PL399618A1 - Sposób wytwarzania trumny do szybkiego montazu i trumna do szybkiego montazu - Google Patents
Sposób wytwarzania trumny do szybkiego montazu i trumna do szybkiego montazuInfo
- Publication number
- PL399618A1 PL399618A1 PL399618A PL39961812A PL399618A1 PL 399618 A1 PL399618 A1 PL 399618A1 PL 399618 A PL399618 A PL 399618A PL 39961812 A PL39961812 A PL 39961812A PL 399618 A1 PL399618 A1 PL 399618A1
- Authority
- PL
- Poland
- Prior art keywords
- casket
- elements
- board
- appropriate
- way
- Prior art date
Links
- 238000009434 installation Methods 0.000 title 1
- 238000004519 manufacturing process Methods 0.000 title 1
- 239000002184 metal Substances 0.000 abstract 3
- 238000000034 method Methods 0.000 abstract 1
- 238000003801 milling Methods 0.000 abstract 1
- 238000000465 moulding Methods 0.000 abstract 1
- 238000010422 painting Methods 0.000 abstract 1
- 238000002360 preparation method Methods 0.000 abstract 1
Landscapes
- Toys (AREA)
- Table Devices Or Equipment (AREA)
Abstract
Sposób wytwarzania trumny do szybkiego montazu i trumna powstala w ten sposób, charakteryzuje sie tym, ze najpierw nastepuje przygotowanie plyty meblowej, nastepnie sklejona plyta jest rozcinana na gotowe wymiarowo elementy trumny. W nastepnej kolejnosci nastepuje struganie formatek plyty z jednoczesnym nadaniem odpowiedniego profilu ozdobnego w zaleznosci od modelu. Pózniej nastepuje struganie z czterech stron sklejonej formatki, gdzie od góry formatki nadawany jest profil ozdobny, natomiast od dolu powstaje specjalne wyfrezowanie pod montaz dna (7) trumny, boki formatki natomiast profilowane sa pod odpowiednimi katami. Nastepnie odbywa sie szlifowanie, do niektórych modeli przybijane sa listwy ozdobne. Potem nastepuje wycinanie elementów pod odpowiednimi katami wraz z wyfrezowaniem wpustów pod polaczenie metalowym lacznikiem (4) dwuteowym. Tak przygotowane elementy podlegaja montazowi w calosc. Na stanowisku montazu czesci A górnej wklada sie odpowiednie elementy, nastepnie zaciska sie je i powoduje mocne scisniecie czterech elementów trumny a nastepnie za pomoca mlotka pneumatycznego wbija sie metalowe laczniki (4) dwuteowe w wyfrezowane wpusty. W nastepnej kolejnosci nastepuje szybki montaz dekla za pomoca zlacz mimosrodowych zamocowanych w otworach montazowych do scianek bocznych i szczytów. Na stanowisku montazu czesci B dolnej wklada sie odpowiednie elementy, zaciska sie w prasie a nastepnie we wczesniej wyfrezowany wpust wklada sie dno (7) trumny, nastepnie obraca sie rame z zamocowanymi elementami do pozycji wbijania metalowych laczników (4) dwuteowych, w ten sposób nastepuje polaczenie scianek bocznych (6) ze szczytami (8), pózniej nastepuje lakierowanie czesci A dolnej i czesci B górnej.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL399618A PL399618A1 (pl) | 2012-06-21 | 2012-06-21 | Sposób wytwarzania trumny do szybkiego montazu i trumna do szybkiego montazu |
| DE201210112185 DE102012112185A1 (de) | 2012-06-21 | 2012-12-12 | Verfahren zur Herstellung eines Sargs |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL399618A PL399618A1 (pl) | 2012-06-21 | 2012-06-21 | Sposób wytwarzania trumny do szybkiego montazu i trumna do szybkiego montazu |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| PL399618A1 true PL399618A1 (pl) | 2013-12-23 |
Family
ID=49767874
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL399618A PL399618A1 (pl) | 2012-06-21 | 2012-06-21 | Sposób wytwarzania trumny do szybkiego montazu i trumna do szybkiego montazu |
Country Status (1)
| Country | Link |
|---|---|
| PL (1) | PL399618A1 (pl) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2015133918A1 (en) | 2014-03-07 | 2015-09-11 | SOCHA, Piotr Zakład Kamieniarski | An environment-friendly coffin |
-
2012
- 2012-06-21 PL PL399618A patent/PL399618A1/pl unknown
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2015133918A1 (en) | 2014-03-07 | 2015-09-11 | SOCHA, Piotr Zakład Kamieniarski | An environment-friendly coffin |
| US9895278B2 (en) | 2014-03-07 | 2018-02-20 | Socha Piotr Zaklad Kamieniarski | Environment-friendly coffin |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2007118028A3 (en) | Galley assembly for an aircraft | |
| GB201117949D0 (en) | Portal frame | |
| CN203808779U (zh) | 一种嵌插组合式木门门扇 | |
| CN204248856U (zh) | 一种玻璃门框架直角装配台 | |
| PL399618A1 (pl) | Sposób wytwarzania trumny do szybkiego montazu i trumna do szybkiego montazu | |
| CN202085986U (zh) | 柜 | |
| PL1778933T3 (pl) | Urządzenie do wykonywania naziemnych struktur otwartych lub zamkniętych | |
| CN204691039U (zh) | 塑料吊顶框架 | |
| CN205758049U (zh) | 便于生产组装的家具柜框架结构 | |
| CN203420432U (zh) | 饰面板装饰用的模块化拼装式钢龙骨结构 | |
| WO2006081184A3 (en) | Overlay members for sectional overhead door panels | |
| CN202698394U (zh) | 模块化防水橱柜 | |
| CN204252467U (zh) | 一种用于木饰板的固定挂件 | |
| CN205422160U (zh) | 一种通透式围墙的立柱及通透式围墙 | |
| CN204282696U (zh) | 木塑双压线型材 | |
| CN205961956U (zh) | 一种180°回转臂 | |
| PL1812213T3 (pl) | Wzorniki do wytwarzania złącz belkowań drewnianych | |
| RU132831U1 (ru) | Дверное полотно | |
| CN205064486U (zh) | 用于家具组装的易固拆装件 | |
| PL74154Y1 (pl) | Trumna | |
| CN206533318U (zh) | 一种隐藏式太阳能板用横梁和立柱的安装结构 | |
| CN203846614U (zh) | 阳光房转角立柱与两侧斜梁及排水槽横梁的连接结构 | |
| CN203961437U (zh) | 一种安装方便的新型木塑围栏 | |
| CN203321193U (zh) | 门框收口型材组件 | |
| DE502004004507D1 (de) | Horizontale Werkzeugmaschine mit zwei vertikalen miteinander verbundenen Rahmen |