PL421670A1 - Method for strengthening of a lattice girder, preferably steel girder and the strengthening construction - Google Patents
Method for strengthening of a lattice girder, preferably steel girder and the strengthening constructionInfo
- Publication number
- PL421670A1 PL421670A1 PL421670A PL42167017A PL421670A1 PL 421670 A1 PL421670 A1 PL 421670A1 PL 421670 A PL421670 A PL 421670A PL 42167017 A PL42167017 A PL 42167017A PL 421670 A1 PL421670 A1 PL 421670A1
- Authority
- PL
- Poland
- Prior art keywords
- strengthening
- girder
- preferably steel
- structural element
- construction
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 229910000831 Steel Inorganic materials 0.000 title abstract 2
- 239000010959 steel Substances 0.000 title abstract 2
- 238000005728 strengthening Methods 0.000 title 2
- 238000010276 construction Methods 0.000 title 1
- 230000003014 reinforcing effect Effects 0.000 abstract 3
Landscapes
- Rod-Shaped Construction Members (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
Przedmiotem wynalazku jest sposób aktywnego wzmocnienia kratownicowego elementu konstrukcyjnego, zwłaszcza stalowego charakteryzujący się tym, że obustronnie na obu końcach elementu konstrukcyjnego mocuje się bloki podporowe, do których następnie wzdłuż obu stron elementu konstrukcyjnego mocuje się pasy górne (2) konstrukcji wzmacniającej, wykonanej w ten sposób, że do każdego z pasów górnych mocuje się ramiona co najmniej dwóch kozłów oporowych (3), których dolne wierzchołki łączy się ze sobą za pomocą elementów sprężających, zaś pasy górne łączy się ze sobą dystansowo. Przedmiotem wynalazku jest także konstrukcja wzmacniająca wykonana tym sposobem.The subject of the invention is a method of actively reinforcing a truss structural element, especially a steel one, characterized in that support blocks are fastened on both ends of the structural element on both sides, to which then upper straps (2) of the reinforcing structure made in this way are attached along both sides of the structural element. that to each of the upper belts, the arms of at least two supporting trestles (3) are attached, the lower vertices of which are connected with each other by means of prestressing elements, while the upper belts are connected with each other by distance. The invention also relates to a reinforcing structure made by this method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL421670A PL232807B1 (en) | 2017-05-22 | 2017-05-22 | Method for strengthening of a lattice girder, preferably steel girder and the strengthening construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL421670A PL232807B1 (en) | 2017-05-22 | 2017-05-22 | Method for strengthening of a lattice girder, preferably steel girder and the strengthening construction |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| PL421670A1 true PL421670A1 (en) | 2018-12-03 |
| PL232807B1 PL232807B1 (en) | 2019-07-31 |
Family
ID=64460729
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL421670A PL232807B1 (en) | 2017-05-22 | 2017-05-22 | Method for strengthening of a lattice girder, preferably steel girder and the strengthening construction |
Country Status (1)
| Country | Link |
|---|---|
| PL (1) | PL232807B1 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| PL448216A1 (en) * | 2024-04-07 | 2025-10-13 | Compact-Project.Pl Spółka Z Ograniczoną Odpowiedzialnością | Truss structure reinforcement system and method for reinforcing a truss structure |
-
2017
- 2017-05-22 PL PL421670A patent/PL232807B1/en unknown
Also Published As
| Publication number | Publication date |
|---|---|
| PL232807B1 (en) | 2019-07-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NZ623847A (en) | A hanger bracket | |
| RU2578401C1 (en) | Cable-stayed bridge | |
| CN104018581A (en) | Prestress concrete F slab and framework structure system | |
| MY178561A (en) | A cabled pipe rack | |
| RU2487222C2 (en) | Method to increase durability of steel truss | |
| PL421670A1 (en) | Method for strengthening of a lattice girder, preferably steel girder and the strengthening construction | |
| RU2528311C1 (en) | Polysystemic truss | |
| PL409367A1 (en) | Road bridge span | |
| KR101569879B1 (en) | Rahmem structure using prestressed steel beam and the construction method therefor | |
| RU153646U1 (en) | Cable-stayed Bridge | |
| RU141981U1 (en) | DEVICE FOR REINFORCING REINFORCED CONCRETE BEAMS | |
| CN107299724A (en) | A Laminated Stirrup and Method for Improving the Ductility of Frame Columns | |
| US2065256A (en) | Arch rib roof truss | |
| FI20175217L (en) | Procedure for building a roof | |
| RU109148U1 (en) | MULTI-DIMENSIONAL FARM FROM COMPOSITE MATERIAL | |
| EP1760218A3 (en) | Stirrups for the construction of rebar reinforcements for reinforced concrete beams | |
| CN205088975U (en) | Frame girder | |
| RU196738U1 (en) | HALF-ARRAY LATTICE OF ROD STRUCTURES WITH ADDITIONAL RODS OF I-SHAPED, Y-SHAPED AND Ψ-SHAPED SHAPE | |
| RU158029U1 (en) | Dismountable BRIDGE FARM WITH A DISPLACED SYSTEM OF CROSSES FROM PIPES OF COMPOSITE MATERIALS | |
| Hasa et al. | Experimental verification of precast dapped-end beams | |
| RU2646283C2 (en) | Method for reinforcing of ribbed reinforced concrete span structures | |
| US936342A (en) | Building construction. | |
| RU163960U1 (en) | REINFORCED CONCRETE COLUMN PERFORMED BY CONTINUOUS FORMING TECHNOLOGY | |
| PH12017000175A1 (en) | Steel box girder continuous bridge and construction methods thereof | |
| RU160643U1 (en) | BENDABLE ELEMENT |