PL369946A1 - Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method - Google Patents

Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method

Info

Publication number
PL369946A1
PL369946A1 PL369946A PL36994604A PL369946A1 PL 369946 A1 PL369946 A1 PL 369946A1 PL 369946 A PL369946 A PL 369946A PL 36994604 A PL36994604 A PL 36994604A PL 369946 A1 PL369946 A1 PL 369946A1
Authority
PL
Poland
Prior art keywords
charges
shot
soil
holes
layer
Prior art date
Application number
PL369946A
Other languages
Polish (pl)
Other versions
PL210676B1 (en
Inventor
Ryszard Imiołek
Ryszard Kaptur
Natalia Kisielowa
Eugeniusz Dembicki
Original Assignee
POLBUD Wykonawstwo Sp.z o.o.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by POLBUD Wykonawstwo Sp.z o.o. filed Critical POLBUD Wykonawstwo Sp.z o.o.
Priority to PL369946A priority Critical patent/PL210676B1/en
Priority to PCT/PL2005/000039 priority patent/WO2005121457A1/en
Priority to US11/662,324 priority patent/US20080003061A1/en
Priority to EP05752697A priority patent/EP1792018B1/en
Priority to PL05752697T priority patent/PL1792018T3/en
Priority to AT05752697T priority patent/ATE382744T1/en
Priority to DE602005004169T priority patent/DE602005004169T2/en
Priority to RU2007112334/03A priority patent/RU2370595C2/en
Publication of PL369946A1 publication Critical patent/PL369946A1/en
Publication of PL210676B1 publication Critical patent/PL210676B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Agronomy & Crop Science (AREA)
  • Civil Engineering (AREA)
  • Soil Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Piles And Underground Anchors (AREA)
  • Lubricants (AREA)
  • Multiple-Way Valves (AREA)
  • Non-Metallic Protective Coatings For Printed Circuits (AREA)
  • Soil Conditioners And Soil-Stabilizing Materials (AREA)
  • Footwear And Its Accessory, Manufacturing Method And Apparatuses (AREA)

Abstract

A pyrotechnic method for stabilisation of low bearing capacity subsoil, that consists of determination of the parameters of the layer of soil to be stabilised, drilling nontabulated, vertical shot-holes at the intersection points of a square or equilateral triangle grid, selection, preparation and firing the oblong charges, characterised by the fact that the shot-holes with a diameter from 0.02 to 1.5 m and a depth of up to 50 m, are drilled with a water flush or a mud or clay suspension, at a spacing of 3 to 25 m, this spacing distance being inversely proportional to the thickness of the layer of soil that is to be stabilised. The charges, the total length of which cannot exceed the thickness of the layer to be consolidated, are composed of several small "sub-charges", spaced at distances from 1 to 10 m down the shot hole. The bottom end of each charge is blocked with a rod the diameter of which is greater than that of the shot hole. The sub-charges are fired successively from the top one to the bottom one, with a delay of between 0.05 to 10 milliseconds. The sequence of firing starts at one end of the area of soil to be consolidated. The charges are fired individually or in small groups at time intervals. Before the drilling of the shot holes a layer of loose soil, the thickness of which should vary from 0.5 to 20 m, is deposited on the area to be stabilized. After the explosions the non-cohesive soil fills the shot holes. The "sub-charges" are vertically fastened in the shot holes with wood, plastic or metal distance making rods.
PL369946A 2004-09-08 2004-09-08 Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method PL210676B1 (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
PL369946A PL210676B1 (en) 2004-09-08 2004-09-08 Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method
PCT/PL2005/000039 WO2005121457A1 (en) 2004-09-08 2005-06-13 A pyrotechnic method for the stabilisation of low bearing capacity subsoil
US11/662,324 US20080003061A1 (en) 2004-09-08 2005-06-13 Pyrotechnic Method for the Stabilisation of Low Bearing Capacity Subsoil
EP05752697A EP1792018B1 (en) 2004-09-08 2005-06-13 A pyrotechnic method for the stabilisation of low bearing capacity subsoil
PL05752697T PL1792018T3 (en) 2004-09-08 2005-06-13 A pyrotechnic method for the stabilisation of low bearing capacity subsoil
AT05752697T ATE382744T1 (en) 2004-09-08 2005-06-13 PYROTECHNICAL METHOD FOR STABILIZING SUBSTRATES WITH LOW BEARING CAPACITY
DE602005004169T DE602005004169T2 (en) 2004-09-08 2005-06-13 PYROTECHNICAL METHOD FOR STABILIZING SUBSTRATE WITH LOW WEARABILITY
RU2007112334/03A RU2370595C2 (en) 2004-09-08 2005-06-13 Pyrotechnic method of consolidation of subsoilwith low supporting power

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL369946A PL210676B1 (en) 2004-09-08 2004-09-08 Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method

Publications (2)

Publication Number Publication Date
PL369946A1 true PL369946A1 (en) 2006-03-20
PL210676B1 PL210676B1 (en) 2012-02-29

Family

ID=34972627

Family Applications (2)

Application Number Title Priority Date Filing Date
PL369946A PL210676B1 (en) 2004-09-08 2004-09-08 Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method
PL05752697T PL1792018T3 (en) 2004-09-08 2005-06-13 A pyrotechnic method for the stabilisation of low bearing capacity subsoil

Family Applications After (1)

Application Number Title Priority Date Filing Date
PL05752697T PL1792018T3 (en) 2004-09-08 2005-06-13 A pyrotechnic method for the stabilisation of low bearing capacity subsoil

Country Status (7)

Country Link
US (1) US20080003061A1 (en)
EP (1) EP1792018B1 (en)
AT (1) ATE382744T1 (en)
DE (1) DE602005004169T2 (en)
PL (2) PL210676B1 (en)
RU (1) RU2370595C2 (en)
WO (1) WO2005121457A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109255191A (en) * 2018-09-20 2019-01-22 中铁第四勘察设计院集团有限公司 A method of quantitatively calculating produced settling amount after railway bed piling prepressing

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9279289B2 (en) 2013-10-03 2016-03-08 Renegade Manufacturing, LLC Combination mud motor flow diverter and tiled bearing, and bearing assemblies including same
DE102014107577B4 (en) * 2014-05-28 2019-01-24 BIUG Beratende Ingenieure für Umweltgeotechnik und Grundbau GmbH Method for stabilizing liquefaction-prone loose rocks
CN111898177B (en) * 2019-07-12 2021-03-05 江苏科能岩土工程有限公司 Calculation method of stratified foundation consolidation degree
PL446342A1 (en) * 2023-10-10 2025-04-14 Politechnika Gdańska Method of strengthening the soil, especially the one with low bearing capacity

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3050149A (en) * 1957-09-26 1962-08-21 Texaco Inc Method for seismic prospecting
US3356178A (en) * 1965-06-29 1967-12-05 Shell Oil Co Method and apparatus for seismic exploration
US3295445A (en) * 1965-07-21 1967-01-03 Atlas Chem Ind Method of blasting
US3590738A (en) * 1967-12-07 1971-07-06 Shell Oil Co Method of shot-hole loading
US3714895A (en) * 1970-01-13 1973-02-06 Gulf Oil Corp Method for excavating by explosions
US3687075A (en) * 1970-12-11 1972-08-29 Hercules Inc Modified presplitting technique
NL7703935A (en) * 1977-04-12 1978-10-16 Ruiter Boringen En Bemalingen Soil compaction system - uses explosive charges and forms drainage channels round charges
US4382410A (en) * 1980-12-22 1983-05-10 Bowling David S Explosive blasting method and means
NL194337C (en) * 1993-12-24 2002-01-04 Nacap Nederland Bv Method and installation for compacting a soil with the help of explosive charges.
US6009946A (en) * 1997-11-14 2000-01-04 Exploration Products Company, Llc Device for sealing charges in shot holes and a method for using the same
JP4540022B2 (en) * 2000-08-01 2010-09-08 佐藤工業株式会社 Ground improvement method combined with blasting method
CA2429447C (en) * 2000-11-21 2009-06-02 International Technologies, Llc Drillhole blasting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109255191A (en) * 2018-09-20 2019-01-22 中铁第四勘察设计院集团有限公司 A method of quantitatively calculating produced settling amount after railway bed piling prepressing
CN109255191B (en) * 2018-09-20 2022-04-26 中铁第四勘察设计院集团有限公司 Method for quantitatively calculating settlement generated after preloading of railway subgrade

Also Published As

Publication number Publication date
EP1792018A1 (en) 2007-06-06
US20080003061A1 (en) 2008-01-03
DE602005004169D1 (en) 2008-02-14
ATE382744T1 (en) 2008-01-15
EP1792018B1 (en) 2008-01-02
PL1792018T3 (en) 2008-05-30
RU2370595C2 (en) 2009-10-20
RU2007112334A (en) 2008-10-27
WO2005121457A1 (en) 2005-12-22
DE602005004169T2 (en) 2008-12-18
PL210676B1 (en) 2012-02-29

Similar Documents

Publication Publication Date Title
US9869177B2 (en) Device for anchoring in multilayer soil
PL369946A1 (en) Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method
CN105040692A (en) Construction method of precast concrete pile body carrier pile
CN1137314C (en) Construction method of concrete pile
RU2601630C2 (en) Method of pile drive device
RU2334049C1 (en) Method of combined in situ pile manufacturing
CN102444119A (en) Method for constructing pipe-sinking cast-in-place pile in pebble layer, gravel layer and sand layer
CN205875178U (en) Concrete anchor draws cling compound system
RU2496944C1 (en) Method to arrange base of structural foundations
EA036628B1 (en) Method for compacting bases laid using weak mineral soils
RU2354778C2 (en) Method of soil stabilisation
RU2543842C1 (en) Ground anchor or drilling pile and manufacturing method of ground anchor or drilling pile
RU2091541C1 (en) Method of construction of piles foundation close to existing building
CN101845819A (en) Method for solidifying support of deep and thick soil side slope
RU2602524C1 (en) Method for making a combined built-in-place pile
RU2081240C1 (en) Method for erecting cast-in-place pile
RU2281997C2 (en) Injection pile and retaining wall built of pile foundation
CN119373113B (en) Deep cutting roadbed excavation construction method
CN1560379A (en) Constructure method of concrete pile
RU2241098C1 (en) Method for increasing load-bearing capacity of cast-in-place pile
SU996620A1 (en) Method of consolidating sagging soil body
JP6549407B2 (en) Pile construction method
PL224818B1 (en) Method for elaboration of explosive charge in soil
SU1652431A1 (en) Method for construction of cast-in-place pile
RU2062834C1 (en) Method for consolidating water-side landslide slope

Legal Events

Date Code Title Description
LAPS Decisions on the lapse of the protection rights

Effective date: 20070908