PL4065776T3 - Sposób formowania ściany palowej w gruncie i odpowiadająca jej ściana palowa - Google Patents

Sposób formowania ściany palowej w gruncie i odpowiadająca jej ściana palowa

Info

Publication number
PL4065776T3
PL4065776T3 PL20838588.0T PL20838588T PL4065776T3 PL 4065776 T3 PL4065776 T3 PL 4065776T3 PL 20838588 T PL20838588 T PL 20838588T PL 4065776 T3 PL4065776 T3 PL 4065776T3
Authority
PL
Poland
Prior art keywords
pile wall
ground
forming
wall
corresponding pile
Prior art date
Application number
PL20838588.0T
Other languages
English (en)
Inventor
Juhani VÄLISALO
Original Assignee
Pirkan Laatupalvelu Oy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from FI20196069A external-priority patent/FI20196069A1/fi
Application filed by Pirkan Laatupalvelu Oy filed Critical Pirkan Laatupalvelu Oy
Publication of PL4065776T3 publication Critical patent/PL4065776T3/pl

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/187Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D11/00Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
PL20838588.0T 2019-11-29 2020-11-27 Sposób formowania ściany palowej w gruncie i odpowiadająca jej ściana palowa PL4065776T3 (pl)

Applications Claiming Priority (7)

Application Number Priority Date Filing Date Title
FI20196036 2019-11-29
FI20196069A FI20196069A1 (fi) 2019-11-29 2019-12-10 Menetelmä porattavan seinärakenteen muodostamiseksi maaperään ja vastaava porattava seinärakenne
FI20196103 2019-12-19
FI20196133 2019-12-27
FI20205010 2020-01-03
FI20205225 2020-03-04
PCT/FI2020/050803 WO2021105569A1 (en) 2019-11-29 2020-11-27 Method for forming a pile wall in ground and a corresponding pile wall

Publications (1)

Publication Number Publication Date
PL4065776T3 true PL4065776T3 (pl) 2024-05-20

Family

ID=74141586

Family Applications (1)

Application Number Title Priority Date Filing Date
PL20838588.0T PL4065776T3 (pl) 2019-11-29 2020-11-27 Sposób formowania ściany palowej w gruncie i odpowiadająca jej ściana palowa

Country Status (3)

Country Link
EP (1) EP4065776B1 (pl)
PL (1) PL4065776T3 (pl)
WO (1) WO2021105569A1 (pl)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022200692A1 (en) * 2021-03-25 2022-09-29 Pirkan Laatupalvelu Oy Method for forming a wall structure in the ground by drilling and wall structure formed by drilling
US12065799B2 (en) 2019-11-29 2024-08-20 Pirkan Laatupalelu Oy Method for forming a pile wall in ground and a corresponding pile wall
WO2023139425A1 (en) * 2022-01-24 2023-07-27 Vo Thanh Minh Pile-substructure column system and construction method of the pile-substructure column system
CN115288112B (zh) * 2022-08-17 2024-02-23 北京市市政一建设工程有限责任公司 一种河道软土地基加固结构
CN116005664A (zh) * 2022-12-23 2023-04-25 中铁二院工程集团有限责任公司 用于钻孔桩基础的施工方法、组合钢护筒及钻孔桩基础

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3420067A (en) * 1965-09-13 1969-01-07 Sven Erik Bjerking Production of piles and pile structures in the ground
GB2315086A (en) * 1996-07-10 1998-01-21 Kwong Yee Chan Piling
KR100866162B1 (ko) * 2008-08-14 2008-10-30 이재호 의자형 자립식 흙막이벽의 시공방법
CN102159769B (zh) * 2008-09-18 2012-12-05 新日本制铁株式会社 钢管板桩、钢管板桩的接头构造和壁构造、以及钢管板桩的拉拔方法
KR101190739B1 (ko) * 2010-06-14 2012-10-12 공정호 지하 합성 외벽 구조물 시공 방법 및 이에 의해 시공된 지하 합성 외벽 구조물
KR101846455B1 (ko) * 2017-07-11 2018-04-06 송호산업 주식회사 겹침형 주열식 벽체의 시공방법 및 이에 의해 시공된 주열식 벽체

Also Published As

Publication number Publication date
EP4065776A1 (en) 2022-10-05
EP4065776C0 (en) 2023-12-20
EP4065776B1 (en) 2023-12-20
WO2021105569A1 (en) 2021-06-03

Similar Documents

Publication Publication Date Title
PL4065776T3 (pl) Sposób formowania ściany palowej w gruncie i odpowiadająca jej ściana palowa
PL3592650T3 (pl) Sposób i system składania pudełek
PL3811748T3 (pl) Maszyna pieląca i sposób prowadzenia pielenia przy użyciu maszyny pielącej
PL3953531T3 (pl) Odłączalne urządzenie fluidyzacyjne do stosowania w rurowych palach fundamentowych i odpowiadający mu sposób
CA3288320A1 (en) Methods and apparatuses for constructing a concrete structure
IL259266B (en) Method for forming a stable foundation ground
PL4045740T3 (pl) Sposób wytwarzania fundamentu śrubowego do mocowania elementów w glebie
HUE065901T2 (hu) Berendezés és eljárás megerõsített betéttel ellátott zacskók kialakítására
ZA201904890B (en) Cone crushing machine and crushing method using such a machine
SG11202003085XA (en) Soil-displacement drill, method for converting a soil-displacement drill and method for forming a foundation pile
GB201602227D0 (en) Method and apparatus for securing a foundation before grouting operations
GB2582429B (en) System and method for erecting a fence
DK3864223T3 (en) Device for pushing four piles into the ground or into a seabed
EP3966131A4 (en) BAGS AND RELATED PROCEDURES
HUE044288T2 (hu) Fúró- és betonozó berendezés és eljárás földbe mélyített betonoszlopok készítésére
EP3663471C0 (de) Verfahren zur herstellung eines schlauchs und schlauch
ZA202007123B (en) Method for constructing full-casing full-rotary internal-ramming pile
EP3545149A4 (en) METHOD AND DEVICE FOR CONSTRUCTION OF CONCRETE STRUCTURES IN STAGES
PT3830346T (pt) Método de instalação de uma estaca metálica tubular num solo rochoso
SG11202109254PA (en) Pile press-in device and pile press-in method
IL290377A (en) A method for the preparation of ivosidanib and its intermediate
IL268914A (en) Marine construction and method for its construction
GB201912586D0 (en) A Wall and Construction Method
SG11202008995UA (en) Tool and method for forming piles
GB201917617D0 (en) Method of forming a pile