PL61882B1 PL124339A PL12433967A PL61882B1 PL 61882 B1 PL61882 B1 PL 61882B1 PL 124339 A PL124339 A PL 124339A PL 12433967 A PL12433967 A PL 12433967A PL 61882 B1 PL61882 B1 PL 61882B1
Authority
PL
Poland
Prior art keywords
decking
frames
cylinders
shell
section
Prior art date
Application number
PL124339A
Other languages
Polish (pl)
Inventor
Król Tadeusz
Original Assignee
Zaklady Konstrukcyjnomechanizacyjne Przemysluweglowego
Filing date
Publication date
Application filed by Zaklady Konstrukcyjnomechanizacyjne Przemysluweglowego filed Critical Zaklady Konstrukcyjnomechanizacyjne Przemysluweglowego
Publication of PL61882B1 publication Critical patent/PL61882B1/pl

Links

Description

Opublikowano: 20.XI.1970 61882 KI. 5 c, 11/10 MKP E 21 d, 11/10 UKD 622.281.4 Twórca wynalazku: Tadeusz Król Wlasciciel patentu: Zaklady Konstrukcyjno-Mechanizacyjne Przemyslu Weglowego, Gliwice (Polska) Odeskowanie do betonowania korytarzowych wyrobisk górniczych i tuneli Przedmiotem 'wynalazku jest odeskowanie ido be¬ tonowania korytarzowych wyrobisk 'górniczych i 'tuneli, przesuwajace sie isamoczynnie w miare po¬ stepu prac.Znane \sa<-odeskowania J0o i^oo^a^^ 5 czych wyrobisk korytarzowych i tuneli polegajace na zastopowaniu szeregu rozbieralnych elementów, które ipo wykonaniu obudowy przesuwa sie w ca¬ losci dla stawiania nastepnego odcinka obudowy recznie lub mechanicznie, na (przyklad za pomoca 10 kolowrotu (limowego. Ten stan irzeczy powoduje, ze obudowa przy tym .sposobie postepowania jest izbyt pracochlonna na skutek koniecznosci ciaglego prze¬ suwania elementów odeskowania^ co wplywa za¬ równo na wydluzenie procesu wykonywania obu- 15 dowy jak d ilosc obslugi.Celem 'wynalazku jest wyeliminowanie koniecz¬ nosci pracochlonnego przekuwania elementów odes¬ kowania w czasie betonowania wyrobiska i skróce¬ nie czasu wykonywania obudowy, oraz zastosowa¬ nia sily (ludzkiej, czy tez pracy innych maszyn do ich przesuwania.Cel ten osiagnieto urzadzeniem wedlug 'Wynalaz¬ ku, utworzonym z dwu wzajemnie 'przesuwnych ramowych zespolów nosnych, do których poprzez silowniki przymocowane ,sa (powloki Iworzace odes¬ kowanie i okreslajace ksztalt betonowego wyro¬ biska, a zespoly nosne sa polaczone ze soba silow¬ nikami przesuwu.Kazda z powlok dzielona jest wzdluznie tworzac 30 20 25 pólpowloke ociosowa i poljpowloke stropowa. Mie¬ dzy ramami zespolów nosnych, a powlokami, sa za¬ mocowane glówne i pomocndcze (silowniki hydrau¬ liczne sluzace do rozpierania i luzowania powlok. nia sa rozparte za pomoca silowników h3#kiauilicz- nych i przylegaja do (betonu, dzieki czemu kon¬ strukcja jest unieruchomiona, co pozwala na swo¬ bodne nakladanie betonu na powloke. Po zakon¬ czeniu 'betonowania i po okresie .stezenia betonu luzuje sie powloke jednej sekcji przez zadzialanie silownikami hydraulicznymi, na skutek czego na¬ stepuje odejscie powloki od (betonu. Nastepnie przez zadzialanie przesuwnikami hydraulicznymi przesu¬ wa sie zluzowana sekcje do przodu, po czym na¬ stepuje ponowne jej rozparcie. W analogiczny spo¬ sób nastepuje zluzowanie, przesuwanie i ponowne rozparcie drugiej sekcji urzadzenia. Po przesunie¬ ciu drugiej sekcji, urzadzenie przyjmuje polozenie, w którym mozna przystapic do betonowania nowe¬ go odcinka wyrobiska.Odeskowanie do betonowania korytarzowych wy¬ robisk górniczych i tuneli wedlug wynalazku, przedstawione jest na zalaczanych irysumkach, na których (fig. 1 przedstawia widok urzadzenia od czola, fig. 2 — szczegól mocowania powloki do ra¬ my, fig. 3 — przedstawia schematycznie wzajemne polozenie ram nosnych w czasie wykonywania obu¬ dowy, zas fig. 4 — wzajemne jpolozenie ram nos¬ nych po pierwszej fazie przesuwu. 618823 Odeskowanie -wedlug wynalazku sklada sie z dwu identycznych sekcji polaczonych ze soba przesuw- nikami hydraulicznymi 1. Kazda sekcja sklada sie z dwoi nosnych ram 2 i 3 zaopatrzonych w dwie pary jezdnych kól 4, do których mocowane jest odeskowanie 5, pnzy czym ramy nosne poszczegól¬ nych sekcji sa ulozone przemiennie. [Pomiedzy ra¬ mami 2 i 3, a powloka odeskowania 5 sa glówne hydrauliczne silowniki 6 i pomocnicze hydrauliczne silowniki 7, sluzace do odsuwania odeskowania 5 przed momentem przesuwu i nastepnego rozparcia po przesunieciu sekcji. We wspornikach 8 wyko¬ nane sa wzdluzne wyciecia 10, w których przesu¬ wa sie sworzen 11 fw czasie rozpierania i odsuwa¬ nia odeskowania. Powloka odeskowania 5 dzielona m jest na dwie czesci, powloke ociosowa 12 i powloke stropowa 13, polaczonych przegubem 14.Sposób przesuwania odeskowania wedlug /wyna¬ lazku przedstawiony jest na fig. 3 i fig. 4. Po -wy¬ konaniu obudowy nastepuje odsuniecie „odeskowa¬ nia 5 od betom za pomoca glównych silowników 6, a nastepnie pomocniczych silowników 7. Poprzez rozparcie silowników 1 sekcja wyprzedzajaca prze¬ suwa sie w nowe pole, nastepuje rozparcie silow¬ ników 6 i 7, a nastepnie luzowanie silowników 6 i 7 sekcji madaznej i jej podciaganie w nowe pole za pomoca tych samych silowników 1 i ponowne rozparcie silowników 6 i 7. Pelny przesuw odesko¬ wania sklada sie wiec kolejno z odsuniecia odes¬ kowania sekcji wyprzedzajacej od betonu, przesuw sekcji wyprzedzajacej i rozparcie silowników 6 i 7, a nastepnie cykl powtarza sie w sekcji nadajznej.Od czola odeskowania przewidziane sa oslony 15 wzglednie poduszki powietrzne zabezpieczajace 4 beton przed wyplywem do przodu, a 'pomiedzy szczeline powstala przy styku powlok 5 umieszczo¬ ny jest np. waz 9. Urzadzenie wedlug wynalazku calkowicie eliminuje udzial sily liudzkiej do przesil- 5 i wu i przystosowane jest do calkowitego zautomaty¬ zowania przesuwu. PL PLPublished: 20.XI.1970 61882 IC. 5 c, 11/10 MKP E 21 d, 11/10 UKD 622.281.4 Inventor: Tadeusz Król Owner of the patent: Zaklady Konstrukcyjno-Mechanizacyjne Przemyslu Weglowego, Gliwice (Poland) Decking for concreting mining corridors and tunnels. The subject of the invention is decking and for the concreting of corridor 'mining pits and tunnels, moving and automatically as the work progresses. There are known descents J0o and ^ o ^ a ^^ 5 corridor workings and tunnels consisting in the stopping of a number of dismountable elements that and after the casing is made, it is completely moved to erect the next section of the casing, either manually or mechanically (e.g. by means of a (lime) turnstile. This state of affairs makes the casing too labor-intensive in this manner due to the necessity to constantly move it. of the formwork elements, which affects both the length of the casing production process and the amount of maintenance. The aim of the invention is to eliminate the need for labor-intensive forging of the decking elements during concreting of the excavation and shortening the time of making the lining, and the use of force (human or other machines to move them.) This goal was achieved with the device according to the 'Invention, made of two mutually' sliding frame load-bearing units, to which, by means of cylinders, are attached (shells forming the decking and defining the shape of the concrete slab, and the load-bearing units are connected to each other by sliding cylinders. and poljpowloke ceiling. The main and auxiliary are fixed between the frames of the carrying units and the shells (the hydraulic cylinders used for spreading and loosening the coating are stretched with the aid of h3 kiauilic cylinders and adhere to the concrete, thanks to which The structure is immobilized, which allows for free application of concrete to the coating. After concreting is completed and the concrete has been concentrated, the coating of one section is loosened by the action of hydraulic actuators, as a result of which the coating drifts away from the (concrete. by actuation of the hydraulic shifter, the loosened section is moved forward, and then it is expanded again. In the same way, the second section of the device is loosened, shifted and expanded again. After the second section is moved, the device takes the position in which can be used to concret a new section of the excavation. Molding for concreting mining corridors and tunnels according to the invention u, is shown on the enclosed irises, on which (fig. 1 shows a front view of the device, fig. 2 - detail of fixing the shell to the frame, fig. 3 - schematically shows the mutual position of the support frames during the construction of the casing, and fig. 4 - the mutual position of the support frames after the first phase travel. 618823 Formwork - according to the invention, it consists of two identical sections connected with each other by hydraulic shifter 1. Each section consists of two load-bearing frames 2 and 3 provided with two pairs of wheels 4, to which the boarding 5 is attached, then the load-bearing frames individual sections are arranged alternately. [Between the frames 2 and 3 and the cladding of the formwork 5 are the main hydraulic cylinders 6 and the auxiliary hydraulic cylinders 7 which serve to move the formwork 5 away before the moment of shifting and the next expanding after the section has been moved. In the supports 8, longitudinal cuts 10 are made, in which the pin 11 f moves during expansion and removal of the formwork. The formwork 5 is divided into two parts, a chisel 12 and a ceiling 13, connected by a hinge 14. The method of sliding the formwork according to the invention is shown in Figs. 3 and 4. After the casing is finished, the casing is moved away. decking 5 from the betom with the use of the main cylinders 6, and then the auxiliary cylinders 7. By expanding the cylinders 1, the leading section moves into a new field, the cylinders 6 and 7 are stretched, and then the cylinders 6 and 7 of the main section are released. and its pulling into a new field with the use of the same actuators 1 and the re-expansion of the actuators 6 and 7. The full travel of the deceleration consists of moving the slab of the leading section away from the concrete, the displacement of the leading section and the expansion of the actuators 6 and 7, and then the cycle is repeated in the transmitting section. At the front of the decking there are shields 15 or airbags protecting the concrete from flowing forward and between the joints For example, a hose 9 is located at the contact of the coatings 5. The device according to the invention completely eliminates the human force involved in the process and is adapted to fully automate the movement. PL PL

Claims (4)

1. Zastrzezenia patentowe 10 1. Odeskowanie do betonowania korytarzowych wyrobisk górniczych i tuneli utworzone z dwóch wzajemnie przesuwnych ramowych zespolów nos¬ nych, których ramy sa ulozone przemiennie, zna- 15 mienne tym, ze do ram (2 i 3) kazdego zespolu nosnego we wspornikach (8) zamocowane sa jedno¬ stronnie powloka (5) odeskowania, przy czym po¬ miedzy powlokami (5), a nosnymi ramami (2 i 3) ma rozporowe glówne silowniki (6) oraz pomooni- 20 cze silowniki (7).1. Patent claims 10 1. The decking for concreting mining corridors and tunnels made of two mutually sliding frame units, the frames of which are arranged alternately, characterized by the fact that the frames (2 and 3) of each beam in the supports (8) are mounted on one side of the decking shell (5), and between the shells (5) and the load-bearing frames (2 and 3) there are main strut cylinders (6) and auxiliary cylinders (7). 2. Odeskowanie wedlug zastrz. 1, znamienne tym, ze powloka odeskowania (5) jest dzielona wzdluz¬ nie na ociosowa pólpowloke (12) i .stropowa pólpo- 25 wlóke (13), laczonych pomiedzy soba przegfuibem (14), przy czym nieco powyzej lub ponizej przegubu (14) mocowany jest glówny rozporowy silownik <6).2. Decking according to claims 3. The form of claim 1, characterized in that the decking (5) is divided lengthwise into a side half-shell (12) and a ceiling half-shell (13), connected between each other by a joint (14), slightly above or below the joint (14). ) the main expansion cylinder <6) is attached. 3. Odeskowanie wedlug zastrz. 1 i 2, znamienne tym, ze ma hydrauliczne przesuwniki (1) laczace w kolejnosci rame pierwsza i czwarta.3. Decking according to claims The apparatus of Claim 1 and 2, characterized in that it has hydraulic shifters (1) connecting the first and fourth frames in sequence. 4. Odeskowanie wedlug zastrz. 1—3, znamienne tym, ze ma na calym obwodzie do iczola powlok odeskowania (5) mocowane przesuwnie oslony (15).KI. 5 c, 11/10 61882 MKP E 21 d, 11/10 )3 15 9 fig.4 PL PL4. Decking according to claims Cables 1 to 3, characterized by the fact that the entire perimeter of the plating (5) is provided with slidably fastened covers (15). 5 c, 11/10 61882 MKP E 21 d, 11/10) 3 15 9 fig. 4 PL PL
PL124339A 1967-12-27 PL61882B1 (en)

Publications (1)

Publication Number Publication Date
PL61882B1 true PL61882B1 (en) 1970-10-25

Family

ID=

Similar Documents

Publication Publication Date Title
US2616149A (en) Method of molding in situ concrete arched structures
CN109519197A (en) A double-purpose trolley for excavation and support of sliding form primary lining and its application
DE2434200B2 (en) METHOD OF CREATING UNDERGROUND CAVITIES
CN108798705A (en) First branch precast framework module, system and the construction method of TBM constructions
CN116378711B (en) A separated trolley device and construction method for a shallow buried tunnel
PL61882B1 (en)
DE2905919A1 (en) Roof layer underpinning in walking coal mine working - involves reinforced concrete filling in deep slit in adjacent rock
CA1251942A (en) Method and apparatus for forming reinforced concrete walls with continuous steel reinforcement
CN112228076B (en) Fast excavation construction method for hard rock large-span tunnel
SU1164425A1 (en) Method of constructing the station complex of deep underground railway
AT395894B (en) Method for the driving of near-surface tunnels
GB680294A (en) Improvements in and relating to reinforced concrete arched structures
ES391873A1 (en) Procedure and constructive unit for the entibation of tunnels and galleries. (Machine-translation by Google Translate, not legally binding)
AT393716B (en) Method of lining sections of tunnels or galleries
DE2443276A1 (en) Circular section tunnel supports - fore poled bars along abutment lines form part of permanent arch work
SU1082958A1 (en) Method of erecting artificial support for mine working roof
CN104314312B (en) High altitude reinforced concrete corridor structure triangle steel tube cantilever formwork construction technology
RU2854884C1 (en) Method of railway tunnel reconstruction
ES2147563T3 (en) SPACE BODY FOR CONSTRUCTION STRUCTURING AND PROCEDURE FOR ITS MANUFACTURE.
CN103075164A (en) Double-hole and two-liner sequential isochronous propelling construction process
SU1571143A1 (en) Method of erecting three-arch underground station
DE457523C (en) Manufacture of pit linings in which iron reinforcements are injected with concrete on the spot
SU859654A1 (en) Filling ix coffer-dam
SU926303A1 (en) Reinforced concrete lining for walls of underground structure
SU1070311A1 (en) Prefabricated roof support for rising workings