PL38469B1 - - Google Patents

Download PDF

Info

Publication number
PL38469B1
PL38469B1 PL38469A PL3846954A PL38469B1 PL 38469 B1 PL38469 B1 PL 38469B1 PL 38469 A PL38469 A PL 38469A PL 3846954 A PL3846954 A PL 3846954A PL 38469 B1 PL38469 B1 PL 38469B1
Authority
PL
Poland
Prior art keywords
slabs
floor
concrete
ceramic
reinforced concrete
Prior art date
Application number
PL38469A
Other languages
Polish (pl)
Filing date
Publication date
Application filed filed Critical
Publication of PL38469B1 publication Critical patent/PL38469B1/pl

Links

Description

isSff- Opublikowano dnia 25 stycznia 1957 r.**AT**.JMk s 'a O |:)!3LIOTEKA| A Urzedu Patentowego 6/otf POLSKIEJ RZECZYPOSPOLITEJ LUDOWEJ OPIS PATENTOWY Nr38469 KI. 33=3^2 JMiastoprojekt-Kraków" ^* */°$ Przedsiebiorstwo Projektowania Budownictwa Miejskiego*) Kraków, Polska Wielkoplytowy strop ielbetoceramiczny Patent trwa od dnia 12 listopada 1954 r.Pustaki ceramiczne traktowane byly dotych¬ czas jedynie jako wypelnienie w ustroju zel¬ betowym i nie pelnily zadnej pracy statycznej, co wiecej pokryte byly plyta zelbetowa lub betonowa grubosci najmniej 4 cm. Sam spo¬ sób wykorzystania dotychczasowego pustaków ceramicznych przez formowanie, zbrojenie i wy¬ pelnienie betonem na budowie odpowiednich ustroi przy uzyciu deskowan byl typowy dla metod budownictwa nieuprzemyslowionego i nie przedstawial zadnych cech budownictwa uprze¬ myslowionego, gdzie zasada polega na produ¬ kowaniu w wytwórniach odpowiednio duzych elementów i montowaniu ich na placu budowy.Wady te i niedogodnosci eliminuje strop wiel¬ koplytowy zelbetoceramiczny wedlug wyna¬ lazku. Elementy tego stropu sa wykonane w (postaci duzych plyt o ciezarze conajmniej 1 tonny, wymagane jest wiec stosowanie na bu¬ dowie dzwigów o odpowiedniej nosnosci. Ply¬ ty wykonuje sie przy uzyciu pustaków cera- *) Wlasciciel patentu oswiadczyl, ze twórca wyna¬ lazku Jert Antoni TarczewakL micznych. Zeberka podluzne i poprzeczne sa zbrojone pretami stalowymi i wypelnione beto¬ nem, który pokrywa równiez i pustaki war¬ stwa grubosci 1,5 cm. Pustaki wraz z ta war¬ stwa betonu pracuja razem statycznie, dajac w wyniku znaczne oszczednosci materialowe.Plyty w czasie produkcji sa wibrowane. Plyty stropu strychowego traktuje sie jako wolno- podparte, zas plyty stropów miedzypietrowych jako czesciowo utwierdzone.Na rysunku fig. 1 przedstawia widok w ak- sonometrii plyt stropowych spoczywajacych na murach, fig. 2 — przekrój poziomy przez plyty stropowe, fig. 3 — przekrój poprzeczny przez styk plyt stropowych, fig. 4 — przekrój po¬ przeczny przez segment wienca plyty, zawiera¬ jacy uchwyty transportowe, fig. 5 — przekrój podluzny przez strop z plyt zelbetoceramicz- nych, fig. 6 — widok w aksonometrii zebra zel¬ betowego prefabrykowanego pod dzialówki ciezkie.Kazda plyta stropowa 1 posiada pomiedzy po¬ dluznymi zeberkami pustaki ceramiczne 6. Ste-zenie poprzeczne stanowia zeberka 7, zas zeber¬ ka poprzeczna 8 i 9 na krancacji plyty stanowia elementy prefabrykowane wienca. Zeberko szersze 8 spoczywa na murze zewnetrznym 2, zas zeberko wezsze 9 na murze wewnetrznym 3. Dla umozliwienia transportu plyta posiada uchwyty 4. Styk plyt pomiedzy soba 10 ma wy¬ krój klina betonowego, który uniemozliwia powstanie klawiszowania. Dzialówki lekkie stawia sie bezposrednio na elementach wielko¬ plytowych, zas dzialówki ciezkie 12 na zelbeto¬ wych zebrach prefabrykowanych 11, które sto¬ jac 2 cm ponad plytami stropu 1 pracuja sta¬ tycznie niezaleznie. Wszelkie piony rur instala¬ cyjnych przebija sie przez pustaki ceramiczne.Po wykonaniu murów danej kondygnacji wy¬ równuje sie ich wierzch zaprawa cementowa.Nastepnie uklada sie plyty stropowe 1 na za¬ prawie cementowej swiezej. Dalsza czynnoscia jest zagiecie na siebie i zespawanie uchwytów transportowych 4 do pozycji 5, poczym pokry¬ wa sie to miejsce zaprawa cementowa. W tej fazie robót kladzie sie zebra prefabrykowane 11 pod dzialówki ciezkie. Teraz wznosi sie mu¬ ry kondygnacji powyzej, poczym uklada sie na nich w sposób podobny plyty stropowe. Po do¬ konaniu tych czynnosci powraca sie do plyt stropowych kondygnacji ponizej i wypelnia za¬ prawa cementowa szczeliny miedzy plytami o * przekroju klinowym 10. Widocznym jest wiec, ze elementy stropu wielkoplytowego zelbeto- ceramicznego sa produkowane w formach i na¬ stepnie montowane na budowie, eliminuja zu¬ pelnie deskowanie i stemplowanie, co pozwala znacznie zaoszczedzic drewno jak równiez i pra¬ cochlonnosc. Przez zmniejszenie o 65% grubosc plyty betonowej ponad pustakami w stosun¬ ku do stanu obecnego oszczedza sie cement, kruszywa, stal, przez to, ze strop jest lzejszy.Przemyslowy sposób produkowania elementów stropu wielkoplytowego w oparciu o system tasmowy realizowany w zakladach prefabry- kacji oraz zmechanizowanie montazu stropów na budowie daje dalsze 50% oszczednosci na pracochlonnosci wykonania stropów w stosun¬ ku do czasokresu potrzebnego dotychczas. PL PLisSff- Published on January 25, 1957**AT**.JMk s 'a O |:)!3LIOTEKA| A Patent Office 6/otf POLISH PEOPLE'S REPUBLIC PATENT DESCRIPTION No. 38469 KI. 33=3^2 JMiastoprojekt-Kraków" ^* */°$ Municipal Construction Design Company*) Kraków, Poland Large-panel reinforced concrete-ceramic floor. Patent valid from November 12, 1954. Ceramic blocks were treated until then only as filling in reinforced concrete structures and did not perform any static work, what is more, they were covered with a reinforced concrete or concrete slab of at least 4 cm thick. The method of using ceramic blocks so far by forming, reinforcing and filling with concrete during the construction of appropriate structures using formwork was typical of non-industrialized construction methods and did not present any features of industrialized construction, where the principle is to produce appropriately large elements in factories and assemble them on the construction site. These disadvantages and inconveniences eliminates the need for a large reinforced concrete-ceramic slab ceiling according to the invention. The elements of this ceiling are made in the form of large slabs weighing at least 1 ton, therefore the use of cranes with appropriate load-bearing capacity is required on the construction site. The slabs are made using ceramic blocks. *) The patent owner declared that the inventor of the invention, Jert Antoni Tarczewak, is a qualified engineer. The longitudinal and transverse ribs are reinforced with steel bars and filled with concrete, which also covers the blocks with a 1.5 cm thick layer. The blocks and this concrete layer work together statically, resulting in significant material savings. The slabs are vibrated during production. The attic ceiling slabs are treated as freely supported, while The floor slabs between the floors are partially restrained. Fig. 1 shows an axonometric view of the floor slabs resting on the walls, Fig. 2 — a horizontal section through the floor slabs, Fig. 3 — a cross-section through the joint of the floor slabs, Fig. 4 — a cross-section through a segment of the slab ring containing transport handles, Fig. 5 — a longitudinal section through the floor made of reinforced concrete ceramic slabs, Fig. 6 — an axonometric view of a prefabricated reinforced concrete rib for heavy partitions. Each floor slab 1 has ceramic blocks 6 between the longitudinal ribs. The transverse bracing is made of ribs 7, while the transverse ribs 8 and 9 at the end The panels are prefabricated elements of the ring frame. The wider rib 8 rests on the external wall 2, while the narrower rib 9 rests on the internal wall 3. To facilitate transport, the panel has handles 4. The joint between the panels 10 has a concrete wedge cutout, which prevents the formation of keying. Lightweight partitions are placed directly on the large-panel elements, while heavy partitions 12 on prefabricated reinforced concrete ribs 11, which, standing 2 cm above the floor slabs 1, work statically independently. All vertical pipes are driven through the ceramic blocks. After the walls of a given floor are completed, their tops are leveled with cement mortar. Then, the floor slabs are laid. 1 on fresh cement mortar. The next step is to bend and weld the transport brackets 4 to position 5, after which this area is covered with cement mortar. In this phase of work, prefabricated ribs 11 are laid under the heavy partitions. Now the walls of the storey above are erected, after which the floor slabs are placed on them in a similar manner. After completing these steps, return to the floor slabs of the storey below and fill the gaps between the wedge-shaped slabs 10 with cement mortar. It is therefore visible that the elements of the large reinforced concrete-ceramic floor are manufactured in molds and then assembled on site, completely eliminating formwork and shoring, which allows for significant savings in wood and also in Labor intensity. By reducing the thickness of the concrete slab above the hollow bricks by 65% compared to the current state, cement, aggregates, and steel are saved, making the ceiling lighter. The industrial method of producing large-panel ceiling elements based on a conveyor belt system implemented in prefabrication plants and the mechanization of the ceiling assembly on site provides a further 50% savings in labor intensity compared to the time required previously.

PL38469A 1954-11-12 PL38469B1 (en)

Publications (1)

Publication Number Publication Date
PL38469B1 true PL38469B1 (en) 1955-04-15

Family

ID=

Similar Documents

Publication Publication Date Title
CN103797197B (en) Building structure with precast monolithic walls and floors
CN103924711A (en) Assembled type gridding shearing wall structural system and construction technology of assembled type gridding shearing wall structural system
CN103953114A (en) Steel frame-reinforced masonry shear wall composite structure and construction method thereof
CN110439291B (en) Assembly type production construction method suitable for low-rise building
US1912290A (en) Slab floor or roof construction
CN210713195U (en) A frame structure prefabricated concrete house
RU178522U1 (en) Precast monolithic overlap
PL128494B1 (en) Ceiling,in particular for dwelling houses and method of making the same
US1726031A (en) Precast roof slab
RU2632592C1 (en) Reinforced formwork block and building structure
EP3719229B1 (en) Concrete floor panel, method of production of such panel and floor made of this panel
US2816346A (en) Method of constructing reinforced concrete floors and beams
US2375744A (en) Half-tubular reinforced concrete beam for use in building construction
GB803484A (en) Improvements in or relating to structural building units
RU72244U1 (en) MONOLITHIC COVERAGE
RU171832U1 (en) PLATFORM FORM
RU215721U1 (en) Formwork for I-beams and T-beams
RU2859328C1 (en) Building block and method for its manufacture
WO2023089600A1 (en) Re-usable plastic formwork used as a replacement for the blocks in block and joist type one-way slabs with pre-fabricated joists (steel or reinforced concrete)
US20240301687A1 (en) Wall elements, unit construction system and method
SU1765435A1 (en) Wide-span chamber work dome liming construction method
CN211646993U (en) A prefabricated large-span dense ribbed concrete roof
CN209194582U (en) A kind of non-dismantling formwork concrete list cabin piping lane or more cabin piping lanes
SU927922A1 (en) Ferroconcrete structure connection assembly
Meneiliuk et al. ERECTION OF LIGHTWEIGHT SOLID SLABS AT THECONSTRUCTION SITE