PL109762B2 - Method of sealing lining tubes in drill-holes - Google Patents

Method of sealing lining tubes in drill-holes Download PDF

Info

Publication number
PL109762B2
PL109762B2 PL20571978A PL20571978A PL109762B2 PL 109762 B2 PL109762 B2 PL 109762B2 PL 20571978 A PL20571978 A PL 20571978A PL 20571978 A PL20571978 A PL 20571978A PL 109762 B2 PL109762 B2 PL 109762B2
Authority
PL
Poland
Prior art keywords
borehole
sealing
filled
pipes
casing
Prior art date
Application number
PL20571978A
Other languages
Polish (pl)
Other versions
PL205719A1 (en
Inventor
Stanislaw Wilk
Original Assignee
Akad Gorniczo Hutnicza
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Akad Gorniczo Hutnicza filed Critical Akad Gorniczo Hutnicza
Priority to PL20571978A priority Critical patent/PL109762B2/en
Publication of PL205719A1 publication Critical patent/PL205719A1/en
Publication of PL109762B2 publication Critical patent/PL109762B2/en

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

Przedmiotem wynalazku jest sposób uszczelniania rur okladzinowych w otworze wiertniczym, znajdujacy zastosowanie zwlaszcza w przemysle naftowym i weglowym.Znany sposób uszczelniania rur okladzinowych w otworze wiertniczym polega na tym, ze do wnetrza zapuszczanych w otwór wiertniczych rur Okladzinowych zatlacza sie zaczyn uszczelniajacy, który nastepnie wytlacza sie z nich do przestrzeni zawartej pomiedzy scianami otworu wiertniczego a zewnetrzna powierzchnia rur okladzinowych. Wada tego sposobu jest koniecznosc stosowania dodatkowego agregatu pompowego do wytlaczania zaczynu uszczelniajacego z rur okladzinowych oraz znaczny gradient cisnienia odpowiadajacy glebokosci i ciezarowi wlasciwemu zaczynu, wystepujacy w czasie wytlaczania zaczynu.Celem wynalazkujest wyeliminowanie wymienionej wady.Istota wynalazku jest sposób uszczelniania rur okladzinowych w otworze wiertniczym, polegajacy na tym, ze po wypelnieniu otworu wiertniczego zaczynem uszczelniajacym o objetosci nie mniejszej od róznicy objetosci otworu wiertniczego i usytuowanej w nim kolumny rur okladzinowych zapuszcza sie do niego pierwszy odcinek rury okladzinowej zakonczony butem prowadniczym z zaworem zwrotnym i wypelnionej pluczka, a nastepnie w miare tworzenia kolumny rur zapuszczanej do otworu wiertniczego, kazdy nastepny odcinek rury polaczony z poprzednim wypelnia sie pluczka o gestosci w przyblizeniu równej gestosci zaczynu uszczelniajacego.Zaleta sposobu uszczelniania rur okladzinowych w otworze wiertniczym, wedlug wynalazku, jest wieksza skutecznosc uszczelniania otworu wiertniczego niz uzyskiwana znanym sposobem, a ponadto mniejsza praco¬ chlonnosc, wynikajaca ze zmniejszonej ilosci agregatów pompowych.Przyklad wykonania. Do otworu wiertniczego o glebokosci 1000 m, wypelnionego pluczka wiertnicza o zawartosci fazy stalej 30% w stosunku wagowym, zapuszcza sie przewód wiertniczy z wylotem zaopatrzonym w glowice z dyszami rozpylajacymi i zatlacza sie nimi 2% roztwór wodny poliakryloamidu w ilosci 2% wagowo w stosunku do kazdego metra szesciennego pluczki znajdujacej sie w otworze wiertniczym, uzyskujac w wyniku zaczyn uszczelniajacy. Zatlaczanie roztworu wodnego poliakryloamidu i mieszanie go z pluczka dokonuje sie odcinkami dziesieciometrowymi. Uzyskany zaczyn charakteryzuje sie konsystencja wynoszaca okolo 60 puazów,109 762 utrzymujaca sie w okresie 24 godzin, przewidzianym na zatopienie rur okladzinowych w odwiercie. Z kolei zatapia sie w otworze wiertniczym pierwszy odcinek rury okladzinowej zakonczonej butem prowadnikowym z zaworem zwrotnym, wypelnionej pluczka wiertnicza o gestosci równej gestosci zaczynu uszczelniajacego, wypelniajacego otwór wiertniczy. Nastepnie, w miare tworzenia kolumny rur zapuszczanej do otworu Wiertniczego, kazrjy nastepny odcinek rury polaczony z poprzednim wypelnia sie pluczka. Po zapuszczeniu kolumny rur do planowanej glebokosci, ostatni odcinek rury mocuje sie w wiezbie rurowej i odczekuje sie 48 godzin. Po tym okresie nastepuje zestalanie sie zaczynu i uszczelnienie górotworu.Zastrzezenie patentowe Sposób uszczelniania rur okladzinowych w otworze wiertniczym, znamienny tym, ze naprzód otwór wiertniczy wypelnia sie zaczynem uszczelniajacym o objetosci nie mniejszej od róznicy objetosci otworu wiertniczego i usytuowanej w nim kolumny rur okladzinowych, po czym zapuszcza sie do niego pierwszy odcinek rury okladzinowej, zakonczonej butem prowadniczym z zaworem zwrotnym i wypelnionej pluczka, a nastepnie, w miare tworzenia kolumny rur zapuszczanej do otworu wiertniczego, kazdy nastepny odcinek rury, polaczony z poprzednim, wypelnia sie pluczka o gestosci równej gestosci zaczynu uszczelniajacego.Prac. Poligraf. UP PRL naklad 120 + 8 Cena 45 zl PLThe subject of the invention is a method of sealing casing pipes in a borehole, which is used especially in the oil and coal industry. A known method of sealing casing pipes in a borehole is based on the fact that a sealing slurry is injected into the inside of casing pipes put into the hole, which then extrudes from them into the space between the walls of the borehole and the outer surface of the casing pipes. The disadvantage of this method is the necessity to use an additional pump unit for extruding the sealing grout from the casing pipes and a significant pressure gradient corresponding to the depth and specific weight of the grout occurring during the extrusion of the grout. The purpose of the invention is to eliminate the above-mentioned disadvantage. consisting in the fact that after filling the borehole with a sealing grout with a volume not less than the difference in volume of the borehole and the columns of casing pipes located in it, the first section of casing pipe is dropped into it, ending with a guide shoe with a check valve and the filled flush, and then as it forms columns of pipes going into the borehole, each subsequent pipe section connected to the previous one is filled with a flush with a density approximately equal to that of the sealing grout. Advantage of the method of sealing the casing pipes into the hole According to the invention, the drilling rig is more effective in sealing the borehole than that achieved by the known method, and moreover, it is less labor-intensive due to the reduced number of pump units. A drill string with an outlet equipped with heads with spray nozzles is injected into the borehole with a depth of 1000 m, filled with drilling fluid with a solid phase content of 30% by weight, with the use of spray nozzles and a 2% water solution of polyacrylamide in the amount of 2% by weight. every cubic meter of flush in the borehole, resulting in a sealing slurry. Concentration of the aqueous solution of polyacrylamide and its mixing with the rinsing is carried out in ten-meter sections. The slurry obtained is characterized by a consistency of about 60 poise, 109 762 for a 24-hour period for sinking the casing pipes in the well. In turn, the first section of a casing pipe, terminated with a guide shoe with a check valve, filled with drilling mud of the density equal to the density of the sealing slurry filling the borehole is submerged in the borehole. Then, in order to create a column of pipes run into the Drill Borehole, the next pipe section connected to the previous one is filled with flush. After the column of pipes has been dropped to the planned depth, the last section of the pipe is fixed in the pipe truss and waiting for 48 hours. After this period, the slurry solidifies and the rock mass is sealed. Patent claim A method of sealing casing pipes in a borehole, characterized in that the borehole is first filled with sealing slurry with a volume not less than the volume difference of the borehole and the column of casing pipes located in it, after by which the first section of casing pipe, terminated with a guide shoe with a non-return valve and filled flush, is entered into it, and then, in the form of a column of pipes running into the borehole, each next pipe section, connected to the previous one, is filled with a flush with a density equal to the density of the slurry sealant. Typographer. UP PRL, circulation 120 + 8 Price PLN 45 PL

Claims (1)

1. Zastrzezenie patentowe Sposób uszczelniania rur okladzinowych w otworze wiertniczym, znamienny tym, ze naprzód otwór wiertniczy wypelnia sie zaczynem uszczelniajacym o objetosci nie mniejszej od róznicy objetosci otworu wiertniczego i usytuowanej w nim kolumny rur okladzinowych, po czym zapuszcza sie do niego pierwszy odcinek rury okladzinowej, zakonczonej butem prowadniczym z zaworem zwrotnym i wypelnionej pluczka, a nastepnie, w miare tworzenia kolumny rur zapuszczanej do otworu wiertniczego, kazdy nastepny odcinek rury, polaczony z poprzednim, wypelnia sie pluczka o gestosci równej gestosci zaczynu uszczelniajacego. Prac. Poligraf. UP PRL naklad 120 + 8 Cena 45 zl PL1. Patent claim A method of sealing casing pipes in a borehole, characterized in that the borehole is first filled with a sealing slurry with a volume not less than the volume difference of the borehole and the casing pipe column located in it, and then the first section of casing pipe is driven into it. , ended with a guide shoe with a check valve and filled with flush, and then, as a column of pipes run into the borehole, each subsequent pipe section connected to the previous one is filled with a flush with a density equal to the density of the sealing slurry. Wash. Typographer. UP PRL, circulation 120 + 8 Price PLN 45 PL
PL20571978A 1978-03-31 1978-03-31 Method of sealing lining tubes in drill-holes PL109762B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL20571978A PL109762B2 (en) 1978-03-31 1978-03-31 Method of sealing lining tubes in drill-holes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL20571978A PL109762B2 (en) 1978-03-31 1978-03-31 Method of sealing lining tubes in drill-holes

Publications (2)

Publication Number Publication Date
PL205719A1 PL205719A1 (en) 1979-03-26
PL109762B2 true PL109762B2 (en) 1980-06-30

Family

ID=19988382

Family Applications (1)

Application Number Title Priority Date Filing Date
PL20571978A PL109762B2 (en) 1978-03-31 1978-03-31 Method of sealing lining tubes in drill-holes

Country Status (1)

Country Link
PL (1) PL109762B2 (en)

Also Published As

Publication number Publication date
PL205719A1 (en) 1979-03-26

Similar Documents

Publication Publication Date Title
CN101747886A (en) Fracturing fluid stock solution, full-filling preposition-free sand adding fracturing method and fracturing fluid cross-linking solution thereof
US2990016A (en) Method of and composition for sealing lost circulation in wells
US4893676A (en) Well treating method and associated apparatus for stimulating recovery of production fluids
PL109762B2 (en) Method of sealing lining tubes in drill-holes
US3064957A (en) Method of well completion
RU2273722C2 (en) Method for water inflow isolation in non-cased horizontal part of production well bore
SU1659626A1 (en) Method of well completion
CN208057065U (en) A kind of drill string assembly structure improving cementing quality
RU2152507C1 (en) Method of insulating water-development strata
RU2057900C1 (en) Process of isolation of absorbing and water-saturated strata
RU2196878C2 (en) Method of shutoff of water inflow over cementing annular space in operation of oil and gas wells
RU2606742C1 (en) Method of well drilling
CN112031704B (en) The method of explosive nesting and plugging of leaking wells in karst caves
RU2175711C1 (en) Process of attachment of casing strings in well
RU2066735C1 (en) Method for well casing in flow rocks
SU1030558A1 (en) Method for consolidating roof of working in permafrost rocks
SU1490259A1 (en) Method of isolating water-saturated central part of producing formation
RU2361062C1 (en) Method of elimination of behind-casing flow in wells of small diametre
RU2077655C1 (en) Method for grouting boreholes
SU1218071A1 (en) Method of setting dividing bridge in absorbing well
RU2034141C1 (en) Method for determination of well volume
RU2101464C1 (en) Well cementation method
RU2039867C1 (en) Method for prevention of collapse of casing string during prolonged well shut-down in zone of permafrost rocks
RU2792128C1 (en) Method for cementing the conductor, a technical column during the construction of wells
RU2018138293A (en) Well construction method