Method of making the liquidation and exit channel of the mechanized complex from a mining wall excavation

Info

Publication number
PL399989A1
PL399989A1 PL399989A PL39998912A PL399989A1 PL 399989 A1 PL399989 A1 PL 399989A1 PL 399989 A PL399989 A PL 399989A PL 39998912 A PL39998912 A PL 39998912A PL 399989 A1 PL399989 A1 PL 399989A1
Authority
PL
Poland
Prior art keywords
exit channel
liquidation
excavation
mechanized
hatch
Prior art date
Application number
PL399989A
Other languages
Polish (pl)
Other versions
PL223966B1 (en
Inventor
Marek Celmer
Zbigniew Czarnecki
Mieczysław Lubryka
Leszek Skrobol
Tadeusz Smolorz
Original Assignee
Jastrzebska Spólka Weglowa Spólka Akcyjna
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jastrzebska Spólka Weglowa Spólka Akcyjna filed Critical Jastrzebska Spólka Weglowa Spólka Akcyjna
Priority to PL399989A priority Critical patent/PL223966B1/en
Publication of PL399989A1 publication Critical patent/PL399989A1/en
Publication of PL223966B1 publication Critical patent/PL223966B1/en

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Wynalazek dotyczy sposobu wykonania kanalu likwidacyjno-wyjazdowego kompleksu zmechanizowanego z górniczego wyrobiska scianowego w podziemiach kopalni glebinowej z zagrozeniem metanowym w obudowie lukowo-prostokatnej (1), wzmocnionej we wczesniejszej fazie szybkopostepowego biegu górniczego wyrobiska scianowego (5) z kompleksem zmechanizowanym strugowym w kierunku do tego kanalu likwidacyjno-wyjazdowego tak, aby w swej fazie koncowej zblizajacy sie front wyrobiska scianowego (5) mógl dojechac i bezposrednio wjechac do wczesniej przygotowanego kanalu likwidacyjno-wyjazdowego w obudowie lukowo-prostokatnej (1), wzmocnionej w swej czesci stropowej podciagami stalowymi oraz kotwami strunowymi (3a,3b,3c) o nosnosci korzystnie 320 kN. Front wyrobiska scianowego (5) wjezdza etapami z kompleksem zmechanizowanym po wykonaniu odcinkami skosowania (6) pod spodem swego wylotu (5a) do wlotu bocznego obudowy lukowo-prostokatnej (1) kanalu likwidacyjno-wyjazdowego w swojej koncowej fazie stopniowo poprzez przesuwajacy sie punkt jego styku z tym kanalem pod odpowiednim katem.The invention relates to the method of constructing the liquidation-exit channel of a mechanized complex from a mining wall excavation in the underground of a soil mine with a methane hazard in a rectangular arch hatch (1), reinforced at an earlier stage of the high-speed run of the mining excavation wall (5) with a mechanized plow complex in this direction the decommissioning and exit channel so that in its final phase the approaching front of the wall excavation (5) can reach and directly enter the previously prepared decommissioning and exit channel in a rectangular hatch (1), reinforced in its ceiling with steel beams and string anchors (3a, 3b, 3c) with a bearing capacity of preferably 320 kN. The front of the wall excavation (5) enters in stages with the mechanized complex after making bevelled sections (6) underneath its outlet (5a) to the side inlet of the hatch-rectangular housing (1) the liquidation-exit channel in its final phase gradually through the moving point of its contact with this channel at the right angle.

PL399989A 2012-07-16 2012-07-16 Manufacturing method for the elimination and exit channel, and the mechanized complex of longwall mining excavations PL223966B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL399989A PL223966B1 (en) 2012-07-16 2012-07-16 Manufacturing method for the elimination and exit channel, and the mechanized complex of longwall mining excavations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL399989A PL223966B1 (en) 2012-07-16 2012-07-16 Manufacturing method for the elimination and exit channel, and the mechanized complex of longwall mining excavations

Publications (2)

Publication Number Publication Date
PL399989A1 true PL399989A1 (en) 2014-01-20
PL223966B1 PL223966B1 (en) 2016-11-30

Family

ID=49920826

Family Applications (1)

Application Number Title Priority Date Filing Date
PL399989A PL223966B1 (en) 2012-07-16 2012-07-16 Manufacturing method for the elimination and exit channel, and the mechanized complex of longwall mining excavations

Country Status (1)

Country Link
PL (1) PL223966B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL447475A1 (en) * 2024-01-08 2025-07-14 Polska Grupa Górnicza Spółka Akcyjna Method for constructing a liquidation channel and a device for special works, especially for implementing this method

Also Published As

Publication number Publication date
PL223966B1 (en) 2016-11-30

Similar Documents

Publication Publication Date Title
AU2015281641B2 (en) Method for removing hydraulic support for solid filling coal mining
GEP20207062B (en) Tunnel construction method using pre-support and post-support
EA201690486A1 (en) METHOD OF DEVELOPMENT OF DEPOSITS
FI20115587A0 (en) A method for creating a betting plan
MX362182B (en) Pre-stressed molded wall, and method for creating such a wall.
EA201590327A1 (en) METHOD OF STRENGTHENING A PART IN THE FORM OF A SUPPORT OF PASSING NEXT PARALLEL TUNNELS BY ARMATURE RODS AND METHOD OF DEVELOPMENT
PH12016501468A1 (en) Stiffeners for mettalic logs structures
BRPI0800009A2 (en) Method and system for modeling a soil trench
PL399989A1 (en) Method of making the liquidation and exit channel of the mechanized complex from a mining wall excavation
RU2010114898A (en) METHOD FOR STRUCTURE OF UNDERWATER TUNNELS
PE20181430A1 (en) FOAMING ADDITIVE FOR SOIL CONDITIONING IN THE PRESENCE OF MECHANICAL EXCAVATION FOR CONSTRUCTION OF TUNNELS
RU2549659C1 (en) Method of abandonment of methane saturated mine
EA201171238A1 (en) METHOD OF PREVENTION OF FLOODING OF POTASSIUM MINES DURING BREAKTHROUGHES IN THE MINE OF UNDERGROUND WATER FROM GEOLOGICAL DISORDERS
Dong et al. 3 D analysis of function of piperoof applied in soft ground.
Porath et al. Excavations along the High Level Aqueduct to Caesarea Maritima
CN203925577U (en) A kind of underground main drainage pump room structure
MX2014015144A (en) Segmented prefabricated concrete structure.
MX2015014002A (en) Pre-blended dry cement mortar for covering underground works and slopes.
PL395597A1 (en) Direct methane removal and inertization method for the caving area of the heading
Dodman et al. Pit slope depressurisation investigation for an open cut iron ore mine in the Pilbara
DEMI et al. Evaluation of the stress-strain state of the rock mass surrounding the underground working with rock bolting support setting
Zhang et al. Alteration of face equipment cooperating and study and application of preventing tumble and glide in big obliquity working face of gequan mine.
EA020859B1 (en) Method of prevention of potash mine flooding
Azadi et al. The Effects of Shallow Tunnels on Nearby Structures
MX2014002711A (en) Cable mining anchor for reinforcing rock.