PL152254B1 - Deposit mining method - Google Patents

Deposit mining method

Info

Publication number
PL152254B1
PL152254B1 PL26114686A PL26114686A PL152254B1 PL 152254 B1 PL152254 B1 PL 152254B1 PL 26114686 A PL26114686 A PL 26114686A PL 26114686 A PL26114686 A PL 26114686A PL 152254 B1 PL152254 B1 PL 152254B1
Authority
PL
Poland
Prior art keywords
support
support casing
roof
casing
line
Prior art date
Application number
PL26114686A
Other languages
Polish (pl)
Other versions
PL261146A1 (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL26114686A priority Critical patent/PL152254B1/en
Publication of PL261146A1 publication Critical patent/PL261146A1/en
Publication of PL152254B1 publication Critical patent/PL152254B1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Description

RZECZPOSPOLITA POLSKA REPUBLIC POLAND OPIS PATENTOWY PATENT DESCRIPTION 152 254 152 254 iii iii Patent dodatkowy ' do patentu nr---- Additional patent 'to patent no. ---- Int. Cl.5 E21C 41/22Int. Cl. 5 E21C 41/22 Zgłoszono: 66 08 21 /P. 261146,/ Reported: 66 08 21 / P. 261146, / Pierwszeństwo ____ Priority ____ (ΖΠίΙΚΙ (ΖΠίΙΚΙ URZĄD PATENTOWY OFFICE PATENT Zgłoszenie ogłoszono: θθ 05 26 Application announced: θθ 05 26 B G Ó L1 A B G Ó L1 A RP RP Opis patentowy opublikowano: 1991 05 31 Patent description published: 1991 05 31

Twórcy wynalazku: Wiesław Biernacki, Zbigniew Szabla, Lech OarońCreators of the invention: Wiesław Biernacki, Zbigniew Szabla, Lech Oaroń

Uprawniony z patentu: Kombinat Górniczo-HutniczyThe holder of the patent: Kombinat Górniczo-Hutniczy

Zakłady Górnicze Sieroszewice, Kazimierzów /Polska/Zakłady Górnicze Sieroszewice, Kazimierzów / Poland /

SPOSÓB EKSPLOATACCI ZŁÓŻHOW TO USE ASSEMBLY

Przedmiotem wynalazku jest sposób eksploatacji złóż, zwłaszcza rud zalegających na dużych głębokościach pod stropem mocnym, stosowany najkorzystniej do średniej i cienkiej grubości warstwy złoża·The subject of the invention is a method of exploiting deposits, especially ores lying at great depths under a strong roof, most preferably used for medium and thin deposit layers.

Sposoby eksploa tacc i złóż systemami uiierkowymi sto)^c^wane powszechnie w podziemnej eksploatacci złóż węgla, z zas^c^^c^wani^m urządzeń urabiaj ących /kombajnów, strugów/ i transporoowych /przenośników zgrzebłowych/, nie znalazły zastosowanie w górnictwie rud ze względu na odmienne warunki geologiczno-górnicze i inne parametry skał złożowych.Methods of exploiting trays and beds with one hundred) uranium systems, commonly used in the underground mining of coal deposits, with the use of mining devices / combines, plows / and transporters / scraper conveyors /, have not been used in mining of ores due to different geological and mining conditions and other parameters of the deposit rocks.

W kopalniach rud miedzi mechanizacja podstawowych i pornomiczych operacc! technologicznych związanych z wybieraniem złoża rozwinęła się na bazie ciężkich samojezdnych maszyn górniczych i techniki strzelnicze,]· W i^si^n^^jąc^/c:h warunkach za najbardziej efektowne uważane sę systemy komooow^^iTi^arowe· Systemy komorowo-filarowe polegają na wybieraniu złoża fronemm składającym się z prostopadle przecinaj ących się przodków komorowych z wydzielenem fiarrów· Filary wybiera się częściowo, do bezpiecznych granic, pozostawiając kostki podporowe· Nie wybrane resztki złoża stanowią straty eksploatacyjne oraz potęgują zagrożenie tąpaniami· Podobne zalety i wady posiada system zabierkowy stosowany w mniejszym zakresie. Czyste wybieranie złoża umowlioiają systemy ścianowe i fllarowo-ubiekrowe polegające na sukcesywnym przemieszczaniu frontu eksploatacyjnego w głąb calizny pola lub fiaaóów wąskim zabiorem.Mechanization of basic and pornomine operations in copper ore mines! technology related to mining the deposit has developed on the basis of heavy self-propelled mining machines and shooting techniques,] · W i ^ si ^ n ^^ joking ^ / c: h conditions, chamber systems ^^ and i ^ ar chambers are considered the most effective. pillars consist of selecting the deposit with a front consisting of perpendicularly intersecting chamber faces with the separation of fiarrows. Pillars are selected partially, to safe limits, leaving support cubes. Unselected deposit remains constitute operational losses and increase the risk of rock bursts. Similar advantages and disadvantages have the system driveway used to a lesser extent. The clean mining of the deposit is facilitated by longwall systems and fllar-mining systems consisting in the successive displacement of the exploitation front into the depths of the field or into a narrow zone.

W przypadku trudno urabialnych skał, które wymagają zastosowania techniki strzelniczej, syste my te charakteryzują się małą koncentracją wydobycia wynikającą z długiego czasu trwania cyklu, uciążlówą pracą samojezdnych maszyn górniczych w wąskiej przestrzeni roboczej pomiędzy calizną ściany lub ubierki a zmechanizowaną obudową podporową oraz dużym nakładem pracy w stosunku do efektu w postaci niewielkiej ilości pozyskiwanego urobku·In the case of hardly workable rocks that require the use of shooting techniques, these systems are characterized by a low concentration of extraction resulting from the long cycle time, cumbersome operation of self-propelled mining machines in a narrow working space between the entire wall or clothes and a mechanized support casing, and a large amount of work to do in in relation to the effect in the form of a small amount of extracted spoil ·

152 254152 254

152 254152 254

Systemy pośrednie tj. zabierkowo-ubierkowe łączące cechy systemu zabierkowego i ubierkowego, polegające na wybieraniu wąskich pasów wzdłuż frontu, z lkkwidacją wybranej przestrzeni w ślad za przemieszczającym się frontem, nie znalazły do tej pory zastosowania w kopalniach rud miedzi·Indirect systems, i.e. tether and dressing systems, combining the features of the towing and dressing systems, consisting in selecting narrow strips along the front, with the removal of the selected space following the moving front, have not yet been used in copper ore mines

Sposób eksploatacji złóż, zwłaszcza rud miedzi sysemmem zabierkowoofilarowo-ubierkowym według wynalazku, polega na ·· wybieraniu złoża dwoma równoważnymi systemami eksploatacc i, zabierkowo-filarowym i filarowouubiekkowym, prowadzonymi równocześnie szerokim froneem' eksploatacyjnym· Front eksploatacyjny składa się z wyprzedzająco· drążonych przodków komorowych, które łączy się zabiegami z pozostawieneem fiamów podtrzymujących strop nad przestrzenią roboczą· W komorach i zabierkach stosuje się obudowę kotwiową· Filary wybiera się ubiorkami z zastosowaniem zmec^anizowi^r^ej obudowy podporowej Sposób wybierania fiaróww ubiorkami polega na tym, że w urabianym fiaarze wierci się otwory strzałowe w kierunku czoła ubierki, której strop podparty jest zmechanizowaną obudową podporową· Po · drugostłonnyy podparciu stropu za fiarem indywiduaIną obudową podporową, filar rozstrzelwuje się w całości za jednym razem· Po wybraniu urobku przemieszcza się zmechanizowaną obudowę podporową w kierunku· zgodnym z postępem frontu eksploatacyjnego do następnego fiaaru· W trakcie wykonywania powyższej czynności rabuje się indywidualną obudowę podporową. Pustą przestrzeń za zmechanizowaną obudową podporową lkkwiduje się przez zawał lub podsadzkę. Ubierki prowadzi się kolejno wzdłuż frontu w·kierunku od starych zrobów do bocznej calizny złoża· Odstęp pomiędzy sąsiednimi wyprzedzeniami ubiorek jest dowolny i rzutuje na układ prowadzenia ubierek: prostolinijny, prostolir^ijno-schooowy lub schodowy. Każda ubiorka może wyprzedzać następną ubierkę wyłącznie o jeden krok zawału lub podsadzki· Ze względu na organizację robót na froncie, głównie ummłliwienie ruchu samo^^nych maszyn górniczych, komory i zabierki drąży się wyprzedzająco w taki sposób, aby minimalna szerokość frontu eksploatacyjnego mierzona od czoła danej ubierki., przed uruchomieniem tej ubierki, wynosiła co najmniej dwa fiaary i dwie przejezdne zabierki.The method of exploitation of deposits, especially copper ores with the entailing-pillar-strip system according to the invention, consists in selecting the deposit with two equivalent mining-pillar and pillar-bead mining systems, simultaneously carried out with a wide exploitation front The exploitation front consists of leading hollow chambers, which are combined with the procedures of leaving the vaults supporting the ceiling above the working space · An anchor casing is used in the chambers and traverses · Pillars are selected with dressings with the use of a mechanical support casing The method of selecting the pieces in the garments consists in drilling there are shot holes towards the front of the dressing, the roof of which is supported by a mechanized support casing. After the second-up support of the ceiling behind the pile with an individual support casing, the pillar is shot completely in one go. After selecting the excavated material, the mechanized supporting casing is moved towards the zgo with the progress of the service front to the next pile. · In the course of performing the above-mentioned activity, an individual support casing is robbed. The empty space behind the mechanized support casing is eliminated by a cave or backfill. The clothes are led sequentially along the front in the direction from the old goafs to the side of the bed. The distance between the adjacent advance of the dress is arbitrary and affects the dressing system: straight, straight-line or staircase. Each piece of clothing may precede the next one by only one step of a caving or filling. Due to the organization of work at the front, mainly the disarming of the movement of self ^^ mining machines, chambers and strippers, the minimum width of the operational front is measured from the front of a given garment., prior to the launch of this garment, it was at least two jackets and two movable bolts.

Przedstawiony sposób eksploatacci złoża systymem zabierkowo-filarowouubierkowym charakteryzuje się dużą koncentracją wydobycia, szybkim postępem frontu eksploatacyjnego, czystym wybieraniem złoża oraz dużym bezpieczeństwem· Zapewnia korzystne przewietrzanie frontu eksploatacyjnego opływowym prądem świeżego powtetera. Stwarza dogodne warunki dla zastosowania samojezdnych maszyn górniczych oraz urabiania fiaarów za pomocą ma^^riałc^w wybuchowych przy czterech płaszczyznach· odsłonięcia. Rówonłegły względem zmechanizowanej obudowy podporowej i indywidualnej obudowy, kierunek rozstrzeliwania fiar^w w niewielkim stopniu naraża obudowę na szkodliwe skutki strzelania.The presented method of exploitation of the deposit with the claw-pillar-dressing system is characterized by high concentration of production, fast progress of the exploitation front, clean deposit removal and high safety · Provides favorable ventilation of the exploitation front with a streamlined fresh repeat current. It creates favorable conditions for the use of self-propelled mining machines and the cutting of chippings with materials in explosives at four levels of exposure. Parallel to the mechanized support casing and the individual casing, the firing direction of the fires slightly exposes the casing to the harmful effects of shooting.

Wynalazek w przykładzie wykonania opisany jest w oparciu o załączone rysunki, na któyym na fig.l przedstawiono w rzucie pozornym sposób eksploatacji złoża syse^iem zabie^owof ilaΓOWO-ubiθrłowym, t rzypofowym, froneem pros tolónnj nocsclioow^^m, natomiast na fig.2,3,4, 516 przedstawiono sposób wybierania fiaaru ubierką w kolejnych fazach·The invention is described in an exemplary embodiment on the basis of the attached drawings, in which Fig. 1 shows the method of exploitation of the deposit with a heavy-duty, three-taper, three-taper, proptolonnj nocsclio, and Fig. 2, 3, 4, 516 presents the method of selecting a garment with a garment in subsequent phases

Partię złoża ograniczoną szeregiem fiaaóów 1 oporowych o wym marach 15 x 30 m, wzdłuż starych zrobów 2, rozcina się trzema wiązkami podwójnych chodników 3 traisportowo-weeiyWacyjf nych połączonych przecinkami 4 tworzących fiaary 1 oporowe usytuowane w kolejnych szeregach·The part of the deposit limited by a series of 1 retaining flanks with the dimensions of 15 x 30 m, along the old goafs 2, is cut by three bundles of 3 traisport-weeiwational double sidewalks connected by commas 4 forming 1 retaining piles located in successive rows ·

W ten sposób prygołowαoe trzy pola 5 eksploatacyjne wybiera się komorami 6 i zabiegami 7, z pozostawieniey fiaaóów 8 o wymiaeαcS 6 x 15 m. W miarę postępu frontu eksploatacyjnego fiaary 8 wybiera się ubierkami 9· Ubierki 9 prowadzi się kolejno wzdłuż frontu w kierunku od starych zrobów 2 do bocznej calizny 10 złoża w odstępie poOstowowym pomiędzy sąsiednimi wyprzedzeniami ubierek czterech Harfow 8· Wyprzedzenie pomiędzy każdą ubierką a następną ubierką · wynosi ok»12 m tj· jeden krok zapału.· Szerokość frontu na wprost każdorazowo uruchamianej ubierki wynosi trzy fiaary 8 i trzy zabierki 7·In this way, three mining fields 5 are selected with 6 chambers and 7 procedures, leaving 8 phases with dimensions 6 x 15 m. As the exploitation front progresses, garments 8 are selected with clothes 9. 9 garments are led sequentially along the front towards the old ones goaf 2 to the side body 10 of the bed with a post distance between adjacent advance of four Harps 8 garments · The advance between each garment and the next garment · is approx. 12 m, i.e. one step of enthusiasm. · The width of the front in front of each garment being activated is three sections 8 and three picks 7

W fiaare 8 wierci się otwory 11 strefowe urabiające w kierunku czoła ubierki 9, której strop 12 podparty jest zmechanizowaną obudową 13 podporową· Równc^g^ z wierceniem otworów 11 strefowych urabiających wierci się pochyłe otwory 14 strzafowe zawałowe· Po drugoskonnym podparciu stropu 12 za fiαaimra 8 indywidualną obudową 15 podporową-, filar 8 rozetrzelówuje się maaeriałami wybuchowymi umieszczonymi w otworach 11 strefowych urabiają152 254 cych· Po wybraniu urobku 16 przemieszcza się zmechanizowany obudowę 13 podporowy do rozpartej indywidualnej obudowy 15 podporowej. Rabuje się indywidua lny obudowę 15 podporowy i w dalszym ciągu przemieszcza się zmechanizowany obudowę 13 podporowy do następnego filaru 8. Do otworów 14 strzałowych zawałowych ładuje się i odpala mteriał wybuchowy, który wywołuje zawał 17 warstw stropowych. Front eksploatacyjny przewietrzany jest opływowym prądem świeżego powietrza, którego obieg wymuszają tamy 18 przejezdne i regulacyjne tamy 19 przejezdne. Odstawa urobku z frontu eksploatacyjnego na wysyp 20· odbywa się chodnikami 3 transportowo-wentylacyjnymi. Każde pole 5 eksploatacyjne posiada doprowadzone sprężone powietrze i wodę przepłuczko*^ rurociągami 21. Maszyny i urządzenia pracujące na froncie zasilane są w sprężone powietrze i wodę przepłuczkową elastycznymi przewodami gumowymi połączonymi z rurociągami 21.In line 8, 11-zone cutting holes are drilled towards the face of the dressing 9, the roof of which 12 is supported by a mechanized 13-support casing. 8 with an individual support 15, the pillar 8 is blown apart with explosive materials placed in openings 11 of the mining 152 254 · After selecting the output 16, the mechanized support 13 is moved to the stretched individual support 15. An individual support casing 15 is robbed and the mechanized support casing 13 continues to move to the next pillar 8. An explosive material is loaded and fired into the blast holes 14, which causes a collapse of 17 roof layers. The exploitation front is ventilated with a streamlined stream of fresh air, the circulation of which is caused by passable 18 dams and 19 passable regulating dams. The transport of the spoil from the operational front to dumping 20 takes place via 3 transport and ventilation walkways. Each mining field 5 has compressed air and scrubber water supplied by pipelines 21. The machines and devices working at the front are supplied with compressed air and scrubbing water by flexible rubber hoses connected to the pipelines 21.

Claims (3)

Zastrzeżenia patentowePatent claims 1. Sposób eksploatacji złóż o średniej i cienkiej miąższości, syseernem zabierkowof ilarowo-ubeerkowym, froneem w układzie prostolinjnnym, prostol^nj-ojhohodowym lub schodowym, za pomocy techniki strzelniczej i przy użyciu samojezdnych maszyn górniczych, z zastoso wani^^m obudowy kotwi^owej i podporowee, z zawałem lub podsadzką stropu, znamienny t y m, że całe fUsry wybiera się w cyklu wydobywczym obejmującym kolejne fazy takie jak wiercenie otworów s ti^-^a oowych, podpieranie stropu zabierki, strzelanie fHaru, załadunek i odstawa urobku, przebudowa obudowy podporowej w wybranej przestrzeni, likwidacja wybranej przestrzeni.1. Method of exploitation of deposits of medium and thin thickness, with the use of a straight-line, straight-line, straight-line or stair-step system, with the use of shooting technique and with the use of self-propelled mining machines, with the use of ^^ m bolt casing ^ and supporting, with caving or backfilling of the roof, characterized in that the entire material is selected in a mining cycle that includes successive phases such as drilling of openings, support of the hauling roof, firing of the roof, loading and hauling of the excavated material, reconstruction of the housing support in the selected space, liquidation of the selected space. 2. Sposób według zast rz .1, znamienny · tym, że w urabianym fHazze wierci się, od strony zabierki, otwory strzaoowe urabiające w kierunku czoła ubierki, której strop podparty jest obudową podporową, odgradzającą zroby, a następnie po drugostonnnym podparciu stropu zabierki indywidualną obudową podporową, filar rozstrzeliwuje się w całości, a po wybraniu urobku, rabuje i przemieszcza się obudowę podporową do linii indywidualnej obudowy podporowee, rabuje indywidualną obudowę podporową, rabuje i przemieszcza obudowę podporową do następnego f^L^^ru - czoła kolejnej ubierki, a następnie lkkwiduje się wybraną przestrzeń.2. The method according to claim 1, characterized in that in the processed fHazze, the cutting holes are drilled in the direction of the front of the dresser, the roof of which is supported by a support casing which separates the goaf, and then, after the second support of the ceiling, an individual the support casing, the pillar is shot in its entirety, and after selecting the excavated material, it robs and moves the support casing to the line of the individual support casing, robs the individual support casing, robs and moves the support casing to the next f ^ L ^^ ru - the face of the next garment, and then the selected space is removed. 3. Sposób według zastrz.l, znamienny tym. Ze komory i zabierki prowadzi się wyprzedzająco tak, aby minimalna szerokość frontu, patrząc od czoła każdej ubierki, przed prznotąpieneem do wybierania fUsru wynosiła co najmniej dwa fHary i dwie przejezdne zabierki·3. A method according to claim 1, characterized in The chamber and the bolts are led in advance so that the minimum width of the front, seen from the front of each garment, before the loading for selecting fUsru is at least two fHars and two passable bolts 152 254152 254 Zakład Wydawnictw UP RP. Nakład 100 egz. Cena 3000 złDepartment of Publishing of the UP RP. Circulation 100 copies. Price PLN 3,000
PL26114686A 1986-08-21 1986-08-21 Deposit mining method PL152254B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL26114686A PL152254B1 (en) 1986-08-21 1986-08-21 Deposit mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL26114686A PL152254B1 (en) 1986-08-21 1986-08-21 Deposit mining method

Publications (2)

Publication Number Publication Date
PL261146A1 PL261146A1 (en) 1988-05-26
PL152254B1 true PL152254B1 (en) 1990-12-31

Family

ID=20032431

Family Applications (1)

Application Number Title Priority Date Filing Date
PL26114686A PL152254B1 (en) 1986-08-21 1986-08-21 Deposit mining method

Country Status (1)

Country Link
PL (1) PL152254B1 (en)

Also Published As

Publication number Publication date
PL261146A1 (en) 1988-05-26

Similar Documents

Publication Publication Date Title
PL152254B1 (en) Deposit mining method
RU2095570C1 (en) Method for development of steep ore bodies
PL165963B1 (en) Method of exploitation of deposits
RU2086765C1 (en) Method of preparing to mining flat-lying coal seam
PL185315B1 (en) Method of completely exctracting mined out material by meanms of breast-and-pilar working method
SU1680994A1 (en) Method for working steep coal seams having tendency towards gas dynamic effects
PL95599B1 (en) SELECTING METHOD OF OIL DEPOSITS
SU1281671A1 (en) Method of working thick steep seams and mechanized unit for performing same
PL199120B1 (en) Method of mining of compact beds
RU1788256C (en) Method for mining and inclined coal seams of medium thickness
SU754067A1 (en) Method of mining thick ore bodies
PL191764B1 (en) Underground mining method useful in getting solid mineral deposits
SU693017A1 (en) Method of mining mineral deposits
PL189135B1 (en) Breast-and-pillar clean working method used in getting minerals from their deposits
PL203799B1 (en) The manner of exploitation of compact bedded deposits
PL199089B1 (en) Method of mining of low seam thickness deposits
PL185652B1 (en) Method obtaining and filling voids produced during mining operations on mineral deposits being carried out by breast-and-stall working
SU374452A1 (en) U
PL200001B1 (en) Method for shortwall working of low thickness beds
PL163210B1 (en) Method of mining coal in steep deposits
PL189980B1 (en) Method of cleanly getting mineral deposits by pillar-and-stall working
PL167982B1 (en) Method of underground mining of mineral deposits
PL158092B1 (en) A chamber and pillar system of mining deposition
PL75372B2 (en)
PL169853B1 (en) The method of backfilling longwall workings