat-seam coal mining method by irregular areas with limited resource and weak roof of seam
RU2069748C1 (en) Method for rill cut mining of thick steeply dipping beds with filling
RU2169264C2 (en) Method of preparation for and mining of steep and sloping coal seams
RU2233983C1 (en) Method for extracting massive sloping coal bed by horizontal descending layers with full filling of extracted space
RU2247245C1 (en) Method for extraction of steep-falling and slanting deposits of low and average power with partial backfill
SU1384754A1 (en) Method of mining gently-sloping and sloping ore bodies of low thickness
RU2046947C1 (en) Method to develop thick steep and inclined coal stratums
RU2254467C1 (en) Method for extraction of steep-dropping and slanting deposits of lowe and average massiveness
SU1765408A1 (en) Method at mining steep medium-thickness mineral deposit seams
SU1624177A1 (en) Flexible canopy
SU1712608A1 (en) Method of mining thick steeply dipping coal seam
RU2344292C1 (en) Method of development of thick flat-lying coal bed on clots of irregular shape
RU99114653A (en) METHOD FOR PREPARATION AND TREATMENT OF STEEL AND INCLINED COAL SEAMS
RU2471990C1 (en) Method to mine sloping and inclined coal beds of average capacity
RU2029087C1 (en) Method for mining of thick steeply dipping coal seams
PL138191B1 (en) Method of mining a coal deposit
SU1446307A1 (en) Method of creating artificial roof in mining coal seams in horizontal layers in descending order
PL77315B2 (en)
RU2064044C1 (en) Method for mining steep medium-thickness coal seams
RU2059818C1 (en) Method for rill stoping of thick seams