Poland
Prior art keywords
boom
tower
head
pin
foot
Prior art date
Application number
PL104322A
Other languages
Polish (pl)
Inventor
inz. Edward Sosna mgr
Original Assignee
Bielskie Zaklady Urzadzen Technicznych
Filing date
Publication date
Application filed by Bielskie Zaklady Urzadzen Technicznych filed Critical Bielskie Zaklady Urzadzen Technicznych
Publication of PL49159B1 publication Critical patent/PL49159B1/pl
Priority to CH526865A priority Critical patent/CH448431A/en
Priority to NL6504811A priority patent/NL6504811A/xx
Priority to GB1639165A priority patent/GB1097872A/en

Links

Description

Opublikowano: 10. II. 1965 49159 k %im.KI.MKR UKD 35b, %fr¥ w6t xfo Twórca wynalazku: mgr inz. Edward Sosna Wlasciciel patentu: Bielskie Zaklady Urzadzen Technicznych, Bielsko- -Biala (Polska) Zawieszenie wysiegnika urzadzen dzwigowych, zwlaszcza zurawi wiezowych samomontujacych Przedmiotem wynalazku jest zawieszenie wysieg¬ nika urzadzen dzwigowych, zwlaszcza zurawi wie¬ zowych samomontujacych z wysiegnikiem sklada¬ nym do wiezy, zlozone ze sworznia glowicy wie¬ zy, znajdujacego sie wewnatrz konturu wiezy, naj¬ lepiej w osi bezwladnosci wiezy i stopy wysiegnika z prowadnicami.Prowadnice stopy wysiegnika zezwalaja na zlo¬ zenie wysiegnika wzdluz wiezy, do montazu ukla¬ du wieza-wysiegnik, bez potrzeby przemieszczenia jego przegubu poza kontur wiezy. Znane dotych¬ czas zawieszenia wysiegników zurawi wiezowych skladanych do wiezy posiadaja sworzen glowicy wiezy przesuniety na zewnatrz konturu wiezy, roz¬ wiazania te maja jednak te zasadnicza wade, ze w roboczym zakresie zmiany wysiegu, w wiezy obok naprezen sciskajacych wystepuja szczególnie niekorzystne naprezenia zginajace. W wyniku zlozo¬ nego stanu obciazen wystepujacego w wiezy, na rozwiazania konstrukcyjne tych elementów zuzywa sie duze ilosci materialu.Celem wynalazku jest usuniecie tych niedogod¬ nosci, czyli zredukowanie stanu obciazenia wiezy, w roboczym zakresie zmiany wysiegu, do naprezen sciskajacych wieze w jej osi. Wedlug wynalazku osiaga sie to w ten sposób, ze sworzen glowicy wiezy znajduje sie wewnatrz konturu wiezy, naj¬ lepiej w osi bezwladnosci wiezy zas stopa wysieg¬ nika wyposazona jest w prowadnice, umozliwiajace w czasie podnoszenia wysiegnika z polozenia zlozo¬ nego wzdluz wiezy, do dolnego krancowego poloze¬ nia roboczego i skladania wysiegnika z dolnego krancowego polozenia roboczego, w polozenie zlo¬ zone wzdluz wiezy, na swobodne przesuwanie sie 5 stopy wysiegnika w stosunku do sworznia glowicy wiezy. Równoczesnie wsporniki elementów lino¬ wych zmiany wysiegu zamocowane sa na stopie wysiegnika w ten sposób, ze przedluzenia ich osi w roboczym zakresie zmiany wysiegu przecinaja sie io z osia sworznia glowicy wiezy, powodujac dociska¬ nie stopy wysiegnika do sworznia glowicy wiezy.Dzieki rozwiazaniu wedlug wynalazku, wady wy¬ stepujace w dotychczas znanych konstrukcjach zo¬ staja w wysokim stopniu usuniete, prowadza do re- 15 dukcji stanu obciazenia naprezen sciskajacych wie¬ ze, a w konsekwencji do znacznie oszczedniejsze¬ go wymiarowania konstrukcji wiezy.Przedmiot wynalazku jest przedstawiony w przy¬ kladzie wykonania na rysunku, na którym fig. 1 20 przedstawia zawieszenie wysiegnika zurawia wiezo¬ wego z wysiegnikiem zlozonym do wiezy, fig. 2 — to samo zawieszenie w polozeniu podnoszenia wy¬ siegnika do pozycji roboczej, a fig. 3 — to samo zawieszenie z wysiegnikiem w dolnym' krancowym 25 polozeniu roboczym.Jak uwidoczniono na fig. 1, 2 i 3, stopa wysieg¬ nika 1 posiada prowadnice 2 pod wodziki na przy¬ klad w postaci kostek 3 osadzonych obrotowo na sworzniu glowicy wiezy 4, znajdujacym sie w osi 30 bezwladnosci wiezy lub w jej poblizu. Wspornik 5 4915949159 3 4 elementów linowych zmiany wysiegu 6 i 7, zamoco¬ wany jest przegubowo na stopie wysiegnika w punkcie lezacym na pirostej, laczacej w robo¬ czych polozeniach wysiegnika os sworznia glowicy wiezy 4 z wezlem 12 elementów linowych 6 i 7, zas wspornik linowy 11, polaczony jest obrotowo ze sworzniem glowicy wiezy.Uklad taki powoduje dociskanie stopy wysiegni¬ ka 1 do sworznia glowicy wiezy 4.Kolejne fazy podnoszenia wysiegnika z polozenia zlozonego wzdluz wiezy do dolnego polozenia robo¬ czego przedstawiaja fig. 1, 2 i 3.Przebieg podnoszenia wysiegnika jest nastepuja¬ cy: zluzowanie liny mechanizmu podnoszenia 10 to¬ warzyszy zwolnienie dolnego konca wysiegnika.Uruchamiajac wciagarke zmiany wysiegu wywie¬ ramy naciag elementów linowych zmiany wysie¬ gu 6 i 7, który wywoluje sily sciskajace we wspor¬ nikach 5 i 11. Wypadkowa tych sil dociska stope wysiegnika 1 do sworznia glowicy wiezy 4.Wysiegnik 1 podnosi sie w góre przy jednoczes¬ nym przetaczaniu sie jego dolnej czesci po rolce 8, a prowadnice 2 przesuwaja sie po wodzi¬ kach 3 do drugiego ich krancowego polozenia przedstawionego na fig. 3, to jest do dolnego kran¬ cowego polozenia roboczego wysiegnika 1. Stad wi¬ dac, ze osie wysiegnika 1 wsporników 5 i 11 oraz os bezwladnosci wiezy 9 przecinaja sie w jednym punkcie lezacym w osi bezwladnosci wiezy lub w jej poblizu, co przy linie zmiany wysiegu 7, zbie¬ gajacej z wspornika 5 równolegle do osi wiezy (w roboczym zakresie zmiany wysiegu) powoduje redukcje stanu obciazenia do wypadkowej sciskaja¬ cej wieze w jej osi.Przy opuszczaniu wysiegnika ponizej dolnego krancowego polozenia roboczego (skladanie wysieg¬ nika do polozenia zlozonego wzdluz wiezy), dolna czesc wysiegnika 1 opiera sie o rolke 8, co prowa¬ dzi do wysuwania prowadnic 2 po wodzikach 3 az do oparcia sie ich po przeciwnej stronie prowad¬ nic 2, a w rezultacie do zlozenia wysiegnika do polozenia zlozonego wzdluz wiezy. PLPublished: 10. II. 1965 49159 k% im.KI.MKR UKD 35b,% fr ¥ w6t xfo Inventor: mgr inz. Edward Sosna Patent owner: Bielskie Zaklady Urzadzen Technicznych, Bielsko-Biała (Poland) Suspension of the boom of crane devices, especially self-assembly tower cranes The invention is the suspension of the boom of lifting devices, in particular of a self-assembly tower crane with a folding boom, composed of a tower head pin located inside the contour of the tower, preferably in the axis of inertia of the tower and the boom foot with guides. The boom foot guides allow the boom to be folded along the tower for the installation of the tower-boom system without the need to move its articulation beyond the contour of the tower. The previously known suspension arms of tower-folding tower cranes have a pin of the head of the tower moved to the outside of the contour of the tower, however, these solutions have the fundamental disadvantage that in the operational range of the change of overhang, in the tower, in addition to the compressive stresses, particularly unfavorable bending stresses occur. As a result of the complex state of loads occurring in the towers, large amounts of material are used for the constructional solutions of these elements. The aim of the invention is to eliminate these inconveniences, that is to reduce the load state of the tower, within the working range of the change of the reach, to the compressive stresses on the towers axis. . According to the invention, this is achieved in such a way that the pin of the head of the tower is inside the contour of the tower, preferably in the axis of inertia of the tower, and the foot of the outrigger is equipped with guides, enabling the boom to be lifted from a folded position along the tower to the lower end working position and folding the boom from the lower end working position to the folded position along the tower, for the free movement of the boom feet relative to the tower head pin. At the same time, the brackets of the line elements of the change of overhang are fixed on the boom leg in such a way that the extension of their axis in the working range of the change of overhang intersect and with the axis of the pin of the head of the tower, causing the foot of the boom to be pressed against the pin of the head of the tower. , the disadvantages of the hitherto known constructions are largely eliminated, leading to a reduction in the state of the load of the compressive stresses of the towers and, consequently, to a much more economical dimensioning of the tower structure. Fig. 1 shows the suspension of a crane boom with the boom folded to the tower, Fig. 2 - the same suspension in the lifting position of the boom to the working position, and Fig. 3 - the same suspension with the boom in the lower end working position. As shown in FIGS. 1, 2 and 3, the foot of the outrigger 1 has guides 2 under the slides, for example in the form of cubes 3 pivotally mounted on the pin of the head of the tower 4, located in the axis 30 of the tower or in the vicinity of it. The bracket 5 4915949159 3 4 of the rope elements of the extension 6 and 7, is articulated on the boom foot at the point lying on the pier, connecting in the working positions of the boom axis pin of the tower head 4 with the knot of 12 rope elements 6 and 7, and the bracket The cable 11 is pivotally connected with the pin of the head of the tower. Such a system presses the foot of the boom 1 against the pin of the head of the tower 4. Successive phases of lifting the boom from the folded position along the tower to the lower working position are shown in Figs. 1, 2 and 3. The boom lifting process is as follows: loosening the rope of the hoisting mechanism 10 accompanied by the release of the lower end of the boom. By activating the overhang winch, the tension of the rope elements of the change of extension 6 and 7 causes compressive forces in the supports 5 and 11. The resultant of these forces presses the foot of the boom 1 against the pin of the head of the tower 4. The boom 1 rises upwards while the lower part rolls over. parts by roller 8, and the guides 2 slide along the luffs 3 to their second end position shown in Fig. 3, i.e. to the lower end working position of the boom 1. Therefore, see that the boom 1 axes of the supports 5 and 11 and the axis of inertia of the tower 9 intersect at one point lying on the axis of inertia of the tower or in its vicinity, which at the line of change of the projection 7, converging from the support 5, parallel to the axis of the tower (within the working range of the change of projection) When lowering the boom below the lower end working position (folding the boom to a folded position along the tower), the lower part of the boom 1 rests on the roller 8, which leads to the extension of the guides 2 along the slides 3 until they rest on the opposite side of the guides 2, and as a result the boom is folded into a folded position along the tower. PL

Claims (3)

Zastrzezenia patentowe 1. Zawieszenie wysiegnika urzadzen dzwigowych, zwlaszcza zurawi wiezowych samomontujacych z wysiegnikiem skladanym wzdluz wiezy i zmia¬ na wysiegu poprzez elementy linowe, zawieszone na wspornikach, zwiazanych ze szczytem wiezy znamienne tym, ze os obrotu wysiegnika w po¬ staci sworznia glowicy (4), znajduje sie we¬ wnatrz konturu wiezy najlepiej w osi bezwlad¬ nosci wiezy (9), zas stopa wysiegnika (1) wypo¬ sazona jest w prowadnice (2), umozliwiajace swobodne przesuwanie sie stopy wysiegnika w stosunku do glowicy wiezy, równoczesnie wspornik linowy {11), polaczony jest obrotowo ze sworzniem glowicy wiezy, a wspornik lino¬ wy (5) polaczony jest przegubowo ze stopa wy¬ siegnika. Zawieszenie wysiegnika wedlug zastrz. 1, zna¬ mienne tym, ze w prowadnicach (2) stopy wy¬ siegnika (1), prowadzone sa wodziki na przyklad w postaci kostek (3), osadzonych obrotowo na sworzniu glowicy (4). Zawieszenie wysiegnika wedlug zastrz. 1, zna¬ mienne tym, ze wspornik linowy (5) polaczony jest przegubowo ze stopa wysiegnika w punkcie lezacym na prostej laczacej w roboczych polo¬ zeniach wysiegnika os sworznia glowicy wie¬ zy (4) z wezlem (12) elementów linowych (6) i (7). Odmiana zawieszenia wedlug zastrz. 1, zna¬ mienna tym, ze glowica wiezy wyposazona jest w element prowadzacy na przyklad w rolke (8), po której przetacza sie wysiegnik w czasie pod¬ noszenia z .polozenia zlozonego wzdluz wiezy do dolnego krancowego polozenia roboczego. 15 20Claims 1. Suspension of the boom of lifting devices, in particular self-mounting tower cranes with the boom folded along the tower and the change of the overhang through rope elements, suspended on brackets connected with the top of the tower, characterized by the fact that the axis of rotation of the boom in the form of a head pin (4 ), is located inside the contour of the tower, preferably in the axis of inertia of the tower (9), while the boom foot (1) is equipped with guides (2), allowing the boom foot to move freely in relation to the head of the tower, and at the same time the bracket cable (11) is pivotally connected to the pin of the tower head and the cable bracket (5) is articulated to the foot of the boom. Boom suspension according to claims 1, characterized by the fact that in the guides (2) of the boom (1) there are guides, for example in the form of cubes (3), pivotally mounted on the pin of the head (4). Boom suspension according to claims 1, characterized by the fact that the cable bracket (5) is articulated with the boom foot at a point lying on a straight line connecting the pin of the tower head pin (4) with the knot (12) of the rope elements (6) in the operating positions of the boom. and (7). Suspension variant according to claims 1, characterized in that the head of the tower is provided with a guiding element, for example a roller (8), over which the boom is rolled during lifting from the folded position along the tower to the lower end operating position. 15 20 2. 252. 25 3. 30 35 4^ /49159 F/g. ?49159 /// 4^ &y' W iri h r i" ir^-^i Jl^^ \ flg.249159 Fig. 3 PL3.30354 ^ / 49.159 F / g. ? 49159 /// 4 ^ & y 'W iri h r i "ir ^ - ^ i Jl ^^ \ flg.249159 Fig. 3 EN
PL104322A 1964-04-15 1964-04-15 PL49159B1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CH526865A CH448431A (en) 1964-04-15 1965-04-14 Folding crane
NL6504811A NL6504811A (en) 1964-04-15 1965-04-14
GB1639165A GB1097872A (en) 1964-04-15 1965-04-15 Tower-cranes with sliding boom-pivots

Publications (1)

Publication Number Publication Date
PL49159B1 true PL49159B1 (en) 1965-02-15

Family

ID=

Similar Documents

Publication Publication Date Title
US3371801A (en) Extensible jib, mast or the like
SE416039B (en) TURNING CRANE FOR BUILDING WORK AND INCLUDING A CONCRETE DISTRIBUTION DEVICE
US4449634A (en) Hoisting assembly with a boom and a counterweight having adjustable respective positions
JP2005112622A (en) Loaded boat lifting and lowering device
JPS6218474B2 (en)
JPH04269209A (en) Boat hoisting device
NO140626B (en) SWIVEL CRANE WITH BOOM.
PL121364B1 (en) Truck mounted jib crane in particular stably balanced one''emnyjj kran,smontirovannyjj na gruzovom avtomobile
US4506791A (en) Ship's derrick
US3219197A (en) Derricks for ships
SU407826A1 (en) MOUNTING DEVICE OF THE TILT Crane
SU745767A1 (en) Cargo arrangement on ship
SU397470A1 (en) LOAD POLYSPAST OF VARIABLE SLATE FOR BOOM CRANES
US3017956A (en) Cargo hoists
SU269027A1 (en)
KR101643893B1 (en) Flying jib applying method of floating crane
SU533544A1 (en) Portal jib crane
GB1385113A (en) Folding tower cranes
SU659453A2 (en) Wind protection arrangement for floating dock
SU83068A1 (en) Jib crane
US1248067A (en) Sail raising and lowering means.
PL45508B1 (en)
US3054512A (en) Lifting apparatus comprising a cargo boom having two topping lifts which, in a horizontal plane, form an angle
SU70251A2 (en) Construction Hoist
SU451617A1 (en) Lifting mast