PL72310B2 - - Google Patents

Download PDF

Info

Publication number
PL72310B2
PL72310B2 PL14790871A PL14790871A PL72310B2 PL 72310 B2 PL72310 B2 PL 72310B2 PL 14790871 A PL14790871 A PL 14790871A PL 14790871 A PL14790871 A PL 14790871A PL 72310 B2 PL72310 B2 PL 72310B2
Authority
PL
Poland
Prior art keywords
steel
dam
casing
wooden
logs
Prior art date
Application number
PL14790871A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL14790871A priority Critical patent/PL72310B2/pl
Publication of PL72310B2 publication Critical patent/PL72310B2/pl

Links

Landscapes

  • Revetment (AREA)

Description

Pierwszenstwo: , Zgloszenie ogloszono: 15.05.1973 Opis patentowy opublikowano: 25.11.1974 72310 KI. 5c,19/00 MKP E21d 19/00 | C ' Y i £ INI Al Urzedu Patentowego 1 Polskiej tostf-pw.: 5| [,-D,tJ 1 Twórcywynalazku: Antoni Golaszewski, Stanislaw Stelmach, Henryk Pajaczek, Ignacy Sochocki Uprawniony z patentu tymczasowego: Kopalnia Wegla Kamiennego „Szombierki", Bytom (Polska) Konstrukcja tamy bocznej zapewniajaca calkowity odzysk obudowy stalowej Przedmiotem wynalazku jest konstrukcja tamy bocznej zapewniajaca calkowity odzysk obudowy stalowej, przeznaczonej do odprowadzenia wód podsadzkowych po podsadzeniu wyeksploatowanego wyrobiska piaskiem.Dotychczasowe znane konstrukcje podsadzkowych tam bocznych w których glównymi elementami konstrukcyjnymi sa podatne luki LP, a na nich luzno ulozone i zamocowane bale drewniane okorki lub inne materialy, dla umozliwienia odsaczenia wody z podsadzonego, przewaznie nachylonego wyrobiska, nie pozwalaja na bezpieczne usuniecie i odzyskanie luków stalowych po zakonczeniu cyklu podsadzkowego. Usuniecie obudowy stalowej stanowiacej konstrukcje tamy spowodowaloby gwaltowne zawalenie sie wewnetrznej przestrzeni tamy stwarzajacej grozbe dla zalogi oraz zmniejszajac efekt podsadzania przez powstanie pustki w podsadzanym wyrobisku.Z tych powodów luki podatne obudowy stalowej stanowiace glówne elementy konstrukcji tamy bocznej pozostawiano w zamulonym wyrobisku, co podrazalo koszt produkcji.Celem wynalazku jest taka konstrukcja tamy bocznej podsadzkowej, przy wykorzystaniu luków podatnych obudowy stalowej jako glównych elementów podtrzymujacych pozostale czesci tamy, aby umozliwila ona calkowite odzyskanie tych luków , po podsadzeniu wyrobiska, nie powodujac zawalenia sie wewnetrzna przestrzeni tamy.Cel ten uzyskano przez ustawienie w przewidzianym do podsadzenia wyrobisku, w okreslonych odstepach * od siebie kompletów odrzwi z luków podatnych obudowy stalowej i umieszczenia na nich siatki stalowej przymocowanej do drewnianych wkladek umieszczonych klinowo w zaglebienia luków od strony zewnetrznej, nastepnie usztywnienie tamy przez poprzecznie na siatke i luki nalozonych bali drewnianych w równych odstepach od siebie, po czym na siatke stalowa i bale drewniane nalozono tkanine podsadzkowa najkorzystniej polipropylenowa, która przymocowana jest gwozdziami do poprzecznych bali drewnianych stanowiac filtr dla odsaczenia wody po podsadzkowej do wewnatrz tamy. Pomiedzy odrzwia z luków stalowych do nawierconych uprzednio otworów w stropie poprzez oczka w siatce stalowej, wprowadzone sa kotwy stalowe wystajace gwintem ponizej siatki która po zalozeniu na gwint podkladek i nakretek, zostaje przymocowana wraz z pozostalymi elementami tamy do stropu wyrobiska.2 72 310 Konstrukcja tamy wedlug wynalazku umozliwia odzysk wszystkich zastosowanych do niej luków podatnych obudowy stalowej, nie dopuszczajac do gwaltownego zawalenia sie wewnetrznej przestrzeni z tamy, poniewaz pozostale elementy tamy przymocowane sa kotwami od stropu w górnej czesci, a drutem stalowym poprzez bale drewniane do obudowy drewnianej podsadzonego wyrobiska, z obydwu boków tamy.Konstrukcja tamy bocznej wedlug wynalazku jest szczególowo wyjasniona na przykladzie wykonania przedstawionym na rysunku na którym fig. 1 przedstawia boczny przekrój tamy wzdluz osi wyrobiska, fig. 2 poprzeczny przekrój tamy przed usunieciem luków obudowy stalowej, oraz fig. 3 poprzeczny przekrój tamy i podsadzonego wyrobiska po usunieciu luków obudowy stalowej.Konstrukcja tamy bocznej wedlug wynalazku sklada sie z luków obudowy stalowej ustawionych w wyrobisku w równych odstepach od siebie, na których na calej powierzchni rozlozono siatke stalowa 5 przymocowana do drewnianych klinowych wkladek 7 umieszczonych w zewnetrznym zaglebieniu luków obudowy. Na siatke stalowa 5 umieszczono poprzecznie do luków obudowy, bale drewniane 2 w kilku równoleglych rzedach, a nastepnie na cala powierzchnie siatki 5 ulozone podsadzkowa filtracyjna tkanine 1 listwami 3 do bali drewnianych 2. Pomiedzy odrzwiami obudowy stalowej do nawierconych otworów w stropie, zalozone sa kotwy stalowe 4 w szeregu prostopadle do osi tamy. Kotwy 4 po zalozeniu na ich wystajacy nagwintowany koniec, podkladek, i nakretek, mocuja konstrukcje tamy w górnej czesci do stropu, natomiast z obydwu boków konstrukcja tamy umocowana jest za posrednictwem bali 2 i drutów stalowych 8 do drewnianych stojaków obudowy wyrobiska.Po podsadzeniu w sposób hydrauliczny wyeksploatowanego wyrobiska, odsaczeniu i odprowadzeniu wody przez tame wedlug wynalazku, nastepuje usuniecie wszystkich elementów obudowy stalowej do powtórnego uzycia. Zawalenie sie przestrzeni stalowej jest niemozliwe poniewaz siatka stalowa 5 zamocowana kotwami stalowymi 4 do stropu, a z boków drutem stalowym 8 do obudowy drewnianej, utrzymuje nadal konstrukcje tamy. PLPriority:, Application announced: May 15, 1973 Patent description was published: November 25, 1974 72310 KI. 5c, 19/00 MKP E21d 19/00 | C 'Y i £ INI Al Urzedu Patentowego 1 Polska tostf-pw .: 5 | [, -D, tJ 1 Inventors: Antoni Golaszewski, Stanislaw Stelmach, Henryk Pajaczek, Ignacy Sochocki Authorized by the provisional patent: "Szombierki" Hard Coal Mine, Bytom (Poland) Side dam structure ensuring complete recovery of steel lining The subject of the invention is the design of the side dam ensuring complete recovery of the steel casing, intended to drain backfill water after backfilling the exploited excavation with sand. Previously known backfilling structures of side dams in which the main structural elements are flexible LP gaps, and on them loosely placed and fixed logs, wooden eyelets or other materials, to allow drainage water from the backfilled, mostly inclined excavation, do not allow for the safe removal and recovery of steel hatches after the completion of the filling cycle. Removal of the steel casing constituting the structure of the dam would cause a rapid collapse of the inner space of the dam, posing a threat to For these reasons, the steel support gaps, which are the main elements of the side dam structure, were left in the silted head, which increased the cost of production. The purpose of the invention is such a construction of the side loading dam, using the flexible hatches of the steel support as the main supporting elements for the remaining parts of the dam, so that it allows the complete recovery of these hatches, after backfilling the excavation, without causing the internal space of the dam to collapse. This goal was achieved by placing sets of support arches with flexible hatches in the excavation to be fired at specified intervals * from each other steel casing and placing on them a steel mesh attached to wooden inserts wedged into the recesses of the hatches from the outside, then stiffening the dam by transversely on the mesh and the gaps of the placed wooden logs at equal intervals from each other, The steel mesh and wooden logs are covered with a backing fabric, preferably polypropylene, which is fastened with nails to the transverse wooden logs as a filter for draining the water from the backing into the dam. Between the arches of the steel hatches to the previously drilled holes in the roof through the mesh in the steel mesh, there are introduced steel anchors protruding with a thread below the mesh, which, after applying washers and nuts on the thread, are fixed with the remaining elements of the dam to the roof of the excavation. 2 72 310 Dam construction According to the invention, it enables the recovery of all the flexible hatches of the steel casing applied to it, preventing the internal space from collapsing rapidly with the dam, because the remaining elements of the dam are fixed with anchors from the ceiling in the upper part, and with steel wire through wooden logs to the wooden casing of the raised excavation, The construction of the side dam according to the invention is explained in detail on the example of the embodiment shown in the drawing, in which fig. 1 shows the side section of the dam along the axis of the excavation, fig. 2 the cross section of the dam before removing the steel casing gaps, and fig. 3 the cross section of the dam and The construction of the side dam according to the invention consists of steel casing hatches set at equal distances from each other, on which a steel mesh 5 is spread over the entire surface, attached to wooden wedge inserts 7 placed in the outer recess of the casing hatches. On the steel mesh 5 are placed transversely to the casing hatches, wooden logs 2 in several parallel rows, and then on the entire surface of the mesh 5 laid filtering cloth 1 with strips 3 for wooden logs 2. Between the steel casing frames to drilled holes in the ceiling, there are anchors steel 4 in a row perpendicular to the dam axis. The anchors 4, placed on their protruding threaded end, washers, and nuts, fasten the dam structure in the upper part to the ceiling, while on both sides the dam structure is fastened by logs 2 and steel wires 8 to the wooden stands of the excavation support. hydraulic of the exploited excavation, drainage and drainage of water through the dam, according to the invention, all elements of the steel casing are removed for reuse. The collapse of the steel space is impossible because the steel mesh 5 fastened with steel anchors 4 to the ceiling and laterally with steel wire 8 to the wooden casing still holds the dam structure. PL

Claims (1)

1. Zastrzezenie patentowe Konstrukqa tamy bocznej, zapewniajaca calkowity odzysk obudowy stalowej, znamienna tym, ze na lukach stalowej obudowy umieszczona jest siatka stalowa 5 na która poprzecznie do luków stalowych umieszczone sa bale drewniane 2 w równoleglych rzedach oraz filtracyjna tkanina podsadzkowa 1 przymocowa¬ na do bali 2 przy pomocy listew 3, ponadto tama ta przymocowana jest w górnej czesci stropu wyrobiska kotwami stalowymi 4 umieszczonymi pomiedzy lukami obudowy, a z obydwu boków w dolnej czesci przy pomocy drutów stalowych 8 i bali 2 do drewnianej obudowy podsadzanego wyrobiska.KI. 5c,19/00 72 310 MKP E21d 19/00 Fig.l F/g. 2 ~^r\ ^r—-f ^-^ly—^f * -^ Jg fy* ir^l 2^r'fe. PL1. Patent claim The structure of the side dam, ensuring complete recovery of the steel casing, characterized in that a steel mesh 5 is placed on the gaps of the steel casing, on which wooden logs 2 are placed transversely to the steel gaps in parallel rows and a filter fabric 1 fastened to logs 2 by means of strips 3, moreover, this dam is fixed in the upper part of the excavation roof with steel anchors 4 placed between the casing gaps, and on both sides in the lower part with steel wires 8 and logs 2 to the wooden casing of the excavated excavation. 5c, 19/00 72 310 MKP E21d 19/00 Fig. 1 F / g. 2 ~ ^ r \ ^ r —- f ^ - ^ ly— ^ f * - ^ Jg fy * ir ^ l 2 ^ r'fe. PL
PL14790871A 1971-05-03 1971-05-03 PL72310B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL14790871A PL72310B2 (en) 1971-05-03 1971-05-03

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL14790871A PL72310B2 (en) 1971-05-03 1971-05-03

Publications (1)

Publication Number Publication Date
PL72310B2 true PL72310B2 (en) 1974-06-29

Family

ID=19954243

Family Applications (1)

Application Number Title Priority Date Filing Date
PL14790871A PL72310B2 (en) 1971-05-03 1971-05-03

Country Status (1)

Country Link
PL (1) PL72310B2 (en)

Similar Documents

Publication Publication Date Title
CN107849917B (en) Tunnel construction method using advanced support and delayed support and device suitable for the same
US4934865A (en) Catchwater drain, excavating structure and method of construction
JPH0454004B2 (en)
RU2592104C1 (en) Coating slopes
US5222342A (en) Component elements of protecting structures against erosion and process for assembling and placing the protection structure
CN103562497B (en) Load bracket and its installation method
PL72310B2 (en)
DE4412880A1 (en) Process for digging underground cavity
US1895985A (en) Construction of retaining walls
RU158735U1 (en) REVETMENT
US2858693A (en) Pre-cast sectional concrete structure
SU1751334A1 (en) Method of isolating assembly site in mining coal seam from day surface
US4096703A (en) Concrete constructional members
US1858664A (en) Emergency closure or lock for weirs, sluice gates, and the like
JPH0562170B2 (en)
DE1058535B (en) Process for the construction of extensive underground spaces, e.g. B. from tunnels or bunkers
US1702646A (en) Tunnel lining
PL51410B3 (en)
IL34532A (en) System for the deepening of the bottom in front of moles and retaining walls of marine and river installations and the re-inforced moles so obtained
SU1712622A1 (en) Mounting-mining shield
RU2078930C1 (en) Method of preservation of extraction drift
SU1145076A1 (en) Lining of pressure-free hydraulic tunnel
SU1165798A1 (en) Excavating complex
SU887812A1 (en) Method of controlling a preparation working with yielding frame-type roof support
JPH0317314A (en) Execution of underground continuous wall