PL369946A1 - Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method - Google Patents
Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic methodInfo
- Publication number
- PL369946A1 PL369946A1 PL369946A PL36994604A PL369946A1 PL 369946 A1 PL369946 A1 PL 369946A1 PL 369946 A PL369946 A PL 369946A PL 36994604 A PL36994604 A PL 36994604A PL 369946 A1 PL369946 A1 PL 369946A1
- Authority
- PL
- Poland
- Prior art keywords
- charges
- shot
- soil
- holes
- layer
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Agronomy & Crop Science (AREA)
- Civil Engineering (AREA)
- Soil Sciences (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Piles And Underground Anchors (AREA)
- Lubricants (AREA)
- Multiple-Way Valves (AREA)
- Non-Metallic Protective Coatings For Printed Circuits (AREA)
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
- Footwear And Its Accessory, Manufacturing Method And Apparatuses (AREA)
Abstract
A pyrotechnic method for stabilisation of low bearing capacity subsoil, that consists of determination of the parameters of the layer of soil to be stabilised, drilling nontabulated, vertical shot-holes at the intersection points of a square or equilateral triangle grid, selection, preparation and firing the oblong charges, characterised by the fact that the shot-holes with a diameter from 0.02 to 1.5 m and a depth of up to 50 m, are drilled with a water flush or a mud or clay suspension, at a spacing of 3 to 25 m, this spacing distance being inversely proportional to the thickness of the layer of soil that is to be stabilised. The charges, the total length of which cannot exceed the thickness of the layer to be consolidated, are composed of several small "sub-charges", spaced at distances from 1 to 10 m down the shot hole. The bottom end of each charge is blocked with a rod the diameter of which is greater than that of the shot hole. The sub-charges are fired successively from the top one to the bottom one, with a delay of between 0.05 to 10 milliseconds. The sequence of firing starts at one end of the area of soil to be consolidated. The charges are fired individually or in small groups at time intervals. Before the drilling of the shot holes a layer of loose soil, the thickness of which should vary from 0.5 to 20 m, is deposited on the area to be stabilized. After the explosions the non-cohesive soil fills the shot holes. The "sub-charges" are vertically fastened in the shot holes with wood, plastic or metal distance making rods.
Priority Applications (8)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL369946A PL210676B1 (en) | 2004-09-08 | 2004-09-08 | Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method |
| PCT/PL2005/000039 WO2005121457A1 (en) | 2004-09-08 | 2005-06-13 | A pyrotechnic method for the stabilisation of low bearing capacity subsoil |
| US11/662,324 US20080003061A1 (en) | 2004-09-08 | 2005-06-13 | Pyrotechnic Method for the Stabilisation of Low Bearing Capacity Subsoil |
| EP05752697A EP1792018B1 (en) | 2004-09-08 | 2005-06-13 | A pyrotechnic method for the stabilisation of low bearing capacity subsoil |
| PL05752697T PL1792018T3 (en) | 2004-09-08 | 2005-06-13 | A pyrotechnic method for the stabilisation of low bearing capacity subsoil |
| AT05752697T ATE382744T1 (en) | 2004-09-08 | 2005-06-13 | PYROTECHNICAL METHOD FOR STABILIZING SUBSTRATES WITH LOW BEARING CAPACITY |
| DE602005004169T DE602005004169T2 (en) | 2004-09-08 | 2005-06-13 | PYROTECHNICAL METHOD FOR STABILIZING SUBSTRATE WITH LOW WEARABILITY |
| RU2007112334/03A RU2370595C2 (en) | 2004-09-08 | 2005-06-13 | Pyrotechnic method of consolidation of subsoilwith low supporting power |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL369946A PL210676B1 (en) | 2004-09-08 | 2004-09-08 | Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| PL369946A1 true PL369946A1 (en) | 2006-03-20 |
| PL210676B1 PL210676B1 (en) | 2012-02-29 |
Family
ID=34972627
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL369946A PL210676B1 (en) | 2004-09-08 | 2004-09-08 | Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method |
| PL05752697T PL1792018T3 (en) | 2004-09-08 | 2005-06-13 | A pyrotechnic method for the stabilisation of low bearing capacity subsoil |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL05752697T PL1792018T3 (en) | 2004-09-08 | 2005-06-13 | A pyrotechnic method for the stabilisation of low bearing capacity subsoil |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20080003061A1 (en) |
| EP (1) | EP1792018B1 (en) |
| AT (1) | ATE382744T1 (en) |
| DE (1) | DE602005004169T2 (en) |
| PL (2) | PL210676B1 (en) |
| RU (1) | RU2370595C2 (en) |
| WO (1) | WO2005121457A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109255191A (en) * | 2018-09-20 | 2019-01-22 | 中铁第四勘察设计院集团有限公司 | A method of quantitatively calculating produced settling amount after railway bed piling prepressing |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9279289B2 (en) | 2013-10-03 | 2016-03-08 | Renegade Manufacturing, LLC | Combination mud motor flow diverter and tiled bearing, and bearing assemblies including same |
| DE102014107577B4 (en) * | 2014-05-28 | 2019-01-24 | BIUG Beratende Ingenieure für Umweltgeotechnik und Grundbau GmbH | Method for stabilizing liquefaction-prone loose rocks |
| CN111898177B (en) * | 2019-07-12 | 2021-03-05 | 江苏科能岩土工程有限公司 | Calculation method of stratified foundation consolidation degree |
| PL446342A1 (en) * | 2023-10-10 | 2025-04-14 | Politechnika Gdańska | Method of strengthening the soil, especially the one with low bearing capacity |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3050149A (en) * | 1957-09-26 | 1962-08-21 | Texaco Inc | Method for seismic prospecting |
| US3356178A (en) * | 1965-06-29 | 1967-12-05 | Shell Oil Co | Method and apparatus for seismic exploration |
| US3295445A (en) * | 1965-07-21 | 1967-01-03 | Atlas Chem Ind | Method of blasting |
| US3590738A (en) * | 1967-12-07 | 1971-07-06 | Shell Oil Co | Method of shot-hole loading |
| US3714895A (en) * | 1970-01-13 | 1973-02-06 | Gulf Oil Corp | Method for excavating by explosions |
| US3687075A (en) * | 1970-12-11 | 1972-08-29 | Hercules Inc | Modified presplitting technique |
| NL7703935A (en) * | 1977-04-12 | 1978-10-16 | Ruiter Boringen En Bemalingen | Soil compaction system - uses explosive charges and forms drainage channels round charges |
| US4382410A (en) * | 1980-12-22 | 1983-05-10 | Bowling David S | Explosive blasting method and means |
| NL194337C (en) * | 1993-12-24 | 2002-01-04 | Nacap Nederland Bv | Method and installation for compacting a soil with the help of explosive charges. |
| US6009946A (en) * | 1997-11-14 | 2000-01-04 | Exploration Products Company, Llc | Device for sealing charges in shot holes and a method for using the same |
| JP4540022B2 (en) * | 2000-08-01 | 2010-09-08 | 佐藤工業株式会社 | Ground improvement method combined with blasting method |
| CA2429447C (en) * | 2000-11-21 | 2009-06-02 | International Technologies, Llc | Drillhole blasting |
-
2004
- 2004-09-08 PL PL369946A patent/PL210676B1/en not_active IP Right Cessation
-
2005
- 2005-06-13 AT AT05752697T patent/ATE382744T1/en not_active IP Right Cessation
- 2005-06-13 WO PCT/PL2005/000039 patent/WO2005121457A1/en not_active Ceased
- 2005-06-13 EP EP05752697A patent/EP1792018B1/en not_active Expired - Lifetime
- 2005-06-13 US US11/662,324 patent/US20080003061A1/en not_active Abandoned
- 2005-06-13 PL PL05752697T patent/PL1792018T3/en unknown
- 2005-06-13 RU RU2007112334/03A patent/RU2370595C2/en active
- 2005-06-13 DE DE602005004169T patent/DE602005004169T2/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109255191A (en) * | 2018-09-20 | 2019-01-22 | 中铁第四勘察设计院集团有限公司 | A method of quantitatively calculating produced settling amount after railway bed piling prepressing |
| CN109255191B (en) * | 2018-09-20 | 2022-04-26 | 中铁第四勘察设计院集团有限公司 | Method for quantitatively calculating settlement generated after preloading of railway subgrade |
Also Published As
| Publication number | Publication date |
|---|---|
| EP1792018A1 (en) | 2007-06-06 |
| US20080003061A1 (en) | 2008-01-03 |
| DE602005004169D1 (en) | 2008-02-14 |
| ATE382744T1 (en) | 2008-01-15 |
| EP1792018B1 (en) | 2008-01-02 |
| PL1792018T3 (en) | 2008-05-30 |
| RU2370595C2 (en) | 2009-10-20 |
| RU2007112334A (en) | 2008-10-27 |
| WO2005121457A1 (en) | 2005-12-22 |
| DE602005004169T2 (en) | 2008-12-18 |
| PL210676B1 (en) | 2012-02-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9869177B2 (en) | Device for anchoring in multilayer soil | |
| PL369946A1 (en) | Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method | |
| CN105040692A (en) | Construction method of precast concrete pile body carrier pile | |
| CN1137314C (en) | Construction method of concrete pile | |
| RU2601630C2 (en) | Method of pile drive device | |
| RU2334049C1 (en) | Method of combined in situ pile manufacturing | |
| CN102444119A (en) | Method for constructing pipe-sinking cast-in-place pile in pebble layer, gravel layer and sand layer | |
| CN205875178U (en) | Concrete anchor draws cling compound system | |
| RU2496944C1 (en) | Method to arrange base of structural foundations | |
| EA036628B1 (en) | Method for compacting bases laid using weak mineral soils | |
| RU2354778C2 (en) | Method of soil stabilisation | |
| RU2543842C1 (en) | Ground anchor or drilling pile and manufacturing method of ground anchor or drilling pile | |
| RU2091541C1 (en) | Method of construction of piles foundation close to existing building | |
| CN101845819A (en) | Method for solidifying support of deep and thick soil side slope | |
| RU2602524C1 (en) | Method for making a combined built-in-place pile | |
| RU2081240C1 (en) | Method for erecting cast-in-place pile | |
| RU2281997C2 (en) | Injection pile and retaining wall built of pile foundation | |
| CN119373113B (en) | Deep cutting roadbed excavation construction method | |
| CN1560379A (en) | Constructure method of concrete pile | |
| RU2241098C1 (en) | Method for increasing load-bearing capacity of cast-in-place pile | |
| SU996620A1 (en) | Method of consolidating sagging soil body | |
| JP6549407B2 (en) | Pile construction method | |
| PL224818B1 (en) | Method for elaboration of explosive charge in soil | |
| SU1652431A1 (en) | Method for construction of cast-in-place pile | |
| RU2062834C1 (en) | Method for consolidating water-side landslide slope |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Decisions on the lapse of the protection rights |
Effective date: 20070908 |