PL111314B1 PL19628477A PL19628477A PL111314B1 PL 111314 B1 PL111314 B1 PL 111314B1 PL 19628477 A PL19628477 A PL 19628477A PL 19628477 A PL19628477 A PL 19628477A PL 111314 B1 PL111314 B1 PL 111314B1
Authority
PL
Poland
Prior art keywords
platform
works
working platform
stand
mining excavations
Prior art date
Application number
PL19628477A
Other languages
Polish (pl)
Other versions
PL196284A1 (en
Inventor
Jozef Labus
Marian Kaczmarczyk
Michal Swierc
Original Assignee
Przed Robot Gorniczych
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Przed Robot Gorniczych filed Critical Przed Robot Gorniczych
Priority to PL19628477A priority Critical patent/PL111314B1/en
Publication of PL196284A1 publication Critical patent/PL196284A1/en
Publication of PL111314B1 publication Critical patent/PL111314B1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Earth Drilling (AREA)

Description

Przedmiotem wynalazku jest pomost roboczy do prac w wyrobiskach górniczych przydatny ció wykonywania prac na wysokosciach przy draze¬ niu wyrobisk korytarzowych w obudowie stalo¬ wej z lulków.Stosowana technologia drazenia wyrobisk kory¬ tarzowych wymaiga recznego wykonawstwa szere¬ gu prac na wysokosci w bezposrednim sasiedz¬ twie czola wyrobiska. Prace te wykonuje sie z pomostów rozbieralnych posadowionych na spagu wyrobiska.Znany jest z opisu patentowego CSM. nr 121 098 pomost roboczy zawieszony na odrzwiach obu¬ dowy lukowej wyrobiska. Niedogodnoscia tego po- mositu jest duza pracochlonnosc przy jego mon¬ tazu oraz trudnosc równoczesnego wykonywania innych prac ze spagu wyrobiska, poniewaz sani pomost przeszkadza w przejezdzie ladowarek, wo¬ zów kopalnianych i innych unzaidzen. Zawieszenie pomostu na odrzwiach obudowy obniza nosnosc obudowy, która w poblizu czola prziodka obcia¬ zona jest dodatkowo obudowa wstejpna, co w przypadku zlych warunków geologicznych sitamowi zagrozenie bezpiecznego prowaldzenia robót górni¬ czych.Celem wynalazku jest umozliwienie bezpieczne¬ go wykonawstwa prac na wysokosci przez stwo¬ rzenie takiego pomostu roboczego, który wyelimi¬ nowalby dotychczasowe trudnosci w montazu a jednoczesnie pozwalalby dostosowanie go do róz- 10 15 20 25 nej wysokosci wyrobisk jak równiez zwiekszalby wytrzymalosc obudowy ostatecznej w poblizu czo¬ la drazonego wyrobiska górniczego.Dalszym celem wynalazku jest takie skonstruo¬ wanie pomostu, który posiadajac powyzsze zalety, jednoczesnie nie bedzie stanowil przeszkody w przejezdzie ladowarek, wozów kopalnianych oraz w poruszaniu sie ludzi zatrudnionych w poblizu.Cel ten zostal osiagniety za pomoca pomostu be¬ dacego przedmiotem niniejszego wynalazku. Istota wynalazku polega na tym, ze konstrukcje nosna pomostu stanowi znany stojak podpierajacy z do¬ wolna sila stropnice obudowy ostatecznej, zas na stojaku przy pomiocy obrotowych tulei i przegu¬ bów osadzony jest podest pomostu, który posiada trzy stopnie swobody zmiany swego polozenia wzgledem stojaka.Przedmiot wynalazku ^est uwidoczniany w przy¬ kladzie jego wykonania na rysunku, na którym fig. 1 przedstawia poprzeczny przekrój przodka wyrobiska z przykladowym usytuowaniem po¬ mostu roboczego w jego róznych polozeniach w widoku z boku, fiiig, 2 wiKjok z góry z uwidocz¬ nieniem mozfldiwosci zmian polozenia podestu.Jiak uwidoczniono na rysunku pomost roboczy sklada sie z teleskopowego stojaka 1 rozpartego pomiedzy spagiem wyrobiska a stropnica obudowy ostatecznej. Wspólosiowo na stojak 1 nalozone sa suwliwie obrotowe tuleje 2 i 3 podparte pierscie¬ niowymi oporami 4 i 5 wyposazonymi w rygluja- 111 314111314 ce urzadzenia 6 unieruchamiajace je wzgledem stojaka 1. Do obrotowej tulei 2 za pomoca prze¬ gubu 7 polaczony jest podest 8. Podest 8 wyposa¬ zony jest w przeguby 9, które lacza go z cieglami 10, polaczonymi przegubami 11 z obrotowa tuleja 3 oparta o pierscieniowy opór 5. Obrotowe tuleje 2 i 3 osadzone obrotowo i suwiliwde na stojaku 1 posiadaja ustalajace elementy 12 zabezpieczajace przed niepozadanym obroitem podestu 8 wzgledem stojaka 1.Wyzej opisany pomost roboczy moze byc przy¬ kladowo zastosowany w sposób nizej przedstawio¬ ny. Dla ulatwienia opisu dzialania na rysunkach cyframi rzymskimi zaznaczone sa poszczególne po¬ lozenia podestu. Na rysunkach fig. 1 i 2 przedsta¬ wiono grubymi liniami polozenia I, w którym po¬ deist 8' zajmuje polozenie robocze, z którego czlo¬ wiek moze wykonywac skrecanie zamków obudo¬ wy i prace zwiazane z wykonaniem obudowy tej czesci wyrobiska.Uniami przerywanyimli na rysunku fig. 2 uwi¬ doczniono podest 8 w polozeniu II powstalym przez obrócenie, go o kat 90°. Z polozenia tego mozna wykonywac prace zwiazane z obrywka stropu, wznoszeniem obudowy tymczasowej i wier¬ ceniem otworów strzalowych. liniami przerywanymi na rysunkach fig. 1 i 2 oznaczono polozenie III powstale przez dalszy obróit podestu 8 z którego wykonuje sie prace zwiazane ze wznoszeniem obudowy w górnych pamtiach wyrobiska.Liniami przerywanymi na rysunku fig. 2 ozna¬ czono. polozenie. IV podestu 8, z którego wykonuje sie prace zwiazane z naprawa obudowy, podwie¬ szeniem luitni i rurociagów.Liniami przerywanymi na rysunku fig. 1 ozna¬ czono polozenie V, w którym przez zluzowanie 5 ryglujacego urzadzenia 6 przesuniejto pierscienio¬ wa opore 5 wraz z obrotowa tuleja 3 w górne polozenie, w wyniku czego podest 8 przez obróit wzgledem przegubu 7 oraz obrót ciegiel 10 w przegubach 9 i 11 zajmuje polozenie pionowe io umozliwiajace przejazd urzadzen górniczych.Niezaleznie od wymienionych polozen podestu 8 poprzez zluzowanie ryglujacych urzadzen 6 moz¬ na przesunac pierscieniowe opory 4 i 5 wraz z obrotowymi tulejami 2 i 3 wzgledem, stojaka 1 15 w góre lub dól i przez ponowne zakleszczenie ry¬ glujacych urzadzen 6' podest 8 ustawiony jest na dowolnie zadanej wysokosci wzgledem spagu wy¬ robiska.Inne dowolne polozenie podestu 8 uzyskuje sie 20 przez skojarzenie mozlliwosci jego obrotu i osio¬ wego przesuwu wzgledem stojaka 1.Zastrzezenie patentowe 25 Pomost roboczy do prac w wyrobiskach górni¬ czych, znamienny tym, ze sklada sie ze znanego stojaka (1), na którym wspólosiowo nalozone sa tuleje (2 i 3) wyposazone w ustalajace elementy (12) i podparte sa pierscieniowymi oporami (4 30 i 5) posiadajacymi ryglujace urzadzenia (6) przy czym tuleja (2) za pomoca przegulbu (7) polaczona jest z podestem (8), który przegubami (9), ciegla¬ mi (10) i przegubami (11) laczy sie z tuleja (3).Fig.4111314 Fig.2 PLThe subject of the invention is a working platform for works in mining excavations, a useful task for carrying out works at heights while tearing corridor workings in a steel casing made of boulders. The technology used to drill the corridor workings requires manual execution of a series of works at height in the immediate vicinity. two faces of the excavation. These works are performed from demountable platforms placed on the pit spag. It is known from the CSM patent description. No. 121 098 working platform suspended on the arches of the excavation hatch. The disadvantage of this prop is the great laboriousness of its assembly and the difficulty of simultaneously carrying out other works from the pit of the excavation, because the sled bridge interferes with the passage of loaders, mine carts and other unzaidzen. Suspension of the platform on the support frames reduces the load-bearing capacity of the support, which is additionally loaded with the initial support near the front face, which in case of bad geological conditions poses a threat to the safe performance of mining works. The purpose of the invention is to enable safe execution of works at height by creating The construction of such a working platform that would eliminate the hitherto difficulties in assembly and, at the same time, would allow it to be adapted to the different heights of the excavations, as well as increase the strength of the final lining near the face of a pitted mine excavation. A further object of the invention is such a construction The construction of a platform which, having the above advantages, at the same time will not constitute an obstacle to the passage of loaders, mine carts and the movement of people employed in the vicinity. This aim has been achieved by means of the bridge which is the subject of the present invention. The essence of the invention consists in the fact that the bridge structure is a known stand that supports the canopy of the final support with any force, and the platform is mounted on the stand by means of rotating sleeves and joints, which has three degrees of freedom to change its position with respect to the stand. The subject of the invention is shown in an example of its implementation in the drawing, in which Fig. 1 shows a cross-section of the face of the excavation with an exemplary location of the working bridge in its various positions in a side view, figure, 2 view from above, showing the possibility of changing the position of the platform. As shown in the figure, the working platform consists of a telescopic stand 1 stretched between the pit floor and the canopy of the final support. Coaxially on the stand 1, rotating sleeves 2 and 3 are slidably supported, supported by ring stops 4 and 5, equipped with interlocking devices 6 for locking them against the stand 1. The platform 8 is connected to the rotating sleeve 2 by means of a joint 7. The platform 8 is equipped with articulations 9, which connect it to the pliers 10, articulated joints 11 with a rotating sleeve 3 based on a ring-shaped resistance 5. Rotary sleeves 2 and 3 mounted in rotation and slide on the stand 1 have retaining elements 12 protecting against undesirable rotation platform 8 relative to the stand 1. The above-described working platform can, for example, be used as shown below. In order to facilitate the description of the operation, the individual positions of the platform are marked with Roman numerals in the figures. Figures 1 and 2 show the position I with thick lines, in which the poist 8 'occupies the working position, from which a man can twist the casing locks and work related to the casing of this part of the pit. FIG. 2 shows the landing 8 in position II, formed by turning it through an angle of 90 °. From this position, work can be carried out on roof trimming, erecting a temporary cladding and drilling blast holes. the dashed lines in the figures 1 and 2 mark the position III, created by the further rotation of the platform 8, from which the works related to erecting the lining in the upper memories of the excavation are carried out. The broken lines in figure 2 are marked. position. IV of the platform 8, from which the works related to the repair of the casing, the suspension of the gill and pipelines are carried out. The dotted lines in Fig. 1 indicate the position V, in which by loosening the locking device 6 the resistance ring 5 has been moved along with rotating sleeve 3 to the upper position, as a result of which the platform 8 is turned with respect to the articulation 7 and the rod 10 in the articulated joints 9 and 11 is rotated in a vertical position and enables the passage of mining devices. Regardless of the above-mentioned positions of the platform 8, by loosening the locking devices 6 can be moved ring-shaped stops 4 and 5 with rotating sleeves 2 and 3 in relation to the stand 1 15 up or down and by re-jamming the locking devices 6 ', the platform 8 is set at any preset height with respect to the spag of the excavation. Any other position of the platform 8 20 is obtained by combining the possibility of its rotation and axial displacement in relation to the stand 1. Patent claim 25 Working platform for the above-mentioned works mining excavations, characterized by the fact that it consists of the known stand (1), on which the sleeves (2 and 3) are coaxially mounted, provided with retaining elements (12) and supported by ring-shaped supports (4, 30 and 5) having interlocking devices (6) the sleeve (2) is connected to the platform (8) by means of a hinge (7), which with articulations (9), rods (10) and articulations (11) connects with the sleeve (3). 4111314 Fig. 2 PL

Claims (2)

1. Zastrzezenie patentowe 25 Pomost roboczy do prac w wyrobiskach górni¬ czych, znamienny tym, ze sklada sie ze znanego stojaka (1), na którym wspólosiowo nalozone sa tuleje (2 i 3) wyposazone w ustalajace elementy (12) i podparte sa pierscieniowymi oporami (4 30 i 5) posiadajacymi ryglujace urzadzenia (6) przy czym tuleja (2) za pomoca przegulbu (7) polaczona jest z podestem (8), który przegubami (9), ciegla¬ mi (10) i przegubami (11) laczy sie z tuleja (3). Fig.4111314 Fig.1. Patent claim 25 Working platform for work in mining excavations, characterized in that it consists of the known stand (1) on which the sleeves (2 and 3) are coaxially mounted, provided with retaining elements (12) and supported by rings the supports (4, 30 and 5) with the locking devices (6), where the sleeve (2) is connected to the platform (8) by means of a joint (7), which with joints (9), links (10) and joints (11) connects to the sleeve (3). Fig. 4111314 Fig. 2 PL2 PL
PL19628477A 1977-02-24 1977-02-24 Working platform for works in mining excavations PL111314B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL19628477A PL111314B1 (en) 1977-02-24 1977-02-24 Working platform for works in mining excavations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL19628477A PL111314B1 (en) 1977-02-24 1977-02-24 Working platform for works in mining excavations

Publications (2)

Publication Number Publication Date
PL196284A1 PL196284A1 (en) 1978-08-28
PL111314B1 true PL111314B1 (en) 1980-08-30

Family

ID=19981152

Family Applications (1)

Application Number Title Priority Date Filing Date
PL19628477A PL111314B1 (en) 1977-02-24 1977-02-24 Working platform for works in mining excavations

Country Status (1)

Country Link
PL (1) PL111314B1 (en)

Also Published As

Publication number Publication date
PL196284A1 (en) 1978-08-28

Similar Documents

Publication Publication Date Title
CN107060749A (en) Using the pick anchoring integral fully-mechanized digging machine of 4 advanced Anchor Cares of jumbolter
US4710064A (en) Movable roof support and bolter system
EA034047B1 (en) Shaft sinking machine
CN110130918A (en) A full-section excavation platform for a single-track railway tunnel and its construction method
CN114673518A (en) Tunneling, anchoring and supporting integrated machine and roadway anchoring and supporting construction method
CN215718927U (en) Tunnel operation bridge convenient to lifesaving
US6505709B1 (en) Sleigh shaped device for mining raises
CN113482704A (en) Tunnel operation bridge convenient to lifesaving
SU1416702A1 (en) Drilling and loading machine for sinking vertical mine shafts
RU2102576C1 (en) Mechanized racks of drilling rig
SU941595A1 (en) Form for erecting concrete roof support of vertical mine working
SU1698446A1 (en) Complex for sinking of vertical shafts
SU1133409A1 (en) Suspension multilevel sinking platform
SU1490302A1 (en) Partition for preventing outburst of coal, muck and gas
SU1102963A1 (en) Sinking platform for passing rock workings
RU2460884C1 (en) Shaft drilling-and-loading plant
CA1251475A (en) Raise bore mining method and apparatus for carrying out the method
PL215750B1 (en) Mining loader with equipment for making the timber heading
RU171309U1 (en) UNIT FOR CONSTRUCTION OF A TILT BAR
JPS5953400A (en) Lifting gear
McGown et al. Lavatube Entrance Amelioration on the Moon and Mars
SU929852A1 (en) Header
SU97852A1 (en) The method of increasing the strength of dyes with oxyazo dyes obtained on the fiber to friction
SU1506111A1 (en) Method and apparatus for stripping and working mineral deposits
CN120830522A (en) An integrated trolley for inclined well drilling and protection