PL447713A1 - Sposób uszczelniania - Google Patents
Sposób uszczelnianiaInfo
- Publication number
- PL447713A1 PL447713A1 PL447713A PL44771324A PL447713A1 PL 447713 A1 PL447713 A1 PL 447713A1 PL 447713 A PL447713 A PL 447713A PL 44771324 A PL44771324 A PL 44771324A PL 447713 A1 PL447713 A1 PL 447713A1
- Authority
- PL
- Poland
- Prior art keywords
- perforated
- casing
- pipeline
- waterproofing
- drill head
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Paleontology (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Przedmiotem zgłoszenia jest sposób uszczelniania poprzez wykonanie przesłony hydroizolacyjnej i wydrążeniu horyzontalnego przewiertu sterowanego, umieszczeniu zestawu rurociągów osłonowego (3) i perforowanego (4) oraz wykonania robót podsadzkowych charakteryzuje się tym, że po wykonaniu horyzontalnego przewiertu sterowanego następuje zmiana głowicy z pilotującej na rozwiercającą przeciągniętą w przeciwnym kierunku wyposażoną w dysze wtryskowe i zakotwieniu rurociągu perforowanego (4) i wyciągnięciu rurociągu osłonowego(3), przez który następuje iniekcja niskociśnieniowa mieszaniny wodno-popiołowej. Kolejnym krokiem jest wykonanie ciągłej warstwy wzmocnionego gruntu za pomocą siatki otworów horyzontalnych we wzajemnej odległości i na określonej powierzchni.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL447713A PL447713A1 (pl) | 2024-02-06 | 2024-02-06 | Sposób uszczelniania |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL447713A PL447713A1 (pl) | 2024-02-06 | 2024-02-06 | Sposób uszczelniania |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| PL447713A1 true PL447713A1 (pl) | 2025-08-11 |
Family
ID=96658335
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL447713A PL447713A1 (pl) | 2024-02-06 | 2024-02-06 | Sposób uszczelniania |
Country Status (1)
| Country | Link |
|---|---|
| PL (1) | PL447713A1 (pl) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| PL172470B1 (pl) * | 1994-03-25 | 1997-09-30 | Kopalnia Soli Wieliczka | Sposób wzmacniania i/lub uszczelniania górotworu,zwlaszcza oslabionej oslony zloza w kopalni soli PL |
| CN105386435A (zh) * | 2015-12-07 | 2016-03-09 | 中交第三航务工程局有限公司南京分公司 | 一种用于水泥与水玻璃溶液的双液注浆系统及其施工工艺 |
| PL427714A1 (pl) * | 2018-11-09 | 2020-05-18 | Akademia Górniczo-Hutnicza im. Stanisława Staszica w Krakowie | Sposób uszczelnienia i konsolidacji nieciągłego ośrodka, zwłaszcza skalnego lub betonowego |
-
2024
- 2024-02-06 PL PL447713A patent/PL447713A1/pl unknown
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| PL172470B1 (pl) * | 1994-03-25 | 1997-09-30 | Kopalnia Soli Wieliczka | Sposób wzmacniania i/lub uszczelniania górotworu,zwlaszcza oslabionej oslony zloza w kopalni soli PL |
| CN105386435A (zh) * | 2015-12-07 | 2016-03-09 | 中交第三航务工程局有限公司南京分公司 | 一种用于水泥与水玻璃溶液的双液注浆系统及其施工工艺 |
| PL427714A1 (pl) * | 2018-11-09 | 2020-05-18 | Akademia Górniczo-Hutnicza im. Stanisława Staszica w Krakowie | Sposób uszczelnienia i konsolidacji nieciągłego ośrodka, zwłaszcza skalnego lub betonowego |
Non-Patent Citations (1)
| Title |
|---|
| google; https://www.nawitel.pl/pl.horyzontalne_przewierty_sterowane.html; 6.11.2016r. * |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107989079B (zh) | 保护城市市政管线的结构 | |
| CN108843343B (zh) | 一种煤矿待采工作面上覆烧变岩隔水帷幕的注浆方法 | |
| CN110005442A (zh) | 下穿既有建筑城市地下暗挖区间围岩加固工艺 | |
| DE102008009499A1 (de) | Geothermisches Zirkulationssystem | |
| CN104612130B (zh) | 一种隧道底部隐伏溶洞注浆处治方法 | |
| CN114961789A (zh) | 一种含水层中斜坡道掘进分段注浆方法 | |
| CN110608047B (zh) | 下穿地铁支护结构及其制造方法 | |
| PL447713A1 (pl) | Sposób uszczelniania | |
| CN109707362B (zh) | 一种挖潜老井储层纵向单砂体剩余油的定点压裂方法 | |
| CN103114602B (zh) | 渗透浸渍聚凝粘结体二次融补的基坑止水帷幕及构建方法 | |
| US12134966B2 (en) | Underground gasifier pre-control structure, gasifier and gasification method | |
| CN211008655U (zh) | 下穿地铁支护结构 | |
| CN108019211B (zh) | 一种富水砂卵石地层的导洞内截水帷幕及其施工方法 | |
| Morey et al. | Quality control of jet grouting on the Cairo metro | |
| Wang et al. | Numerical simulation on fracture propagation of multilayer combined fracturing in coal-bearing strata: analyzing perforation design effects | |
| CN104088618B (zh) | 地下气化通道的上方地层的处理方法及地下气化建炉方法 | |
| CN116220733A (zh) | 一种用于顶部卸载时下部既有隧道的内固锚联合保护工艺 | |
| KR20170020951A (ko) | 복합 수리자극을 이용한 대심도 지열정 형성 방법 | |
| GB2608305A9 (en) | Method and system of underground deployment of materials and equipment | |
| TWM622144U (zh) | 建築物地下樓層連續壁洩壓引流裝置 | |
| CN106930285B (zh) | 一种承压型卵砾石土层扩体锚杆及其施工方法 | |
| JP2000328560A (ja) | 鋼管柱列土留壁の造成方法 | |
| KR102696797B1 (ko) | 중압 그라우팅 장치 및 이를 이용한 중압 그라우팅 시공방법 | |
| CN116044357B (zh) | 对超短半径侧钻水平井井段进行压裂的方法和开采方法 | |
| RU2299967C1 (ru) | Способ проводки коммуникационной скважины |