PL129521B1 - Method of protecting a longwall/gallery crossing - Google Patents

Method of protecting a longwall/gallery crossing Download PDF

Info

Publication number
PL129521B1
PL129521B1 PL22687280A PL22687280A PL129521B1 PL 129521 B1 PL129521 B1 PL 129521B1 PL 22687280 A PL22687280 A PL 22687280A PL 22687280 A PL22687280 A PL 22687280A PL 129521 B1 PL129521 B1 PL 129521B1
Authority
PL
Poland
Prior art keywords
wall
pavement
sections
sidewalk
ceiling
Prior art date
Application number
PL22687280A
Other languages
Polish (pl)
Other versions
PL226872A1 (en
Inventor
Jerzy Lippa
Wiktor Siodmok
Andrzej Zyzak
Original Assignee
Kopalnia Wegla Kamiennego Anna
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kopalnia Wegla Kamiennego Anna filed Critical Kopalnia Wegla Kamiennego Anna
Priority to PL22687280A priority Critical patent/PL129521B1/en
Publication of PL226872A1 publication Critical patent/PL226872A1/xx
Publication of PL129521B1 publication Critical patent/PL129521B1/en

Links

Landscapes

  • Road Paving Structures (AREA)

Description

Przedmiotem wynalazku jest sposób zabezpiecza¬ nia skrzyzowania sciany zaopatrzonej w saimoprze- suwna obudowe z chodnikiem, zwlaszcza posrednim o przekroju lukowym, a wiec wlotu sciany, miej¬ sca gdzie sipotyka sie wzmozone cisnienie górotwo¬ ru i stosunkowo duze powierzchnie odslonietego stropu.Znane dotychczas sposoby zabezpieczania stropu w miejscu, w którym chodnik majacy wlasna obu¬ dowe laczy sie z wyrobiskiem scianowym, zaopa^ trzonym w samoprzesuwna obudowe, polegaly na przemieszczaniu zmechanizowanego podciagu kro¬ czacego w chodnikach przyscianowych, ustawione¬ go wzdluz frontu scianowego i przesuwanego ra¬ zem z nim -lub tez na ustawianiu w chodnikach posrednich podciagów drewnianych czy stalowych o dlugosciach dochodzacych od 6 do 9 m. Podciagi zmechanizowane stanowily .dwie sekcje o róznej dlugosci stropnic.Stropnica sekcji pierwszej podparta czterema sto¬ jakami oparta byla na dwóch sztywnych podsta¬ wach umieszczonych^ przed i za podstawa napedu przenosnika, a sekcja druga z krótsza stropnica byla podparta czterema stojakami umocowanymi do podstawy napedu przenosnika scianowego. Pod¬ stawy stojaków sekcji pierwszej polaczone byly z podstawa napedu za pomoca silowników, sluzacych do przemieszczania podciagu wraz z napedem i umozliwiajacym przesuwanie calego urzadzenia bez koniecznosci zupelnego zluzowania obudowy. Nato- Z miast podciagi stalowe czy drewniane trudno bylo dostosowywac do luków stropnicowych odrzwi obu¬ dowy chodnika, poniewaz luki obudowy bedace nie zawsze na jednakowej wysokosci zadanie to utrudz 5 nialy. W obu wymienionych sposobach zabezpie¬ czenie stropu bylo niezadawalajace, a ponadto pra¬ cochlonne i czasochlonne.Niespodziewanie okazalo sie w odróznieniu od wyzej wymienionych sposobów, ze zastosowanie w w chodniku samodzielnej sekcji samoprzesuwnej o/bu¬ dowy zmechanizowanej zapewnia wlasciwe zaWz- pieczenie wlotu sciany.Sposób wedlug wynalazku polega na tym, ze w chodniku ustawia sie w odleglosci nie przekracza- 15 jacej dlugosci stropnicy obudowy sciany conaj- mniej jedna z samodzielnych sekcji obudowy zme¬ chanizowanej, skierowana czolem naprzeciwko przesuwajacego sie frontu eksploatacyjnego sciany.Stropnice postawionych naprzeciw siebie sekcji kb- ao rzystnie nachyla sie, lagodzac ewentualny kaft po¬ miedzy stropem wzglednie spagiem chodnika a stropem czy spagiem wyrobiska scianowego, wy¬ nikajacy z nachylenia wyrobiska.Potem nad stropnice wzdluz chodnika zaklada 25 sie elementy zaslaniajace odkryty strop, laczac ustawione naprzeciw siebie sekcje. Nastepnie w miare przesuwania sie frontu eksploatacyjnego sciany, przy pomocy wlasnego przepychacza przy¬ mocowanego w glebi chodnika, wycofuje sie ty- 30 lem sekcje w chodniku, uzupelniajac stale elemen- 129521129 521 3". • 4 ty zaslaniajace nad stropnicami, przy czym rów¬ noczesnie prowadzi sie znanym sposobem demon¬ taz luków obudowy chodnika.Zaleta sposobu wedlug wynalazku jest zapew¬ nienie nieprzerwanego urabiania sciany z jedno¬ czesna likwidacja obudowy chodnika bez wzgledu na predkosc postepu frontu eksploatowanej scia¬ ny.* Sposób wedlug wynalazku zostanie blizej wyja¬ sniony na rysunku, na którym fig. 1 przedstawia przekrój 'poprzeczny zabezpieczenia skrzyzowania sciany *z chodnikiem w przypadku gdy strop i spag chodnika pokrywaja sde ze stropem i spagiem wyrobiska scianowego, fig. 2 i 3 — przekrój po¬ przeczny zabezpieczenia skrzyzowania sciany z chodnikiem w przypadku, gdy strop wzgl. spag chodnika ze stropem czy spagiem wyrobiska scia¬ nowego tworza kat a fig. 4 — widok z góry za¬ bezpieczanego skrzyzowania.W celu zabezpieczenia skrzyzowania sciany zao¬ patrzonej w samoprzesuwna obudowe 1 z chod¬ nikiem posrednim o przekroju lukowym,, wystepu¬ jacym z jej srodku i likwidowanym wraz z jej postepem, oraz dla zapewnienia efektywnego rabo¬ wania odrzwi obudowy 2 tego chodnika ustawia sie w chodniku samodzielna sekcje 3 obudowy zmechanizowanej najlepiej odpowiadajaca stosowa¬ nej w scianie. Sekcje 3 w chodniku ustawia sie czolem do frontu eksploatacyjnego tak aby odle¬ glosc jej konca stropnicy? od stropnicy obudowy 1 uistawionej naprzeciw w scianie wynosila 1,2 do 1,5 m.Sekcje 3 w chodniku zasila sie oddzielnie niz sekcje obudowy 1 w scianie, a ponadto po odwró¬ ceniu jej przepychacza 4" na zewnatrz laczy sie je¬ go koniec lancuchem 5 dlugosci kilkudziesieciu metrów z' rozpora 6 rozparta w glebi chodnika.Nastepnie nad stropnice ustawionych naprzeciw siebie sekcji 3 obudowy chodnika i obudowy 1 sciany zaklada sie drewniane bale 7 laczace dwie obudowy I i 3 i zaslaniajace odkryty strop wlotu sciany.W przypadku kiedy strop wzglednie spag chod¬ nika tworza ze stropem czy spagiem wyrobiska scianowego kat, wynikajacy czy to z nachylenia wyrobiska czy z tego, ze strop w tym miejscu jest spekany i nierówny to przed zakladaniem la¬ czacych bali 7 nad stropnicami, odpowiednio po- . chyla sie_.stropnice obudowy 1 sciany.W przypadku zas kiedy kat ten jest bardzo du¬ zy bale 7 zaklada sie nad stropnice obudowy 1 sciany i na spag chodnika tuz przed sama sekcja 3 obudowy chodnika. Dalej w miare przesuwania sie frontu eksploatacyjnego sciany sekcje 3 chod¬ nika przy pomocy jej przepychacza 4 wycofuje sie stopniowo tylem w glab chodnika uzupelniajac sta¬ le bale 7 laczace naprzeciwlegle stropnice obudo¬ wy 3 chodnika i obudowy 1 sciany. Równoczesnie rozkreca sde sruby laczace luki ze stopkami obu¬ dowy 2 chodnika i roluje sie najpierw stojakii a potem luki.W podobny sposób mozna zabezpieczac skrzyzo¬ wanie sciany z chodnikiem przyscianowym, zwla¬ szcza w przypadku likwidacji tego ostatniego.Zastrzezenie patentowe 'Sposób zabezpieczania skrzyzowania sciany z chodnikiem zwlaszcza posrednim o przekroju lu¬ kowym zaopatrzonej w samoprzesuwna obudowe. znamienny tym, ze w chodniku ustawia sie w od¬ leglosci nie przekraczajacej dlugosci stropnicy obu¬ dowy (1) sciany conajmniej jedna z samodzielnych sekcji (3) obudowy zmechanizowanej, skierowana czolem naprzeciwko przesuwajacego sie frontu eks¬ ploatacyjnego sciany, a stropnice postawionych na¬ przeciw siebie sekcji (1) i (3) korzystnie nachyla sie, lagodzac ewentualny kat pomiedzy stropem wzglednie spagiem chodnika a stropem czy spa¬ giem wyrobiska scianowego wynikajacy z nachy¬ lenia wyrobiska, a potem nad stropnice sekcji (3) wzdluz chodnika zaklada sie elementy (7) zaslania¬ jace odkryty strop laczac ustawione naprzeciw sie¬ bie sekcje (1) i (3), a nastepnie w miare przesu¬ wania sie frontu eksploatacyjnego sciany przy po¬ mocy wlasnego przepychacza (4) przymocowanego w glebi chodnika stopniowo wycofuje sie tylem sekcje (3) w chodniku uzupelniajac stale elementy (7) zaslaniajace nad stropnicami przy czym rów¬ noczesnie prowadzi sie znanym sposobem demon¬ taz luków obudowy (2) chodnika. 10 15 20 25 30 35 40129 521 fy.1 Tic.3129 521 J^ M Drukarnia Narodowa, Zaklad nr 6, 402/85 Cena 100 zl PLThe subject of the invention is a method of securing the intersection of a wall provided with a self-sliding cladding with a pavement, especially an intermediate one with an arched cross-section, i.e. the wall inlet, a place where increased pressure from the rock mass and relatively large surfaces of the exposed ceiling meet. securing the ceiling in the place where the sidewalk with its own housing connects with the wall excavation, provided with a self-moving casing, consisted in the displacement of a mechanized joist running in the wall walkways, positioned along the front of the wall and moved together with it - or also on placing wooden or steel beams in intermediate sidewalks with lengths from 6 to 9 m. Mechanized beams consisted of two sections with different lengths of canopies. The trestle of the first section was supported by four tables, was based on two rigid bases placed on ^ before and behind the base of the conveyor drive, and the section of dr The leg with the shorter canopy was supported by four stands attached to the base of the drive of the wall conveyor. The bases of the props of the first section were connected to the base of the drive by means of actuators used to move the string along with the drive and to move the entire device without the need to completely loosen the casing. Instead of steel or wooden beams, it was difficult to adjust the door frames of the pavement to the roof hatches, because the gaps in the support, which were not always at the same height, made the task difficult. In both of the above-mentioned methods, the securing of the floor was unsatisfactory, and moreover, labor-intensive and time-consuming. Surprisingly, in contrast to the above-mentioned methods, it turned out that the use of an independent self-moving section in the pavement with a mechanized construction ensures proper protection of the wall inlet. The method according to the invention consists in placing at a distance not exceeding the length of the canopy of the wall support at least one of the independent sections of the mechanized support, facing the moving front of the wall with its face. - or preferably tilts, softening the possible dome between the ceiling or the slope of the pavement and the ceiling or slope of the wall excavation, resulting from the inclination of the excavation. Then, over the canopies along the walkway, the elements covering the exposed ceiling are installed, joining the sections facing each other. Then, as the exploitation front of the wall moves, with the help of its own plunger attached to the pavement, the sections in the pavement are retracted backwards, constantly supplementing the elements - 129521129 521 3 ". • 4th covering over the canopies, with even The advantage of the method according to the invention is to ensure uninterrupted cutting of the wall with the simultaneous removal of the pavement cover regardless of the speed of the front of the exploited wall. * The method according to the invention will be explained in more detail. in the drawing, in which fig. 1 shows the cross-section of the protection of the intersection of the wall with the pavement in the case when the ceiling and the spade of the sidewalk cover the floor with the ceiling and the slab of the wall excavation, fig. 2 and 3 - cross-section of the protection of the intersection of the wall with the pavement in in the case where the roof or the foot of the sidewalk with the roof or foot of the wall excavation forms an angle, and Fig. 4 - view from the top of the secure crossing. In order to secure the crossing of the wall fitted with the self-moving casing 1 with an intermediate sidewalk with an arched cross-section, protruding from its center and liquidated as it progresses, and to ensure effective breaking of the support arches 2 of this pavement, an independent section 3 of the powered support is placed in the pavement, best suited to the one used in the wall. The sections 3 in the sidewalk are placed face to face with the mining front so that the distance of the canopy end? 1.2 to 1.5 m from the canopy of the casing 1 placed opposite to the wall. Sections 3 in the pavement are supplied separately from the sections of the casing 1 in the wall, and moreover, after turning its pusher 4 "outwards, its end is connected A chain 5, several dozen meters long, with a strut 6 stretched in the pavement. Then, over the canopies of the sections 3 of the pavement lining and lining 1 facing each other, wooden logs 7 are installed, connecting the two enclosures I and 3 and covering the exposed ceiling of the inlet wall. relatively, the foot of the sidewalk creates an angle with the roof or the foot of the wall excavation, resulting either from the inclination of the excavation or from the fact that the ceiling at this point is cracked and uneven, then prior to the installation of the joining logs 7 over the canopies, it tilts accordingly. rails of the cladding 1 wall. In the case when this angle is very large, the logs 7 are placed above the rails of the cladding 1 of the wall and on the foot of the pavement just before the section 3 of the pavement cladding itself. As the operational front of the wall moves, the sections 3 of the sidewalk with its pusher 4 gradually retracts backwards into the sidewalk complementing the fixed logs 7 connecting the opposite canopies of the casing 3 of the sidewalk and the casing 1 of the wall. At the same time, he unscrews the bolts connecting the gaps with the feet of the pavement 2, and first the stand is rolled up, and then the gaps. Walls with a sidewalk, especially an intermediate, arc-shaped wall provided with a self-moving casing. characterized by the fact that in the pavement, at a distance not exceeding the length of the casing canopy (1) of the wall, at least one of the independent sections (3) of the mechanized support is placed, facing the face opposite the moving front of the exploitation wall, and the canopies placed on sections (1) and (3) preferably tilts against each other, easing the possible angle between the ceiling or the slope of the sidewalk and the ceiling or slope of the wall excavation resulting from the inclination of the excavation, and then elements (7) covering the exposed ceiling joining sections (1) and (3) facing each other, and then, as the operational front of the wall moves, with the help of its own pusher (4) attached to the pavement, it gradually withdraws backwards, sections (3) in the pavement are constantly supplemented with the elements (7) covering over the canopies, while at the same time removing the hatch of the casing (2) from the roof nika. 10 15 20 25 30 35 40129 521 fy.1 Tic. 3129 521 J ^ M National Printing House, Plant No. 6, 402/85 Price PLN 100 PL

Claims (1)

1. Zastrzezenie patentowe 'Sposób zabezpieczania skrzyzowania sciany z chodnikiem zwlaszcza posrednim o przekroju lu¬ kowym zaopatrzonej w samoprzesuwna obudowe. znamienny tym, ze w chodniku ustawia sie w od¬ leglosci nie przekraczajacej dlugosci stropnicy obu¬ dowy (1) sciany conajmniej jedna z samodzielnych sekcji (3) obudowy zmechanizowanej, skierowana czolem naprzeciwko przesuwajacego sie frontu eks¬ ploatacyjnego sciany, a stropnice postawionych na¬ przeciw siebie sekcji (1) i (3) korzystnie nachyla sie, lagodzac ewentualny kat pomiedzy stropem wzglednie spagiem chodnika a stropem czy spa¬ giem wyrobiska scianowego wynikajacy z nachy¬ lenia wyrobiska, a potem nad stropnice sekcji (3) wzdluz chodnika zaklada sie elementy (7) zaslania¬ jace odkryty strop laczac ustawione naprzeciw sie¬ bie sekcje (1) i (3), a nastepnie w miare przesu¬ wania sie frontu eksploatacyjnego sciany przy po¬ mocy wlasnego przepychacza (4) przymocowanego w glebi chodnika stopniowo wycofuje sie tylem sekcje (3) w chodniku uzupelniajac stale elementy (7) zaslaniajace nad stropnicami przy czym rów¬ noczesnie prowadzi sie znanym sposobem demon¬ taz luków obudowy (2) chodnika. 10 15 20 25 30 35 40129 521 fy.1 Tic.3129 521 J^ M Drukarnia Narodowa, Zaklad nr 6, 402/85 Cena 100 zl PL1. Claim 'A method of securing the intersection of a wall with a sidewalk, especially an intermediate, arched section provided with a self-sliding casing. characterized by the fact that in the pavement, at a distance not exceeding the length of the casing canopy (1) of the wall, at least one of the independent sections (3) of the mechanized support is placed, facing the face opposite the moving front of the exploitation wall, and the canopies placed on sections (1) and (3) preferably tilts against each other, easing the possible angle between the ceiling or the slope of the sidewalk and the ceiling or slope of the wall excavation resulting from the slope of the excavation, and then over the canopies of section (3) along the sidewalk, elements are installed (7) covering the exposed ceiling joining sections (1) and (3) facing each other, and then, as the operational front of the wall moves, with the help of its own pusher (4) attached to the pavement, it gradually withdraws backwards, the sections (3) in the pavement are constantly supplemented with the elements (7) covering over the canopies, while at the same time removing the hatch of the casing (2) from nika. 10 15 20 25 30 35 40129 521 fy.1 Tic. 3129 521 J ^ M National Printing House, Plant No. 6, 402/85 Price PLN 100 PL
PL22687280A 1980-09-23 1980-09-23 Method of protecting a longwall/gallery crossing PL129521B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL22687280A PL129521B1 (en) 1980-09-23 1980-09-23 Method of protecting a longwall/gallery crossing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL22687280A PL129521B1 (en) 1980-09-23 1980-09-23 Method of protecting a longwall/gallery crossing

Publications (2)

Publication Number Publication Date
PL226872A1 PL226872A1 (en) 1982-03-29
PL129521B1 true PL129521B1 (en) 1984-05-31

Family

ID=20005143

Family Applications (1)

Application Number Title Priority Date Filing Date
PL22687280A PL129521B1 (en) 1980-09-23 1980-09-23 Method of protecting a longwall/gallery crossing

Country Status (1)

Country Link
PL (1) PL129521B1 (en)

Also Published As

Publication number Publication date
PL226872A1 (en) 1982-03-29

Similar Documents

Publication Publication Date Title
CN208280965U (en) Coal mine deep well tunnel smooth surface concrete spraying support structure
PL129521B1 (en) Method of protecting a longwall/gallery crossing
CN208252137U (en) Based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force
RU2196868C2 (en) Process of reinforcement of stone structures of building
WO2012168762A1 (en) A modular enclosure for a space over a ground surface for environmental control
US2648116A (en) Method of making hollow monolithic concrete slabs
RU2000105938A (en) METHOD FOR STRENGTHENING STONE CONSTRUCTIONS OF BUILDING
SE9000655D0 (en) COVERED BY MOUNTAIN WALLS THAN THUNDERLY AND SOUNDLY, AS WELL AS ACHIEVED TO ASTAD AQUAD THE CLOTHING
SU141280A1 (en) Panel building intended for construction above mines, on subsiding soils and in seismic areas
RU1795109C (en) Movable shield-type support
SU1065608A1 (en) Mobile forms for erecting monolithic roof support
Jäger A short summary of the history of the Frauenkirche in Dresden
Grønhaug Optimization of Linings in Road Tunnels
PL95057B1 (en)
SU1712622A1 (en) Mounting-mining shield
SU1242614A1 (en) Method of layer-wise working of thick steep coal seam with caving roof
SU1671871A1 (en) A method of protecting preliminary drift in working thick beds
KR200145485Y1 (en) Safety facility installation structure of temporary structure of horizontal structure
SU58469A1 (en) Device to protect people working in the face from the dam rock
PL223966B1 (en) Manufacturing method for the elimination and exit channel, and the mechanized complex of longwall mining excavations
SU1712613A1 (en) Method of making inset from mine shaft
Morandotti et al. Temporary shelters for the archaeological excavation at Kinik Höyük. Considerations after three years of work
PL159406B1 (en) Method and support for making the crossings in the mine heardings
SU1177514A1 (en) Method of erecting a fill-up partition
PL181081B1 (en) Method of building a culvert/tunnel under railway tracks and roads in embankments or natural hills