PL436574A1 - Sposób zabudowy skrzyżowania ściany z chodnikiem przyścianowym - Google Patents

Sposób zabudowy skrzyżowania ściany z chodnikiem przyścianowym

Info

Publication number
PL436574A1
PL436574A1 PL436574A PL43657420A PL436574A1 PL 436574 A1 PL436574 A1 PL 436574A1 PL 436574 A PL436574 A PL 436574A PL 43657420 A PL43657420 A PL 43657420A PL 436574 A1 PL436574 A1 PL 436574A1
Authority
PL
Poland
Prior art keywords
wall
sidewalk
support
face
intersection
Prior art date
Application number
PL436574A
Other languages
English (en)
Other versions
PL244359B1 (pl
Inventor
Leszek Żyrek
Tomasz Budniok
Krzysztof Szymiczek
Bartosz Bukowiecki
Original Assignee
Becker-Warkop Spółka Z Ograniczoną Odpowiedzialnością
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Becker-Warkop Spółka Z Ograniczoną Odpowiedzialnością filed Critical Becker-Warkop Spółka Z Ograniczoną Odpowiedzialnością
Priority to PL436574A priority Critical patent/PL244359B1/pl
Publication of PL436574A1 publication Critical patent/PL436574A1/pl
Publication of PL244359B1 publication Critical patent/PL244359B1/pl

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/36Linings or supports specially shaped for tunnels or galleries of irregular cross-section
    • E21D11/365Linings or supports specially shaped for tunnels or galleries of irregular cross-section for intersecting galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/36Linings or supports specially shaped for tunnels or galleries of irregular cross-section
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/36Linings or supports specially shaped for tunnels or galleries of irregular cross-section
    • E21D11/367Linings or supports specially shaped for tunnels or galleries of irregular cross-section for junction with the longwall coal face
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space
    • E21D19/04Provisional protective covers for working space for use in drifting galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/0004Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face
    • E21D23/0008Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face comprising a pair of joined struts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/0004Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face
    • E21D23/0034Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face comprising a goaf shield articulated to a base member
    • E21D23/0043Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face comprising a goaf shield articulated to a base member and supported by two or more rows of struts parallel to the working face
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • E21D23/0418Positioning devices and stabilizing means for the props

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Road Paving Structures (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Zgłoszenie dotyczy sposobu zabudowy skrzyżowania ściany z chodnikiem przyścianowym, przydatnego w górnictwie podziemnym węgla kamiennego. Sposób wykorzystuje trzysegmentowe sekcje (6) obudowy zmechanizowanej skrzyżowania do wyprzedzającego zabezpieczenia chodnika przyścianowego (3) przed czołem (1a) ściany (1). W chodniku przyścianowym (3) sukcesywnie do postępu czoła (1a) ściany (1) wypina się kolejno odrzwia obudowy chodnikowej (4) i zastępuje się je na bieżąco rozsuwanymi hydraulicznie, dodatkowymi elementami stropnicowo-ociosowymi (16), zlokalizowanymi z przodu członu podporowego przedniego (11) sekcji (6) obudowy zmechanizowanej, połączonymi funkcjonalnie ze stropnicami (8a, 8b, 8c) tej sekcji (6). Odrzwia obudowy chodnikowej (4) wypina się na odcinkach zbliżonych długością do wielkości zabioru czoła (1a) ściany (1), z korzystnym wyprzedzeniem nie większym, niż pięciokrotna wielkość zabioru.
PL436574A 2020-12-31 2020-12-31 Sposób zabudowy skrzyżowania ściany z chodnikiem przyścianowym PL244359B1 (pl)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL436574A PL244359B1 (pl) 2020-12-31 2020-12-31 Sposób zabudowy skrzyżowania ściany z chodnikiem przyścianowym

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL436574A PL244359B1 (pl) 2020-12-31 2020-12-31 Sposób zabudowy skrzyżowania ściany z chodnikiem przyścianowym

Publications (2)

Publication Number Publication Date
PL436574A1 true PL436574A1 (pl) 2022-07-04
PL244359B1 PL244359B1 (pl) 2024-01-15

Family

ID=82271641

Family Applications (1)

Application Number Title Priority Date Filing Date
PL436574A PL244359B1 (pl) 2020-12-31 2020-12-31 Sposób zabudowy skrzyżowania ściany z chodnikiem przyścianowym

Country Status (1)

Country Link
PL (1) PL244359B1 (pl)

Also Published As

Publication number Publication date
PL244359B1 (pl) 2024-01-15

Similar Documents

Publication Publication Date Title
CN102606152B (zh) 新型矩形煤巷快速掘锚一体机
CN202611695U (zh) 新型矩形煤巷快速掘锚一体机
CN109538224B (zh) 一种新型煤巷快速掘进机
CN105240013A (zh) 长壁开采n00工法
CN104481536A (zh) 控制覆岩裂隙与地表沉陷的掘采充平行作业的采煤方法
CN105952453B (zh) 长壁前进式煤层工作面机械化无巷开采成套设备
BR0307301A (pt) Método de pulverização das superfìcies de minas de carvão
CN110700833A (zh) 用于挂帮矿体开采的中深孔多采场并分段共溜井采矿方法
CN103244122A (zh) 沿空掘巷煤柱稳定性三位一体耦合支护控制方法
CN102261247A (zh) 一种条带逆向膏体充填的二次采煤方法
CN103899342A (zh) 沿空掘巷煤柱锚索对穿加固方法
CN201874569U (zh) 掘进机机载物探钻机
PL436574A1 (pl) Sposób zabudowy skrzyżowania ściany z chodnikiem przyścianowym
CN209494569U (zh) 一种新型煤巷快速掘进机
HU et al. Graded optimization design method on surface gas drainage borehole
RU2407890C1 (ru) Способ отработки выемочных полей
CN106150535A (zh) 一种条带式旺格维利采煤技术支巷支护方法
CN115030723B (zh) 一种非爆机械破岩两步骤折返式进路充填采矿法
CN211500687U (zh) 一种煤矿巷道顶板锚杆临时支护系统
RU2188321C1 (ru) Способ разработки тонких угольных пластов
CN214836455U (zh) 一种煤矿采空区的支护装置
CN205422746U (zh) 一种采空区内煤层复采破碎围岩掘进超前支护装置
Wang et al. Feasibility study on the technology of filling the vacant space of the caving rock with cement materials
LIU et al. Numerical simulation for the failure process of floor with water pressure
CN219387929U (zh) 一种煤矿掘进支护装置